Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
14625 - Convention (Subpart B), Gross Ton
12568 - Regulatory (Subpart C or D), Gross Ton
26658 - Dead Weight, Gross Ton
8093 - Convention (Subpart B), Net Ton
12568 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-1597131
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 22 October 2025Resolved
46 CFR 160.151-7
MSC.1-Circ 1328
Onboard inspections of liferafts should only be undertaken by qualified persons who have
been adequately trained and certificated by the liferaft manufacturer.
- Vessel did not have certificated liferaft servicing personel onboard for extended service life rafts.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2025
Resolved 24 October 2025
Resolution: Crew have been trained and certified.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 22 October 2025Resolved
46 CFR 32.53-10(b)
Each inert gas system must be designed, constructed and installed IAW the provisions of SOLAS II-2, reg 62.
- Vessel's scrubber high water level shutdown was not operational.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2025
Resolved 24 October 2025
Resolution: IG repaired and tested SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 October 2025Resolved
46 CFR 58.01-5
The applicable standards established by the ABS steel rules may be used as the standard for the design, construction, and testing of main and auxiliary machinery except as modified in this subchapter.
- Vessel personnel were unable to test installed high jacket water temperature alarm.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2025
Resolved 24 October 2025
Resolution: Alarms were tested.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 28 February 2025Resolved
A tankship also defined as (oceangoing non-self propelled vessel)in 46 CFR 153.01(b), IAW the stated cites must have two toxic/flammable vapor detectors, at least one of which must be portable, each able to measure vapor concentrations in the range of the time weighted average (TWA) for the cargo. The portable detector may be a direct reading detector tube instrument. If a fixed system is installed at least one portable must be provided. Additionally, vessel must provide a timeline for recalibration of the fixed system or a plan for its removal, and vessel must provide proof that the portable meters on board are capable of detecting toxic/flammable vapors for the cargoes carried. Vessel is restricted from carrying cargoes listed in the vessels CAA and COF that require the toxic/flammable vapor detectors. The above requirement should be rectified no later than 31JAN25 or the CAA and COF will be amended.
Condition: Invalid
Action required: 705 - Other - as specified
Due 28 March 2025
Resolved 14 March 2025
Resolution: Vessel sent in calibration cert. for the fixed gas detection system.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 February 2025Resolved
On all tank vessels, the construction
or conversion of which is started on or
after November 10, 1936, the cargo
pumps shall be designed and installed
to minimize the danger of sparking.
Special care shall be exercised in the
design of packing spaces in order to secure
ample depth and accessibility of
glands. Where cargo pump shafts pierce
gastight bulkheads, stuffing boxes with
readily accessible gastight glands shall
be provided.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2025
Resolved 1 March 2025
Resolution: Vessel sent in photos of replaced seals.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 February 2025Resolved
Containers, brackets, racks, and
other similar stowage locations for
lifesaving equipment must be marked
with symbols in accordance with IMO
Resolution A.760(18) indicating the device
stowed in that location.
(b) If more than one device is stowed
in a location, the number of devices
stowed must be indicated.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 9 May 2025
Resolution: Rcvd photo evidence of stowage marked properly.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 28 February 2025Resolved
The survival craft should be stowed away from access to the tug to provide separate access should the tug be inaccessible. IAW NVIC 2-81 ch2.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 14 March 2025
Resolution: Vessel relocated the liferaft up near the bow that can be moved from side to side as well as the accomodation ladder.