Records from 2012 to 2026. Most recent: inspection, 9 June 2026.
Inspection history · 23
9 June 2026
Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8396253
17 October 2025
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8249123
19 February 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8081443
21 March 2024
Internal Structural Exam · COI Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7871902
19 December 2023
Drydock Exam · In-Service Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7828722
9 August 2023
Damage Survey · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7770010
9 August 2023
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7776875
22 February 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7639934
17 March 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7412624
15 February 2022
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7397013
29 January 2021
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7132112
20 March 2020
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6929815
5 March 2020
Deficiency Check · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6920875
25 February 2020
Annual Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6915691
12 March 2019
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6652257
19 February 2019
Internal Structural Exam · Administrative Inspection · COI Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6630679
9 May 2018
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6410155
19 April 2018
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6395289
16 February 2018
Administrative Inspection · Examination of Repairs · Internal Structural Exam · In-Service Inspection · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6356354
21 September 2017
Type not recorded
No type recorded · USCGC GALVESTON ISLAND (WPB 1349) · USCG Oceania District (CGD-O) · Activity 6272136
1 February 2017
Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6087835
16 February 2016
In-Service Inspection · Examination of Repairs · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5807603
13 January 2016
DAPI Audit · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5800077
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 19 February 2025
Resolved
A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry— (1) Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.121; and (2) Six hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. The 6 red hand flares and 6 orange hand flares were expired. Replace to the satisfaction of attending marine inspector.
46 CFR 180.68(a)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 February 2025
Resolution: 12 new red flares are onboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 19 February 2025
Resolved
A penetration in a watertight bulkhead must be as high and as far inboard as practicable and made watertight. The cable penetrations in port and starboard watertight bulkheads are not watertight. Make cable penetrations tight and prove tightness to the satisfaction of the attending Marine Inspector. Once resolved the vessel’s route is restricted to 3nm from shore until the life floats and EPIRB deficiencies below are resolved.
46 CFR 171.114(a)(1-2)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2025
Resolution: MI atteneded vessel to clear deficiency.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 19 February 2025
Resolved
To enhance protection of life and property it is mandatory that each 406.0-406.1 MHz EPIRB be registered with NOAA before installation and that information be kept up to date. Vessel could not produce valid EPIRB registration. Provide valid EPIRB registration to the satisfaction of the attending Marine Inspector. The vessel’s route is restricted to 3nm from shore until all the life floats deficiencies are resolved.
47 CFR 80.1061(f)
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 20 February 2025
Resolution: Agent provided valid EPIRB Registration.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 February 2025
Resolved
The painter line on a life float must be stowed in such a way that it runs out freely. The installed painter line was packed in a way that did not allow it to run out freely from the cage. Prove painter line is stowed so it runs out freely to the satisfaction of the attending Marine Inspector. The vessel’s route is restricted to 3nm from shore until all the life floats deficiencies are resolved.
46 CFR 180.175(f)(3)(iv)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2025
Resolved 17 April 2025
Resolution: Operator repacked painter line properly.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 February 2025
Resolved
The light of a life float must be a floating water light approved under approval series 161.010 or other standard specified by the Commandant. The batteries of both life float water lights were expired. Replace with approved batteries and prove proper operation of the water lights to the satisfaction of the attending Marine Inspector. The vessel’s route is restricted to 3nm from shore until all the life floats deficiencies are resolved.
46 CFR 180.175(f)(4)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2025
Resolved 17 April 2025
Resolution: Life float batteries replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 February 2025
Resolved
Each life float must be fitted with two paddles. One paddle in the aft life float was cracked. Replace to the satisfaction of the attending Marine Inspector. The vessel’s route is restricted to 3nm from shore until all the life floats deficiencies are resolved.
46 CFR 180.175(d)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 April 2025
Resolved 17 April 2025
Resolution: Paddle replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 February 2025
Resolved
Each paddle must be marked with the name of the vessel Aft life float paddle name not legible. Mark with vessel name to the satisfaction of the attending Marine Inspector. The vessel’s route is restricted to 3nm from shore until all the life floats deficiencies are resolved.
46 CFR 185.604(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2025
Resolved 17 April 2025
Resolution: Vessel name legible.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 February 2025
Resolved
Each buoyant apparatus must have type II retroreflective material meeting subpart 164.108 of this chapter on each side and end. The retroreflective material on the forward life float was degraded. Replace in-kind to the satisfaction of the attending Marine Inspector. The vessel’s route is restricted to 3nm from shore until all the life floats deficiencies are resolved.
46 CFR 160.010-4(p)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2025
Resolved 17 April 2025
Resolution: Retro replaced satisfactorily.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 February 2025
Resolved
The life float must be fitted with a light attached to the body of the float with a lanyard at least 18 feet in length. The lanyard for the light was under 18 feet in length. Make lanyard for the light 18 feet in length to the satisfaction of the attending Marine Inspector. The vessel’s route is restricted to 3nm from shore until all the life floats deficiencies are resolved.
46 CFR 180.175(f)(4)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2025
Resolved 17 April 2025
Resolution: Lanyard measured to 18 feet, all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 February 2025
Resolved
All fuel tanks must be electrically bonded to a common ground. Port side fuel tank was not bonded to a common ground. Re-attach fuel tank bonding wire to the satisfaction of the attending Marine Inspector.
46 CFR 182.440 (b)(4)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2025
Resolved 17 April 2025
Resolution: Bonding reattached satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 February 2025
Resolved
Fuses must be of the cartridge type only and be listed by Underwriters Laboratories or another independent laboratory recognized by the Commandant. There are three (3) blade type fuses installed under the main helm console. Replace in-kind with an approved UL cartridge fuse of the same amperage rating to the satisfaction of the attending Marine Inspector.
46 CFR 183.380 (l)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2025
Resolved 17 April 2025
Resolution: Approved UL cartridge installed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 March 2024
Resolved
The following spaces must be equipped with a fixed gas fire extinguishing system in compliance with 181.410: A space containing propulsion machinery. Fireboy for port engine room inoperable. Provide a certified technician service report & demonstrate all shutdowns, alarms, and overrides to the attending USCG marine inspector.
46 CFR 181.400(a)(1)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2024
Resolution: Witnessed successful operation of installed system and servicing report.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 21 March 2024
Resolved
Each watertight bulkhead must be of sufficient strength to be capable of remaining watertight with a head of water to the top of the bulkhead. Make port side compartments watertight where Roxtec blocks are missing where cable penetrations are located.
46 CFR 179.320(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2024
Resolution: Roxtec blocks added at cable penetrations.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 March 2024
Resolved
The OCMI may require the vessel to get underway. Get underway in presence of marine inspector to conduct drills and complete COI.
46 CFR 176.404(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 May 2024
Resolution: Satisfactory drills conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 March 2024
Resolved
Vessel must be provided with satisfactory arrangement for draining any watertight compartment. Vessel was unable to demonstrate operation for dewatering the port side compartments using the installed bilge manifold.
46 CFR 182.500(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2024
Resolution: Demonstrated operation of dewatering on the port side using installed bilge manifold.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 March 2024
Resolved
A vessel must carry either a first aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. Replace expired aspirin inside first aid kit.
46 CFR 184.710
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 May 2024
Resolution: Aspirin replaced.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 21 March 2024
Resolved
A vessel must be fitted with a FCC type accepted general marine radar system for surface navigation with a radar screen mounted at the primary operation station if: The vessel is self-propelled, the vessel has an oceans, coastwise, limited coastwise, or great lakes route and the vessel carries more than 49 passengers. Vessel does not have a radar and is self propelled, has a limited coastwise route and carries 70 passengers. Vessel limited to 49 passengers until radar is installed.
46 CFR 184.404(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 May 2024
Resolution: Radar installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 21 March 2024
Resolved
At each initial and sebsequent inspection for certification of a vessel, the owner of managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: inspection of all railing and bulwarks and their attachment to the hull structure. Finish installing port side upper rub railing.
46 CFR 176.802(a)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 May 2024
Resolution: Rub rail installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 March 2024
Resolved
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018. Many life jackets were not marked properly with appropriate retroreflective material. Provide appropriate markings to the satisfaction of the attending marine inspector.
46 CFR 185.604
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2024
Resolution: Retroreflective material added to life jackets.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 March 2024
Resolved
Vessel is required to have one 20" or 24" ring lifebuoy fitted with 60' lifeline and floating water light attached with a corrosion resistant clip to allow quick disconnect. Ring lifebouy did not have 60' lifeline attached. Provide proper arrangement of ring lifebuoy, to include the lifeline.
46 CFR 180.70(c)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2024
Resolution: 60' line added to ring lifebuoy.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 21 March 2024
Resolved
In addition to meeting 180.130 each life float and buoyant apparatus must be stowed as required under this section, certified to meet 160.073 in subchapter Q of this chapter, or other standard specified by the Commandant. Properly repair torn life float grab line where attached.
46 CFR 180.137(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2024
Resolution: Life float repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 February 2023
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Observed flexible hose discharge side of fire pump/bilge pump torn/wasted in port engine room. Renew hose in port engine room.
46 CFR 182.100
Action required: 10 - Deficiency Rectified
Resolved 22 February 2023
Resolution: New hose installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 February 2023
Resolved
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018. Numerous life jackets had retro material that had lost its reflectiveness. Provide new retroreflective material to life jackets.
46 CFR 185.604
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2023
Resolved 21 March 2023
Resolution: Retro tape provided.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 22 February 2023
Resolved
Each vessel must be equipment with at least two operable portable battery lights. One light must be located at the operating station and the other at the access to the propulsion machinery space. Vessel did not have any portable lights. Provide 3 portable lights, one at the operating station and one at each engine room.
46 CFR 183.430
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2023
Resolved 23 February 2023
Resolution: 03 lights provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 February 2023
Resolved
Gauges to indicate engine RPM, cooling water temp, and lube oil pressure must be provided for engine. Stbd side oil pressure not operational. Provide working gauge.
46 CFR 182.410(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2023
Resolved 16 March 2023
Resolution: New gauge installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 March 2022
Resolved
Spanner wrench must be provided where a 1.5 inch diameter fire hose is required. Vessel missing spanner wrench. Provide spanner wrench.
46 CFR 181.310(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 15 April 2022
Resolution: Spanner wrench provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 March 2022
Resolved
Fire hose with nozzle must be attached to hydrant at all times. Hose was attached to hydrant but did not make a good connection and was leaking. Secure leak at hydrant/hose connection.
46 CFR 181.320
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 15 April 2022
Resolution: Leak secured.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 26 February 2020
Resolved
The release pin for the starboard engine compartment’s emergency ventilation closure was seized, prohibiting it from being removed. Replace / repair pin to allow for the closure of emergency ventilation to the space.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 March 2020
Resolved 20 March 2020
Resolution: Received notification and proof that the release pin for the starboard engine compartment’s emergency ventilation closure was replaced in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 26 February 2020
Resolved
Pitting was found in the port sewage compartment’s deck plating in the vicinity of the compartment’s lowest and aft most part, directly below the high water alarm. Correct at next dry dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 5 March 2020
Resolution: Upon further investigation of affected area after removal of tank in dry dock, only minor pitting discovered not warranting repair at this time. Location will be monitored. Special note added.
Lifesaving › Embarkation Appliances/Stations › Steps
Issued 19 April 2018
Resolved
11115-Conduct satisfactory man overboard drill. Inadequate means to recover person in water.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2018
Resolved 9 May 2018
Resolution: Adequate means provided.
Engineering › Fuel Oil Service System › Piping
Issued 19 April 2018
Resolved
13101-Inspection of all fuel system. High pressure fuel lines clamps are loose.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2018
Resolved 9 May 2018
Resolution: Fuel lines secured.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 19 April 2018
Resolved
07115-Ventilation closures general condition. Closures do not close properly.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2018
Resolved 9 May 2018
Resolution: Closures close properly.
Lifesaving › Lifefloat › Serviceable
Issued 1 February 2017
Resolved
22 person lifefloat not in serviceable condition.
Due 31 March 2017
Resolved 14 August 2017
Resolution: Contacted [name withheld] stated he remebered clearing def. Contacted vesel rep [name withheld] who provided photographs sent to [name withheld] 24March17 of new lifefloat.
Engineering › Bilge Water Management System › Pump
Issued 1 February 2017
Resolved
Stbd bilge pump not operating.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 February 2017
Resolution: Vessel rebuilt bilge pump.