MAURY USCG vessel records
← All vessels

KRISTINA

KRISTINA is a 1974 public freight. The Coast Guard has recorded 27 inspections since 2016, most recently in April 2019, along with 28 deficiencies and 6 operational controls.

Records from 2016 to 2019. Most recent: operational control imposed, 30 September 2019.

Built
1974
Last inspected
8 April 2019
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 8 April 2019
…with no type recorded17
Operational controls None recorded without a removal date
Years with a record 4 calendar years (2016–2019)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7358705
226710
Flag
SAINT VINCENT AND THE GRENADINES
Maury page id
psix-226710

Documentation record

Tonnage as PSIX records it2100 - Dead Weight, Metric Ton
1517 - Convention (Subpart B), Gross Ton
784 - Convention (Subpart B), Net Ton
1517 - Simplified, Gross Ton
784 - Simplified, Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 27

8 April 2019 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6657934
11 March 2019 Administrative Inspection · Ballast Water Examination · ISPS II Exam · Deficiency Check · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6640364
4 March 2019 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6635836
2 February 2019 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6618958
21 January 2019 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6612918
23 December 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6602155
7 November 2018 In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6576249
30 October 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6571213
1 October 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6552439
27 August 2018 Ballast Water Examination · ISPS II Exam · PII Safety Exam · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6523998
25 August 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6519579
20 July 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6485423
9 May 2018 PII Safety Exam · Ballast Water Examination · Deficiency Check · ISPS II Exam · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6407881
4 May 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6405595
29 March 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6381037
27 February 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6362724
23 February 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6360486
2 January 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6331054
5 December 2017 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6318757
14 November 2017 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6306596
31 October 2017 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6298185
28 March 2017 PII Safety Exam · ISPS II Exam · Deficiency Check · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6112751
7 March 2017 In-Service Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6100599
8 February 2017 PII Safety Exam · Ballast Water Examination · Deficiency Check · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6084458
6 September 2016 Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5993703
28 July 2016 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5954884
1 February 2016 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5807284

Deficiency record · 28

07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 March 2019 Resolved
07113 - A cargo ship shall be provided with fire pumps, water service pipes, hydrant and hoses complying with Regulation 56: shall be sufficient for the effective distribution of the maximum required discharge. The ship’s fire main piping on the weather deck was severely wasted showing signs of large size holes. During the operational test of the system significant leaks were discovered which rendered the system unable to properly maintain water supply to the system in order to fight a fire. The water was leaking at approximately 100-150 gallons per minute. 60 SOLAS Ch. II/Reg. 56(c)
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 22 March 2019
Resolution: Sector Miami has received flag attestation attesting to repairs, audits and their findings
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 14 March 2019 Resolved
Fire extinguishing appliances shall be kept in good order and available for immediate use. The fire hydrant on the second deck (Aft) had a barbecue grill tied off to fire hose connection blocking access, preventing immediate use. 60 SOLAS CH. II/Reg.66
Action required: 30 - Ship detained
Resolved 22 March 2019
Resolution: Sector Miami has recieved flag attestion attesting to repairs, audits and their findings
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 14 March 2019 Resolved
Objective evidence discovered during an expanded ISM exam revealed the following non-conformities: the vessel failed to fully implement the requirements of the ISM Code through their SMS procedures as evident by the following deficiencies indicating that the ship and/or company are not meeting the SMS requirements. Recommend an external audit. 74 SOLAS (2014) IX/3.1, 6.2 ISM Code Part A The company is responsible for ensuring that adequate resources and shore-based support are provided to enable persons to carry out their functions. During a conversation with the current Captain and the previous Captain, it was determined the previous Captain of the vessel made mention to the company that the overall condition of the fire main had been in need of immediate repair for several months. The previous Captain additionally informed the PSCO that the DPA was verbally notified several times dating back to October 2018. ISM Code 10.1, ISM Code 10.2.3 The safety management system should include procedures ensuring that nonconformities and hazardous situations are reported to the company. Although the vessel Captain made verbal notification of the condition of the fire main they did not follow SMS procedures by properly filling out and filing the “Advice of Defect and Repair” form. ISM Code 9.1
Action required: 30 - Ship detained
Resolved 22 March 2019
Resolution: Sector Miami has received flag attestation attesting to repairs, audits and their findings
10 - Safety of Navigation › N/A - No Subsystem › Navigation bridge visibility
Issued 11 March 2019 Resolved
Ships constructed before 01july 1998 shall meet the requirements of 1.1 & 1.2:The view of the sea surface from the conning position shall not be obscured: No blind sectors caused by cargo, cargo gear. Vehicles loaded on top of containers are obstructing the required view of the sea. 74 SOLAS (14 Cons.) Ch.V/Reg. 1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2019
Resolution: Sector Miami has received flag attestation attesting to repairs, audits and their findings
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo Securing Manual
Issued 11 March 2019 Resolved
All Cargoes shall be loaded, stowed and secured throughout the voyage in accordance with the Cargo Securing Manual. Vehicles loaded on vessel are stowed on the roofs of 20' containers that are structurally failing due to the weight of the vehicles. The failure of the roof will cause the vehicles to become unsecured during the voyage. 74 SOLAS (14 Cons.) Ch. VI/Reg. 5.6
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2019
Resolution: Sector Miami has received flag attestation attesting to repairs, audits and their findings
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 August 2018 Resolved
After any survey of the ship no chang eshall be made in the structural arrangements, machinery, equipments covered by the survey without the sanction of the Administration. PSCO observed pressure relief valves gagged open with hose clamps. In addition, main air receiver without proper safety relief and corroded. 60SOLAS CH 1/11 17bc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 September 2018
Resolution: Pressure relief valves have been replaced
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 27 August 2018 Resolved
After any survey of the ship no change shall be made in the structural arrangements , machinery, equipments covered by the survey without the sanction of the Administration. Approx 4' diameter steel engine room ventilation cover wasted and in danger of falling onto persons below. 60SOLAS CH 1/11 17bc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 September 2018
Resolution: Ventilation cover has been repaired and is welded in place.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 27 August 2018 Resolved
All ships 150 gross tonsand above shall be fitted with a BNWAS. Vessel does not have BNWAS as indicated on Equipment FORM E. 74SOLAS(14Cons.) CH V/Reg 19.2.2 17bc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 September 2018
Resolution: BNWAS has been installed and Captain of vessel verified the alarm in front of PSCO's
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 August 2018 Resolved
Hoses shall together with any necessary fittings and tools be kept ready for use in conspicuous positions near the water service hydrants or connections. Missing nozzles in hydrant station starboard side engine room. 60SOLAS CH 2/56(f)
Action required: 10 - Deficiency Rectified
Resolved 27 August 2018
Construction/Loadline › Hull › Side Shell
Issued 12 June 2018 Resolved
A temporary repair was made for a hole found in the ship's hull that was allowing the ingress of sea water in Ballast Tank #1. The vessel must make permanent reparis prior to the next U.S. port after sailing foreign.
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 June 2018
Resolved 2 August 2018
Resolution: Marine Chemist Certificate submitted. PSCO went out to verify weld and deemed repairs to be in compliance with regulations.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 11 May 2018 Resolved
1240. The means for securing and maintaining weather tightness shall be to the satisfaction of the Administration. The arrangements shall ensure that the tightness can be maintained in any sea conditions, and for this purpose tests shall be required at the initial survey and may be required at periodical surveys and at annual inspections or at more frequent intervals. The accordion cargo hatch cover is heavily wasted and has at least 5 holes throughout. Several closing devices used to secure the hatch in the closed position are missing or wasted. ICLL 66 ANNEX I/16(4) 30bc
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 12 June 2018
Resolution: PSCOs observed steel welding repairs made to cargo hatch cover and observed no daylight entering cargo hold.
Construction/Loadline › Hull › Longitudinal Frame
Issued 11 May 2018 Resolved
0299. After any survey of the hull has been completed, no change shall be made in the structural arrangements covered by the survey, without the sanction of the Administration. The vessel’s last survey was in November 2017 with no areas of concern identified. However, PSCOs found wastage and holes along the steel beams supporting the landings in the ladder wells into the cargo hold. 60 SOLAS 1/11. 30bc
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 12 June 2018
Resolution: PSCOs observed longitudnal beam plate-welded on both sides in order to effect repairs and strengthen the landing support in the previously wasted areas.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 May 2018 Resolved
0820. Mechanical and equipment presenting hazards to personnel shall have installations of built-in guards for moving parts. The built in guard on the anchor windlass is wasted exposing the gears and presents a hazard to the crew. ILO 147 ART.4 & PWSA 33 USC 1233(B) 17bc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2018
Resolution: Anchor windlass guard welded in place on starboard windlass in order to protect crew from involved hazard.
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2018 Resolved
1299. The Administration shall satisfy itself that the general structural strength of the hull is sufficient for the draught corresponding to the freeboard assigned. Significant wastage and penetrations were discovered in the vessel’s starboard side ballast tanks. The forepeak tank was found to be leaking into ballast tank #1 STBD side. In addition, when ballast tank #1 was drained, a hole approximately 2 inches by 3 inches in the ship's hull allowed for the passage of sea water into the tank. The last survey in November 2017 found no areas of concern in the affected areas. ICLL 66 ANNEX I CH1/REG.1 30bc
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 12 June 2018
Resolution: PSCOs observed entire plate replaced between forepeak tank and ballast #1 and no further wasted observed in this area.
Construction/Loadline › Structures › Machinery Space Opening
Issued 28 March 2017 Resolved
Machinery Space openings shall be properly framed and efficiently enlcosed by steel casing. Access openings on such casings shall be fitted with doors complying with reg 12(1). Other openings in such casings shall shall be fitted with equivalent covers, permanently attached in their proper position. Bulkhead leading into engine room has a 10x10 inch square with a temporary cover forward port side.
Action required: 705 - Other - as specified
Due 11 April 2017
Resolved 20 April 2017
Resolution: Permanent insert was welded into the bilkhead.
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 28 March 2017 Resolved
Fire protection systems and appliances shall be maintained ready for use and shall be properly inspected. 01 out of 02 fire suits onboard was found with tears on leg. 74 SOLAS (14) II-2/Reg 14.1.1-14.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 March 2017
Resolution: Firemans outfit confirmed replaced and ready for use by PSCO.
Operations/Management › Vessel Safety Management › Company Responsibilities/Authority
Issued 17 March 2017 Resolved
2515 - Company resp - ISM related def - Objective evidence discovered during an expanded ISM exam revealed the following non-conformities. The vessel failed to fully implement the requirements of the ISM Code through their SMS procedures as evident by the following identified deficiencies. Recommend external audit. 74 SOLAS 14 con. IX/3.1, ISM Code Part A
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 March 2017
Resolution: ISM Audit conducted by Flag State 19Mar17
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 17 March 2017 Resolved
2525 - Masters resp - ISM related def - The company should ensure that master is fully conversant with company's safety management system. Master is not familiar with the familiarization for the procedures to report hazardous occurrences. ISM Code 6.1.2.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 March 2017
Resolution: ISM Audit conducted by Flag State 19Mar17
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 17 March 2017 Resolved
2545 - Reports of non-conformities - ISM related def - The company should ensure that any non-conformity is reported. The vessel had a fuel leak from piping that leads to the starboard #1 tanks. The fuel leaked into ballast tank #4. No non-conformities were made to the company. ISM Code 12.1
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 March 2017
Resolution: ISM Audit conducted by Flag State 19Mar17
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 7 March 2017 Resolved
0940 - Ballast fuel and other tanks- The condition of the ship and its equipment shall be maintainted to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons onboard. The #4 center ballast tank was found to contain fuel oil. 74 SOLAS (14 cons) Ch 1/Reg 11a
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 March 2017
Resolved 17 March 2017
Resolution: A fuel pipe that passes through ballast tank #4 was holed. A section of the pipe was cropped and replaced.
Documentation › Logs/Records › Oil Record Book
Issued 7 March 2017 Resolved
1710 -Oil record book- Every ship of 400 GT and above shall be provided with an oil record book. The ORB shall be in the form specified in Appendix III to the Annex. ORB did not identify the quantity and tanks for fuel oil transfer during bunkering. MARPOL (11 cons) Annex I/Reg 17
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 April 2017
Resolution: Proper soundings have been recorded.
Documentation › Logs/Records › Bunker Delivery Notes/Samples
Issued 7 March 2017 Resolved
2199 -Other (MARPOL operational def)- The bunker delivery note shall be kept on board the ship in such place as to be readily available for inspection at all reasonable times and retained for three years. Chief Engineer could not produce any bunkering receipts. MARPOL (11 cons) Annex VI/Reg 18
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 April 2017
Resolution: Bunker notes have been rpovided onboard.
Fire Fighting › Fire Pumps › Arrangement
Issued 8 February 2017 Resolved
0740 Pumps - On a cargo ship where a fire in any one comprtment could put all the pumps out of action, there must be an alternative means of providing water for fire fighting. Alternative means for providing water for fire fighting not provided. Fire pump inoperable. SOLAS 60 Reg. 65(b)(ii) 17bc
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2017
Resolved 13 February 2017
Resolution: Sector Miami attended vessel to conduct a deficiency check on M/V KRISTINA after receiving an attestation from class regarding deficiencies issued on 08FEB17. All deficiencies have been rectified. Fire Pump is in working conditions, COTP Rescinded.
Fire Fighting › Fire Hoses › Condition
Issued 8 February 2017 Resolved
0730 Fire Appliances - Fire extinguishing appliances shall be kept in good order and available for immediate use at all times. Port forward hose station missing fire hose. SOLAS 60 Reg. 66 17bc
Action required: 17 - Rectify deficiencies prior to departure
Due 22 February 2017
Resolved 13 February 2017
Resolution: Missing Fire Hoses in station were replace with a new sets of hoses.
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 8 February 2017 Resolved
0199 Other - All cargoes shall be loaded, stowed, and secured throughout the voyage in accordance with the Cargo Securing Manual approved by the Administration. No cargo Securing Manual approved by Flag State of the vessel on board. 74SOLAS(14 Cons.) CH VI Reg. 5.6 17bc
Action required: 17 - Rectify deficiencies prior to departure
Due 22 February 2017
Resolved 13 February 2017
Resolution: Cargo Securing Manual approved by Flag - Checked and Verified for new Flag approval stamp on the Cargo Securing Manual, manual is approved.
Navigation › Piloting/Steering › Gyro Compass
Issued 28 July 2016 Resolved
1540 - Navigation - The condition of the ship and its equipment shall be maintained fit to proceed to sea. Vessel is fitted with a Gyrocompass, however it is inoperable. 74 SOLAS 14 con. I/11
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 August 2016
Resolved 19 August 2016
Resolution: Received Flag report attesting to repair, def cleared.
Communications › Long Range Identification and Tracking (LRIT) › Transmission Unit
Issued 28 July 2016 Resolved
1699 - Radio other - Ships shall be fitted with system to automatically transmit info specified. Conformance test report should be issued on satisfactory completion of test by Admin. LRIT test has been completed, however the Admin has not issued acceptance of the test. 74 SOLAS 14 con. V/19-1.4.1
Condition: Placed in Improper Service
Action required: 15 - Rectify deficiencies by next port
Resolved 19 August 2016
Resolution: Received Flag Report, def cleared.
Navigation › Piloting/Steering › Marine Charts
Issued 28 July 2016 Resolved
1560 - Charts - nautical charts shall be adequate and up to date. Charts were not up to date. 74 SOLAS 14 con. V/27
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 28 July 2016
Resolution: Charts were corrected with the latest updates.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.