Records from 2005 to 2021. Most recent: inspection, 17 March 2021.
Documentation record
Registered dimensions (L × B × D)62.0 ft × 24.0 ft × 5.8 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSUN CONTRACTORS INC · HARVEY LA, UNITED STATES · built 1979
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 5 February 2026 · expires 28 February 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 24 April 2020
Resolved
Vessel must undergo an annual inspection 3 months before/after anniversary date 22 NOV. Annual inspection conducted on 24APR2020.
Action required: 10 - Deficiency Rectified
Due 24 April 2020
Resolved 24 April 2020
Resolution: Completed annual inspection.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 April 2020
Resolved
All wires must have stranded copper wire. Vessel supplied power to fan utilizing single stranded wire. Vessel must remove wire. 46 CFR 183.340(b)(1)
Action required: 10 - Deficiency Rectified
Due 24 May 2020
Resolved 24 April 2020
Resolution: Vessel removed the romex wire.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 24 April 2020
Resolved
Discharge end of fuel tank vents must be flame screen of at least 30X30 mesh. Port side fuel vent was missing its flame screen. Vessel must show proof that a flame screen was added.
Action required: 10 - Deficiency Rectified
Due 24 May 2020
Resolved 24 April 2020
Resolution: Vessel put a flame screen under the port side fuel tank.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 24 April 2020
Resolved
Rescue boats have to be equipped with one pair of oars. Vessel only have one oar. Vessel must show proof that the rescue boat has a pair of oars.
Action required: 10 - Deficiency Rectified
Due 24 May 2020
Resolved 24 April 2020
Resolution: Vessel provided another oar.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 21 May 2019
Resolved
Vessel must undergo an annual inspection 3 months before/after anniversary date 22 NOV. Annual inspection conducted on 21MAY2019.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 May 2019
Resolved 21 May 2019
Resolution: Completed annual inspection.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 May 2019
Resolved
60 Month crane rated load test due 04 FEB 2019. Load test to be witnessed by USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2019
Resolved 23 May 2019
Resolution: Witnessed Test
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 21 May 2019
Resolved
Grablines/pendants on life floats not serviceable. Replace IAW 46 CFR 160.010
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 21 June 2019
Resolved 23 May 2019
Resolution: Float replaced
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 21 May 2019
Resolved
Float free link for life float broken and painter line wasted. Replace IAW 160.073
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2019
Resolved 5 June 2019
Resolution: Link and painter replaced.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 21 May 2019
Resolved
Prove proper operation of MSD. Prior to using installed toilet.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2019
Resolved 5 June 2019
Resolution: Piping and air pump replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 May 2019
Resolved
PRV on both pressure vessel did reset after test. Both to be serviced or replaced.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2019
Resolved 23 May 2019
Resolution: PRV's replaced
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 21 May 2019
Resolved
Water heater relief device piping wasted. C/R
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2019
Resolved 5 June 2019
Resolution: Piping replaced and not routed in overhead.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 22 November 2017
Resolved
Provide covers for all rotating and radiating equipment in port and stbd engine rooms.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 22 November 2017
Resolved 30 November 2017
Resolution: GS-12 Landry attended vsl and verified guards in place
Accommodation/Occupational Safety › Potable Water System › General
Issued 22 November 2017
Resolved
Provide replacement hot water heater with working relief valve.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 22 November 2017
Resolved 30 November 2017
Resolution: GS-12 Landry attended vessel and verified new hot water heater installed with working relief valve
Operations/Management › Vessel Activity › Other
Issued 22 November 2017
Resolved
Provide proof of payment for inspection fees.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 22 November 2017
Resolved 30 November 2017
Resolution: Vessel Rep provided proof of payment for user dues.
Electrical › Electric Generation Source (service) › Generator
Issued 9 August 2016
Resolved
Stbd side gen plate was painted and not readable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 August 2016
Resolved 11 August 2016
Resolution: Paint was removed.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 9 August 2016
Resolved
Fresh water tank in port side eng room was not secured properly to the bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 August 2016
Resolved 11 August 2016
Resolution: Tank was welded to the bulkhead.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 9 August 2016
Resolved
Bulkhead penetrations between port and stbd eng rooms not watertight.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 August 2016
Resolved 11 August 2016
Resolution: Properly secured watertight penetrations.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 9 August 2016
Resolved
Fire extinguishers (all) not properly mounted.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 August 2016
Resolved 11 August 2016
Resolution: All fire extinguisher mounts repaired and fit properly in all locations.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 9 August 2016
Resolved
Float switch for bilge alarms (port and stbd eng rooms) not properly mounted.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 August 2016
Resolved 11 August 2016
Resolution: Both float switched mounted properly.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 August 2016
Resolved
Hydrolic actuator valve for stern leg has exposed wiring.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 August 2016
Resolved 11 August 2016
Resolution: Exposed wiring was properly covered.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 9 August 2016
Resolved
Port side emergency escape hatch not watertight.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 9 August 2016
Resolved 11 August 2016
Resolution: Hatch cover was properly cropped and renewed.