Records from 1995 to 2026. Most recent: inspection, 5 January 2026.
Documentation record
Registered dimensions (L × B × D)61.5 ft × 26.0 ft × 9.2 ft
Registered tonnagegross 152 / net 103
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSHERMAN SHIPYARD, INC. · PANAMA CITY FL, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 1 November 2025 · expires 30 November 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it103 - Regulatory (Subpart C or D), Net Ton
152 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 27
5 January 2026
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8290462
22 November 2024
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8031570
20 May 2024
TPO Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7915884
19 January 2023
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7623620
27 October 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7585234
21 March 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7160008
27 August 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7044460
22 October 2019
Initial Certification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6839735
4 May 2017
MTSA Verification · Administration · Industry Initiated Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6136190
5 June 2013
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4613907
20 February 2013
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4538736
13 July 2010
Deficiency Check · Administration · Industry Initiated Exam · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3794669
18 September 2009
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3602033
20 September 2006
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2783022
4 July 2004
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2125873
30 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1990342
25 April 2000
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 770625
13 April 2000
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 199172
9 July 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 75245
27 April 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 21881
23 September 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 32783
15 December 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 763527
11 November 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 209927
24 March 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 59312
13 January 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 63610
8 May 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 757905
13 April 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 191049
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 January 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Proplusion Loss on the STBD engine, repair to the satisfaction of the TPO or attending CG Marine Inspector.
46 CFR 143.205(a)
Action required: 60 - Rectify deficiencies prior to movement
Due 19 January 2023
Resolved 19 January 2023
Resolution: Received ABS class report, all test with new pump Satisfactory for ABS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 October 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
Port Main lost propulsion. Repair and provide TPO Report to the satisfaction of the attending Marine Inspector.
46 CFR 143.205(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 October 2022
Resolution: Received class report attesting to the repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 March 2021
Resolved
Machinery and electrical systems must be designed and maintained toprovide for safe oepration of the towing vessel and safety of person onboard under normal and emergency conditions.Prior to movement, provide satisfactory technician's report detailing the preliminary assessment of the fire that occurred onboard on 20MAR21.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 March 2021
Resolution: Recieved TPO report with proof of repairs and OPTEST SAT. Ensured fire extinguishers were replaced IAW COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 March 2021
Resolved
Machinery and electrical systems must be designed and maintained toprovide for safe oepration of the towing vessel and safety of person onboard under normal and emergency conditions. Prior to return to service, provide causative factors analysis detailing the cause of the fire that occured onboard on 20MAR21.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 March 2021
Resolution: Recieved TPO report with proof of repairs and OPTEST SAT. Ensured fire extinguishers were replaced IAW COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 March 2021
Resolved
Machinery and electrical systems must be designed and maintained toprovide for safe oepration of the towing vessel and safety of person onboard under normal and emergency conditions. Provide proof of permanent repairs to the satisfaction of TPO and/pr CG to be satisfied via attendance.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 March 2021
Resolution: Recieved TPO report with proof of repairs and OPTEST SAT. Ensured fire extinguishers were replaced IAW COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 August 2020
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board. Vessel reported
a loss of their starboard rudder. Upon satisfactory transit plan to the Coast Guard vessel will be authorized to proceed to Ashton Shipyard ICW Harvey canal MM2 for repairs. Prior to leaving the shipyard repairs to the rudder/steering systems must be enacted to the satisfaction of the attending Coast Guard MI.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 September 2020
Resolved 4 September 2020
Resolution: Cleared based on ABS preliminary report, sea trial test report, and shipyard photo documentation of repairs.