Records from 2016 to 2024. Most recent: operational control imposed, 28 June 2024.
Inspection history · 45
28 June 2024
In-Service Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7944455
3 April 2024
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7890587
28 March 2024
Damage Survey · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7886439
28 March 2024
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8009541
15 March 2024
Type not recorded
No type recorded · Activities Europe · Activity 7889706
14 January 2024
Type not recorded
No type recorded · Activities Europe · Activity 7852525
17 November 2023
ISM SMC Audit · Deficiency Check · Damage Survey
Physical examination · Activities Europe · Activity 7826645
5 November 2023
Administrative Inspection
Administrative · Activities Europe · Activity 7820791
4 November 2023
Type not recorded
No type recorded · Activities Europe · Activity 7832096
3 August 2023
Type not recorded
No type recorded · Activities Europe · Activity 7764540
17 July 2023
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7752846
15 July 2023
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7743116
8 July 2023
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7737779
8 July 2023
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7737786
8 July 2023
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7738433
7 July 2023
In-Service Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7736330
19 May 2023
In-Service Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7692048
7 March 2023
Deficiency Check · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7648733
23 December 2022
Examination of Repairs · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7622173
17 November 2022
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7595943
14 October 2022
MTSA/ISPS Verification · Annual Inspection · ACP COI Oversight
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7557162
22 February 2022
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7399070
21 January 2022
ACP Drydock Oversight
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7383631
14 January 2022
Permit to Proceed
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7394812
10 November 2021
Administrative Inspection · MTSA/ISPS Verification · ACP Additional Oversight – Risk Assessment
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7343750
10 November 2021
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7389538
18 October 2021
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7334642
1 April 2021
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7167197
31 March 2021
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7166433
18 September 2020
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7060640
17 September 2020
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7060305
18 February 2020
MTSA Verification · ACP Annual Oversight · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6913672
9 October 2019
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6831501
20 September 2019
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6817378
20 September 2019
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6818678
16 July 2019
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6751967
1 May 2019
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6674387
3 April 2019
Administrative Inspection
Administrative · Activities Europe · Activity 6654874
9 January 2019
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6607680
28 August 2018
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6525397
26 May 2018
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6449116
6 February 2018
DAPI Audit · MTSA Verification · ACP Annual Oversight · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6351781
29 January 2018
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6345332
9 November 2016
Annual Inspection · ACP COI Oversight
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6038285
19 January 2016
MTSA/ISPS Verification · DAPI Audit · ACP Annual Oversight
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5813878
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 June 2024
No resolution recorded
The machinery, boilers and other pressure vessels, and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended.
During inspection, ship’s crew stated that there was no determination made for the cause to the multiple blackouts that occurred during the transit to and from Europe. It was also noted at some point there were fuel boost pumps installed for the generators and have since been removed but the controls remained in the ECR. Crew believes this could be the causative factor for the black outs. Trouble shoot generator to identify cause of failures and make repairs. SOLAS 74/81/83 Amended II-2/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 June 2024
No resolution recorded
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use.
LPCO2 gaging system has inaccurate gauge and showed 110% full. Crew stated that the level was approximately 65%, which was enough for all spaces with the exception of #5 cargo deck. 74 SOLAS 20 II-2/14.2.1.2 a
Action required: 30 - Ship detained
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 28 June 2024
No resolution recorded
- A ‘critical maintenance list’ of 73-line items, items was provided to the Coast Guard the day of the inspection. These items pertain to the major issues with a variety of critical equipment and key safety systems onboard including machinery, propulsion, and watertight integrity. All items are to be rectified to the satisfaction of the attending ABS surveyor (with CG oversight). Any deviations from this time frame for rectification form specific listed items must be agreed upon by both ABS and CG. ISM Code A/10.1
MARAD-CG MOU VIII
ABS Rules for Classification, Part 1A, Section 1.1 and 1.3
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 28 June 2024
No resolution recorded
To maintain a valid Certificate of Inspection, you must complete your annual and periodic inspections within the periods specified in 91.27-1(a) and (b) and your Certificate of Inspection must be endorsed.
Vessel's COI has an expiration date of 31 Jan 2027 and is required to complete annual inspections within a 3 month before or after each anniversary date. Vessel failed to have annual inspection completed by 01 May 2024. 46 CFR 91.27-5 c
Action required: 30 - Ship detained
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 28 June 2024
No resolution recorded
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. Due to the objective evidence in deficiencies # 1, 2, and 3, the vessel is not in substantial compliance with relevant conventions. An external SMS audit conducted by the vessel’s RO should be conducted prior to being released from detention. This audit should be focused to include engineering preventative maintenance program, procedures, reporting to company, sufficient spare parts and company engagement for maintenance/repairs needed. In addition, this audit should include a focus on ISM clauses 6.1 and 9.1.
74 SOLAS 20 IX/3.1 ISM Code 10.1
Action required: 30 - Ship detained
10 - Safety of Navigation › N/A - No Subsystem › Pilot ladders and hoist/pilot transfer arrangements
Issued 28 June 2024
No resolution recorded
Pilot ladder winch reel as currently arranged does not meet the applicable statutory requirements. The pilot ladder is not secured at the deck level >915mm horizontally inward from the ship’s side, and weight of the pilot ladder can still be partially hanging on the reel. ABS to carry out full evaluation of onboard pilot embarkation arrangements against the applicable standards. 74 SOLAS 20 V/23.1.1.2 IMO Resolution A.1045(27), 7.4 a
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 March 2024
Resolved
While transiting through the Sector Virginia regulated navigation area, your vessel must have tug assist by at least (2) tugs with an aggregate total horsepower of at least 6,000 HP or 40 ton bollard pull.
Action required: 705 - Other - as specified
Due 4 April 2024
Resolved 30 March 2024
Resolution: Vessel made it safely into port.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 March 2024
No resolution recorded
While pressure testing the port side S/W elbow (def 30) observed an approximate 3 inch crack on the 20" discharge/outlet piping of the outboard raw water cooler. Make permanent repairs or provide acceptable temporary repair proposal to USCG & ABS. SOLAS 74/81/83 Amend II-1/26.3 (Update- Temp repair authorized to sail to Port of Baltimore.)
Action required: 15 - Rectify deficiencies by next port
Due 25 March 2024 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 March 2024
No resolution recorded
High pressure CO2 for firefighting system protecting the incinerator space found with one empty cylinder and the paint store cylinder found half empty during annual servicing. Make repairs to incinerator CO2 system, refilling the empty cylinder and verify the CO2 cylinder for the paint store has remained full. 74 SOLAS 74/81/83 II-2/5 & 7
Action required: 15 - Rectify deficiencies by next port
Due 25 March 2024 — due date passed with no resolution recorded
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 5 March 2024
No resolution recorded
Deck 5 ramp (at bulkhead deck) forward section two locking pins/securing devices were removed to secure ramp for return voyage. Replace damaged securing devices and make permanent repairs. SOLAS 74/81/83 Amended II-1/25-9.4
Action required: 15 - Rectify deficiencies by next port
Due 25 March 2024 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 November 2023
Resolved
Properly repair engine room door to cargo deck 5 to make reasonably gas-tight. SOLAS 74/81/83 Amended II-2/5.1.4
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 March 2024
Resolution: New door fabricated and inspected by ABS/MI's.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 November 2023
Resolved
Properly stow O2 & Acetylene cylinders in authorized location(s). SOLAS 74/81/83 Amended II-2/51
(Update- O2/Acetelyne stowed on cargo deck. Cargo deck 5 fans shall be operating while underway.)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 January 2024
Resolution: Stowage racks installed outside engine room on cargo deck. ABS to update DG-DOC.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 27 November 2023
Resolved
The following areas shall be cleaned of oil soaked trash/debris:
- MDE top of scavenge air box below turbos;
- Oil soaked sorbent around JW cooling pipe (aft DG #5);
- Open buckets of oil near air receivers;
- Bilges/voids under Deck 5 ramp hydraulic rams;
- Under emergency fire pump discharge valve.
SOLAS 74am (04ConsEd)
II-2/4.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 January 2024
Resolution: Areas sufficiently cleaned.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 27 November 2023
Resolved
Aft peak tank valve found with piping into E/R removed and valve dripping. Determine reason piping was removed and reinstall or blank. SOLAS 74am (20ConsEd)
II-1/3-1
Update- valve/piping are for cargo deck drains.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 January 2024
Resolution: Valve replaced and piping reinstalled.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 27 November 2023
Resolved
Repair/replace pin holed fuel piping found in purifier flat marked with 25-23 and secure tank flange leaking directly above. SOLAS 74am (20ConsEd)
II-1/3-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 January 2024
Resolution: Repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 November 2023
Resolved
On day of inspection, only 1 of 5 generators were identified as a reliable power generation source. SSDG#1 requires manual priming to start from a cold condition. SSDG#3 is down for unknown reasons. SSDG#4 and SSDG#5 will not stay on line and intermittently shutdown due to possible fuel pressure issues. Trouble shoot generators to identify cause of failures and make repairs.
Action required: 30 - Ship detained
Due 17 November 2023
Resolved 31 January 2024
Resolution: Witnessed SSDG's 1-4 running with successful PSTP testing.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 November 2023
Resolved
Installed power management automation system was failing to properly adjust/share generator loads causing blackouts and losses of propulsion. Crew identified failed phase current transformers for SSDG’s #3 & #5 within electrical switchboard and which required “jumping” connections. This alone should not cause failure of the power management system. Identify root cause and make appropriate repairs.
Action required: 30 - Ship detained
Due 17 November 2023
Resolved 31 January 2024
Resolution: Witnessed SSDG's running under load, in parallel and with successful PSTP testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 November 2023
Resolved
Observed Auxiliary Lube Oil purifier in alarm status. When questioned, engineer stated temperature probe needed to be moved from other purifiers to make operational. Replace malfunctioning temperature probe. In addition, fuel purifiers may not be operating at manufacturer’s recommended fuel throughput. Follow manufacturer’s recommendations or provide confirmation from manufacturer that a lower throughput is acceptable.
Action required: 30 - Ship detained
Due 17 November 2023
Resolved 1 December 2023
Resolution: Observed temperature probes installed in all 04 purifiers and functional.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 17 November 2023
Resolved
The following areas found with excessive fuel/oil accumulation: tank top under and around main engine/shaft alley, fuel transfer room, purifier room, under SSDG's, aft generator flat, under generator lube oil strainers and bilge in workshop near generator flat. Drain pipe to oily waste tank from oily machinery parts cleaning basin in workshop near generators found cut and allowed to drain straight to bilge. Main engine piston cooling chambers on port side found with flexible hoses to drain to deck level onto sorbent pads. Properly clean all areas of excessive fuel and oily waste.
Action required: 30 - Ship detained
Due 17 November 2023
Resolved 5 March 2024
Resolution: Conducted E/R walk-through. Bilges, decks, bulkheads found sufficiently cleaned of fuel/oil accumulation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 November 2023
Resolved
Main cooling water pump starboard was tested on standby automatic start. With port pump running, manual valve between both pumps was opened. Observed starboard pump shaft begin to spin indicating failure of check valve between pumps. Weight on check valve handle was not installed. Upon automatic start of pump, excessive vibration was observed and temperature of pump shaft seal rose from 16C to 30C within ten minutes. Port pump was running all day w/ temperature at 16C when starting test. Shutdown starboard due to temperature rise. Trouble shoot heat rise/vibration/valve failures and make repairs.
Action required: 30 - Ship detained
Due 17 November 2023
Resolved 31 January 2024
Resolution: Witnessed stbd pump running without steady temperature. Vibration was satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 November 2023
Resolved
Observed portable diaphragm pumps and flexible hoses (some with oil residue) at tank top deck. When questioned, engineers stated the installed sludge pump and sewage pumps were not operational. The dedicated bilge water pump (with a garden hose attached to prime pump) wasn’t able to pull suction from rose boxes. Portable pumps and hoses were used to transfer via sounding tubes of sludge from tank to tank, sewage/grey water from tank to tank. Crew must use back-up general service/fire/bilge pump to transfer oily bilge slops to oily waste tank. Repair/replace non-operational or failing pumps.
Action required: 30 - Ship detained
Due 17 November 2023
Resolved 6 March 2024
Resolution: On 05MAR24 observed operation of newly installed sewage pump and bilge pump and remote shutdowns. On 06MAR24 observed installation of new sludge transfer pump. Could not test full function due to empty sludge tanks.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 17 November 2023
Resolved
Oil content meter for OWS was recently replaced by Chief Engineer. No notification was made to IOPP issuing authority (ABS). No valid calibration certificate found. Provide calibration certificate and notify ABS.
Action required: 30 - Ship detained
Due 17 November 2023
Resolved 1 December 2023
Resolution: Observed new OCM installed with calibration certificate. ABS surveyors tested OWS system with crew.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 17 November 2023
Resolved
The grey water and black water skin valves both leak by as identified by crew and confirmed by testing with divers. Grey water tank overflowed into bilge and sludge tanks through interconnected tank vent piping manifold. Questioned crew if any other skin valves were not working properly. It is suspected the main cooling water valve to stbd pump off sea chest is not closing fully. Make repairs/replace leaking skin valves.
Action required: 30 - Ship detained
Due 17 November 2023
Resolved 31 January 2024
Resolution: ABS witnessed satisfactory testing of new valves and verified IACS witnessed shop testing.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 November 2023
Resolved
Plastic waste receptacles for used and oily rags found in machinery spaces. Replace with waste receptacles constructed of non-combustible materials.
Action required: 17 - Rectify deficiencies prior to departure
Due 17 November 2023
Resolved 11 January 2024
Resolution: New metal containers for waste and oily rags placed in engine room.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 17 November 2023
Resolved
Focused SMS audit required prior to departure from port. This audit shall focus on the deficiencies marked as SMS Related to include engineering preventative maintenance program, unauthorized repairs/alterations/procedures, reporting to company, sufficient spare parts and company engagement for maintenance/repairs needed.
Action required: 17 - Rectify deficiencies prior to departure
Due 17 November 2023
Resolved 5 March 2024
Resolution: MI's attended closing meeting of ISM Audit on 26FEB24. Final report to be submitted to ACTEUR.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 17 November 2023
Resolved
Low oil pressure alarmed when testing free-fall lifeboat engine. Investigate cause and make repairs. (Update- Upon testing FFLB engine failed to stop with stop button- corrected) (Update 2- Water ingress identified around stern plate at cort-nozzle, further inspection by BW found GRP cracks on internal GRP layer)
Action required: 17 - Rectify deficiencies prior to departure
Due 17 November 2023
Resolved 6 March 2024
Resolution: MI's inspected fiberglass repairs and tested FFLB in the water. No water ingress identified and engine performed satisfactory. Witnessed simulated launch by primary and emergency controls. Conducted 110% overload test on holding hook.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 July 2023
Resolved
The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of this chapter. Systems of this type include the following:
Steering Systems.
Bilge and Ballast Systems.
Tank Vent and Sounding Systems.
Overboard Discharges and Shell Connections.
Pipe and Pressure Systems.
Liquefied Petroleum Gas For Cooking and Heating.
Fix and verify proper operation of vessels propulsion equipment. Provide class report to CG Marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 15 July 2023
Resolved 17 July 2023
Resolution: Class report sent attesting to completion of repair and testing, finding #1227.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 7 July 2023
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and readily available for immediate use.
During in-water maneuvering test of the freefall lifeboat, the main/primary steering was found to not be working properly. Steering via the emergency tiller verified as working as designed/intended. Make permanent repairs to the main/primary steering to the satisfaction of the attending ABS surveyor prior to departure from the next port of call (reported to be Beaumont, TX).
Action required: 15 - Rectify deficiencies by next port
Due 14 July 2023
Resolved 24 July 2023
Resolution: Per ABS report no. 5952411, an ABS surveyor attended the vessel while berthed in Beaumont and verified that the main steering operation of the FFLB had been restored with OEM parts and proven to be fully operational.
14 - Pollution Prevention › 148 - Ballast Water › Ballast water discharge
Issued 10 March 2023
Resolved
To discharge ballast water into the waters of the United States, the master, owner, operator, agent, or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standards in 151.2030 (a) [e.g. install and use a CG-approved ballast water treatment system] or ballast with water from a U.S. public water system as described in 151.2025(a)(2), according to the schedule in paragraph (b) of this part.
The Cape Wrath completed a scheduled dry dock in 2022, and thus is past its compliance date as listed in 151.2035 (b).
The vessel’s ballast water records indicate that seawater was taken on in Bayonne, NJ and subsequently discharged in Baltimore, MD in January 2023. The vessel is not equipped with a ballast water treatment system; thus, this water was not managed via one of the allowable methods in 33 CFR 151.2025.
Provide a corrective action plan for how the subject vessel will meet the U.S. ballast water regulations moving forward, taking into account the vessel’s purpose of providing sealift service for worldwide deployment.
*Note: 151.2025 (a)(3) – ballast water exchange >200nm from any shore – is not a permissible ballast water management method for the subject vessel, as this is only a permitted ballast water management method for vessels not yet past their compliance date.
Updated 4/24/23: the due date for this deficiency has been extended to 5/24/23, to facilitate updates to the BWMP to accurately reflect the permissible ballast water management options under 33 CFR 151 for this vessel based on the implementation schedule in 33 CFR 151.2035.
Updated 5/19/23: the due date for this deficiency has been extended to 6/10/23, as discussions are reportedly still on-going with MARAD and Crowley regarding this matter, and the vessel has received turbo-activation orders.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2023
Resolved 7 July 2023
Resolution: Crowley submitted an updated BWMP which states that vessel will use U.S. public water system (PWS) water to comply with the ballast water management requirements of 33 CFR 151. Unmanaged ballast to be retained onboard or discharged ashore.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 10 March 2023
Resolved
A minimum of 2 two-way portable radiotelephone apparatus for each fire party for fire-fighter’s communication shall be carried onboard. Those two-way portable radiotelephone apparatus shall be of an explosion-proof or intrinsically safe type.
The label for the Motorola fire-fighter radios onboard indicate that a NNTN4852A battery must be used in order to meet explosion-proof / intrinsically safe requirements. However, the batteries currently used with the radios are of different types (NNTN4497DR and NNTN4970A).
Update 3/24/23: at the request of the operator (communicated by ABS), this deficiency has been extended until 4/24/23. A PO has been issued for ten (10) Motorola NNTN4852A batteries.
Update 4/26/23: Update 3/24/23: at the request of the operator (communicated by ABS), this deficiency has been extended until 8/1/23. Reportedly the aforementioned radio batteries have a long lead-time with current estimated delivery date of 7/25.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2023
Resolved 7 July 2023
Resolution: Appropriate firefighter radio batteries were provided onboard to the satisfaction of the attending ABS surveyor, as reported in ABS report no. 5916865.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 March 2023
Resolved
A vessel at anchor shall exhibit where it can best be seen: at or near the stern, an all-around white-light.
Aft starboard anchor light is alarming as inoperable on the navigation light panel on the bridge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2023
Resolved 24 March 2023
Resolution: Per ABS report no. 5734103, the light was proven fully operational in the presence of the attending Surveyor and found satisfactory.
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 10 March 2023
Resolved
All ships of 150 gross tons and upwards shall have a daylight signaling lamp not solely dependent upon the ship’s power supply.
Daylight signaling lamp is missing battery power pack.
Update 3/24/23: at the request of the operator (communicated by ABS), this deficiency has been extended until 4/24/23. A PO has been issued for a new daytime signaling lamp with appropriate backup battery pack.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2023
Resolved 26 April 2023
Resolution: Per ABS report no. 5786590, a new ALDIS lamp kit was provided and tested to the satisfaction of the attending ABS Surveyor.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 10 March 2023
Resolved
Maintenance, testing, and inspection shall be carried out based on the guidelines developed by the Organization and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. Portable containers or portable tanks containing foam concentrate, excluding protein based concentrates, less than 10 years old, that remain factory sealed can normally be accepted without the periodical foam control tests required in MSC.1/Circ.1312 being carried out.
ChemGuard AR-AFFF portable foam containers in the DC lockers have a date stamp of 2006, and there is no record of periodical foam testing being carried out.
Update 3/24/23: at the request of the operator (communicated by ABS), this deficiency has been extended until 4/24/23. A PO has been issued for six new 20L foam canisters/units.
Update 4/26/23: at the request of the operator (communicated by ABS), this deficiency has been extended until 5/24/23. Reportedly the aforementioned 20L foam canisters should be delivered onboard shortly.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2023
Resolved 26 April 2023
Resolution: Per ABS report no. 5786590, the foam containers were replaced to the satisfaction of the attending ABS Surveyor.
10 - Safety of Navigation › N/A - No Subsystem › Long-range identification and tracking system (LRIT)
Issued 10 March 2023
Resolved
Systems and equipment used to meet the requirements of this regulation (LRIT) shall confirm to performance standards and functional requirements not inferior to those adopted by the Organization. A Conformance test report should be issued, on satisfactory completion of a conformance test.
At time of attendance, there was no objective evidence available onboard of a valid LRIT conformance test report for the current installed equipment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2023
Resolved 24 March 2023
Resolution: Per ABS report no. 5734103, the LRIT was tested by a recognized 3rd party specialist and conformance report provided to the attending ABS Surveyor for review and found in satisfactory operational condition at this time.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 10 March 2023
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: protection of openings and penetrations in divisions. Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use.
The ventilation and fire damper panels on the bridge and at the fire control station (ballast control room) have various bulbs not properly functioning when tested.
Update 3/24/23: at the request of the operator (communicated by ABS), this deficiency has been extended until 4/24/23. The crew continues to troubleshoot and address some of the malfunctioning/inoperable light indicators at this time.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2023
Resolved 26 April 2023
Resolution: Per ABS report no. 5786590, both panels were lamp tested at this time in the presence of the attending ABS Surveyor and found satisfactory with all bulbs found illuminated.
05 - Radio Communications › N/A - No Subsystem › Operation of GMDSS equipment
Issued 10 March 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
At time of attendance on 10 March 2023, multiple radio equipment forming part of the GMDSS suite (examples: MF/HF, INMARSET-C, etc.) lists a date of 25 July 2003.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2023
Resolved 24 March 2023
Resolution: Per ABS report no. 5734103, a technician attended the vessel and updated the digital display to reflect the current date to the satisfaction of the attending Surveyor.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 10 November 2021
Resolved
Ships shall be provided with a main steering gear and an auxiliary steering gear to the satisfaction of the Administration.
Port steering pump inoperable.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 November 2021
Resolution: ABS statutory finding no. 1176 opened on 11/15/21. On 12/8/21, ABS report attests to pump motor being overhauled and reinstalled, and steering gear rested to the attending surveyor's satisfaction.
10 - Safety of Navigation › N/A - No Subsystem › Pilot ladders and hoist/pilot transfer arrangements
Issued 10 November 2021
Resolved
All arrangements used for pilot transfer shall efficiently fulfill their purpose of enabling pilots to embark and disembark safely. The appliances shall be kept clean, properly maintained and stowed and shall be regularly inspected to ensure they are afe for use [2.1]. Arrangements shall be provided to enable the pilot to embark and disembark safely on either side of the ship [3.1].
Starboard and port side accommodation ladders found with significant wastage/corrosion near turntable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2021
Resolution: ABS statutory finding no. 1177 opened on 11/15/21. On 12/8/21, ABS report attests to port ladder taken temporarily out of service pending permanent repairs at DD, and temp repairs completed to starboard ladder, with permanent repairs scheduled for DD.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 10 November 2021
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: [.1] structural fire protection, including fire-resisting divisions, and protections of openings in these divisions.
Starboard door on aft side of accommodation will not close and latch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2021
Resolution: ABS statutory finding no. 1178 opened on 11/15/21. On 12/8/21, ABS report attests that the door was adjusted and tested to the attending surveyor's satisfaction.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 November 2021
Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the Administration.
Light can be seen coming through the door from the galley to exterior and a section of the gasket has popped out of its seating on the door.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2021
Resolution: ABS statutory finding no. 1179 opened on 11/15/21. On 12/8/21, ABS report attests to that the gasket materiel was refitted and door verified weathertight to the attending surveyor's satisfaction.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 November 2021
Resolved
All electrical apparatus shall be so constructed and so installed that danger of injury in ordinary handling shall not exist.
Battery charger alarm system in electrical equipment room (#432) found with open junction box. Also, multiple light fixtures in engine room found broken/missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2021
Resolved 15 November 2021
Resolution: ABS statutory finding no. 1180 opened on 11/15/21. On 12/8/21, ABS report attests that junction box cover in overhead verified as installed to the satisfaction of the attending surveyor [name withheld] light covers on order for dry-dock.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 10 November 2021
Resolved
Maintenance, testing, and inspections shall be carried out based on the guidelines developed by the Organization (MSC Circ 1432) and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. Monthly inspections of fixed fire detection and alarm system shall to carried out to ensure that a sample of detectors are tested so that all devices have been tested within five years (MSC Circ 1432/5.10).
Periodical testing of heat detectors using proper equipment and procedures is not being carried out at requisite intervals.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2021
Resolved 15 November 2021
Resolution: ABS statutory finding no. 1181 opened on 11/15/21. On 12/8/21, ABS report attests to fire detection system procedures for periodic testing provided to attending surveyor and sampling of detectors tested satisfactorily.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 November 2021
Resolved
Watertight doors of satisfactory construction may be fitted in watertight bulkheads dividing cargo between deck spaces.
Watertight door for B deck ramp B5 found with hydraulic leak at connection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2021
Resolved 15 November 2021
Resolution: ABS statutory finding no. 1182 opened on 11/15/21. On 12/8/21, ABS report attests to replacement of the leaking hydraulic hose to the satisfaction of the attending surveyor.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 April 2021
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules. Deterioration of exterior insulation of SSDG exhaust trunk. Possible exhaust leak into confined space. 46 CFR 58.05-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2021
Resolved 21 April 2021
Resolution: See attached ACS report in this activity documents section.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 April 2021
Resolved
The termination of each cable must be sealed to prevent the entrance of electrolyte by spray or creepage. Dead end wires were found in the purifier room, forward bulkhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2021
Resolved 21 April 2021
Resolution: See attached ACS report in this activity documents section.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 1 April 2021
Resolved
It is the intent of this subpart that the accommodations provided for officers and crew on all vessels must be securely constructed, properly lighted, heated, drained, ventilated, equipped, located, arranged, and insulated from undue noise, heat, and odors. Drainage pipe coming from port side truck work shop was wasted. Location was approximately 5ft above the waterline.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2021
Resolved 21 April 2021
Resolution: See attached ACS report in this activity documents section.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 1 April 2021
Resolved
Main inlets and outlets of all ventilation systems shall be capable of being closed from outside the space in the event of a fire. Noted accommodation spaces had pull closure operation / inoperable and missing label.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2021
Resolved 21 April 2021
Resolution: See attached ACS report in this activity documents section.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 1 April 2021
Resolved
Each Administration shall, in accordance with the provisions of section A-I/14, hold companies responsible for the assignment of seafarers for service on their ships in accordance with the provisions of the present Convention, and shall require every such company to ensure that each seafarer assigned to any of its ships holds an appropriate certificate in accordance with the provisions of the Convention and as established by the Administration and its ships are manned in compliance with the applicable safe manning requirements of the Administration. Provide MMC for all crew members upon activation of vessel. STCW Reg I/14.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2022
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 1 April 2021
Resolved
Every crew member shall participate in at least one abandon ship drill and one fire drill every month. The drills of the crew shall take place within 24 hrs of the ship leaving a port if more than 25% of the crew have not participated in drills on board that particular ship in the previous month. Vessel unable to complete drills while in ROS status. Conduct drills upon activation of vessel. SOLAS 74 (2014) III/19.3.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2022
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 18 September 2020
Resolved
Each vessel must have the following equipment, A gyrocompass. Vessel reported that the gyrocompass was providing inaccurate readings while departing port. Prove proper operation to the attending class surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2020
Resolution: Received Radio Holland and ABS Reports attesting to the repair of the Gyro Compass
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 18 February 2020
Resolved
Prior to departure and upon activation provide valid crew licenses and documents.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 17 September 2020
Resolution: Inspected all crew licenses and document for vessel prior to vessel getting u/w for turbo activation.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 18 February 2020
Resolved
Upon activation and prior to departure conduct satisfactory fire and abandon ship drills.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 17 September 2020
Resolution: Witnessed satisfactory fire and abandon ship drill prior to vessel getting u/w for turbo activation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 February 2020
Resolved
Prove proper operation of port/aft cargo hold H/W float switch.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 March 2020
Resolution: Conducted satisfatory test of Float switch. All sat.
14 - Pollution Prevention › 141 - MARPOL Annex I › Segregation of oil and water ballast
Issued 18 February 2020
Resolved
Clean fwd and Starboard aft bilge wells in main cargo hold, and determine source of oily contamination in both locations.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 March 2020
Resolution: Attended vessel and inspected clean bilge wells. Origional source of spill was after pressing up F/O tanks with a failed gasket on holding tank. Tank gasket was replaced. All sat.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 17 October 2019
Resolved
Every crew member shall participate in at least one abandon ship drill and one fire drill every month. The drills of the crew shall take place within 24 h of the ship leaving a port if more than 25% of the crew have not participated in abandon ship and fire drills on board that particular ship in the previous month. Upon activation and prior to getting underway, conduct satisfactory fire and abandon ship drills. SOLAS (2014) III/19.3.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 September 2020
Resolution: witnessed drills.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 20 September 2019
Resolved
Each vessel of 10,000 gross tons or more must have, in addition to the radar system under § 164.35(a), a second marine radar system that operates independently of the first. Provide this office with Class Report attesting to the satisfactory condition of the newly install secondary radar.
Action required: 10 - Deficiency Rectified
Due 20 September 2019
Resolved 20 September 2019
Resolution: This deficiency was rectified on 20SEP2019. Port Engineer provided a copy of the Class Surveyor report via email, ALL SAT.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 20 September 2019
Resolved
Every officer in charge of a navigational watch serving on a seagoing ship of 500 gross tonnage or more shall hold a certificate of competency. Every officer in charge of an engineering watch in a manned engine-room or designated duty engineer officer in a periodically unmanned engine-room of a seagoing ship powered by main propulsion machinery of 750kw or more shall hold a certificate of competency. Upon activation and prior to getting underway, provide crew licenses and documents IAW vessel COI. STCW II/1 and STCW III/1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 September 2020
Resolution: Inspected licenses, all sat.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 26 May 2018
Resolved
Provide proof of and verify crew license, documents.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 June 2018
Resolved 9 January 2019
Resolution: Verified valid crew licenses and documents.
Operations/Management › Drills/Instruction › Fire
Issued 26 May 2018
Resolved
Complete Fire and Abandonship drills.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 June 2018
Resolved 9 January 2019
Resolution: Witnessed satisfactory fire and abandonship drill.