MAURY USCG vessel records
← All vessels

DB AVALON

DB AVALON is a 2022 industrial vessel. The Coast Guard has recorded 11 inspections since 2021, most recently in May 2026, along with 32 deficiencies — 1 with no resolution recorded —.

Records from 2021 to 2026. Most recent: inspection, 27 May 2026.

Built
2022
Last inspected
27 May 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 2016.

Inspection record

Last inspected 27 May 2026
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2021–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDN3395
1711219
Flag
UNITED STATES
Maury page id
psix-1711219

Documentation record

Registered dimensions (L × B × D)240.0 ft × 77.0 ft × 14.9 ft
Registered tonnagegross 3,487 / net 1,046
ITC dimensions (L × B × D)240.0 ft × 77.0 ft × 14.9 ft
ITC tonnagegross 3,487 / net 1,046
BuilderCONRAD SHIPYARD LLC · AMELIA, LA, UNITED STATES · built 2022
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portMORGAN CITY, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 6 June 2026 · expires 31 July 2027
Service, as the file records itIndustrial Vessel
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it3487 - Convention (Subpart B), Gross Ton
1046 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 3

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

TERRY FONTENOT Towing Vessel · MISLE 135988 · 5 February 2023 · activity 7686892CENAC 113 Tank Barge · MISLE 1307411 · 5 February 2023 · activity 7686892WEEKS 189 Industrial Vessel · MISLE 1380292 · 5 February 2023 · activity 7686892

Inspection history · 11

27 May 2026 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8381922
20 October 2025 Administrative Inspection · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8259368
3 September 2025 Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8225846
3 September 2025 Internal Structural Exam · Underwater Inspection in lieu of Drydock
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8226474
23 October 2024 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8023721
30 March 2024 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7887283
11 March 2024 Deficiency Check · Administrative Inspection · Load Line/Change of Employment
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7877300
5 December 2023 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7834168
5 February 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7686892
10 October 2022 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7574644
15 April 2021 Inclining Experiment · Initial Certification · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7442236

Deficiency record · 32

02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 27 May 2026 No resolution recorded
If, during an internal structural, cargo tank internal examination, or underwater survey, damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the Officer in Charge, Marine Inspection, may require the vessel to be drydocked or otherwise taken out of service to further assess the extent of the damage and to effect permanent repairs. ABS reported to MI that vessel operator notified them that a small crack was found on STBD side deck edge side shell. MI was informed by ABS that a temporary clap weld was completed to the crack to their satisfaction. Permanent repair will need to be completed to the satisfaction of a MI prior to credit dry dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 3 September 2025 Resolved
Each of 400 gross tons and above other than an oil tanker shall maintain an Oil Record Book Part I (Machinery Space Operations). Vessel is not maintaining an Oil Record Book Part I. 33 CFR 151.25
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: ORB added to vessel
01 - Certificates & Documentation › 013 - Documents › Garbage record book
Issued 3 September 2025 Resolved
The master or person in charge of a ship to which this section applies shall ensure that a written record is maintained on the ship of each of the following garbage discharge or disposal operations: (1) Discharge to a reception facility or to another ship; (2) Incineration on the ship; (3) Discharge into the sea; and/or (4) Accidental or other exceptional discharges. The record under paragraph (a) of this section must be prepared at the time of the operation, certified as correct by the master or person in charge of the ship, maintained on the ship for 2 years following the operation, and made available for inspection by the Coast Guard. Written records must include the information specified in 151.55(b)-(e). Vessel is not maintaining a written Garbage Record Book. 33 CFR 151.55
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: Garbage record book added
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 3 September 2025 Resolved
Fire detection, manual alarm, and supervised patrol systems are not required except in special cases; but if installed, the systems must meet the applicable requirements of 46 CFR, part 76 of subchapter H (Passenger Vessels) of this chapter. The fire detection and alarm system must be capable of immediate operation at all times that the vessel is in service. The smoke detector in way of the welding shop was covered in duct taped plastic. There was no hot work ongoing. 46 CFR 95.05-1(a) 46 CFR 76.27-5(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: Tape removed
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 September 2025 Resolved
Where fire extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation must meet the requirements of this part. Vessel has two unapproved foreign fire extinguishers in the crane. 46 CFR 91.01-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: Extinguisher removed from vessel
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 September 2025 Resolved
The marine inspector must check the settings of the safety or relief valves on all pressure vessels, except cargo tanks, twice every 5 years. The pressure relief valve on the inboard of the two air receivers in the house did not reseat after relieving pressure. 46 CFR 61.10-5(i)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: New relief valve installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 September 2025 Resolved
The marine inspector must check the settings of the safety or relief valves on all pressure vessels, except cargo tanks, twice every 5 years. The pressure relief valve on the outboard of the two air receivers in the house and of the air receiver in the crane were unable to be tested onboard. Bench test and submit tech report. 46 CFR 61.10-5(i)(2) The marine inspector must check the settings of the safety or relief valves on all pressure vessels, except cargo tanks, twice every 5 years. The pressure relief valve on the outboard of the two air receivers in the house and of the air receiver in the crane were unable to be tested onboard. Bench test and submit tech report.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: New relief valve installed
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 3 September 2025 Resolved
Bulkheads of galleys, paint and lamp lockers, and emergency generator rooms shall be of “A” Class construction. There is an open rectangle cut into the steel bulkhead of the galley, negating its “A” class construction. 46 CFR 92.07-10(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: Cut out sealed with steel plate.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 3 September 2025 Resolved
Means shall be provided for closing all other openings to the space protected [by fixed CO2] from outside such space. There are four small holes in the engineering space that cannot be closed. 46 CFR 91.15-35(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: Holes sealed
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 3 September 2025 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work except as modified by 46 CFR 91.45-1. The general scope of the plans shall be as noted in 46 CFR 91.55-5. Vessel had a gymnasium onboard built out of two connected conex boxes and electrical powered by the vessel without plan review/ approval or CG oversight. Under CG-END Policy Letter No.01-16, CH-1, a gymnasium is considered a “recreational space” and therefore this installation is considered a Portable Accommodation Module while onboard. This installation does not have a general alarm, a public announcement system, or fire detection. It has only one means of escape and it is unknown if it meets and structural fire protection requirements. Either remove installation permanently or submit appropriate plans to the Marine Safety Center for review. 46 CFR 91.55-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: Gym has been removed from vessel
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 3 September 2025 Resolved
raining material must be on board each vessel and must consist of a manual of one or more volumes written in easily understood terms and illustrated wherever possible, or of audiovisual training aids, or of both as follows: (1) If a training manual is used, a copy must be in each crew messroom and recreation room or in each crew cabin. If audiovisual training aids are used, they must be incorporated into the onboard training sessions described in paragraph (g) of this section. (2) The training material must explain in detail (i)-(xviii). Training and drill subjects required under 46 CFR 199.180 may be omitted if the vessel is not fitted with the relevant equipment, installation or system. Vessel did not have written training material placed in the crew messroom. 46 CFR 199.180(a) 46 CFR 199.620
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: Training material added.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 September 2025 Resolved
On systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate. The schematics posted for the CO2 systems are inaccurate and are based on when the superstructure was installed on another vessel. 46 CFR 95.15-10(h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 17 September 2025
Resolution: Updated CO2 instructions
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 3 September 2025 Resolved
Every crew member with emergency duties assigned on the muster list must be familiar with their assigned duties before the voyage begins. A lifeboatman was unfamiliar with how to bring the liferafts alongside for embarkation. 46 CFR 199.180(b)
Action required: 10 - Deficiency Rectified
Resolved 3 September 2025
Resolution: Discussed with vessel crew
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 September 2025 Resolved
Fire pumps, hydrants, hose, and nozzles shall be installed on the following vessels: (a)(2) On all barges with sleeping accommodations for more than 12 persons. A fire hose ruptured during the inspection and was replaced on the spot. 46 CFR 95.05-5
Action required: 10 - Deficiency Rectified
Resolved 3 September 2025
Resolution: Hose was replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 October 2024 Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this type include the following: Ship's service generating systems. MI observed after testing emergency generator, the breaker on the EDG switchboard continuously tripped and could not be reset to allow vessel to operate on ship's service generators.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 October 2024
Resolution: Generator switch no longer tripped.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 23 October 2024 Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this type include the following: Emergency lighting and power systems. Emergency lighting failed to energize.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 October 2024
Resolution: E lighting operational.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 23 October 2024 Resolved
Vessels must be equipped with independently driven fire pumps in accordance with Table 95.10-5(a). Each pump must be capable of delivering water simultaneously from the two highest outlets at a Pitot tube pressure of approximately 50 p.s.i. Fire pump failed to achieve adequate pressure. Demonstrate proper operation to attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 October 2024
Resolution: Adequate pressure observed.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 23 October 2024 Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Fire door between galley and mess deck remained in open position and did not close. Ensure fire door closes.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 October 2024
Resolution: Fire door closed.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 23 October 2024 Resolved
The boundary bulkheads and decks separating the accommodations and control stations from cargo and machinery spaces, galleys, main pantries and storerooms, other than small service lockers, shall be of "A" Class construction. MI observed hole in deck in between cable penetrations. Restore bulkhead boundary.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 October 2024
Resolution: Boundary sealed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 October 2024 Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Smoke detector in welding compartment was found covered. Vessel rep removed cover.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 October 2024
Resolution: Vessel rep removed cover.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 23 October 2024 Resolved
Each fire hydrant must have at least one length of firehose, a spanner wrench, and a hose rack or other device for stowing the hose. 3 fire hoses have leaks. Replace.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 October 2024
Resolution: New hoses ordered and replaced.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 December 2023 Resolved
CO2 room A-60 insulation on fwd and aft bulkheads and overhead found to have portions missing due to removal from previous repairs. The boundary bulkheads and decks separating the accommodations and control stations from cargo and machinery spaces, galleys, main pantries and storerooms, other than small service lockers, shall be of “A” Class construction. 46 CFR 92.07-10 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2024
Resolved 29 February 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 December 2023 Resolved
On vessels other than motorboats, a fixed carbon dioxide or other approved system must be installed in all lamp and paint lockers, oil rooms, and similar spaces. Port Side Main Deck hazardous material storage locker not of an approved type. Port side hazardous material storage locker and main deck bay hazardous storage lockers do not have fixed extinguishing systems as required. 46 CFR 95.05-10 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 January 2024
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 5 December 2023 Resolved
Where natural ventilation is provided for spaces protected by a carbon dioxide extinguishing system, provisions shall be made for easily and effectively closing off the ventilation. Port side ventilation lower louvres for emergency generator room not operating properly when closure mechanism is actuated. 46 CFR 95.15-35
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 January 2024
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 5 December 2023 Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter Main deck bay first aid kit found to have expired items, replenish and renew as necessary. 46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 January 2024
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 December 2023 Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electric hazards. MI discovered SSDG electrical conductors feeding winding terminals improperly sealed where entering housing. Replace/renew with approved seals. 46 CFR 111.01-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 January 2024
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 December 2023 Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electric hazards. MI discovered Engine room alarm box on stairwell leading to lower pump-room has two live wires protruding outward. Remove or properly stow dead end wires.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 January 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 December 2023 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules. MI discovered improper use of pvc piping on ssdg main raw-water supply line. Replace piping to original design. 46 CFR 58.05-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 January 2024
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 December 2023 Resolved
Ceilings, linings, and insulation, including pipe and duct laggings shall be of approved incombustible material. MI discovered fire protection insulation cropped-out on forward and starboard bulkhead of hydraulic room. Replace renew as required. 46 CFR 92.07-10(d)(7)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 January 2024
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 15 September 2022 Resolved
Each vessel must have a line throwing appliance approved under approval series 160.040. As per 46 CFR 160.040-4 the following equipment is required for the line throwing gun: Four rocket projectile, each complete with bridle and leader of fire-resistant materials. Two of the projectiles shall be of the buoyant type. The vessel only has 02 rock projectiles and no buoyant projectiles.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 October 2022
Resolution: Recieved photographs showing resolution vis email.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 9 September 2022 Resolved
Each launching appliance must be approved under 46 CFR part 160, subpart 160.132 for use with the intended craft, with a winch approved under 46 CFR part 160, subpart 160.115 for use with the intended craft. As allowed by 46 CFR 199 640 (g), the vessel may use the installed deck crane to launch the rescue boat until the Coast Guard approved davit is installed and weight tested. No personnel will be inside the rescue boat while it is being launched or recovered. The vessel is limited to work within a Coastwise route or less until the approved davit is installed.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 8 March 2024
Resolution: Davit installed and testing complete.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 15 April 2021 Resolved
Except as provided in paragraph (b) of this section, each vessel must have a stability letter issued by the Coast Guard before the vessel is placed in service. This letter sets forth the conditions of operation. The Vessel has been issued a temporary stability letter for transit from Morgan City, LA to Houston, TX. The vessel's crane boom must stay in the stowed position during the voyage and can only be moved while the vessel is docked. No Dredgig operations are permitted until the final stability letter is issued.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2022
Resolved 26 September 2022
Resolution: Stability letter has been issued dated September 23, 2022.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.