Records from 1993 to 2025. Most recent: inspection, 13 August 2025.
Inspection history · 22
13 August 2025
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8204388
16 August 2024
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7974887
30 May 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7922617
12 July 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7740875
16 June 2022
COI Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7479372
10 February 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7138659
26 October 2020
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7084116
5 August 2019
Initial Certification · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6773598
10 July 2018
Industry Initiated Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6464089
2 June 2011
MTSA Verification · Deficiency Check · Industry Initiated Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4033047
25 October 2010
Type not recorded
No type recorded · Station Venice · USCG Heartland District (CGD-H) · Activity 3878580
28 July 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3282052
18 July 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3302966
7 March 2007
Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2883695
7 March 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2883748
7 March 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2895177
11 October 2006
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2798714
22 February 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2589979
30 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1979795
18 September 2003
Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 1929636
7 April 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 169536
6 December 1993
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 644885
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 16 August 2024
Resolved
46 CFR 199.70(c)(4)(i): Each immersion suit must have a light approved under approval series 161.112 securely attached to the front shoulder area of the immersion suit or anti-exposure suit. All six immersion suits are missing lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 August 2024
Resolved 28 August 2024
Resolution: Received photographic proof of affixed water lights to immersion suits.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 30 May 2024
Resolved
Crop and renew aft bulkhead in port potable water tank.
Action required: 705 - Other - as specified
Resolved 8 July 2024
Resolution: Approved C/R.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 July 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Vessel's forepeak bilge suction pipe is corroded causing the pipe to be unfit for intended use.
46 CFR 143.205
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 3 August 2023
Resolution: New pump and piping installed in forepeak. Operational test complete. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 July 2023
Resolved
Repairs and minor alterations to existing towing vessels must be made in accordance with this part. New installations that are not replacements in kind must comply with the requirements of subpart C of this part, if applicable. Bilge suction in engine room is fitted with flexible tubing not in kind with original design.
46 CFR 143.205(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 3 August 2023
Resolution: Engine room flexible bilge piping was replaced with hard pipes. Operational test conducted, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 12 July 2023
Resolved
A towing vessel must carry a combination of day and night visual distress signals indicated in Table 141.370 of § 141.370 for specified areas where the vessel operates. Vessel was missing 4 day and 2 night distress signals.
46 CFR 141.375(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 3 August 2023
Resolution: O/O provided 6 day and 6 night distress signals in watertight container labeled distress signals. all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 12 July 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Vessels port side generator and main engine cooling water expansion tank level alarms were inoperable.
46 CFR 143.205(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 3 August 2023
Resolution: MIs witness test of port side generator and main engine cooling water expansion tank level alarms, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 12 July 2023
Resolved
Each immersion suit or anti-exposure suit must be marked in such a way as to identify the person or vessel to which it belongs. None of the immersion suits on board were marked with vessels name or person.
46 CFR 199.70(c)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 3 August 2023
Resolution: All immersion suits on board were marked appropriatley, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 July 2023
Resolved
At least two lifebuoys on a towing vessel greater than 26 feet must be fitted with a floating electric water light approved under approval series 161.010 or 161.110. Port side lifebuoy floating electric water light was to have the incorrect battery installed.
46 CFR 141.360(c)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 3 August 2023
Resolution: O/O installed proper floating water light battery into port ring buoy light, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 July 2023
Resolved
Each lifejacket must be marked: In block capital letters with the name of the vessel. Vessels operating station lifejacket was found unmarked with vessels name.
46 CFR 141.340(f)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 3 August 2023
Resolution: Operating station life jacket marked properly, all sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 July 2023
Resolved
Each integral fuel tank must have a vent that connects to the highest point of the tank,and is fitted with a 30-by-30-mesh corrosion-resistant flame screen. Vessels fuel tank vent mesh is not the correct size.
46 CFR 143.265(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 3 August 2023
Resolution: Vessels fuel tank vent mesh screen was replaced with proper vent mesh, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 12 July 2023
Resolved
In addition to the immersion suits required under paragraph (a)(1) of this section, each watch station, work station. Vessel was missing 1 immersion suit.
46 CFR 141.350(a)(2)
Action required: 10 - Deficiency Rectified
Due 26 July 2023
Resolved 12 July 2023
Resolution: Vessel representative brought on an additional immersion suit before completion of the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 June 2022
Resolved
The STBD main engine RPM gauge must be at the machinery location. STBD gauge missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 July 2022
Resolved 28 June 2022
Resolution: Operator installed gauge.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 June 2022
Resolved
The Port main engine RPM gauge must be at the machinery location. Port gauge missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 July 2022
Resolved 28 June 2022
Resolution: Operator installed gauge.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 June 2022
Resolved
The STBD generator RPM gauge must be at the machinery location. STBD gauge missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 July 2022
Resolved 28 June 2022
Resolution: Operator installed gauge.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 June 2022
Resolved
The Port generator RPM gauge must be at the machinery location. Port gauge missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 July 2022
Resolved 28 June 2022
Resolution: Operator installed gauge.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 June 2022
Resolved
Fire hose nozzle must be capable of providing a solid stream and a spray pattern.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 July 2022
Resolved 28 June 2022
Resolution: Operator purchased vary nozzle.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 June 2022
Resolved
Machinery must be designed to provide for safe operation, bilge pump not mounted to frame, suspended by bilge piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 June 2022
Resolved 28 June 2022
Resolution: Operator installed mounting plate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 October 2020
Resolved
There must be an installed or portable bilge pump for dewatering. Both bilge pumps were seized. Show evidence of an operating bilge pump in presence of Marine Inspector (MI) prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 November 2020
Resolution: Installed new bilge pump and tested sat.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 26 October 2020
Resolved
Towing vessel (T/V) must be equipped with a means to detect smoke in the berthing spaces. The smoke detector was inop. Replace/repair and test in presence of a MI
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 November 2020
Resolution: Replaced batteries and tested sat.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 26 October 2020
Resolved
An exposed hazard such as gears & rotating machinery, must be protected by a cover. Both genset prime movers pulleys were missing a cover. Install cover and test run
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 November 2020
Resolution: Installed covers correctly
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 26 October 2020
Resolved
Each T/V must be equipped with an industrial type first aid kit. The first aid kit was missing most supplies. Replace kit with a new one.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 November 2020
Resolution: Purchased new kit and mounted.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 October 2020
Resolved
Each T/V must be maintained & operated so as to minimize fire hazards. The dryer vent was venting to the E/R bilge. Ensure vent trap is vented to atmosphere or contained.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 November 2020
Resolution: Installed lint trap.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 October 2020
Resolved
Machinery systems must be designed and maintained to provide for safe operation of the towing vessel. The steering ram securing pins were missing cotter pins in the pre-drilled holes. Place cotter pins and test system
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 November 2020
Resolution: Cotter pins installed correctly.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 26 October 2020
Resolved
Each T/V must have a reliable means to provide notification when an emergency exist. The bilge level alarm was not secured and moving around. Secure float with proper mounting hardware.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 November 2020
Resolution: The level alarm was mounted with second securing bolt.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 26 October 2020
Resolved
The following systems must be equipped with gauges at the machinery location: Hydraulic steering fluid psi. The gauge was missing, install gauge and test.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 December 2020
Resolution: Installed new gauge
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 26 October 2020
Resolved
The tablet for logging the TVR entries was missing. Begin logging properly IAW regulations.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 November 2020
Resolution: Replaced tablet and secured with lanyard.
14 - Pollution Prevention › 145 - MARPOL Annex V › Placards
Issued 26 October 2020
Resolved
A garbage pollution placard must be installed to notify reader of operating requirements. The placard was out of date. Install new placard in the galley.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 November 2020
Resolution: The placard was installed near the liferaft station.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 October 2020
Resolved
Lifebuoys must have the attachments IAW regs. The waterlight line was over 50' in length and the lifeline was missing. Replace line for inspection by MI.
Action required: 10 - Deficiency Rectified
Resolved 26 October 2020
Resolution: Vessel crew repaired defs prior to departure by shortening waterlight line and installing a lifeline.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 6 August 2019
Resolved
Generator missing RPM gauge. Owner stated engine will not allow for a RPM gauge and will file for appeal.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2019
Resolved 13 April 2022
Engineering › Steering Gear System › Rudder
Issued 7 March 2007
Resolved
Repair/replace rudder that sustained unknown damage.
Action required: 705 - Other - as specified
Resolved 17 May 2007