MAURY USCG vessel records
← All vessels

MAR-LO

MAR-LO is a 1981 towing vessel. The Coast Guard has recorded 22 inspections since 1992, most recently in May 2025, along with 8 deficiencies and 2 casualty investigations between 2008 and 2023.

Records from 1992 to 2025. Most recent: inspection, 14 May 2025.

Built
1981
Last inspected
14 May 2025
Documentation
Case Pending · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Inspection record

Last inspected 14 May 2025
…with no type recorded12
Operational controls None recorded without a removal date
Years with a record 14 calendar years (1992–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDC9610
193906
Flag
UNITED STATES
Maury page id
psix-193906

Documentation record

Registered dimensions (L × B × D)56.8 ft × 22.0 ft × 7.0 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDRAVO STEELSHIP CORP · PINE BLUFF, AR, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portBATON ROUGE, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationCase Pending · issued 18 July 2024 · expires 31 August 2025
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it67 - Regulatory (Subpart C or D), Net Ton
99 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1980 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 10

Inspection history · 22

14 May 2025 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8135844
25 July 2023 Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7753841
22 June 2023 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7712956
20 September 2022 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7555152
20 April 2021 Initial Certification · Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7178897
15 February 2011 DAPI Audit · MTSA Verification · Industry Initiated Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3948038
8 January 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3391003
28 November 2008 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3385867
28 November 2008 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3390300
11 October 2006 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2798774
8 September 2006 MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2772977
18 August 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2752215
30 June 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2408855
7 March 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2304994
14 August 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 761772
14 August 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 761773
8 August 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 196733
8 August 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 196738
21 August 1997 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 70664
26 June 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 8059
4 October 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 168612
28 January 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 156110

Deficiency record · 8

03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 20 September 2022 Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weather-tight function properly. The door to the engine room marked watertight requires a new gasket.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 September 2022
Resolution: Received pictures from vessel rep of new gasket.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 20 September 2022 Resolved
Alarms must: (1) Be visible and audible at each operating station. The alarm located at the operating station may be a summary alarm; if the alarm at the operating station is a summary alarm, the specific alarm condition must be indicated at the machinery or bilge location; Visual engine room high level bilge alarm was not working, but was repaired on site.
Action required: 10 - Deficiency Rectified
Resolved 20 September 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 July 2021 Resolved
Portable and semi-portable fire extinguishers must be inspected as required by Chapters 7 and 8 of NFPA 10, Standard for Portable Fire Extinguishers with the frequency specified by NFPA 10. Vsl did not have record of monthly inspections for portable extinguishers. Vsl shall perform monthly maintenance and record as required. 46CFR142.240(1),(iv)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2021
Resolved 22 July 2021
Resolution: Log was created for required monthly portable extinguisher inspections
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 20 July 2021 Resolved
Electrical equipment must be marked with its respective current and voltage ratings. Vsl had multiple electrical panels that were not marked as required. Vsl shall mark as required.46CFR143.400(c)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2021
Resolved 22 July 2021
Resolution: Electrical panels were marked as required
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 20 July 2021 Resolved
An existing vessel may be deemed by the OCMI to be in compliance provided that the vessel has been both in satisfactory service insofar as structural adequacy is concerned. Vsl had unsatisfactory fuel line through hull penetration and hole caused by corrosion in blkhead. Vsl shall make repairs to fwd void watertight bulkhead to the satisfaction of the marine inspector. 46CFR144.200(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2021
Resolved 22 July 2021
Resolution: Inserts were installed for fuel line blkhd penetration and blkhd behind ladder.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 July 2021 Resolved
Machinery systems must be maintained to provided for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Piping was vibrating against air receiver causing damage and chafing. Vsl shall make adjustments as required to prevent further damage.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2021
Resolved 22 July 2021
Resolution: added clearance to piping which prevents vibration and chafing with reciever
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 July 2021 Resolved
Each towing vessel must be maintained so as to minimize fire hazards. Vsl had threaded cap on port side fuel tank drain line in E/R but was missing on stbd side. Vsl shall install threaded cap on stbd side to further prevent diesel from leaking into bilge in the event of possible valve failure.46CFR142.220
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2021
Resolved 22 July 2021
Resolution: threaded cap was installed
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 July 2021 Resolved
The frame or support of any semi-portable fire extinguisher fitted with wheels must be welded or otherwise permanently attached to a steel bulkhead or deck to prevent it from rolling. Semi-portable was not secured as required. Semi-portable shall be secured as required.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2021
Resolved 22 July 2021
Resolution: installed means to secure extinguisher

Casualty record · 2

28 November 2008Routine · role: Involved in a Marine Casualty · activity 3385867
25 July 2023Routine · role: Involved in a Marine Casualty · activity 7753841
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.