MAURY USCG vessel records
← All vessels

NEW ROADS

NEW ROADS is a 1976 passenger vessel (inspected). The Coast Guard has recorded 47 inspections since 2016, most recently in May 2026, along with 87 deficiencies and 10 casualty investigations between 2002 and 2010.

Records from 2002 to 2026. Most recent: inspection, 14 May 2026.

Built
1976
Last inspected
14 May 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 14 May 2026
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7527980
WDC9803
145694
Flag
UNITED STATES
Maury page id
psix-145694

Documentation record

Registered dimensions (L × B × D)142.7 ft × 60.0 ft × 9.6 ft
Registered tonnagegross 656 / net 446
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderEQUITABLE SHIPYARDS INC · MADISONVILLE LA, UNITED STATES · built 1976
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portBATON ROUGE, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 13 May 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it656 - Regulatory (Subpart C or D), Gross Ton
446 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

47 inspections, each with its date, unit and type; 87 deficiencies with the resolution recorded against each; 10 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 47

14 May 2026 Re-Inspection · Administrative Inspection · Vessel Attendance · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8373033
27 January 2026 MTSA Verification · COI Inspection · Vessel Attendance · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8302103
19 November 2025 Re-Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8271036
23 September 2025 Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8239420
10 September 2025 MTSA Verification · Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8230810
28 August 2025 Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8219898
21 August 2025 Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8215126
10 June 2025 Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8156488
6 May 2025 Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8129400
10 April 2025 Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8106247
20 March 2025 In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8096799
12 February 2025 COI Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8078694
15 January 2025 Deficiency Check · Administrative Inspection · MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8063979
20 December 2024 Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8049577
10 December 2024 Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8045766
24 September 2024 Examination of Repairs · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8007965
26 August 2024 Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7989473
19 July 2024 Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7962180
20 June 2024 Administrative Inspection · MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7938734
21 March 2024 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7882959
29 April 2022 Drydock Exam · Construction Oversight · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7440842
11 April 2022 Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7428468
9 November 2021 Administrative Inspection · Examination of Repairs · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7345177
7 September 2021 Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7306339
25 May 2021 Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7206433
9 February 2021 Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7137678
24 November 2020 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7101505
9 November 2020 Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7092161
15 October 2020 MTSA Verification · Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7077878
16 July 2020 Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7007789
30 April 2020 Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6946209
20 March 2020 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6929599
14 November 2019 Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6854343
2 October 2019 Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6826632
4 June 2019 Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6702472
21 February 2019 MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6629892
7 November 2018 COI Inspection · Administrative Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6576789
20 August 2018 Re-Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6517797
22 May 2018 Re-Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6437057
21 February 2018 MTSA Verification · Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6373002
11 January 2018 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6372690
20 November 2017 Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6310231
10 October 2016 Examination of Repairs · Administrative Inspection · Drydock Exam · Construction Oversight · Damage Survey · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6020715
6 October 2016 Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6017765
10 May 2016 Damage Survey · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5873657
22 April 2016 Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5860398
2 February 2016 Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5808954

Deficiency record · 87

11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 May 2026 Resolved
The lifejackets stowage positions must be marked with the words “LIFEJACKETS” or “CHILD LIFEJACKETS” as appropriate. The MI observed the starboard aft box containing adult lifejackets weren't marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2026
Resolution: Signs installed sat.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 14 May 2026 Resolved
Each entrance to a space storing carbon dioxide cylinders must be conspicuously marked as follows: Spaces storing carbon dioxide—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. VENTILATE THE AREA BEFORE ENTERING. A HIGH CONCENTRATION CAN OCCUR IN THIS AREA AND CAN CAUSE SUFFOCATION.” Mark outside of the CO2 storage room door.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2026
Resolution: Signs installed sat.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 14 May 2026 Resolved
The inspector shall examine all accessible parts of the vessel's hull, machinery, and equipment to be assured that it is in a satisfactory condition. MI observed approximately 1 inch of standing water in the CO2 room.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 May 2026
Resolution: All water was removed from the space.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 14 May 2026 Resolved
There shall be at least two means of escape from all general areas accessible to the passengers or where the crew may be quartered or normally employed. While testing the emergency escape from the port aft steering gear room the MI observed the escape hatch was seized. Licensed engineer fixed the hatch while on scene.
Action required: 10 - Deficiency Rectified
Resolved 14 May 2026
Resolution: The hatch was cleaned and activated several times and crew will work more often.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 November 2025 Resolved
Vessels over 500 gross tons must have 02 fire pumps to provide firefighting water. The secondary (independent engine driven) fire pump would not operate. The secondary bilge pump was tested for use in the firemain system and may be used temporarily in lieu of a second fire pump. Repair secondary fire pump within 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 December 2025
Resolved 3 December 2025
Resolution: Fire pump repaired and test ran. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 November 2025 Resolved
The material, design, workmanship, and arrangement must be equivalent to ABS standards for engineering systems. The port generator had a significant lube oil leak on the oil pressure sensor. Repair oil leak.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 December 2025
Resolved 3 December 2025
Resolution: Leak repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2025 Resolved
Safety relief valves for air service shall be provided with a substantial lifting device so that the disk can be lifted from its seat. The lifting device on one of the relief valves for the start air system was not lifting the seat. Repair relief valve.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 December 2025
Resolved 3 December 2025
Resolution: Relief valves replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 November 2025 Resolved
Vessels required to meet stability standards of 46 CFR 170 subpart H must have audible/visual alarms on all Class 1 doors below the waterline. The alarm for the watertight door to the steering space was not working properly, alarming intermittently. Repair alarm.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 December 2025
Resolved 3 December 2025
Resolution: Alarm repaired.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 10 September 2025 Resolved
Oil tank piping must be fitted with a remotely controlled shutoff readily available outside the space. The port remote reach rod was inoperable when tested.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2025
Resolution: Witnessed the proper operation after the repair was complete.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 September 2025 Resolved
Each hydraulic system must be provided with-(1) arrangements to maintain the cleanliness of the hydraulic fluid. The starboard steering ram had an excessive oil leak dripping into a containment pan that was full. Drain containment pan and repair oil leak on ram.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 September 2025
Resolution: Ram repaired.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 25 March 2025 Resolved
A vessel of 12 meters or more in length shall be provided with a whistle. A whistle means any sound signaling appliance capable of producing the prescribed blasts. The vessel's sound producing appliance (horn) is inoperable. Prove proper operation to the satisfaction of the attending USCG Marine Inspector prior to operating in restricted visibility, but no later than 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 25 March 2025
Resolution: Received objective evidence of the horn working properly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 March 2025 Resolved
All lifesaving appliances and arrangements on passenger vessels must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. At least one-half the total number of lifebuoys on the vessel must each be fitted with a self-igniting light approved under approval series 161.010. Floating water lights were found with improper batteries installed. Install proper batteries to the satisfaction of the attending USCG Marine Inspector no later than 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 10 April 2025
Resolution: Proper batteries were installed
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangements rescue boats
Issued 25 March 2025 Resolved
All lifesaving appliances and arrangements on passenger vessels must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. The rescue boat must meet the muster and embarkation arrangement requirements of 199.110. Each muser station and embarkation station must be adequately illuminated by lighting with power supplied from the vessel’s emergency source of electrical power. Rescue boat embarkation station lighting was found inoperable. Repair rescue boat embarkation lighting to the satisfaction of the attending USCG Marine Inspector no later than 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 10 April 2025
Resolution: Vessel embarkation light was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 25 March 2025 Resolved
Accommodations provided for officers and crew on all vessels shall be properly lighted. Numerous lights throughout the vessel are inoperable not providing for adequate lighting. Prove proper operation of all installed lighting fixtures to the satisfaction of attending USC Marine Inspector no later than 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 10 April 2025
Resolution: All non operable lights were fixed or replaced
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 25 March 2025 Resolved
No person may operate any vessel equipped with installed toilet facilities unless it is equipped with an operable Type I, II or III device. The vessel's MSD pump air filter is completely clogged not allowing the system to operate as designed. Prove proper operation of the system to the satisfaction of the attending USCG Marine Inspector no later than 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 10 April 2025
Resolution: Filter was replaced
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 25 March 2025 Resolved
Each vessel must carry a certificate with a valid endorsement while subject to the Bridge-to-Bridge Act. The vessel's Bridge-to-Bridge Act Certificate is expired. Provide, onboard, a valid certificate no later than 14 days. 47 CFR 80.1005
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 25 March 2025
Resolution: New certificate was issued.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2025 Resolved
Each valve must close with a clockwise moton of the hand wheel or operating lever. A keel cooler valve assembly will not properly close due to a broken stem. Prove proper operation of valve assembly to the satisfaction of attending CG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2025
Resolved 19 May 2025
Resolution: Received photographic evidence of valve replacement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 27 February 2025 Resolved
A gauge is required on a pressure vessel with the upper range no less than 1.2 times nor more than 2 times the pressure reliving device. The lower pressure vessel was missing the required pressure gauge. Install and test.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2025
Resolved 14 April 2025
Resolution: Gauge showing 0-300 psi installed. MAWP of air receiver is 200 psi.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 27 February 2025 Resolved
A vessel owner or operator required by § 155.1035, § 155.1040, or § 155.5035 to have a response plan shall conduct exercises as necessary to ensure that the plan will function in an emergency. Both announced and unannounced exercises must be included. Provide proof of last exercise or conduct the required exercises (LADOTD NTVRP pg. 26).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2025
Resolved 10 April 2025
Resolution: Exercises were completed in Lake Charles
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 27 February 2025 Resolved
A log for records of inspections and maintenance. Last entry in vessel maintenance log was 01/15/2025. Conduct and document inspections (lifesaving Maintenance Log).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2025
Resolved 10 April 2025
Resolution: Required maintenance was completed in Lake Charles
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 February 2025 Resolved
At least half the lifebuoys on the vessel must have a self igniting light. The port pilothouse lifebuoy light was cracked and not serviceable.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 February 2025
Resolved 7 February 2025
Resolution: Lifebuoy with cracked hull was replaced new-in-kind.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 7 February 2025 Resolved
Oil tank piping must be fitted with a remotely controlled shutoff readily available outside the space. The port remote reach rod was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2025
Resolved 3 March 2025
Resolution: Objective evidence provided for repair.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 7 February 2025 Resolved
Each opening in an exposed weather deck must be close weather-tight. The port rudder room escape hatch gasket was wasted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2025
Resolved 3 March 2025
Resolution: Objective evidence provided for repair.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 7 February 2025 Resolved
Battery wire installations must be installed to prevent loosening due to vibration. The wire for the battery on the 01 deck aft pilothouse had wingnuts. Secure with double nuts or locking nuts.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2025
Resolved 27 February 2025
Resolution: Witnessed during inspection, connection was double lock nut.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 7 February 2025 Resolved
Spaces storing carbon dioxide must be marked with "CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. VENTILATE THE AREA BEFORE ENTERING. A HIGH CONCENTRATION CAN OCCUR IN THIS AREA AND CAN CAUSE SUFFOCATION."
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2025
Resolved 27 February 2025
Resolution: Witnessed during inspection that hte door was properly marked.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 10 December 2024 Resolved
ests and inspections shall be carried out during each periodic inspection and shall include proving the proper servicing of inflatable life rafts. Vessel's Inflatable Buoyant Apparatus (IBA) was past due for servicing. Ensure IBA is serviced prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 December 2024
Resolved 10 December 2024
Resolution: Objective evidence provided with new IBA installed with an expiration date 7/2025 for the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 December 2024 Resolved
The material, design, workmanship, and arrangement must be equivalent to ABS standards for engineering systems. The keel cooler expansion joint on the port main engine was repaired using a piping patch instead of re-installing the proper expansion joint. Install proper expansion joint in piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 December 2024
Resolved 20 December 2024
Resolution: Permanent expansion joint installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 December 2024 Resolved
Each switchboard must meet the requirements of IEEE code 45-2002. Switchboard rear access is not locked. Provide lock for access.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 December 2024
Resolved 20 December 2024
Resolution: Lock installed.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 10 December 2024 Resolved
A general alarm emergency signal must be located in the engine room and must be audible. The audible bell for the general alarm was not functioning in the engine room. Repair alarm bell.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 December 2024
Resolved 20 December 2024
Resolution: New bell installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 December 2024 Resolved
Electrical installations on vessels must ensure protection of crew from electrical hazards. Junction box in galley and CO2 room were missing and/or were missing securing screws. Repair junction boxes.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 December 2024
Resolved 20 December 2024
Resolution: Junction box installed.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 10 December 2024 Resolved
Emergency lighting must be provided to allow crew to find their way to survival craft and embarkation stations. Emergency lights at the rescue boat were not operating. Repair emergency lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 December 2024
Resolved 20 December 2024
Resolution: Lights repaired.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 June 2024 Resolved
CO2 Lockout valve- The master or person-in-charge must ensure that the valve is locked open at all times, except while maintenance is being performed on the extinguishing system, when the valve must be locked in the closed position. The CO2 System lockout valve was found to be in the closed position and padlock unlocked, during the inspection. Valve was opened and padlock locked prior to the completion of the inspection. 46 CFR 76.15-50(e)
Action required: 10 - Deficiency Rectified
Due 20 June 2024
Resolved 20 June 2024
Resolution: Corrected on the spot.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 June 2024 Resolved
Personnel lifesaving appliances- Attachments and fittings. Lifebuoys must have the following attachments and fittings: (D) Of a breaking strength which is not less than 5 kilo-newtons (1,124 pounds-force); and (E) Is, if synthetic, a dark color or certified by the manufacturer to be resistant to deterioration from ultraviolet light. The lifeline was found to deteriorating and fraying at the time of inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 19 July 2024
Resolution: Witnessed satisfactory replacement of the line.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 6 March 2024 Resolved
Onboard training, musters, and drills must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. An abandon-ship drill and a fire drill, as described in § 199.180, must be conducted on each passenger vessel at least weekly. Vessel shall conduct Abandon-ship and fire drill prior to operations. Item must be completed to the satisfaction of the attending USCG Marine Inspector.
Due 6 April 2024
Resolved 21 March 2024
Resolution: Fire, Abandon Shipoe and MOB drill condcuted satisfactorily.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 November 2021 Resolved
Each vessel must carry a life jacket that meets required approvals for each person on board. Replace 09 unserviceable adult life jackets and 01 unserviceable child life jackets. Passenger count is reduced to 140 passengers until life jackets are replaced.
Action required: 705 - Other - as specified
Resolved 15 November 2021
Resolution: Renewed life jackets
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 9 November 2021 Resolved
Each inflatable lifesaving appliance must be serviced every 12 months. Additionally, every hydrostatic release must be serviced every 12 months. Both IBA and HSR are due for service by 30 NOV 2021. Service IBA and HSR on or before 30 NOV 2021.
Action required: 705 - Other - as specified
Due 30 November 2021
Resolved 15 November 2021
Resolution: Servicing complete on IBA and HSR renewed
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 9 November 2021 Resolved
Each rescue boat must be ready to launch within 5 minutes. Tending lines for rescue boat launching are worn and need to be replaced, which may hinder launching operation. Replace lines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 December 2021
Resolved 15 November 2021
Resolution: Tending lines renewed
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 September 2021 Resolved
Lifebuoys must have self igniting lights attached to at least one-half of the required number of life buoys. A self-igniting light was detached from the life buoy. Re-attach light.
Action required: 10 - Deficiency Rectified
Resolved 7 September 2021
Resolution: Light re-attached.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 September 2021 Resolved
Each hand portable fire extinguisher shall be marked with a number and location where stowed. Renew extinguisher marking on port bow main deck extinguisher.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2021
Resolved 22 September 2021
Resolution: Label installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 September 2021 Resolved
Additional life jackets for persons on watch shall be stowed at manned watch stations. Crew life jacket locker, which is required to have 6 life jackets for the crew, only contained 3 life jackets. Add 3 approved and equipped life jackets to crew life jacket locker.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2021
Resolved 30 September 2021
Resolution: Lifejackets installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 September 2021 Resolved
The material, design, workmanship, and arrangement must be equivalent to ABS standards. Under ABS Standards, machinery installation is to function satisfactorily under operating conditions and be free from detrimental operating phenomena. Repair leaking cooling water hose on starboard main engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2021
Resolved 22 September 2021
Resolution: Leak fixed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 September 2021 Resolved
Non-metallic flexible hose may be used in lube oil systems where flexibility is required in lengths not exceeding 30 inches. Lube oil sensors for both main diesel engines and both reduction gears have flex hoses in excess of 30 inches. Re-pipe or reconfigure system to ensure that flex hose lengths do not exceed 30 inches. If piping is installed, ensure piping is an approved, steel type of pipe. Make repairs prior to next COI Inspection (November of 2021).
Action required: 705 - Other - as specified
Due 12 November 2021
Resolved 9 November 2021
Resolution: Switches moved closer to engines/red gears to allow for shorter hoses
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 May 2021 Resolved
There must be two means of escape from all areas accessible to passengers. Repair door to starboard passenger area prior to any passengers using or accessing the space.
Action required: 705 - Other - as specified
Resolved 8 June 2021
Resolution: Repaired door knob to allow door to open.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 25 May 2021 Resolved
The bulkheads of a vessel required to have Type I or II subdivision must be watertight below the bulkhead deck. Additionally, bilges must be kep to a minimum content at all times. Starboard dripless shaft seal is leaking approximately 0.5 pints per minute when shaft is turning. Also, pump excess water out of steering space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2021
Resolved 8 June 2021
Resolution: Shaft seal repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 May 2021 Resolved
Each cable installation must meet IEEE 45-2002. Each vertical cable must be supported every 610mm with metal straps. Electrical installations on vessels must ensure protection of crew from electrical hazards. Repair loose wiring for General Alarm light, secure or repair wiring near light above port reduction gear, and repair cut wire beside door between engine room and shaft alley.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 8 June 2021
Resolution: All wiring repaired.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 25 May 2021 Resolved
At each inspection, the inspector shall examine the bilges in the machinery space to ensure there is no accumulation of oil that might create a fire hazard. Engine room bilges were filled with oily residue and oily water. Remove excess oil, oil soaked rags, and oily water from engine room bilge and from under machinery.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 8 June 2021
Resolution: Bilge has been pumped and excess soaked rags have been removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 May 2021 Resolved
The material, design, workmanship, and arrangement must be equivalent to ABS standards. Under ABS Standards, machinery installation is to function satisfactorily under operating conditions and be free from dangerous vibration and other detrimental operating phenomena at speeds within the operating range. Determine and repair source of excessive vibration on port engine (causing inboard exhaust pipe to vibrate excessively).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 8 June 2021
Resolution: An extra bracket has been installed to reduce vibration on the exhaust coupling.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 May 2021 Resolved
The general construction and arrangement of the vessel shall be to minimize fire hazards. Also, the material, design, workmanship, and arrangement must be equivalent to ABS standards. Starboard main engine has an exhaust leak. Repair exhaust leak.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 8 June 2021
Resolution: Exhaust leak repaired
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 May 2021 Resolved
The general construction and arrangement of the vessel shall be to minimize fire hazards. Repair oil leak on port engine crankcase breather (inboard side).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 8 June 2021
Resolution: Oil leak repaired.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 12 November 2020 Resolved
Each navigation light must meet the technical details of the applicable navigation rules. Masthead light was not visible during inspection. Prove satisfactory operation of masthead light.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2020
Resolved 3 December 2020
Resolution: Repaired.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 12 November 2020 Resolved
The minimum sound pressure levels for the emergency alarm tone in interior and exterior spaces must be a sound level of not less than 80 dB(A) measured at 10 feet on the axis. General alarm bell on the stern vibrated but did not ring during inspection. Repair to satisfaction of Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2020
Resolved 3 December 2020
Resolution: Repaired and tested sat.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 12 November 2020 Resolved
There must be at least two sources of power for the electric equipment of each fire detecting and alarm system. Prove operation of emergency back up power source for alarm panel.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2020
Resolved 3 December 2020
Resolution: Repaired and tested sat.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 16 July 2020 Resolved
Each liferaft must be arranged for float-free launching. A hydrostatic release used in a float-free arrangement must be approved under approval series 160.162. Hydrostatic release for vessel's only IBA was expired. Replace hydrostatic release.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 July 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 July 2020 Resolved
Life jackets must be readily accessible. Life jacket stowage positions must be labeled " LIFE JACKETS". Extra crew life jackets in crew lounge were in a locked container and the container was not labeled. Remove lock from container and properly label container.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2020
Resolved 12 August 2020
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 July 2020 Resolved
Emergency lighting must be provided to allow crew to find their way to survival craft and embarkation stations. Emergency light on aft deck was not operating.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2020
Resolved 12 August 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 July 2020 Resolved
Each cable installation must meet IEEE 45-2002. Each vertical cable must be supported every 610mm with metal straps. Electrical installations on vessels must ensure protection of crew from electrical hazards. Repair loose light switch for steering gear space (hanging from wire) and loose lighting fixture in shaft alley.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2020
Resolved 12 August 2020
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 July 2020 Resolved
Each space used by crew must have lighting that provides for a safe working environment under normal conditions. Lights behind main switchboard are out, which makes area unlit. Repair lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2020
Resolved 12 August 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 July 2020 Resolved
Electrical installations on vessels must ensure protection of passengers, crew, and other persons from electrical hazards. Ground detection system on main switchboard indicates electrical ground on 12 volt circuit and 115 volt circuit. Troubleshoot and repair electrical grounds.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2020
Resolved 12 August 2020
Resolution: DOTD Electricians fixed ground. No ground faults indicated on panel.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 16 July 2020 Resolved
At each inspection, the inspector shall examine the bilges in the machinery space to ensure there is no accumulation of oil that might create a fire hazard. Engine room bilges were filled with oily residue and oily water. Remove excess oil and oily water from engine room bilge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2020
Resolved 12 August 2020
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 30 April 2020 Resolved
Hydrostatic release device was expired.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 April 2020
Resolved 30 April 2020
Resolution: Operator provided a spare from shoreside facility.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 March 2020 Resolved
STBD propeller has cracks at the base of three blades. Repair prop to the satisfaction of the MI.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 April 2020
Resolved 6 April 2020
Resolution: Vessel rep submitted documentation that repairs were completed.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 14 November 2019 Resolved
An audible and visual alarm must activate in the machinery space upon overload of any steering motor. Alarm failed periodic test.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2019
Resolved 4 December 2019
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 14 November 2019 Resolved
Suitable guards shall be installed in way of dangerous places. Outboard of STBD Main Engine, a deck plate is missing. Replace deck plate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2019
Resolved 4 December 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 14 November 2019 Resolved
Emergency lighting must be provided to allow crew to find their way to survival craft and embarkation stations. Emergency lights on deck aft of wheelhouse were not operating.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2019
Resolved 4 December 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 November 2019 Resolved
Electrical installations on vessels must ensure protection of crew from electrical hazards. Remove dead-end wires from beneath engine room console.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2019
Resolved 4 December 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 November 2019 Resolved
Connections and terminations to all conductors must retain original electrical and mechanical properties of the cable to which they are connected. Battery charger mounted on back of engine room console is permanent equipment connected with a removable plug. Replace removable plug with permanent connection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2019
Resolved 4 December 2019
08 - Alarms › N/A - No Subsystem › General alarm
Issued 2 October 2019 Resolved
During test of general alarm system, one of the four bells on the main deck, located on the aft side of the superstructure, did not sound as required by 46 CFR 113. The minimum sound pressure levels for the emergency alarm tone must be a sound level of not less than 80 dB(A) measured at 10 feet on the axis; and at least 10 dB(A) above background noise level when the vessel is underway in moderate weather.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 2 October 2019
Resolved 2 October 2019
Resolution: Striker was adjusted so that bell made sound as designed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 4 June 2019 Resolved
Each vessel must carry a lifejacket for each person on board and for persons on watch and for use at remotely located survival craft stations. Replace two passenger lifejackets and install the required second lifejacket on the bridge and six lifejackets in the crew quarters.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 4 June 2019
Resolved 4 June 2019
Resolution: Vessel rep provided all necessary lifejackets in each location where one or more were missing/damaged.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 June 2019 Resolved
Approved portable and semi-portable extinguishers must be installed in accordance with table 76.50-10(a). Service or replace two fire extinguishers in the engine room and the one extinguisher in the passenger space.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 5 June 2019
Resolution: Fire extinguishers had proper servicing provided immediately following the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 June 2019 Resolved
Non-metallic flexible hose must be in accordance with SAE J1942. Fuel hose on starboard main diesel engine was beginning to chafe. Install protection against chafing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 19 June 2019
Resolution: Chafing protection installed. Inspectors verified onboard.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 June 2019 Resolved
Spaces having a secondary means of escape which is not obviously apparent shall have a suitable sign in red letters "EMERGENCY EXIT" directing attention to such escape. Emergency escape route through steering space and shaft tunnel is not suitably marked. Repair escape markings.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 19 June 2019
Resolution: Escape marings repaired. Inspectors verified onboard.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 June 2019 Resolved
Each switchboard must meet the requirements of IEEE code 45-2002. Switchboard rear access is not locked. Provide lock for access.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 19 June 2019
Resolution: Rear access locked. Inspectors verified onboard.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 June 2019 Resolved
Each cable installation must meet IEEE 45-2002. Each vertical cable must be supported every 610mm with metal straps. Some cables behind switchboard weren't strapped.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 19 June 2019
Resolution: Cables stripped IAW IEEE 45-2002. Inspectors verified onboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 June 2019 Resolved
Each space used by crew must have lighting that provides for a safe working environment under normal conditions. Both lights in vicinity of Port Main Engine are out, which makes area unlit. Repair lights. Additionally, aft light is in disrepair (cover latches broken, feeder wire exposed). Repair light to make it electrically safe.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 19 June 2019
Resolution: Engine room lighting repaired. Inspectors verified onboard.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 4 June 2019 Resolved
Suitable guards shall be installed in way of dangerous places. Outboard of STBD Main Engine, a deck plate is missing. Replace deck plate.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 19 June 2019
Resolution: Deck plate replaced. Inspectors verified onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 June 2019 Resolved
The general construction and arrangement of the vessel shall be to minimize fire hazards. Also, the material, design, workmanship, and arrangement must be equivalent to ABS standards. Starboard main engine water pump is leaking oil excessively. Repair oil leak.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 8 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 4 June 2019 Resolved
The manufacturer's instructions for onboard maintenance of lifesaving appliances must be onboard the vessel. Provide a ship's maintenance schedule with instructions for weekly, monthly, and annual inspections of the vessel's rescue boat, rescue boat davit, inflatable buoyant apparatus, and general alarm system. Implement logkeeping procedures for all of the above listed inspections.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 8 July 2019
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 November 2018 Resolved
At each annual inspection, the inspector must check all components of a fixed fire extinguishing system listed in table 71.25-20(a)(2). The fixed CO2 system must be tested and witnessed by an attending USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2018
Resolved 28 November 2018
Resolution: Witnessed satisfactory test of CO2 System.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 November 2018 Resolved
Vessel must have adequate emergency lighting as required by 46 CFR 112.15-5. Multiple emergency lighting stations were non-operational. Prove proper operation of emergency lighting to the satisfaction of attending USCG marine inspector. Provide portable flashlights for all crew until deficiency is rectified.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2018
Resolved 18 December 2018
Resolution: All emergency lights tested and in working order.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Marking
Issued 21 February 2018 Resolved
Properly tag bridge fire extinguisher IAW 46 CFR 78.47-30(a)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 21 February 2018
Resolution: Replace with new, tagged extinguisher.
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 21 February 2018 Resolved
Perform annual service on inboard IBA or replace with serviced one.
Action required: 705 - Other - as specified
Resolved 21 February 2018
Resolution: Replaced IBA with one off of the ST.FRANCISVILLE.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 21 February 2018 Resolved
Replace two Adult size lifejackets in the port aft lifejacket locker IAW 46 CFR 199.70(1).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 21 February 2018
Resolution: Removed old condemmed jackets and replace with 02 new ones.
Operations/Management › Drills/Instruction › Fire
Issued 17 November 2017 Resolved
Upon arrival back to the vessels home port, and prior to placing the vessel back into service carrying passengers, contact the local OCMI and demonstrate fire, security and rescue boat operational drills to the satisfaction of the attending USCG marine inspector.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2017
Resolved 20 November 2017
Resolution: Witnessed MOB and fire drill for the pilot house and engine room, master and crew performed proficiently with emergency procedures and appeared knowledgeable in the use of the emergency equipment on board. 00 requirements issued, 01 corrected, 02 remain o
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 November 2017 Resolved
Replace the power cable from the switch to the motor on the rescue boat davit, currently armor cable is frayed and "Fish Hooks" are a personnel hazard.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 20 November 2017
Fire Fighting › Firemans Outfit › Axe
Issued 17 November 2017 Resolved
Replace Broken glass on the fire axe container located on the fwd of the house on the main deck, this presents a personnel hazard. This 835 is not related to firemans outfit, none required, but the only place a fire axe is noted for the componet.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 20 November 2017
Documentation › Certificates/Documents › Certificate of Inspection
Issued 6 October 2016 Resolved
Dry Dock inspection is expired; vessel is authorized to transit directly to the Port of New Orleans to conduct/complete the dry dock inspection. Vessel is not authorized to carry passengers until the dry dock inspection is complete to the satisfaction of the attending MI.
Condition: Invalid
Action required: 705 - Other - as specified
Due 6 November 2016
Resolved 20 November 2017
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 15 May 2016 Resolved
Prior to putting vessel back into service or carrying passengers. Vsl to replace Port and Starboard shaft fwd and aft strut bearings. Make ready for inspection by USCG marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 November 2017

Casualty record · 10

4 August 2002Routine · role: Involved in a Marine Casualty · activity 1659121
8 November 2006Routine · role: Involved in a Marine Casualty · activity 2817185
4 July 2007Routine · role: Involved in a Marine Casualty · activity 2984679
15 March 2008Routine · role: Involved in a Marine Casualty · activity 3167132
15 May 2008Routine · role: Involved in a Marine Casualty · activity 3221309
1 September 2008Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 3332553
5 November 2009Routine · role: Involved in a Marine Casualty · activity 3644699
8 November 2009Routine · role: Involved in a Marine Casualty · activity 3631252
27 March 2010Routine · role: Involved in a Marine Casualty · activity 3727543
30 March 2010Routine · role: Involved in a Marine Casualty · activity 3707758
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.