Inspection history · 42
26 June 2026
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8385915
31 October 2025
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8261534
31 October 2025
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8264575
10 June 2025
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8155540
13 May 2025
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8134757
17 October 2024
Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8020200
16 October 2024
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8048372
15 May 2024
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7912725
28 March 2024
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7886288
17 March 2023
Internal Structural Exam · Drydock Exam · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7652697
9 September 2022
Periodic Inspection · Commercial Dive Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7557156
23 September 2021
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7318623
17 September 2020
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7065310
6 March 2020
Internal Structural Exam · COI Inspection · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6921442
9 October 2019
Administrative Inspection · Spot Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6831685
13 June 2012
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4341693
13 December 2010
Hull Examination · Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3909461
25 September 2010
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3857954
23 March 2010
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3703567
4 March 2010
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3689961
20 April 2009
Ballast Water Examination · Administrative Inspection · MTSA/ISPS Verification · Commercial Dive Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3468129
5 May 2008
Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3199319
11 April 2008
Administrative Inspection · Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3182195
4 December 2007
Examination of Repairs · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3109275
15 March 2007
MTSA Verification · Deadweight Survey · Ballast Water Examination · Re-Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2888421
31 January 2006
COI Inspection · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2576236
12 July 2005
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2423799
6 July 2005
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2418005
12 April 2005
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2329633
15 March 2005
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2310309
25 October 2004
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2228162
19 August 2004
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2170848
19 August 2004
Damage Survey · Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2170956
18 August 2004
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2170682
26 February 2004
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2013421
28 April 2003
Administrative Inspection · Construction Oversight · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1782254
21 April 2003
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1777926
15 April 2003
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1774024
6 February 2003
Hull Examination · Internal Structural Exam · Cargo Tank Internal · Annual Inspection · Construction Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1768441
18 April 2002
Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1606097
7 August 2001
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1074476
19 January 2001
Initial Certification · Hull Examination · Initial Construction-Excluding Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1471419
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 October 2025
Resolved
Each vessel must have-
(1) A propulsion-control system operable from the pilothouse. Vsl STBD engine shutdown. Tech report must be sent to marine inspector in 14 days.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2025
Resolved 3 November 2025
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 10 June 2025
Resolved
46 CFR 199.150 (f)(6)
Survival craft and their launching location are to be illuminatedby lighting supplied from the emergency source of electrical power. Port aft liferaft and the three forward liferafts did not have emergency lighting.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2025
Resolution: New emergency lights installed to cover all liferafts.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 10 June 2025
Resolved
46 CRF 91.01-5
Vessel assigned a load line must meet subchapter E. The watertight door between the machinery space passageway and machinery space escape hatch were foud not to be watertight. A penetration through the on the main machinery space bulkhead for an ROV cable was found to not be watertight. Provide Load Line certificate endorsed for annual credit by ABS.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2025
Resolution: Watertight enclosures fixed, ABS issued loadline.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 June 2025
Resolved
46 CFR 111.60-13
No flexible cord (extension) may be used as a permanent installation. Two extension cords abot the foward operating station were powering fans and a monitor.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 20 June 2025
Resolution: Extension cords removed, outlet box installed.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 10 June 2025
Resolved
46 CFR 160.156-7 (b)(11)
Each propeller on a rescue boat must be fitted with a propeller guard. Propeller did not have a guard.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 12 June 2025
Resolution: Prop guard installed on rescue boat engine.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 June 2025
Resolved
46 CFR 67.123
The hailing port of the vessel must be marked on the stern of the vessel. Hailing port was not on stern.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 12 June 2025
Resolution: Hailing port painted on the starboard quarter.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 10 June 2025
Resolved
46 CFR 130.330
Vessel must carry adequatw charts. Vesel utilities electronics charts via Rose Point Coatal Explorer, which is not approved for commercial use. If vessel wants to continue to use Rose Point, they must get Rose Point ECS.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 20 June 2025
Resolution: Rose Point ECS installed onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 10 June 2025
Resolved
46 CFR 199.176 (a)(2)
Rescue boat must be marked with the number of persons it is equipped to carry. Rescue boat did not have marked the number of persons (six).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 12 June 2025
Resolution: Number of persons painted on the rescue boat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 June 2025
Resolved
46 CFR 111.12-1(b)
Each generator prime mover must have an overspeed device so that the speed cannot exceed the maximum rated speed by more than 15 percent. Could not prove operation of port generator overspeed device when attempting to test. Provide a satisfactory third-party technician report attesting to satisfactory operation.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2025
Resolution: Tech reported provided showing overspeed test (solenoid, overspeed box, and time delay changed).
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 June 2025
Resolved
46 CFR 91.27 (a)(4)
Nothing in this subpart limits the MI from conducting tests or inspections to be assured of a vessel's seaworthiness. The port MDE was showing an active alarm while operating. Provide a third-party technician report indicating the fault and its satisfactory rectification.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2025
Resolution: Tech changed oil pressure sensor, fault cleared.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 June 2025
Resolved
46 CFR 95.10-5(e)
Fire pumps must be fitted with a pressure gage on the dicharge side of the pumps. The main fire pump gauge on the outlet was found to be inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 12 June 2025
Resolution: New gage installed.
02 - Structural Conditions › N/A - No Subsystem › Spaces in cargo areas
Issued 10 June 2025
Resolved
46 CFR 91.27(a)(4)
Nothing in this subpart limits the MI from conducting tests or inspections to be assured of a vessel's seaworthiness. Fixed piping between the potable water head pressure tanks had a temporary repair. Effect permanent repair.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 8 July 2025
Resolution: Piping replaced with new.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 10 June 2025
Resolved
46 CFR 131.530(b)/131.535(a)
Abandon ship and fire drills must be held on alternate weeks. Vessel was only conducting abandon ship and fire drills monthly.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 10 June 2025
Resolved 10 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 October 2024
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Marine Vessel Rules. Engine shut off suddenly while under normal operations. Mechanic report required to ensure any issues are resolved.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 17 October 2024
Resolution: The vessel confirmed no hull damage via dive report. Mechanic came onboard and could not replicate the engine issue again. Vessel provided maintenance log for what was completed on the port main engine.
02 - Structural Conditions › N/A - No Subsystem › Damage control plan
Issued 17 March 2023
Resolved
Vessel must have general arrangement plans showing vessel name and location and stowage of liferafts
Vessels name was not changed on the fire plan and the additional life raft arrangement was not updated
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 12 May 2023
Resolution: Plan updated.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 17 March 2023
Resolved
Each side of each lifeboat and rescue boat bow must be marked in block capital letters and numbers with the name of the vessel
Only one side of the rescue boat was labeled
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 12 May 2023
Resolution: Rescue boat labeled.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 17 March 2023
Resolved
Survival craft should be numbered consecutively starting from the vessel's bow. Survival craft on the starboard side should be numbered with odd numerals and survival craft on the port side should be numbered with even numerals. Each liferaft stowage location should be marked with the capacity of the liferaft stowed there.
Liferaft stowage locations were not numbered and labeled with capacity.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 May 2023
Resolution: Liferafts labeled.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 9 September 2022
Resolved
A fire drill must be held on each vessel normally on alternating weeks. Vessel's log had sporadic logging of fire drill with last being on 30JUL2022. Cleared on 9SEP2022 during inspection.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 September 2022
Resolution: Educated Vessel Rep (Vice-President of Company) and Master; Ran drill, sat.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 9 September 2022
Resolved
A abandon ship drill must be held on each vessel in alternating weeks. Vessel's log had sporadic logging of abandon ship drills with last on 16JUL2022. Cleared on 09SEP2022 during insepction.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 September 2022
Resolution: Educated Vessel Rep (VP of Company) and Ran Drill, Sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 September 2022
Resolved
Vessel shall maintain watertight integrity. Escape hatch, ER watertight door to ER hallway, Galley Watertight door to ER were not watertight (light showing through ER hatch; Air Flow through ER Watertight door; and gasket spacer placed into the Galley Watertight door)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2022
Resolution: ABS cleared all WTDs and Signed [name withheld] of signed ILLC is objective evidence of defs cleared.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 9 September 2022
Resolved
Vessel shall maintain proper railing. Railing was observed to be wasted on the stbd quarter steps.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2022
Resolved 15 September 2022
Resolution: ABS signed ILLC for annual credit. ABS Annual endorsement is objective evidence for deficiency being cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 9 September 2022
Resolved
Vessel shall ensure operational readiness, maintenance and inspection of lifesaving equipment. Vessel did not keep records for lifesaving maintenance of weekly, monthly, and quarterly requirement including rescue boat or other lifesaving equipment. Master was educated on requirements.
Action required: 10 - Deficiency Rectified
Resolved 9 September 2022
Resolution: Master was educated on requirements.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 9 September 2022
Resolved
Vessel shall have up-to-date charts. Vessel did not have proof of chart updates; chart date was JUL2022 and Rosepoint was DEC2020. Master was educated on what to do.
Action required: 10 - Deficiency Rectified
Resolved 9 September 2022
Resolution: Vessel updated Rosepoint and was educated on requirements.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 September 2021
Resolved
Emergency repair (welded patch) made to fuel oil transfer piping. Any repairs must notify OCMI of temporary repair and all repairs must be made permanent.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2021
Resolution: Patched section of fuel pipe was cut out, new section of pipe (4 ft) welded in.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 23 September 2021
Resolved
Each hydrostatic release unit must be properly serviced. Port and stbd liferaft release units were expired. Replace expired units.
Action required: 10 - Deficiency Rectified
Resolved 23 September 2021
Resolution: Hydrostatic release units were replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 23 September 2021
Resolved
Each embarkation station must be illuminated by emergency lights. Lights did not work under emergency power.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2021
Resolution: Lighting installed port and stbd side to illuminate embarkation points, tested lights on emergency power; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 23 September 2021
Resolved
Pilothouse must contain visual indicator showing position (open or closed) of each Class-1 WTD. Indicators do not work.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2021
Resolution: Visual indicators operating properly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 September 2021
Resolved
Ground detection system required for ship's service power system. Ground indicator panel is faulty and will not reset when tested. Repair indicator and verify no grounds are present.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 October 2021
Resolved 22 October 2021
Resolution: Tested ground test system on switchboard (three lights); all sat.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 23 September 2021
Resolved
Crane record book must be maintained with dates and results of frequent tests and inspections. Record book has not been updated in over a year. Properly maintain and ensure record book is kept up to date.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 October 2021
Resolved 22 October 2021
Resolution: Inspected crane record book, entries made for SEP and OCT, crew will continue to maintain book.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 19 June 2020
Resolved
Alcohol Strips are expired.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Vessel purchased new alcohol test stips.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 June 2020
Resolved
Anchor chain wasted >12%
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Resolved to the satisfaction of the Marine Inspector.
09 - Working and Living Conditions › 091 - Living Conditions › Sleeping room
Issued 19 June 2020
Resolved
Berthing area being used as storage.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Room cleared to the satisfaction of the Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 June 2020
Resolved
Pressure Relief Valves for Dive compressors must be tested or replaced. 46 CFR 54.15
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Purchased and installed new pressure relief valves to the satisfaction of the Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 19 June 2020
Resolved
Data sheets on ILR have old boat name. VSL must update all information on ILR.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Corrected to the satisfaction of the Marine Inspector
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 19 June 2020
Resolved
Hydrostatic release units do not have dates notched out. VSL must notch out dates as to when Hydos expire.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Corrected to the satisfaction of the Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 June 2020
Resolved
Both Bridge Buoys missing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2020
Resolution: Vessel had bridge buoys with smoke properly marked. Corrected to the satisfaction of the Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 19 June 2020
Resolved
There are multiple renditions of the fire/safety plan on board and all are incorrect. Vsl must provide and post an accurate fire/safety plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Fire Control plan corrected and modifed on the spot to the satisfaction of the Marine Inspector.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 June 2020
Resolved
Both PVHO pressure relief valves are not installed.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 July 2020
Resolution: Corrected to the satisfaction of the Marine Inspector.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 19 June 2020
Resolved
Emergency lighting in engine room is inop.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 July 2020
Resolution: Emergency lighting was corrected to the satsifaction of the Marine Inspectors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 June 2020
Resolved
Rotating machinery must be provided with guards. Bow thruster engine does not have a guard installed on the pump end of the prime mover. vsl must install guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 July 2020
Resolution: Corrected to the satisfaction of the Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 June 2020
Resolved
STBD MDE missing lagging over turbo.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Lagging installed to the satisfaction of the Marine Inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 19 June 2020
Resolved
Overhead light in main passageway in auxillary engineering space is inop.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2020
Resolution: Lighting was corrected to the satisfaction of the Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 June 2020
Resolved
Lifebuoy must be installed near the stern of the vsl. No life buoy was installed near the stern.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 July 2020
Resolution: Life buoy was installed near the aft of the vessel to the satisfaction of the Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 19 June 2020
Resolved
Rescue Boat Davit must operate in all service conditions. VSL rescue boat davit works intermittently. VSL must provide a reliable, serviceable rescue boat davit.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2020
Resolution: Corrected to the satifaction of the Marine Inspector.
Lifesaving › Launching Appliances › Davit
Issued 11 April 2008
Resolved
Replace rescue boat davit to meet 46 CFR 133.160.
Due 11 April 2008
Resolved 5 May 2008
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 11 April 2008
Resolved
Rescue boat shall be placed on deck so as to be lauched by deck crane until an approved rescue boat davit is installed as per 46 CFR 1330.160.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 April 2008
Resolution: Attended vessel to witness intallation of rescue boat craddle on main deck. Rescue boat has been temporarily placed on the main deck where it can be launched by the deck crane until an approved rescue boat davit is installed as per 46 CFR 133.160.
Communications › Radio Communications › EPIRB
Issued 5 February 2007
Resolved
Provide hydro
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2007
Communications › Radio Communications › EPIRB
Issued 5 February 2007
Resolved
Provide epirb registration
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2007
Construction/Loadline › Hull › Bottom Plating
Issued 15 March 2005
Resolved
After temp repairs to the 3,000 gal F/O tank are completed and all F/O removed from the tank, and tank emptied, vessel allowed to transit to Amelia Shipyard, Morgan City for repairs. Morgan City OCMI to be kept informed of progress and upon arrival in that [name withheld] repairs to be completed to their satisfaction. F/O tank to be monitored for integrity during transit.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 March 2005
Resolved 18 March 2005
Resolution: Damaged area inserted and air tested.
Lifesaving › Launching Appliances
Issued 4 April 2003
Resolved
Repair / replace the life raft launching cradle ramps. LEGACY COMPONENT DESC: Ramp (free-fall)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 April 2003
Resolved 7 April 2003
Resolution: ramps properly installed
Electrical › Electrical Distribution System (service) › Cable
Issued 4 April 2003
Resolved
Properly secure wiring and cable in the auxiallary generator space and the wire way on the 01 level.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 April 2003
Resolved 7 April 2003
Resolution: properly secure with metal ties.
Accommodation/Occupational Safety › Occupational Safety
Issued 4 April 2003
Resolved
Demonstrate proper operation of the dive air compressor pressure relief devices prior to diving operations. LEGACY COMPONENT DESC: Dive Air Compressors
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 May 2003
Resolved 17 April 2003
Resolution: Tested
Accommodation/Occupational Safety › Occupational Safety
Issued 4 April 2003
Resolved
Conduct pressure test of the port and stbd dive chambers in the presence of a marine inspector, and prior to diving operations. LEGACY COMPONENT DESC: PVHO''''''''s
Condition: Unknown
Action required: 705 - Other - as specified
Due 7 May 2003
Resolved 17 April 2003
Resolution: tested
Engineering › Diesel Engine (auxiliary) › Air-flex Clutch
Issued 4 April 2003
Resolved
Secure the power take off and air lines for the high pressure jet pump, on the back of the bowthruster engine.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 April 2003
Resolved 7 April 2003
Resolution: secured
Construction/Loadline › Penetrations
Issued 4 April 2003
Resolved
properly pack and make watertight the following bulkhead penetrations: engine room forward bulkhead (3" pipe), main deck superstructure aft bulkhead (3 wiring transits) LEGACY COMPONENT DESC: Gasket
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 April 2003
Resolved 7 April 2003
Resolution: packed with approved material
Engineering › Steering Gear System › Ram
Issued 4 April 2003
Resolved
Repair / replace the port steering ram due to excessive amount of play in stationary pin.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 April 2003
Resolved 7 April 2003
Resolution: port ram removed, new bushing and retaining pins installed
Engineering › Fuel Oil Service System › Filter
Issued 4 April 2003
Resolved
Provide drip pans under all fuel oil filter canisters.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 April 2003
Resolved 7 April 2003
Resolution: installed
Stability › Incline Test
Issued 4 April 2003
Resolved
Provide updated stability letter/booklet LEGACY COMPONENT DESC: letter
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2003
Resolved 9 May 2003
Resolution: provided
Electrical › Electrical Distribution System (service)
Issued 4 April 2003
Resolved
Install circuit directory and Amp trip cards in all panel boards. LEGACY COMPONENT DESC: Panelboard
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 May 2003
Resolved 9 April 2003
Resolution: INSTALLED
Navigation › Collision/Grounding Avoidance
Issued 4 April 2003
Resolved
provide second ball for restricted in ability to maneuver signals LEGACY COMPONENT DESC: Day Shapes
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 April 2003
Resolved 7 April 2003
Resolution: provided
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 4 April 2003
Resolved
Provide and install all containment basin plugs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 April 2003
Resolved 7 April 2003
Resolution: paint removed and all plugs installed.
Documentation › Certificates/Documents
Issued 4 April 2003
Resolved
Provide new Load line certificate. LEGACY COMPONENT DESC: International Load Line Certificate
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2003
Resolved 9 May 2003
Resolution: provided
Accommodation/Occupational Safety › Occupational Safety
Issued 4 April 2003
Resolved
Prove acceptability of the ASTM - A269 material installed in the dive air supply system or remove and replace with an accepted material, prior to conducting diving operations. LEGACY COMPONENT DESC: Dive Air Supply
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 9 May 2003
Resolved 15 April 2003
Resolution: Reviewed ltr from manufacture of tubing stating that A-269 meets or exceeds the specifications of A-268 which is on the Coast Guard approval list.
Deck/Cargo › Cargo Transfer (solid)
Issued 4 April 2003
Resolved
Provide approved plans and calculations for the main deck crane prior to utilizing the crane under Subchapter "L". LEGACY COMPONENT DESC: crane
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 9 May 2003
Resolved 15 April 2003
Resolution: Reviewed paper work provided by Oceaneering proving identical type crane approved by ABS prior date. Cleared 835.