Records in 2016. Most recent: inspection, 12 April 2016.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)64.0 ft × 24.0 ft × 4.4 ft
Registered tonnagegross 77 / net 69
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderELEVATING BOATS INC · CAERNARVON, LA, UNITED STATES · built 1978
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 10 June 2026 · expires 30 June 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it77 - Regulatory (Subpart C or D), Gross Ton
69 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page
1 inspection, each with its date, unit and type; 10 deficiencies with the resolution recorded against each; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
Engineering › Bilge Water Management System › Pump
Issued 12 April 2016
Resolved
Bilge pump was not operational.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 April 2016
Resolved 25 April 2016
Resolution: Bilge pump was witnessed to be operational.
Documentation › Safety Management System › Key Shipboard Operations Plans/Instructions
Issued 12 April 2016
Resolved
Vessel's operational manual states they need an anemometer to monitor weather conditions for operation purposes. The anemometer was broken off the mounting pole and laying on the back deck.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 April 2016
Resolved 25 April 2016
Resolution: Anemometer was mounted and witnessed operartional.
Engineering › Fuel Oil Service System › Valve
Issued 12 April 2016
Resolved
Main diesel engines fuel stop valves are seized up and not operational.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 April 2016
Resolved 25 April 2016
Resolution: fuel stops were witnessed to be operational.
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 April 2016
Resolved
vessel had temporary wiring to an outlet by the washer and dryer.
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 25 April 2016
Resolution: Corrected wiring.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 12 April 2016
Resolved
Vessel's hand rail at pilot house is wasted and will not hold a persons weight. Needs to be rewelded.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 25 April 2016
Resolution: Hand rail was repaired.
Construction/Loadline › Structures › Deck Plating
Issued 12 April 2016
Resolved
vessel had to spots in the deck behind pilot house that was patched with epoxy and not repaired properly. These spots need to be cropped and renewed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 25 April 2016
Resolution: spots on deck where cropped and renewed.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 12 April 2016
Resolved
outlet cover in bearthing area was broken and needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 25 April 2016
Resolution: Cover was replaced.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 12 April 2016
Resolved
Ventilation damper needed to be adjusted to close completely.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 25 April 2016
Resolution: Damper was adjusted to close properly.
Electrical › Lighting (service) › Lighting Fixture
Issued 12 April 2016
Resolved
Rack light on bridge has an improper splice.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 25 April 2016
Resolution: Rack light was repaired correctly.
Communications › Radio Communications › VHF Radiotelephone
Issued 12 April 2016
Resolved
Vessel does not have second VHF radio for a 100 mile route. Vessel's route has been reduced to 20NM until second radio is installed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 April 2017
Resolved 25 April 2016
Resolution: Vessel does not need a second radio due to applicability of 47 CFR 80.