Records from 2023 to 2026. Most recent: inspection, 21 July 2026.
Documentation record
Registered dimensions (L × B × D)221.7 ft × 54.0 ft × 9.8 ft
Registered tonnagegross 92 / net 62
ITC dimensions (L × B × D)221.7 ft × 54.0 ft × 9.8 ft
ITC tonnagegross 3,344 / net 1,003
BuilderCHESAPEAKE SHIPBUILDING CORP · SALISBURY, MD, UNITED STATES · built 2023
Hull materialSteel
PropulsionDiesel Outdrive
Hull shapeShip
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationValid · issued 5 January 2026 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1003 - Convention (Subpart B), Net Ton
62 - Regulatory (Subpart C or D), Net Ton
3344 - Convention (Subpart B), Gross Ton
92 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 11
21 July 2026
Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8443196
25 February 2026
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8319353
5 February 2026
Deficiency Check · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8306683
3 December 2025
Internal Structural Exam · Vessel Attendance · Hull Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8276908
5 September 2025
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8234629
12 November 2024
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8034704
26 March 2024
In-Service Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7887566
24 March 2024
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7885289
23 March 2024
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7883774
19 December 2023
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7840808
18 September 2023
Plan Review (Other than "T") · Deficiency Check · Construction Oversight
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7793775
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 5 February 2026
No resolution recorded
Each small battery installation must be located in a well ventilated space and protected from falling objects. A small battery installation must not be in a closet, storeroom, or similar space.
Marine Inspector observed emergency lighting battery arrangement located in the general locker on the STBD side main deck behind the laundry room. The batteries are stored inside a storeroom, located on the deck and not protected from falling objects stored inside the space, and there is no natural or induced ventilation into the space required by 46 CFR 120.350(a).
Submit proposal for relocation of emergency lighting system that complies with 46 CFR 112 that is required by 46 CFR 120.434(c).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 March 2026 — due date passed with no resolution recorded
Resolution: MSC approved mod and MSU Savannnah will over see the the3 mod in Brunswick, GA. Unit extended the def until 06MAY26.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 February 2026
Resolved
All unfired pressure vessels must be installed to the satisfaction of the cognizant OCMI. The design, construction, and original testing of such unfired pressure vessels must meet the applicable requirements of subchapter F of this chapter.
The safety relief valves would not reseat after being lifted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 February 2026
Resolved 20 February 2026
Resolution: relief valve was replaced and tested
08 - Alarms › N/A - No Subsystem › General alarm
Issued 5 February 2026
Resolved
Where the general emergency alarm signal cannot be heard over the background noise, there must be a red-flashing light or rotating beacon, in addition to the general emergency alarm signal, that: Has sufficient intensity above the background lighting that would alert personnel in the space;Is activated whenever the general emergency alarm signal in the space are activated; and(3) Is supplied by the general emergency alarm system power supply or the vessel emergency power source through a relay that is operated by the general emergency alarm system.
The General Alarm could not be heard above the noise level of the engine room with one generator online and the flashing light was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 February 2026
Resolved 20 February 2026
Resolution: INOP GA was adjusted my a tech and tested.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 February 2026
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories.
The remote fuel shut off valve was not able to be activated due to the arrangement of the cable where it attaches to the valve, and subsequently broke the pull handle. Design new attachment mechanism and prove proper operation of the remote shutoff valve to the satisfaction of attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 February 2026
Resolved 20 February 2026
Resolution: Shutoff was adjusted and tested
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 19 December 2023
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 2 inches high: "EMERGENCY EXIT, KEEP CLEAR."
MI observed a primary means of escape from the crew berthing on deck 1 was not marked.
46 CFR 122.606
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2024
Resolved 14 February 2024
Resolution: Received evidence of proper marking.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 22 November 2023
Resolved
46 CFR 116.415
A-Class bulkheads or decks must be so insulated with approved structural insulation. Penetrations in A-class fire control boundaries for electrical cables, pipes, trunks, ducts, etc. must be constructed to prevent the passage of flame and smoke for one hour. In addition, the penetration must be designed or insulated so that it will withstand the same temperature rise limits as the boundary penetrated.
Structural fire protection is missing above the door to the main machinery space.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 November 2023
Resolution: Reattended vessel and confirmed repairs were made.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 22 November 2023
Resolved
46 CFR 116.202 (b)(8)(iii)
he owner shall submit for approval to MSC: fire detecting system and smoke detecting system plans.
MSC plan review letter E2-2303952 returned CSC Dwg. No. CS-H147-SC-FDSGS, Rev. 01 for revision. Plans and amplifying details were resubmitted on 11/21 to address MSC’s comments, with MSC review pending. Separately, new construction oversight identified incorrect model of heat detector listed on Dwg No. CS-H147-SC-FDSGS that was re-submitted to MSC.
Revise the plan and resubmit to MSC for approval, with follow-on verification by the local OCMI as appropriate.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 January 2024
Resolution: Plan was revised and approved by MSC. Full system testing was completed and verified prior to commissioning of the system during new contruction oversite.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 November 2023
Resolved
46 CFR 116.202 (b)(5) and (10)
The owner shall submit for approval to MSC: machinery installations and piping systems.
MSC plan review letter E1-2304070 returned CSC Dwg. No. CS-H147-SC-ECPS, Rev. 01, “Engine Cooling Piping Schematic,” CSC Dwg. No. CS-H147-SHPUCS, Rev. 01, “Stabilizer HPU Cooling Schematic,” and CSC Dwg. No. CS-H147-FSOP1L, Rev. 01, “FSOP Fuel Line Piping Schematic” for revision.
Address the comments and resubmit to MSC for approval, with follow-on verification by the local OCMI as appropriate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 December 2023
Resolved 6 May 2024
Resolution: O/O submitted corrected plans that were approved by MSC
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 November 2023
Resolved
46 CFR 116.210
Plans are not required for a vessel that is a sister vessel, provided that…several listed criteria are met, with amplifying CG policy per MTN 01-11 CH1.
A plan approval extension request covering multiple plans required under 116.202 has been submitted to MSC, but not yet reviewed.
Provide proof of MSC approval for plan approval extension that covers the remaining required plans under 116.202.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 December 2023
Resolution: Plan approval extention has been recieved for Hull 147 from MSC.