Records from 1984 to 2023. Most recent: inspection, 18 May 2023.
Inspection history · 74
18 May 2023
Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7687875
1 May 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7678784
20 April 2023
PSC A
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7669126
27 March 2023
PSC A · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7654206
10 June 2020
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6972785
30 May 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6972279
10 April 2020
Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6937867
17 March 2020
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6927853
15 March 2020
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6926800
24 February 2020
Deficiency Check · PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6914348
3 February 2020
ISPS Exam · Deficiency Check · ISM Exam · PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6901496
11 February 2019
Ballast Water Examination · PII Safety Exam · ISPS II Exam · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6620924
16 January 2019
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6609155
30 December 2018
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6604081
22 June 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6452128
21 June 2018
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6452343
16 November 2017
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6307854
20 October 2017
Deficiency Check · Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6291583
16 August 2016
ISPS II Exam · Deficiency Check · PII Safety Exam · Ballast Water Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5974026
27 August 2002
Annual Inspection · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1666926
26 August 2002
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1666690
16 August 2001
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 292928
16 August 2001
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 293712
23 July 2001
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 291959
18 June 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 451898
22 May 2001
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 187978
26 September 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 282379
10 March 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 275653
6 January 2000
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 273407
29 July 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 431087
18 January 1999
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 424623
6 September 1998
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 440102
21 January 1998
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 411995
29 July 1997
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 406306
21 January 1997
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 399479
21 August 1996
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 394452
1 July 1996
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 392697
16 January 1996
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 386853
29 November 1995
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 385433
16 October 1995
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 384011
13 October 1995
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 467203
12 September 1995
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 120744
22 June 1995
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 379728
12 June 1995
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 379319
18 January 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 374280
21 September 1994
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1172407
7 September 1994
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 370228
7 September 1994
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1176300
28 August 1994
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 370034
27 August 1994
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 447055
13 August 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 117987
17 July 1994
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 188634
7 July 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 368351
7 July 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1172289
9 May 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 366644
8 May 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 95439
24 March 1994
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 699770
3 February 1994
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 364352
9 October 1991
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 346499
12 July 1991
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 344937
14 November 1990
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 465946
1 June 1990
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 537743
18 February 1990
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 335391
20 August 1989
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 526159
19 September 1988
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 325780
28 December 1987
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 320419
27 May 1987
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 536486
24 April 1987
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 315606
5 February 1987
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 314166
5 January 1987
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 313627
14 May 1986
Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 308818
20 January 1986
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 507102
17 May 1985
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 302131
6 October 1984
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 537046
14 - Pollution Prevention › N/A - No Subsystem › VGP: Annual Report
Issued 20 April 2023
Resolved
FOR EACH VESSEL, OWNERS/OPERATORS ARE REQUIRED TO SUBMIT AN ANNUAL REPORT FOR EACH YEAR THEY HAVE ACTIVE PERMIT COVERAGE. VGP 4.4.1
PSCO OBSERVED A NOTICE OF INTENT FROM 2016 BUT NO ANNUAL REPORTS HAVE BEEN SUBMITTED.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2023
Resolved 18 May 2023
Resolution: Vessel Resubmitted EPA reports for years dating back to 2017 to satisfaction of MI.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 27 March 2023
Resolved
11134 - Life Saving Appliances - Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed 03 ring lifebuoy lights were inop. PSCO expanded inspection of ring lifebuoy lights and discovered the lights had incorrect batteries installed.
- 74 SOLAS (20) III/20.2
17ac
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2023
Resolution: Vessel submitted class report attesting that all life buoy batters were replaced, and are operational.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 27 March 2023
Resolved
07120 - Fire Safety - Such doors shall be arranged so that positive closure is assured by self-closing. PSCO observed self-closing door for emergency escape truck in the engine room would not properly close and latch, allowing for the passage of smoke and flame.
- 74 SOLAS II/34(b)(iii)
17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2023
Resolution: Self-closing mechanism was adjusted and the emergency escape door was found to be operational, and was verified by class.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 March 2023
Resolved
03199 - Water/Weathertight Conditions - The ring, lines and letters shall be painted in white or yellow on a dark background or in black on a light ground. PSCO observed portside deckline was not painted contrast in color.
- ICLL 1966 Annex I/8
40ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 2 April 2023
Resolution: Vessel submitted class report attesting to the deck line being repainted black and both port and starboard deck lines and freeboard assignments are in contrast.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 17 March 2020
Resolved
The condition of the ship and it's equipment be maintained to conform with the provisions of the present regulations to ensure the ship in all respect will remain fit to proceed to sea without danger to the ship and persons on board.
Fire doors in engine room are missing latch locking mechanisms. Ship is awaiting parts. Fire doors include; fire door going down the stairs to engine control room. Fire door to shop across from ECR, emergency escape door from ECR and fire door between ECR and engine room.
Invoice # 58429, estimated arrival- week 14 of 2020.
74 SOLAS (14) I/II
40bc
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 April 2020
Resolved 10 April 2020
Resolution: Latch locking mechanisms installed. Operation of fire doors verified by flag representative.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 24 February 2020
Resolved
The periodical surverys reffered to in paragraphs (a)(iii) shall be endorsed on the cargo ship radio certifcate.
Certficate was issued 07JUN2019 by Flag, already had surveyors signature on the blocks on back page not allowing blocks to be properly signed and dated when surveys take place.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 March 2020
Resolution: New SOLAS safety radio certificate can be properly signed.
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 24 February 2020
Resolved
An annual survey within three months before or after each anniversary date of the certicate including a general inspection of the structure, equipment sysemts, fitting arrangement and material.
IOPP issued on 23JAN2020 by Flag, already had surveyors signature on the blocks on back page not allowing blocks to be properly signed and dated when surveys take place.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 March 2020
Resolution: New IOPP can be properly signed and dated.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 3 February 2020
Resolved
One approved cover of a highly visible color capable of protecting the occupants against injury by exposure.
There were 2 covers of which were in poor condition for the lifeboats. The covers had gaping holes and duct tape that served as temporary repairs.
74SOLAS III/11.9.xxvi
17bc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 February 2020
Resolved 5 February 2020
Resolution: Vessel provided class report and photos of new lifeboat cover.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 February 2020
Resolved
All exposed metal parts of electrical machines or equipment which are not intended to be “live” but are liable to become “live” under fault conditions... shall be so constructed and so installed that danger of injury in ordinary handling shall not exist.
One electrical outlet next to the Masters office desk was completely pulled off the wall with exposed wires. Cables that were previously used for water pumps on the lower level of the engine room were still present (2 pumps total) and could cause shock if “live” and touched inadvertently. Those cables are dead ended and wrapped in only electrical tape. The attached cable to one of these pumps is heavily worn such that the protective sheathing was broken. Other small junction boxes were loose allowing unprotected parts of cabling to be pulled out.
74SOLAS II-1/27(a)(I)(1)
16bc
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 February 2020
Resolved 24 February 2020
Resolution: PSC conducted a Deficiency check and cleared the outstanding Defeiciency.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 February 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
Several fire doors around the ship were in disrepair. The latching bolts were broken, missing or sealed with epoxy when all 3 bolts in each door intended to be operational. The hardware on several doors were broken. Some doors were difficult to close when provided closing arrangements. One did not latch at all (engine control room door) and could be pushed open. The fire doors noted include: the fire door going down the stairs to the engine control room (ECR), the fire door to the shop at the bottom of the stairs, the emergency escape door from ECR, and the fire door between ECR and the engine room.
74 SOLAS(14) I/11
16bc
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 February 2020
Resolved 17 March 2020
Resolution: Extended and re issued form B for shipping time of parts.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 3 February 2020
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company (10.1). And meeting these requirements the company should ensure that (10.2); inspections are held at appropriate intervals (10.2.1); any non-conformity is reported with its possible cause if known (10.2.2); appropriate corrective action is taken (10.2.3); in records of these activities are maintained (10.2.3). The company should identify equipment and technical systems, the sudden operational failure of which may result in hazardous situations. The safety management system should provide for specific measures aimed at promoting the reliability of such equipment or systems. These measures should include the regular testing of standby arrangements and equipment or technical systems that are not in continuous use (10.3)
According to ships procedures M1 - M13, the lifeboats and all associated equipment are visually inspected weekly (10.2.2).
As required by ships procedures in accordance with requisition number 151/19, the crew submitted a request for new medication on 28 August 2019; however, the order has not been completed (10.2.3).
The ships safety management systems do not include procedures for training on installing the lifeboats canopy. Additionally, procedures are not in place for regular inspections on class a fire doors found in the engine room (10.3)
Deficiencies one, two, three, and observations above are objective evidence that the vessel failed to fully implement the requirements of the SMS.
An internal audit is required within three months with a focus on crew inspection procedures of the safe life-saving and fire fighting and requisitions.
74 SOLAS 14 IX/ 3.1
ISM 10.1, 10,2, 10.3
705c (3 months)
Condition: Invalid
Action required: 705 - Other - as specified
Due 3 May 2020
Resolved 30 May 2020
Resolution: Received satisfactory internal audit for subject deficiency to clear the deficiency. The internal audit has been uploaded to the documents tab as "ISM Internal Audit - 30May2020."
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 11 February 2019
Resolved
04114 - In cargo ships 5000 tons gross tonnage and upwards, there shall be a self contained emergency source of power. PSCO observed crew unable to start emergency generator after multiple attemps. - 74 SOLAS II-1/26(a)(1) 17ac
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 February 2019
Resolution: Starter solenoid replaced. Class and USCG attended to test.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 11 February 2019
Resolved
15105 - A vessel equipped with ballast water tanks that operates in the waters of the U.S. must maintain a ballast water management plan that has been developed specificaly for the vessel and that will allow those responsible for the plans implementation to understand follow the vessel's ballast water management strategy and comply with the requirements of this subpart. Vessel's ballast water management plan does not include all of the necessary provisions listed in 33 CFR 151 Subpart D. 33 CFR 151.2050(g) 50c
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 February 2020
Resolution: Vessel's company updated BWM Plan relating to how to handle ballast water in US waters. According to the vessel's new policy, vessel is not permitted to discharge ballas waster into US waters at all.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 11 February 2019
Resolved
15105 - The master, owner, operator, agent or PIC of a vessel must ensure the maintenance of records. PSCO observed that the ballast water management record book was missing signature attesting to the accuracy of the information provided. 33 CFR 151.2070(a)(2) 50c
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 February 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 11 February 2019
Resolved
15105 - Vessels operating within 03 miles nautical miles of the U.S. must conduct routine visual inspections, once per week or voyage and document in official logbook. Inspections are not being conducted nor recorded as required under section 4.1.1.1 in 2013 VGP. 33 USC 1251 40c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 February 2020
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 22 June 2018
Resolved
0810-Every ship shall carry appropriate portable atmoshpere testing instrument and suitable means shall be provided for calibration of such instruments. PSCO observed portable gas meters on board were not calibrated for 272 days and no calibration equipment was onboard. 74SOLAS(14)XI-2/7. 40c
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 December 2018
Resolution: Mexican Class Surveyor provided class report attesting that the vessel was provided with a new gas detector, calibration accessories and factory calibration certificate dated 20SEP18.
Electrical › Electric Generation Source (emergency) › Generator
Issued 22 June 2018
Resolved
1499-The Condition of the ship nad its equipment shall be maintained to conform with the provions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed flexible ducting missing between emergency generator cooling radiator and outside vent. 74SOLAS(14)I/II(a). 50a
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2018
Resolved 30 December 2018
Resolution: Class Surveyor onboard witnessed and provided class report identifying repairs made to the emergency generator by means of installing flexible ducting between radiator and vent.
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 20 October 2017
Resolved
0160 - IAPP Certificate - Ships constructed before the date of entry into force of Annex VI for such ship's Administration shall be issued with an IAPP Ceritificate. - The ship does not have an IAPP Certificate - MARPOL VI / 6.2
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 October 2017
Resolution: Recieved confirmation MEXICO is NOT signatory to ANNEX VI of MARPOL.
Documentation › Logs/Records › Oil Record Book
Issued 20 October 2017
Resolved
1710 - Oil Record Book - Each operation of this regualtion shall be full recorded with out delay in the ORB Part I, so that all entries in the book appropiate to that operation are completed. - ORB displays entries exceeding maximum input of OWS system according to IOPP Certificate. All entries observed far exceeded the input since 01JAN17. - MARPOL I / 17.4
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 November 2017
Documentation › Logs/Records › Oil Record Book
Issued 20 October 2017
Resolved
1710 - Oil Record Book - The company should ensure that all personnel involved in the company's safety management system have an adequate understanding of relevant rules, regulations, codes and guidelines. - Provided with the dificiencies listed on PSC Form B dated 20OCT17, the vessel is not following procedures concerning proper documentation in the Oil Record Book. An external audit concerning the protection of the enviroment is recommended. - SOLAS 74(2014CONS.)IX/3.1 - ISM Code 6.4
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 15 November 2017
Resolved 16 November 2017
Resolution: Verified external audit, crew training and knowledge of Oil Record Book. Proper modifications were found to be satifactory by Coast Guard personnel.
Documentation › Logs/Records › Oil Record Book
Issued 20 October 2017
Resolved
1710 - Oil Record Book - Each operation of this regulation shall be fully recorded without delay in the ORB Part I, so that all entries in the book appropiate to that operation are completed. Vessel is not correctly labeling discharges to shore reception facilities - MARPOL I / 17.4
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 October 2017
Resolution: Deficiency rectified to the satisfaction of the U.S Coast Guard
Documentation › Logs/Records › Oil Record Book
Issued 20 October 2017
Resolved
1710 - Oil Record Book - Each completed operation shall be signed by the officer or offices in charge of the operations concerned and each completed page shall be signed by the master of the ship. Master signed incomplete ORB page - MARPOL I / 17.4
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 October 2017
Resolution: Deficiency rectified to the satisfaction of the U.S. Coast Guard.
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 29 November 2016
Resolved
0740-Pumps-Ships must have alternative means of providing water for fire fighting. The vessel's emergency fire pump is inoperable. - SOLAS 74 II-2 Reg 52(b)(ii)- 17abc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 November 2016
Resolved 13 December 2016
Resolution: Vessel's fire pumps are fully operational
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 29 November 2016
Resolved
2050- Ships must be outfitted with a self-contained emergency source of power. The emergency generator onboard is inoperable. - SOLAS 74 II-1 Reg. 26 (a)(i) - 17abc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 November 2016
Resolved 13 December 2016
Resolution: Vessel overhauled and installed new batteries in the EDG
Navigation › Piloting/Steering › Gyro Compass
Issued 29 November 2016
Resolved
1540 - All ships 500gt and upwards must have a gyro-compass to determine and display their heading. Proper heading between bridge and steering can not be confirmed. SOLAS 14 V reg. 19.2.5 - 17abc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 November 2016
Resolved 13 December 2016
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 29 November 2016
Resolved
1581 - The exact position of the rudder if power operated, shall be indicated at the principal steering station. The vessel has different rudder indication at the bridge station and steering controls. - SOLAS 74 Ch. II-1 Reg. 29(a)(iv) - 17abc
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 29 November 2016
Resolved 13 December 2016
Resolution: ABS attested to repairs, full test was completed by PSCOs.
Operations/Management › Pollution › Approved Method for Annex VI Compliance
Issued 29 November 2016
Resolved
1999-MARPOL-Vessels operating in emissions control areas shall carry a written procedure showing how the fuel oil changeover is to be done. The vessel does not have changeover procedures onboard.- MARPOL Annex VI/reg. 14.6
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 29 November 2016
Resolved 13 December 2016
Resolution: Vessel provided proper documentation regarding changeover procedures.
Engineering › Steering Gear System › Rudder
Issued 29 November 2016
Resolved
0936-Safety in General- Indicators for running indication of the motors of electric and electrohydraulic steering gear shall be installed.The power failure alarm for the steering gear system does not work.-74 SOLAS CH.II-I/30
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 November 2016
Resolved 13 December 2016
Resolution: Alarms were tested for both steering gears, all sat.
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 16 August 2016
Resolved
0820-Accident prevention-There shall be non-conducting mats or gratings front and rear where necessary. The vessel is missing non-conducting mats at several switchboards and control panels throughout the engine room.-74 SOLAS II-I/27(a)(ii)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 29 November 2016
Resolved 29 November 2016
Resolution: Non conducting mats were placed in all apropriate spots.
Pollution Prevention/Response › Prevention Equipment
Issued 27 August 2002
Resolved
ATTENDING MARINE INSPECTOR WITNESSED THE USE OF SURFACTINS TO CLEAN ENGINE ROOM. THE USE OF SURFACTINS WILL RENDER OWN INOPERATIVE. ADMINISTRATION TO PROVIDE ATTTENDING MARINE INSPECTOR WITH TECH REPORT ATTESTING TO THE PROPER OPERATION OF OWS IN ORDER TO VERIFY IT MEETS 15PPM STANDARD. LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Action required: 705 - Other - as specified
Due 27 August 2002
Resolved 30 August 2002
Resolution: CLASS ATTESTED TO PROPER REPAIR AND LAB REPORT RECIEVED.
Pollution Prevention/Response › Prevention Equipment
Issued 27 August 2002
Resolved
OWS TANKS AND ASSOCIATED PIPING WASTED/HOLED. UNABLE TO VERIFY PROPER OPERATION. ADMINISTRATION TO VERIFY PROPER REPAIRS AND OPERATION OF OWS SYSTEM. OWS CANNOT BE OPERATED IN U.S. OR ITS TERRITORIES, UNTIL ADMINISTRATIONS REPORT IS RECEIVED, REVIEWED AND APPROVED BY COGNIZANT COTP. LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Condition: Unknown
Due 27 August 2002
Resolved 30 August 2002
Resolution: OWS REPAIRED AND TESTED BY CLASS.
Lifesaving › Launching Appliances
Issued 27 August 2002
Resolved
PORT & STBD. LIFEBOAT SHEAVES AND DAVIT FALLS PLATE WASTED AT UPPER AND LOWER DAVIT ARMS. CLASS TO ATTEST TO PROPER REPAIR AND OPERATION OF LIFEBOAT DAVIT SYSTEMS PRIOR TO DEPARTURE PORT OF BALTIMORE. LEGACY COMPONENT DESC: Davit
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 August 2002
Resolved 30 August 2002
Resolution: CLASS ATTESTED TO THE PROPER REPAIR AND OPERATION OF BOTH LIFEBOAT DAVIT SYSTEMS.
Lifesaving › Lifeboat Equipment
Issued 27 August 2002
Resolved
REPLACE DAMAGED FOOD RATIONS 12 PORT AND 3 STBD.; FOR TOTAL OF 15 RATIONS AT 10,000 KJS EACH. FAX RECEIPT TO ATTENDING MARINE INSPECTOR PRIOR TO DEPARTURE. LEGACY COMPONENT DESC: Food Ration
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 27 August 2002
Resolved 28 August 2002
Resolution: RECEIPT FOR FOOD RATIONS RECEIVED.
Pollution Prevention/Response › Prevention Equipment
Issued 27 August 2002
Resolved
MSD TANK TOP WASTED AND LEAKING FUMES. MSD MUST BE REPAIRED TO PREVENT THE ESCAPE OF VAPORT. LEGACY COMPONENT DESC: Marine Sanitation Device, Type II
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 September 2002
Resolved 30 August 2002
Resolution: CLASS ATTESTED TO PROPER REPAIR.
Engineering › Bilge Water Management System
Issued 27 August 2002
Resolved
BILGE PIPING ON PORT SIDE IWO GENERATOR IS TEMPORARILY REPAIRED WITH SOFT PATCHES. REPAIR TO THE SATISFACTION OF CLASS. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 September 2002
Resolved 30 August 2002
Resolution: CLASS ATTESTED TO PROPER REPAIR.
Engineering › Freshwater Generation System
Issued 27 August 2002
Resolved
MULTIPLE SOFT PATCHES FOUND ON FRESH WATER GENERATOR. REPAIR TO THE SATISFACTION OF CLASS. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 September 2002
Resolved 30 August 2002
Resolution: CLASS APPROVED OF TEMP REPAIRS.
Fire Fighting › Firemans Outfit
Issued 27 August 2002
Resolved
REPLACE DAMAGED FIRE SUIT, CLOSING DEVICES INOPERATIVE. PRIOR TO DEPARTURE PORT OF BALTIMORE. LEGACY COMPONENT DESC: Protective Clothing
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 28 August 2002
Resolved 28 August 2002
Resolution: RECEIVED RECEIPT FOR NEW FIRE RESISTANT JACKET.
Navigation › Piloting/Steering › Gyro Compass
Issued 22 August 2002
Resolved
Gyro inoperable, make repairs in BALMS.
Due 22 August 2002
Resolved 26 August 2002
Resolution: REPAIRS MADE
Electrical
Issued 23 July 2001
Resolved
REPAIR PIPE FITTINGS FOR HYDRAULIC PUMP FOR MOORING WINCH.
Condition: Unknown
Due 12 September 2001
Resolved 12 September 2001
Unknown
Issued 23 July 2001
Resolved
PROPERLY REPAIR RPM GAUGES ON BOTH SHIP SERVICE GENERATORS.
Condition: Unknown
Due 12 September 2001
Resolved 12 September 2001
Electrical
Issued 23 July 2001
Resolved
REMOVE DEAD END WIRES IN FORWARD HYDRAULIC WINCH SPACE.
Condition: Unknown
Due 12 September 2001
Resolved 12 September 2001
Navigation
Issued 21 January 1997
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 29 July 1997
Resolved 29 July 1997
Documentation
Issued 1 July 1996
Resolved
SOLAS III/26.1.4: LIFE RAFT REQUIRED BY REGULATION NOT ON BOARD. LENGTH OFVSL DOES NOT REQUIRE ADDITIONAL RAFT FOREWARD. SAFETY EQUIPMENT CERT SHOWS EQUIPMENT ON BOARD. CLASS CONTACTED, CERTIFICATE TO BE CORRECTED AT NEXT SURVEY FOR RENEWAL BY CLASS SURVEYOR, BUT NOT LATER THAN 11JUL97
Condition: Unknown
Due 21 August 1996
Resolved 21 August 1996
Lifesaving
Issued 12 June 1995
Resolved
O2 cylinder, port side weather deck forward of house was, missing metal strap on bottom.
Condition: Unknown
Due 23 June 1995
Resolved 23 June 1995
Engineering
Issued 12 June 1995
Resolved
Threaded fittings missing from containment boxes.
Condition: Unknown
Due 23 June 1995
Resolved 23 June 1995
Lifesaving
Issued 12 June 1995
Resolved
Starboard lifeboat, starboard bilge keel grab rail broken.
Condition: Unknown
Due 23 June 1995
Resolved 23 June 1995
Navigation
Issued 12 June 1995
Resolved
Bell clapper missing from ship's bell.
Condition: Unknown
Due 23 June 1995
Resolved 23 June 1995
Fire Fighting
Issued 7 September 1994
Resolved
THREE OF VESSEL'S FIRE HOSES FAILED WHILE TESTING FIRE FIGHTING SYSTEMS DURING THE BOARDING
Condition: Unknown
Due 8 September 1994
Resolved 8 September 1994
Unknown
Issued 3 February 1994
Resolved
UPON INSPECTION COAST GUARD BOARDING OFFICER NOTED THAT THE OVER BOARD DISCHARGE VALVE FOR THE OILY-WATER SEPARATOR WAS NOT LOCKED CLOSED WHILE INU. S. WATERS.
Condition: Unknown
Due 3 February 1994
Resolved 7 February 1994
Navigation
Issued 3 February 1994
Resolved
No tidal current tables or equivalent were found by Coast Guard Bboarding Officer.
Condition: Unknown
Due 28 August 1994
Resolved 30 August 1994
Navigation
Issued 3 February 1994
Resolved
NOAA CHARTS OR THE FOREIGN EQUIVALENT FOR THE LOCAL AREA WERE FOUND BY THE COAST GUARD BOARDING OFFICER TO BE NOT CORRECTED UP TO DATE.
Condition: Unknown
Due 28 August 1994
Resolved 30 August 1994
Navigation
Issued 3 February 1994
Resolved
The coast pilot for the local area was found by the coast guard boarding officer to be not corrected up to date.
Condition: Unknown
Due 28 August 1994
Resolved 30 August 1994
Navigation
Issued 3 February 1994
Resolved
The Coast Guard light list was fond by the Coast Guard Boarding Officer to be out of date and not corrected.
Condition: Unknown
Due 28 August 1994
Resolved 30 August 1994
Navigation
Issued 3 February 1994
Resolved
No current tide tables were found o/b by the Coast Guard boarding officer.
Condition: Unknown
Due 28 August 1994
Resolved 30 August 1994
Navigation
Issued 3 February 1994
Resolved
Upon inspection Coast Guard Boarding Officer found no block diagram emergency change-over on bridge.
Condition: Unknown
Due 28 August 1994
Resolved 30 August 1994
Documentation
Issued 3 February 1994
Resolved
THE VESSEL HAD NO OIL TRANSFER PROCEDURES THAT WERE MADE AVAILABLE FOR INSPECTION, DURRING THE EXAM BY THE COAST GUARD BOARDING OFFICER.
Condition: Unknown
Due 7 July 1994
Resolved 7 July 1994
Navigation
Issued 19 September 1988
Resolved
A VIOLATION OF 33 CFR 164.30 IN THAT THE VSL DID NOT HAVE ON BOARD CHARTS 12278, 12281, WHICH WERE REQUIRED FOR THE VSLS ROUTE FROM SMITH PT VA TO BALTIMORE HARBOR.
Condition: Unknown
Due 19 September 1988
Resolved 19 September 1988
Navigation
Issued 19 September 1988
Resolved
A VIOLATION OF 33 CFR 164.30 IN THAT THE U.S. CHARTS 12230,12263, USED BY THE VSL WERE NOT CORRECTED UP THRU NTMS 24/88, 20/88, RESPECTIVELY, WHICH WERE REASONABLY AVAILABLE AND CONTAINED CORRECTIONS APP TO THE VSLS ROUTE FROM SMITH PT VA TO BALT HBR. NO FOREIGN EQUIV O/B.
Condition: Unknown
Due 8 February 1994
Resolved 30 August 1994
Navigation
Issued 5 February 1987
Resolved
NAVIGATION CHARTS 11412,11413,AND 11414 WERE NOT CURRENTLY CORRECTED. ABOVE CHARTS REQUIRED FOR ENTRY INTO THE PORT OF TAMPA, FL.
Condition: Unknown
Due 5 February 1987
Resolved 5 February 1987
Navigation
Issued 5 January 1987
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 5 January 1987
Resolved 5 January 1987
Navigation
Issued 5 January 1987
Resolved
NAVIGATION CHARTS 11412,11413, AND 11414 WERE NOT CURRENTLY CORRECTED. ABOVE CHARTS REQUIRED FOR ENTRY INTO PORT OF TAMPA.
Condition: Unknown
Due 5 March 1987
Resolved 5 January 1987
Navigation
Issued 5 January 1987
Resolved
VESSEL DID NOT HAVE A CURRENTLY CORRECTED COPY OF, OR APPLICABLE CURRENTLY CORRECTED EXTRACT OF COAST GUARD LIGHT LIST FOR THE PORT OF TAMPA FL.
Condition: Unknown
Due 5 January 1987
Resolved 5 January 1987
Navigation
Issued 5 January 1987
Resolved
VESSEL DID NOT HAVE A CURRENTLY CORRECTED COPY OF, OR APPLICABLE CURRENTLY CORRECTED EXTRACT OF TIDE TABLES FOR THE PORT OF TAMPA FL.
Condition: Unknown
Due 5 January 1987
Resolved 5 January 1987
Navigation
Issued 5 January 1987
Resolved
VESSEL DID NOT HAVE A CURRENTLY CORRECTED COPY OF, OR APPLICABLE CURRENTLY CORRECTED EXTRACT OF TIDAL CURRENT TABLES FOR THE PORT OF TAMPA FL.
Condition: Unknown
Due 5 January 1987
Resolved 5 January 1987
Navigation
Issued 14 May 1986
Resolved
33CFR164.33(A)(1) THE VESSEL'S CHARTS 11364 AND 11369 WERE NOT CURRENTLY CORRECTED.
Condition: Unknown
Due 14 May 1986
Resolved 14 May 1986
Navigation
Issued 14 May 1986
Resolved
33CFR164.33(A)(2)(II) THE VESSEL'S U.S. LIGHT LIST WAS OUTDATED (1980 EDITION).
Condition: Unknown
Due 14 May 1986
Resolved 14 May 1986
Navigation
Issued 14 May 1986
Resolved
33CFR164.35(G) THE VESSEL'S MANEUVERING INFORMATION WAS INCOMPLETE.
Condition: Unknown
Due 14 May 1986
Resolved 14 May 1986
Navigation
Issued 14 May 1986
Resolved
33CFR164.33(A)(3) THE VESSEL'S NOTICE TO MARINERS WERE OUTDATED. THE MOST RECENT EDITIONS ONBOARD WERE FROM 1984.
Condition: Unknown
Due 14 May 1986
Resolved 14 May 1986