MAURY USCG vessel records
← All vessels

PHILADELPHIA

Built
1984
Last inspected
5 March 2012
Documentation
No record in the NVDC file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 5 March 2012
…with no type recorded63
…past their stated due date8
Operational controls None recorded without a removal date
Years with a record 28 calendar years (1984–2012)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8001191
234614
Flag
UNITED STATES
Maury page id
psix-234614

Documentation record

Tonnage as PSIX records it23913 - Regulatory (Subpart C or D), Gross Ton
28482 - Convention (Subpart B), Gross Ton
22947 - Regulatory (Subpart C or D), Net Ton
48067 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 181 inspections, each with its date, unit and type; 208 deficiencies with the resolution recorded against each, 13 without one; operational controls, none recorded without a removal date; 1 other vessel inspected with it; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

DBL 327 Tank Barge · MISLE 11199 · 17 March 2001 · activity 89844

Inspection history · 181

5 March 2012 Administrative Inspection
Administrative · Activities Europe · Activity 4256383
14 April 2010 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3716251
31 March 2010 Type not recorded
No type recorded · Activities Europe · Activity 3710925
29 March 2010 Drydock Extension · MTSA/ISPS Verification · Administrative Inspection
Physical examination · Activities Europe · Activity 3704619
2 March 2010 Deficiency Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3688709
28 January 2010 MARPOL Annex I Examination · MTSA/ISPS Verification · DAPI Audit · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3671715
13 July 2009 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3533547
12 June 2009 Administrative Inspection
Administrative · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3501696
28 April 2009 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3464386
31 March 2009 Annual Inspection · Ballast Water Examination · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3443893
19 July 2008 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3362922
3 July 2008 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3256558
23 May 2008 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3214250
27 April 2008 MARPOL Annex II Examination
Physical examination · Activities Europe · Activity 3193202
11 April 2008 Deficiency Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3182148
8 April 2008 Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3180178
29 February 2008 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3155993
6 February 2008 Type not recorded
No type recorded · Activities Europe · Activity 3157309
6 February 2008 Damage Survey
Physical examination · Activities Europe · Activity 3157354
10 January 2008 Damage Survey
Physical examination · Activities Europe · Activity 3127816
19 December 2007 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3118512
11 October 2007 Internal Structural Exam · Hull Examination · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3077711
11 September 2007 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3055252
11 September 2007 Administrative Inspection · Drydock Extension
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3055378
12 April 2007 Administrative Inspection · MARPOL Annex I Examination · Ballast Water Examination · Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2906578
7 December 2006 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2836237
13 July 2006 Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2711391
25 May 2006 Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2658719
1 August 2005 In-Service Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2447509
21 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2397950
2 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2376820
4 April 2005 Cargo Tank Internal
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2323295
14 March 2005 MTSA/ISPS Verification · COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2304977
10 March 2005 Underwater Inspection in lieu of Drydock · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2306846
7 March 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2324527
2 March 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2302315
18 February 2005 In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2298323
12 November 2004 Administrative Inspection
Administrative · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2238683
15 October 2004 In-Service Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2222864
29 September 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2208759
10 September 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2192307
28 June 2004 Deficiency Check
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2113909
11 June 2004 MTSA/ISPS Verification
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2097672
20 May 2004 Annual Inspection
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2073161
15 March 2004 MARPOL Annex II Examination · MARPOL Annex I Examination
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2024509
6 November 2003 In-Service Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1945852
8 October 2003 Deficiency Check · Damage Survey
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1927395
4 October 2003 Damage Survey
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1922330
4 October 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1925579
12 September 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1904340
29 July 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1862093
19 May 2003 Periodic Inspection
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1796881
19 April 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1787167
12 February 2003 Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1743838
9 December 2002 Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1716473
8 October 2002 Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1686786
27 September 2002 Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1681097
2 August 2002 Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1655761
23 April 2002 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1607926
19 April 2002 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1615724
12 April 2002 Drydock Extension
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1606248
24 July 2001 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1070771
2 May 2001 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1065995
6 April 2001 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1389348
17 March 2001 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 89844
15 December 2000 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1056942
11 April 2000 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1421842
3 April 2000 Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1466119
24 March 2000 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 276181
16 March 2000 Hull Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1470553
24 February 2000 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1448066
4 November 1999 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1433573
13 June 1999 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 807537
29 May 1999 Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1421676
2 March 1999 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 796980
2 January 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 44271
28 September 1998 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 798847
6 April 1998 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1434680
8 March 1998 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 453788
8 January 1998 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 411790
18 November 1997 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1109086
28 September 1997 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1115221
16 September 1997 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1108035
11 August 1997 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 406596
22 June 1997 Hull Examination · Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1441279
28 May 1997 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1108894
16 April 1997 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1392657
10 December 1996 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1092490
27 September 1996 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 177362
30 April 1996 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 153152
25 April 1996 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1363590
11 April 1996 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 669028
9 April 1996 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1435744
26 March 1996 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 122904
4 March 1996 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1078215
19 October 1995 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 873590
1 September 1995 Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 880540
29 August 1995 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 30391
18 July 1995 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1186143
14 June 1995 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 379289
14 June 1995 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 880328
2 June 1995 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 874439
13 May 1995 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 136239
13 May 1995 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 161356
13 May 1995 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 877057
4 May 1995 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 869331
4 May 1995 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 874072
26 April 1995 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 669025
19 April 1995 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1457256
10 April 1995 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 519844
10 April 1995 Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1157543
10 February 1995 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 60733
15 November 1994 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 491115
30 September 1994 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 438745
22 August 1994 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1173299
17 May 1994 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1335989
22 April 1994 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 859790
8 April 1994 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 858266
31 March 1994 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 53771
20 January 1994 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 492407
22 November 1993 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 843354
30 September 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 361222
7 September 1993 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1151656
5 September 1993 Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1139725
24 August 1993 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1151787
10 August 1993 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 15552
10 August 1993 Type not recorded
No type recorded · Commandant (CG-CVC) · Activity 1156035
16 July 1993 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1156443
4 July 1993 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1157658
23 June 1993 Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 849930
22 June 1993 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 846281
22 December 1992 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1135631
30 November 1992 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 513462
24 October 1992 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 944200
18 September 1992 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 934521
5 September 1992 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 938162
24 July 1992 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1269219
22 May 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 497087
20 April 1992 Hull Examination · COI Inspection · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 949349
22 August 1991 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 669015
5 August 1991 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 939057
24 July 1991 Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 941910
24 July 1991 Drydock Extension
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1263814
25 October 1990 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 913941
5 October 1990 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 930332
4 October 1990 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 918962
4 October 1990 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1217762
4 October 1990 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1218377
6 July 1990 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 914484
22 March 1990 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1214422
14 February 1990 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1228837
12 February 1990 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 436454
9 February 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1219803
7 November 1989 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1339798
3 July 1989 Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1208569
17 February 1989 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1347148
6 February 1989 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 899273
23 January 1989 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 891270
30 November 1988 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1205890
18 October 1988 MARPOL Annex II Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1198443
17 October 1988 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1197210
22 September 1988 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1041933
8 September 1988 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1043178
8 September 1988 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1348284
4 August 1988 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1040973
9 July 1988 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 900537
9 May 1988 Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1347946
15 January 1988 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1318380
27 August 1987 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1309444
16 August 1987 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1031317
27 July 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1331924
13 July 1987 Hull Examination · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1310237
5 March 1987 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 515228
9 October 1986 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 451048
24 August 1986 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 989249
10 July 1986 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 989033
26 March 1986 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 480711
2 August 1985 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1292268
17 July 1985 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 977806
9 May 1985 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1286640
12 June 1984 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1281466

Deficiency record · 208

Construction/Loadline › Hull › Side Shell
Issued 29 March 2010 No resolution recorded
crop & renew port side shell at frame 20 to 31 IWO Bos'n stores.
Action required: 705 - Other - as specified
Due 15 June 2010 — due date passed with no resolution recorded
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2010 No resolution recorded
renew rolled frame sections at 21,23,24,25,27, & 28 IWO Bos'n stores.
Action required: 705 - Other - as specified
Due 15 June 2010 — due date passed with no resolution recorded
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2010 No resolution recorded
crop & renew forward transverse blkhd of the cofferdam at frame 29. (approx area 6x3)
Action required: 705 - Other - as specified
Due 15 June 2010 — due date passed with no resolution recorded
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 29 March 2010 No resolution recorded
crop & renew forward transverse blkhd of the cofferdam at frame 30. (approx area 6x3)
Action required: 705 - Other - as specified
Due 15 June 2010 — due date passed with no resolution recorded
Construction/Loadline › Hull › Bracket
Issued 29 March 2010 No resolution recorded
renew the second port side horizontal bracket IWO cofferdam.
Action required: 705 - Other - as specified
Due 15 June 2010 — due date passed with no resolution recorded
Engineering › Bilge Water Management System › Eductor
Issued 29 March 2010 No resolution recorded
replace the seals in the 8 inch valve acuator.
Action required: 705 - Other - as specified
Due 15 June 2010 — due date passed with no resolution recorded
Engineering › Lubricating Oil Storage/Transfer System › Hose
Issued 29 March 2010 No resolution recorded
remove the obsolete hydraulic hose from the 4th level of the forepeak tank.
Action required: 705 - Other - as specified
Due 15 June 2010 — due date passed with no resolution recorded
Construction/Loadline › Penetrations › Valve Flange
Issued 29 March 2010 No resolution recorded
repair reachrod on 3rd level of forepeak tank. (or prove other means of opening)
Action required: 705 - Other - as specified
Due 15 June 2010 — due date passed with no resolution recorded
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 11 February 2010 No resolution recorded
Have all cargo piping, cargo vent fittings, cargo gauging/monitoring system, and cargo pumps available for testing and inspection by the attending CG marine inspector. Vessel is prohibited from engaging in bulk liquid cargo ops until this requirement has been cleared. 46 CFR 32/33 CFR 156.
Action required: 705 - Other - as specified
Deck/Cargo › Inert Gas System › Venting System
Issued 11 February 2010 No resolution recorded
Have the vessel's Inert Gas System available for testing and inspection by the attending CG marine inspector. Vessel is prohibited from operating this system until this requirement is cleared. 46 CFR 32.53
Action required: 705 - Other - as specified
Deck/Cargo › Vapor Control Systems › Vapor Recovery Unit
Issued 11 February 2010 No resolution recorded
Have the vessels Vapor Control System available for testing and inspection by the attending CG marine inspector. Vessel is prohibited from operating this system until this requirement is cleared. 46 CFR 39
Action required: 705 - Other - as specified
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Combustible Gas Indicator
Issued 11 February 2010 No resolution recorded
Have the vessels portable O2 & Combustible Gas Indicator and portable radio equipment tested and inspected to the satisfaction of the attending CG marine inspector. Vessel is prohibited from engaging in bulk liquid cargo ops until this requirement is cleared. 46 CFR 35.30
Action required: 705 - Other - as specified
Fire Fighting › Fixed Low-Expansion Foam Fire Extinguishing System › Piping
Issued 11 February 2010 No resolution recorded
Have the vessels deck foam fire fighting system available for testing and inspection by the attending CG marine inspector. Vessel is prohibited from engaging in bulk liquid cargo ops until this requirement is cleared.
Action required: 705 - Other - as specified
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Drum Safety
Issued 11 February 2010 Resolved
Prior to operating barge boiler complete all Periodic Safety Test Procedures for the boiler and demonstrate safety relief valves. Vessel is prohibited from operating this machinery until this requirement is cleared. 46 CFR 63.15-9 / 61.35-3
Action required: 705 - Other - as specified
Due 3 March 2010
Resolved 3 March 2010
Lifesaving › Launching Appliances › Winch Brake
Issued 28 January 2010 Resolved
Brake failed 1 out of 3 times. Drum appears to not be sitting properly. Vsl is permitted to proceed to Galveston to address problem. Original due date was 26Feb10 extended until 12Mar10. To be completed in and load test witnessed in Galveston Texas or other arrangements made with CG Galveston.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 March 2010
Resolved 2 March 2010
Documentation › Certificates/Documents › Stability Letter
Issued 31 March 2009 Resolved
The stability letter references a document identified as HEC Report No. 2008-44-01, Rev.1, Supplemental Damage Stability Calculations. The veesel was unable to produce this document. The vessel is to provide proof of this document and maintain a copy onboard.
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 28 April 2009
Resolution: Provided proof of vessels stability calcs
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 31 March 2009 Resolved
A new flow monitor has been installed as part of the Oil Discharge Monitoring Equipment, however the installation is not complete nor has the system been commissioned by class. The vessel is restricted from using the ODME until ABS attends the vessel and commissions the unit and the vessel provides a copy of the class survey report attesting to the same.
Due 31 July 2009
Resolved 16 October 2009
Resolution: See narrative.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 31 March 2009 Resolved
Prior to loading cargo in #1 port cargo tank repair the high level alarm and prove proper operation.
Action required: 705 - Other - as specified
Due 31 July 2009
Resolved 13 July 2009
Resolution: Proved proper operation of the #1 port cargo tank high level alarm.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 31 March 2009 Resolved
Provide blanks for two openings in the galley equipment 230 volt distribution panel.
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 28 April 2009
Resolution: C/E installed blanks in elec. panel.
Electrical › Lighting (service) › Ground Detection
Issued 31 March 2009 Resolved
Replace missing bulbs and light covers on electrical panels and controllers throughout the vessel as needed.
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 28 April 2009
Resolution: Missing covers installed.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 31 March 2009 Resolved
Numerous leaks exist throughout the hydraulic tubing runs on the barge deck. Trace out hydraulic lines and locate and repair all leaks.
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 28 April 2009
Resolution: Repaired leaks on deck of tank barge. No evidence of active leaking.
Lifesaving › Lifeboat › Propulsion Transmission
Issued 8 April 2008 Resolved
# 2 Port side lifeboat throttles do not operate properly. Vessel shall repair prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 April 2008
Resolved 12 April 2008
Resolution: Lifeboat swapped out with stand by spare, conducted operational test, all sat
Lifesaving › Launching Appliances › Davit
Issued 8 April 2008 Resolved
# 2 port side lifeboat limit switch inoperable. Repair prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2008
Resolution: Conducted operational test of limit switches both forth and aft both operated sat.
Deck/Cargo › Holds/Tanks › Tank Pressure Monitoring Device
Issued 8 April 2008 Resolved
Vessel could not test the cargo tank high pressure alarms connected to the vapor control system.
Action required: 705 - Other - as specified
Due 7 May 2008
Resolved 11 April 2008
Engineering › Diesel Engine (auxiliary) › Cylinder Liner
Issued 6 February 2008 Resolved
Make repairs to PORT Main Engine to satisfaction of ACTEUR. The vessel is permitted to depart Valetta Malta once the Coast Guard receives a Class report attesting to satisfactory condition of the starboard, right bank, #8 liner.
Due 15 February 2008
Resolved 11 February 2008
Resolution: PORT main engine repairs have not been made. ACTEUR approved voyage plan for vessel to sail under STBD engine to Sector NY zone for repairs. STBD engine inspection of #8 RB liner completed.
Engineering › Diesel Engine (auxiliary) › Connecting Rod
Issued 6 February 2008 Resolved
Make repairs to PORT main engine to satisfaction of attending USCG Marine Inspector. See ABS report K1952638 dated 10 Feb 2008.
Action required: 705 - Other - as specified
Due 15 March 2008
Resolved 20 March 2008
Construction/Loadline › Hull › Bottom Plating
Issued 10 January 2008 Resolved
Make permanent repairs to the cracked shell plate between frames 45-46 in #3 Port Double Bottom tank, under Classification Society oversight, prior to departure from Djibouti and no later than 10 February 2008.
Due 10 February 2008
Resolved 29 January 2008
Resolution: Repairs made to the #3 P DB tank. ABS witnessed repairs in Djibouti. See ABS Survey Report # DU944159.
Engineering › Steam Boiler (auxiliary/waste heat) › Mount
Issued 19 December 2007 Resolved
Vsl is required to conduct boiler mount inspection prior to boiler operation.
Action required: 705 - Other - as specified
Resolved 14 March 2008
Engineering › Steam System (auxiliary) › Piping
Issued 11 October 2007 Resolved
Conduct an internal exam of barge boiler (cargo heating boiler) including all fire side, water side and mounts. To be completed prior to using boiler for cargo operations.
Action required: 705 - Other - as specified
Resolved 19 December 2007
Resolution: Exam satisfactory.
Engineering › Steam System (auxiliary) › Piping
Issued 11 October 2007 Resolved
Conduct a hydrostatic pressure test of Barge Boiler. Must be completed prior to using boiler for cargo operations
Action required: 705 - Other - as specified
Resolved 19 December 2007
Resolution: Hydrostatic test completed.
Operations/Management › Cargo Transfer/Lightering › Cargo Tank Stripping
Issued 11 October 2007 Resolved
Amend vessels P & A Manual to reflect most recent stripping test results.
Due 6 February 2008
Resolved 28 April 2008
Operations/Management › Cargo Transfer/Lightering › Cargo Tank Stripping
Issued 11 October 2007 Resolved
Vessel must use a shore-based reception facility for the discharge of category "X" and "Y" NLS cargo residue when carried in cargo tanks 1,2, and 5 center. Due to residue level left in C/T 4 center (more than all NLS category allowance) all NLS (category X, Y and Z) cargo residues from 4 Center must be discharged ashore. These tanks failed to meet the minimum stripping residue levels.
Due 6 February 2008
Resolved 28 April 2008
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 26 May 2006 Resolved
Renew or repair tug boiler safety relief valves. Test/prove proper operation in the presence of a Coast Guard Marine Inspector. Prior to repairs, boiler shall be monitored during operation.
Action required: 705 - Other - as specified
Due 26 June 2006
Resolved 26 June 2006
Resolution: Renewed safety valves.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 14 March 2005 Resolved
Ensure CG Inspector attends the annual inspection of fixed fire fighting systems to ensure proper function.
Due 30 April 2005
Resolved 4 April 2005
Engineering › Pressure Vessel › Shell Plate
Issued 14 March 2005 Resolved
Open all pressure vessels and make ready for inspection during UWILD inspection.
Due 30 April 2005
Resolved 4 April 2005
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 14 March 2005 Resolved
Open and make ready for inspection during next cargo tank internal exam.
Due 30 April 2005
Resolved 4 April 2005
Construction/Loadline › Penetrations › Valve Flange
Issued 10 March 2005 Resolved
SC3, SC4, SC4A, OB1, OB2 AND OB3 ARE LOCATED IN THE COFFERDAM OF THE BARGE AND HAVE NOT BEEN INSPECTED VISUALLY OR INTERNALLY. THESE VALVES MUST BE INSPECTED AT NEXT US PORT.
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 12 April 2007
Resolution: Valves inspected, narrative to Activity number 2711391.
Construction/Loadline › Hull › Bottom Plating
Issued 10 March 2005 Resolved
Complete repairs to hull damage in way of port side bottom fore peak deep tank, port forward ballast and number 1 port double bottom ballast tank, see activity 1927395 and 1922330. Repairs completed considered temporary until complete survey can be completed with vessel on blocks.
Due 4 October 2007
Resolved 3 December 2007
Resolution: Cleared during vessel''s drydock in New York. Repairs completed to the satisfaction of the attending Marine Inspector and ABS Surveyors.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2005 Resolved
Grind out and reweld, weld where fractured (approx 8 inches) fourth frame aft port side (approx 2 feet port of centerline) where frame meets bottom plate in fore peak. Repairs are to be completed prior to UWILD or 11 Apr 05.
Due 11 April 2005
Resolved 10 March 2005
Resolution: Cleared by Sector Miami
Engineering › Steering Gear System › Pump
Issued 15 October 2004 Resolved
Repair and prove proper operation of port steering gear pump prior to departing Port Everglades.
Due 16 October 2004
Resolved 16 October 2004
Accommodation/Occupational Safety › Medical/First Aid
Issued 20 May 2004 Resolved
Update Medical Chest Medicines, provide Fax copy of updated medicines with letter from Master of the vessel. LEGACY COMPONENT DESC: Medicine Chest
Due 28 May 2004
Resolved 28 May 2004
Engineering › Steam System (auxiliary) › Lagging/Insulation
Issued 20 May 2004 Resolved
De-scale, renew fittings, amd make data plate readable if possible. Hydro test both Soot air blower air receivers. If data plates not readable tanks will need to be replaced.
Action required: 705 - Other - as specified
Due 24 June 2004
Resolved 29 June 2004
Resolution: Witnessed sat hydro test of both air receivers.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 20 May 2004 Resolved
M-sat retro fit cables run thru decks unsat. Properly run cable thru class A Deck IAW approved methods.
Action required: 705 - Other - as specified
Due 24 June 2004
Resolved 29 June 2004
Resolution: Verified proper installation for M-Sat cable.
Construction/Loadline › Hull
Issued 8 October 2003 Resolved
Submit repair proposal to complete temporary repairs to internal strength members where damaged along port side bottom fore peak deep trank, port forward ballast and Nr 1 port double bottom ballast tank.
Due 8 November 2003
Resolved 13 December 2003
Construction/Loadline › Structures
Issued 4 October 2003 Resolved
Make temporary repairs in forepeak to six inch tear in stringer and to bent frame under that tear to the satisfaction of the attending ABS surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 October 2003
Resolved 6 October 2003
Resolution: Temporary repairs were made.
Construction/Loadline
Issued 4 October 2003 Resolved
After offloading cargo in Port Everglades, FL, make permanent repairs as per the ABS class report, to the satisfaction of the attending ABS surveyor.
Due 15 October 2003
Resolved 8 October 2003
Resolution: Cleared and reissued item accepting temporary repairs.
Engineering › Steering Gear System
Issued 4 October 2003 Resolved
Make permanent repairs to the steering system to the satisfaction of the attending ABS surveyor.
Due 7 October 2003
Resolved 6 October 2003
Construction/Loadline › Hull
Issued 4 October 2003 Resolved
Prior to loading cargo after discharge in Port Everglades, FL, make full swim by of hull with divers to determine any other damage to the satisfaction of the attending ABS surveyor.
Due 15 October 2003
Resolved 8 October 2003
Lifesaving › Lifeboat
Issued 27 September 2002 Resolved
Perform hose test to port/stbd lifeboat doors to prove watertight integrity of same in the presence of marine inspector. LEGACY COMPONENT DESC: Hatches
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2002
Resolved 8 October 2002
Resolution: Cleared by MSO Houston.
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 20 September 2002 Resolved
Prior to using barge boiler in service, perform satisfactory hydrostatc test of boiler (to 150% MAWP due to recent tube plugging procedure) in presence of marine inspector. LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 20 October 2002
Resolved 8 October 2002
Resolution: Cleared by MSO Houston.
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 20 September 2002 Resolved
Cargo boiler water wall inspected by MSO Boston, deficiency noted. LEGACY COMPONENT DESC: Water Wall
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 October 2002
Resolved 8 October 2002
Resolution: Deficiency cleared, no leakes of water-wall noted.
Lifesaving › Lifeboat
Issued 20 September 2002 Resolved
MSO Boston issued deficiency for Lifeboat water tight doors. LEGACY COMPONENT DESC: Watertight Enclosure
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 September 2002
Resolved 8 October 2002
Resolution: Deficiency cleared by [name withheld].
Deck/Cargo
Issued 6 April 2001 Resolved
Repair excessive hydraulic leak at starboard side forward mooring winch. 33CFR 156.120(a)
Condition: Unknown
Due 6 April 2001
Resolved 6 April 2001
Lifesaving
Issued 6 April 2001 Resolved
Emergency Lighting lamp is missing bulb, located on port side bridge wing and illuminates port side embarkation area. 74 SOLAS III/19(a)(ii)
Condition: Unknown
Due 6 May 2001
Resolved 16 April 2001
Lifesaving
Issued 6 April 2001 Resolved
Port side lifeboat does not have an adequate watertight seal around the entry hatch. Lifeboat is self righting and must retain watertight integrity. 74 SOLAS Amended III/44.1
Condition: Unknown
Due 6 May 2001
Resolved 16 April 2001
Lifesaving
Issued 6 April 2001 Resolved
Repair #17 Emergency Light Station and prove proper operation.
Condition: Unknown
Due 6 May 2001
Resolved 16 April 2001
Accommodation/Occupational Safety
Issued 6 April 2001 Resolved
Repair loose railings located on the steps near the #1 fire pump and by thestarboard engine room console located in the engine room. ILO 147
Condition: Unknown
Due 6 May 2001
Resolved 16 April 2001
Fire Fighting
Issued 6 April 2001 Resolved
Vessel had two self closing fire doors that were not closing properly, located one deck below navigation bridge in stairwell. 74 SOLAS II-2/37(f)
Condition: Unknown
Due 6 May 2001
Resolved 16 April 2001
Engineering
Issued 6 April 2001 Resolved
Prove proper operation of Port and Starboard oily water seperator.
Condition: Unknown
Due 6 May 2001
Resolved 16 April 2001
Electrical
Issued 6 April 2001 Resolved
Demonstrate proper operation of emergency generator automatic bus transistor start. 74 SOLAS II-1/26
Condition: Unknown
Due 10 April 2001
Resolved 16 April 2001
Fire Fighting
Issued 6 April 2001 Resolved
Prior to cargo operations, replace Halon bottle for barge.
Condition: Unknown
Due 7 April 2001
Resolved 16 April 2001
Lifesaving
Issued 6 April 2001 Resolved
Ensure all acetylene bottles are properly secured. 46 CFR 147.60(b)
Condition: Unknown
Due 6 May 2001
Resolved 16 April 2001
Lifesaving
Issued 6 April 2001 Resolved
Take manual readings with portable Oxygen equipment every 1/2 hour during cargo operations until fixed Oxygen indicator on IGS system is repaired.
Condition: Unknown
Due 6 April 2001
Resolved 6 April 2001
Construction/Loadline
Issued 6 April 2001 Resolved
The watertight entry door into the forward BOSN hole did not have an adequate seal and day light was showing through to the internal compartmentwhen the door was dogged down. Must Repair prior to 06MAY01. _x001C_ ILLC 66 ANNEX 1/15
Condition: Unknown
Due 6 May 2001
Resolved 16 April 2001
Construction/Loadline
Issued 3 April 2000 Resolved
Crop & renew bottom plate, longs and stantions in #5 double bottom ballast tank just fwd of frame 63 approximately 8'x8' area IWO longs #3 and #4.
Condition: Unknown
Due 22 June 2002
Resolved 2 June 2003
Resolution: Vsl had credit dry dock in Sept. 2002
Fire Fighting
Issued 16 March 2000 Resolved
Properly label Gaylord fire supression system actuator at door on port side.
Condition: Unknown
Due 16 March 2000
Resolved 16 March 2000
Fire Fighting
Issued 16 March 2000 Resolved
Prove proper operation of fire sprinkler system on port lifeboat.
Condition: Unknown
Due 16 March 2000
Resolved 16 March 2000
Deck/Cargo
Issued 16 March 2000 Resolved
Effect permanent repairs to salt water pipe on Inert Gas System; spray nozzles to combustion chamber.
Condition: Unknown
Due 16 March 2000
Resolved 16 March 2000
Lifesaving
Issued 16 March 2000 Resolved
Provide additional alarm cards for automation system (4 each).
Condition: Unknown
Due 16 March 2000
Resolved 16 March 2000
Deck/Cargo
Issued 16 March 2000 Resolved
Install adequate audio alarm on thermal fluid heater in way of barge engineroom.
Condition: Unknown
Due 16 March 2000
Resolved 16 March 2000
Engineering
Issued 16 March 2000 Resolved
Make repairs to alarm light sockets on both boiler panels.
Condition: Unknown
Due 16 March 2000
Resolved 16 March 2000
Deck/Cargo
Issued 16 March 2000 Resolved
Make repairs to high water temp alarm in way of Number 1 cargo pump engine.
Condition: Unknown
Due 16 March 2000
Resolved 16 March 2000
Deck/Cargo
Issued 29 May 1999 Resolved
PROVE PROPER OPERATION OF HIGH LEVEL AND OVERFILL ALARMS PRIOR TO LOADING CARGO.
Condition: Unknown
Due 29 May 1999
Resolved 29 May 1999
Engineering
Issued 22 June 1997 Resolved
Test proper operation of Waste Heat boilers underway and their respective safety valves. [name withheld]. must provide documentation to CG Marine Inspector showing what pressure valves lifted at and what pressure they reset.
Condition: Unknown
Due 29 December 1997
Resolved 29 December 1997
Electrical
Issued 22 June 1997 Resolved
Renew battery charger for fire decection system.
Condition: Unknown
Due 29 December 1997
Resolved 29 December 1997
Unknown
Issued 22 June 1997 Resolved
Replace data plates on both port and stbd MSDs._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 December 1997
Resolved 29 December 1997
Unknown
Issued 16 April 1997 Resolved
Permission to enter the Port of New York on one MDE with an assist tug in all waters North of the Verrazano-Narrows Bridge and Outerbridge Crossing.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Engineering
Issued 16 April 1997 Resolved
Vessel may depart the Port of New York, conduct tank cleaning and ballast operations, reenter the Port of New York, offload cargo slops and proceed to GMD Shipyard for DD and repairs on one MDE with one tug escort. Vessel must prove proper op. of port MDE to attending CGMI or Class Surveyor.
Condition: Unknown
Due 18 May 1997
Resolved 24 April 1997
Engineering
Issued 16 April 1997 Resolved
Vessel may not conduct commercial operations until proper operation of PortMDE is proven to the satisfaction of the attending Coast Guard Marine Inspector or Class Surveyor.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Electrical
Issued 25 April 1996 Resolved
REPAIR STBD GENERATOR TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 29 April 1996
Resolved 29 April 1996
Engineering
Issued 9 April 1996 Resolved
Proceed to the Port of New York and make permanent repairs to the leaking port side stern tube seal to the satisfaction of the cognizant officer in charge marine inspection.
Condition: Unknown
Due 9 April 1996
Resolved 9 April 1996
Electrical
Issued 1 September 1995 Resolved
FAILURE OF THE INSULATION OF THE ELECTRICAL WINDINGS CAUSED AN ELECTRICAL SHORT INSIDE OF THE PORT SSDG, RESULTING IN THE LOSS OF THE PORT SSDG. PICTO NOTIFY THIS OFFICE UPON COMPLETION OF REPAIR/REPLACEMENT AND TO PROVIDE COPY OF CLASS SOCIETY REPORT.
Condition: Unknown
Due 8 September 1995
Resolved 11 September 1995
Construction/Loadline
Issued 13 May 1995 Resolved
ACQUIRE ABS AND COAST GUARD MIONY ACCEPTANCE FOR REPAIR TO DAMAGE IN #1 PORT DOUBLE BOTTOM WING BALLAST TANK INCURRED ON 13MAY95. _x001C_ _x001C_ ITEM #1 MUST BE COMPLETED BY NO LATER THAN 1600 15MAY95.
Condition: Unknown
Due 14 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 May 1995 Resolved
CONDUCTED PERMANENT REPAIR TO DAMAGE INCURRED DURING GROUNDING OF 13MAY95 DURING NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 13 May 1995
Resolved 13 May 1995
Lifesaving
Issued 10 April 1995 Resolved
Provide on board 8 exposure suits for a total of 27 exposure suits. Vesselis restricted from operating with more than 17 people on board above 32 degrees North and below 32 degrees South latitude in the Atlantic Ocean until all required exposure suits are on board. 46 C.F.R. 33.37.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Deck/Cargo
Issued 10 April 1995 Resolved
Repair hydraulic oil leaks in way of the barge's starboard anchor windless and the tug's stern capstan on the port side.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
Repair watertight door position indicator (open/closed) switch in way of the tug's starboard machinery trunk. 46 C.F.R. 170.270(e).
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
Make permanent repairs repairs to the port aft peak vnet line on the tug. The vent line has several weep holes.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Deck/Cargo
Issued 10 April 1995 Resolved
Troubleshoot audible/visual alarm indicators for the inert gas system generator. Visual alarm indicates only after audible alarm has been acknowledged.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Engineering
Issued 10 April 1995 Resolved
Make permanent repairs to the port side oily water separator and prove proper operation of same.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Lifesaving
Issued 10 April 1995 Resolved
Make proper repairs to deck rails on barge cargo deck port and starboard sides. 46 C.F.R. 32.03-10.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Accommodation/Occupational Safety
Issued 10 April 1995 Resolved
Provide and install a new cover for the marine sanitation device's holding tank. The holding tank is venting into the machinery space._x001C_
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Accommodation/Occupational Safety
Issued 10 April 1995 Resolved
Remove securing device from the starboard , aft engineer's escape scuttle and reinstall the ladder.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Lifesaving
Issued 10 April 1995 Resolved
Make necessary repairs to the barge's general alarm bells located behind the barge control room, forward of the cargo pump prime movers and next to the barge boiler lower lever. The bells are not loud enough.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Fire Fighting
Issued 10 April 1995 Resolved
Renew the barge B-V fire extinguisher hose at the reel connection. Hose iscracking/rotting.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
Port bow #12 knee bracket in way of fashion plate, fractured weld at deck connection. Repair using good marine practice.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Engineering
Issued 10 April 1995 Resolved
Make permanent repairs to the starboard stern tube seals not later than thenext scheduled underewater survey.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
Replace watertight access cover plate to port void on tug at 27 foot level.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Electrical
Issued 10 April 1995 Resolved
Provide and install two (02) blanks for the electric fuse panel indentifiedas "L-1" in way of the barge's DC heater.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Lifesaving
Issued 10 April 1995 Resolved
Post launching instructions at the number 1 inflatable life raft.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Deck/Cargo
Issued 10 April 1995 Resolved
Make permanent repairs to seawater supply line to the inert gas system's scrubber tower where leaking.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Engineering
Issued 10 April 1995 Resolved
Demonstrate the automatic transfer operation of #1 and #2 reduction gear lube oil pumps on the port side.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Engineering
Issued 10 April 1995 Resolved
Make permanent repairs to the #1 port reduction gear lube oil pump and prove proper operation of same.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Engineering
Issued 10 April 1995 Resolved
Make repairs to and demonstrate the operation of the LED read outs in way of the starboard side, 27 foot level, outboard of the boiler.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Engineering
Issued 10 April 1995 Resolved
Make necessary repairs to eliminate exhaust leaks from the starboard main diesel engine.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Fire Fighting
Issued 10 April 1995 Resolved
Provide the service report for the portable, semi-portable and fixed fire extinguishers. The fixed fire extinguishing system is to be serviced in the presence of a USCG marine inspector._x001C_ _x001C_
Condition: Unknown
Due 9 May 1995
Resolved 9 May 1995
Navigation
Issued 10 April 1995 Resolved
On vessel's maneuvering information fact sheet posted on the bridge, include maneuvering information for vessel in normal ballast condition. 33 C.F.R. 164.35(g)(6).
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Fire Fighting
Issued 10 April 1995 Resolved
Upon returning to St. Croix, U.S. Virgin Islands, conduct a fire/boat drillin the presense of local Coast Guard marine inspectors.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Engineering
Issued 10 April 1995 Resolved
Make permanent repairs to the steam condenser overboard discharge line on the starboard side not later than the next scheduled underwater survey.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Lifesaving
Issued 10 April 1995 Resolved
Remove all MAPP gas, paint and other flammables from engineer's stores unless a suitable fire proof locker is provided.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Fire Fighting
Issued 10 April 1995 Resolved
Remove obstructions from the fixed CO2 system located in the starboard hullmachinery space.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
Provide and install a new louver assemby with operating devices in the fan room on the tug.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Electrical
Issued 10 April 1995 Resolved
Provide and install a battery operated emergency light at the forward end of the fore/aft tunnel on the tug.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Lifesaving
Issued 10 April 1995 Resolved
Provide on board a suitable fire proof paint locker for the engineer's store room.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Construction/Loadline
Issued 8 April 1994 Resolved
MAKE PROPER REPAIRS TO AND PROVE PROPER OPERATION OF THE PORT OILY WATER SEPARATOR AND ASSOCIATED ALARMS.
Condition: Unknown
Due 27 July 1994
Resolved 27 July 1994
Deck/Cargo
Issued 8 April 1994 Resolved
MAKE PROPER REPAIRS TO AND PROVE PROPER OPERATION OF THE #2 CARGO PUMP PRIME MOVER OVERSPEED PROTECTION.
Condition: Unknown
Due 27 July 1994
Resolved 27 July 1994
Engineering
Issued 8 April 1994 Resolved
PROVE PROPER OPERATION OF THE REMOTE SHUTOFF TO THE STBD FORWARD IFO STORAGE TANK.
Condition: Unknown
Due 27 July 1994
Resolved 27 July 1994
Engineering
Issued 8 April 1994 Resolved
PROVE PROPER OPERATION OF THE PORT MAIN DIESEL ENGINE LEFT BANK TURBO LOW LUBE OIL SHUTDOWN AND ASSOCIATED ALARM.
Condition: Unknown
Due 27 July 1994
Resolved 27 July 1994
Deck/Cargo
Issued 23 June 1993 Resolved
PERFORM THE HYDRO TEST OF CARGO AND BUNKERING PIPING AND HOSES AS PER_x001C_ 33 CFR 156.170 (1.5 TIMES M.A.W.P.).
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Construction/Loadline
Issued 23 June 1993 Resolved
REINSTALL A WEATHERTIGHT DOOR AT THE LINE LOCKER ON TUG'S STERN DECK.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Lifesaving
Issued 23 June 1993 Resolved
RENEW THE STARBOARD LIFEBOAT CLUTCH OVER-RIDING ASSEMBLY AS NECESSARY AND SHOW PROPER OPERATION OF THE WINCH TO AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Fire Fighting
Issued 23 June 1993 Resolved
DEMONSTRATE PROPER OPERATION OF THE FIRE DETECTION SYSTEM TEST PANEL.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Electrical
Issued 23 June 1993 Resolved
DEMONSTRATE PROPER OPERATION OF THE AUTOMATIC ON-LINE FEATURE OF THE PORT SHIP'S SERVICE GENERATOR WHEN STARBOARD GENERATOR TRIPS OFF-LINE.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Electrical
Issued 23 June 1993 Resolved
CALIBRATE THE FREQUENCY AND VOLTAGE METERS ASHORE AND DEMONSTRATE PROPER OPERATION OF TEST PROCEDURE SPECIFICATIONS 6.3 AND 6.4. METERS ARE TO BE CALIBRATED ANNUALLY AS PER 46 CFR 61.40-6.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Navigation
Issued 23 June 1993 Resolved
INSTALL A SIGHT GLASS ON THE EMERGENCY HYDRAULIC FLUID RESERVOIR IN STEERING GEAR ROOMS AS PER SOLAS CHAP II-I, PART C, REGULATION 29.12.3
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Electrical
Issued 23 June 1993 Resolved
DEMONSTRATE PROPER OPERATION OF PORT SHIP SERVICE GENERATOR ALARM AT ECC. GENERATOR TRIPS BUT ONLY ALARM SHOWING TRIP IS LOW LUBE OIL ALARM.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Electrical
Issued 23 June 1993 Resolved
DEMONSTRATE PROPER OPERATION OF THE BARGE GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Electrical
Issued 23 June 1993 Resolved
DEMONSTRATE PROPER OPERATION OF THE BARGE GENERATOR LOW LUBE OIL PRESSURE ALARM AND TRIP.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Engineering
Issued 23 June 1993 Resolved
DEMONSTRATE PROPER OPERATION OF THE BARGE BOILER LOSS-OF-BLOWER SHUTDOWN.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Engineering
Issued 23 June 1993 Resolved
CALIBRATE BARGE AND TUG METERS AND GAUGES ANNUALLY AS PER 46 CFR 61.40-6.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Construction/Loadline
Issued 23 June 1993 Resolved
PROVE PROPER OPERATION OF THE OIL DISCHARGE MONITOR UNIT IN CARGO CONTROL ROOM ON BARGE.
Condition: Unknown
Due 23 June 1993
Resolved 23 June 1993
Engineering
Issued 18 September 1992 Resolved
PROVE PROPER OPERATION OF THE WRONG DIRECTION ALARMS IAW THE EEA AUTOMATIONPROCEDURES. _x001C_
Condition: Unknown
Due 20 October 1992
Resolved 20 October 1992
Engineering
Issued 18 September 1992 Resolved
REMOVE THE ECC SINGLE POINT FAILURE BELOW THE CONSOLE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Electrical
Issued 18 September 1992 Resolved
PROVE PROPER OPERATION OF THE "UNANSWERED ALARM" ON THE STBD CONSOLE IAW THE EEA AUTOMATION TEST PROCEDURES._x001C_ (TESTED JW/LUBE OIL/RG LUBE OIL LOW PRESSURE-ALL UNSAT)
Condition: Unknown
Due 20 October 1992
Resolved 20 October 1992
Engineering
Issued 5 September 1992 Resolved
PROVE PROPER OPERATION OF THE FOLLOWING IAW EEA ACCU TEST PROCEDURE (REV C)1.4-ENG. NEEDS ALARM, 1.5-CONSOLE POWER FAIL, 1.7-DEADMANS ALM; 1.8-UNACK. ALM, 5.2-FIRE ALM AND 7.2-HIGH BILGE LVL. ALM.
Condition: Unknown
Due 14 September 1992
Resolved 4 December 1992
Lifesaving
Issued 20 April 1992 Resolved
Provide 100% liferaft coverage for port and starboard sides, or provide a means for transporting suitable single liferaft from side to side.
Condition: Unknown
Due 20 April 1992
Resolved 20 April 1992
Engineering
Issued 20 April 1992 Resolved
Provide approved drawings addressing the comments in G-MSC-2 letter serial no. E-00410 of 7 August 1990 regarding the vessel's automation system, and comply with all comments pertaining to these drawings to the satisfaction of an attending marine inspector.
Condition: Unknown
Due 6 May 1992
Resolved 6 May 1992
Navigation
Issued 20 April 1992 Resolved
Repair vessel's digital depth sounder.
Condition: Unknown
Due 20 April 1992
Resolved 20 April 1992
Navigation
Issued 20 April 1992 Resolved
Repair vessel's 3cm radar.
Condition: Unknown
Due 20 April 1992
Resolved 20 April 1992
Engineering
Issued 20 April 1992 Resolved
Provide an approved automation test procedure for the new automation system.
Condition: Unknown
Due 17 June 1992
Resolved 17 June 1992
Accommodation/Occupational Safety
Issued 20 April 1992 Resolved
Provide approved drawings for bond strand air line on deck and comply with all commments pertaining to these drawings to the satisfaction of an attending marine inspector. The air line is not to be placed in service until the system has been approved.
Condition: Unknown
Due 20 April 1992
Resolved 20 April 1992
Navigation
Issued 20 April 1992 Resolved
Vessel is not to get underway until the gyro compass is fully operational. Contact the MSO Tampa watchstander and addvise when the gyro is operational.
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Lifesaving
Issued 24 July 1991 Resolved
END-FOR-END PORT AND STARBOARD LIFE BOAT FALLS. WEIGHT TEST FALLS UPON COMPLETION OF WORK.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Engineering
Issued 24 July 1991 Resolved
PROVE PROPER OPERATION OF BARGE'S BOILERS LOW WATER ALARM AND LOW LOW WATERTRIP IAW 46CFR62.35-20(B)(1).
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Engineering
Issued 24 July 1991 Resolved
PROVE PROPER OPERATION OF THE STBD MDE #1 REDUCTION GEAR L/O PUMP/MOTOR IAWTHE AUTOMATION TEST PROCEDURES.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Deck/Cargo
Issued 24 July 1991 Resolved
PROVIDE CURRENTLY CALIBRATED GAUGES FOR EACH CARGO PIPE AT THE MANIFOLD.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Deck/Cargo
Issued 24 July 1991 Resolved
USING COMPANIES STANDARD TEST PROCEDURE, PROVE PROPER OPERATION OF BALLAST DISCHARGE MONITOR.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Unknown
Issued 24 July 1991 Resolved
SUPPLY A WRITTEN PROCEDURE FOR DISCHARGE OF GARBAGE.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Deck/Cargo
Issued 24 July 1991 Resolved
PROVE PROPER OPERATION OF INERT GAS SYSTEM HIGH GAS TEMPERATURE SENSOR.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Navigation
Issued 24 July 1991 Resolved
PROVIDE CURRENTLY DATED CFR'S.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Engineering
Issued 24 July 1991 Resolved
PROVE PROPER OPERATION OF THE TUG'S BOILER LOW WATER ALARM AND LOW LOW WATER TRIP IAW 46CFR62.35-20(B)(1).
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Engineering
Issued 24 July 1991 Resolved
REPAIR/RENEW THE TUG INBOARD SAFETY VALVE. VALVE TO BE SET AND SEALED IAW 46CFR52.01-120 (C)(2).
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Electrical
Issued 24 July 1991 Resolved
PROVE PROPER OPERATION OF THE PORT AND STBD TUG SSDG OVERSPEED. TRIP SHALL ACTIVATE AT NMT 1380 RPM. IAW 46CFR111.12-156.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Lifesaving
Issued 24 July 1991 Resolved
HYDROSTATICALLY TEST ALL COMP0SIT WRAPPED ALUMINUM SCBA CYLINDERS FOR BOTH FIRE FIGHTING TEAMS WHICH HAVE NOT BEEN TESTED IN THE LAST THREE YEARS._x001C_
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Lifesaving
Issued 24 July 1991 Resolved
UPON COMPLETION OF INSTALLING 406 EPIRB, CONTACT FCC FOR NEW RADIOTELEPHONESAFETY CERTIFICATE. SUBMIT CERTIFICATE TO [name withheld], PR.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Lifesaving
Issued 24 July 1991 Resolved
PROVIDED CURRENTLY DATED BATTERIES FOR EACH FIRE FIGHTING OUTFIT FLASHLIGHT. FOUR FLASHLIGHTS REQUIRED FOR A TOTAL OF TWENTY-FOUR BATTERIES.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Navigation
Issued 24 July 1991 Resolved
REPAIR AND PROVE PROPER OPERATION OF SECONDARY MAST HEAD AND STERN LIGHTS.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Accommodation/Occupational Safety
Issued 24 July 1991 Resolved
REPAIR LADDER ON TUG LEADING FROM PORT EMBARKATION DECK TO BARGE CONNECTIONDECK.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Lifesaving
Issued 24 July 1991 Resolved
PROVIDE TWELVE CURRENTLY DATED RED HAND HELD FLARES FOR BRIDGE PYROTECHNICS.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Deck/Cargo
Issued 24 July 1991 Resolved
PROVE PROPER OPERATION OF THE #3 CARGO PUMP DIESEL PRIME MOVER'S OVERSPEED TRIP IAW 46CFR58.05-1(A).
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Engineering
Issued 24 July 1991 Resolved
PROVE PROPER OPERATION OF THE STBD OWS SENSOR OPERATION IAW 33CFR155.380
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Engineering
Issued 24 July 1991 Resolved
CALIBRATE THE STEAM PRESSURE GAUGES FOR THE TUG AND BARGE BOILERS.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Accommodation/Occupational Safety
Issued 24 July 1991 Resolved
RE-PIPE THE STBD MSD EFFLUENT SYSTEM IAW 33CFR159.7
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Deck/Cargo
Issued 24 July 1991 Resolved
REMOVE 6" CARGO HOSE FROM VESSEL.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Lifesaving
Issued 24 July 1991 Resolved
PROVIDE EMBARKATION LIGHTS FOR THE PILOT LADDER ON PORT AND STARBOARD SIDE.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Fire Fighting
Issued 24 July 1991 Resolved
PROVIDE AND POST ON THE TUG A FIRE CONTROL PLAN FOR THE ITB UNIT.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Engineering
Issued 24 July 1991 Resolved
REPAIR FUEL CONTAINMENT DRAIN PLUG FITTINGS AND PROVIDE APPROPRIATE PLUGS.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Electrical
Issued 24 July 1991 Resolved
REPLACE BARGE EMERGENCY ELECTRICAL DISCONNECT BOX AND PROVE PROPER OPERATION.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Deck/Cargo
Issued 24 July 1991 Resolved
HYDRO ALL CARGO PIPING.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Lifesaving
Issued 24 July 1991 Resolved
STRIP AND CLEAN BOTH PORT AND STARBOARD LIFE BOATS AND REPLACE ALL OUTDATEDEQUIPMENT AS NEEDED IAW 46CFR97.15-45.
Condition: Unknown
Due 19 December 1991
Resolved 19 December 1991
Lifesaving
Issued 24 July 1991 Resolved
PROVIDE TWELVE HAND HELD RED FLARES FOR PORT AND STARBOARD LIFE BOATS FOR ATOTAL OF TWENTY-FOUR. PROVIDE NEW CANNED MILK FOR PORT LIFE BOAT. PROVIDE SIX DATED BATTERIES FOR EACH LIFE BOAT FOR A TOTAL OF TWELVE.
Condition: Unknown
Due 19 December 1991
Resolved 19 December 1991
Lifesaving
Issued 24 July 1991 Resolved
PROVIDE LIFE RAFT LAUNCHING PROCEDURES FOR AFT LIFE RAFT.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Lifesaving
Issued 24 July 1991 Resolved
PROVIDE FOUR CURRENTLY DATED LINE THROWING ROCKETS.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Fire Fighting
Issued 24 July 1991 Resolved
CLEAN AND GREASE CROSSOVER VALVES BETWEEN TUG AND BARGE. REPLACE WORN CROSSOVER HOSE.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Lifesaving
Issued 24 July 1991 Resolved
PROVIDE AND POST LIFE BOAT LAUNCHING INSTRUCTIONS FOR BOTH BOAT.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Fire Fighting
Issued 24 July 1991 Resolved
PROVIDE FOAM ANALYSIS FOR PROTEIN.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Fire Fighting
Issued 24 July 1991 Resolved
SERVICE ALL FIXED, SEMI-PORTABLE, AND PORTABLE EXTINGUISHERS. UPON COMPLETION SEND SERVICE REPORT TO U.S. COAST GUARD ST. CROIX.
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Deck/Cargo
Issued 4 October 1990 Resolved
PROVE PROPER OPERATION OF REMOTE CARGO PUMP SHUTDOWNS FOR CARGO MANIFOLD.
Condition: Unknown
Due 4 October 1990
Resolved 4 October 1990
Deck/Cargo
Issued 4 October 1990 Resolved
PROVE PROPER OPERATION OF REMOTE CARGO PUMP SHUTDOWN FOR CARGO MANIFOLD
Condition: Unknown
Due 4 October 1990
Resolved 4 October 1990
Deck/Cargo
Issued 6 July 1990 Resolved
MAKE DC HEATER READY FOR INTERNAL INSPECTION.
Condition: Unknown
Due 6 July 1990
Resolved 6 July 1990
Electrical
Issued 6 July 1990 Resolved
PROVIDE SUITABLE BLANKS FOR THE FOLLOWING ELECTRICAL DISTRIBUTION PANELS: MAIN DECK LIGHTING STBD SIDE, EMERGENCY LIGHTING PANEL #4, GALLEY-LAUNDRY PANEL, GALLEY EQUIPMENT 230 VOLT PANEL
Condition: Unknown
Due 6 July 1990
Resolved 6 July 1990
Electrical
Issued 6 July 1990 Resolved
PROPERLY SUPPORT ELECTRICAL CABLE OVERHEAD IN STBD PLENUM SPACE.
Condition: Unknown
Due 6 July 1990
Resolved 6 July 1990
Engineering
Issued 6 July 1990 Resolved
PROVE PROPER OPERATION OF PORT OILY WATER SEPARATOR PRIOR TO DISCHARGING OVERBOARD THROUGH THIS UNIT.
Condition: Unknown
Due 6 July 1990
Resolved 6 July 1990
Fire Fighting
Issued 9 February 1990 Resolved
RECHARGE THE HALON BOTTLE THAT IS LOW FOR THE SYSTEM WHICH SERVES THE VSL CARGO PUMP ENGINE ROOM. MUST BE COMP. TO [name withheld] PRIOR TO DEPARTING NEW YORK HARBOR. DURING ALL TIMES OF CARGO TRANSFER, MAINTAIN FIRE WATCH & PROVIDE 100# SEMI-PORT CO2 EXTGUISHER FOR ENGINE ROOM.
Condition: Unknown
Due 9 February 1990
Resolved 9 February 1990
Engineering
Issued 9 July 1988 Resolved
PROVIDE APPROPRIATE SAFETY VALVE GAG FOR BARGE BOILER SAFETY VALVES.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Engineering
Issued 9 July 1988 Resolved
UPON APPROVAL OF WASTE HEAT BOILERS, SET SAFETY VALVES AT SEA, MAKE AN OFFICIAL LOG ENTRY GIVING DATE TESTED, PRESSURE LIFTED AND SET. AT NEXT PORT, NOTIFY LOCAL [name withheld] CAN BE SEALED.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Electrical
Issued 9 July 1988 Resolved
PROVIDE ADEQUATE GENERAL ALARM BELLS AND FLASHING RED LIGHTS ON THE 11'6 LEVEL OF TUG'S PORT AND STBD ENGINE ROOMS.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Fire Fighting
Issued 9 July 1988 Resolved
RELOCATE CONTROLS FOR PAINT LOCKERS CO2 SYSTEM TO A REMOTE LOCATION.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Fire Fighting
Issued 9 July 1988 Resolved
PROVIDE MSO HAMPTON ROADS WITH APPROVED PLANS FOR NEW HALON SYSTEMS FOR TUGAND BARGE ENGINE ROOMS.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Fire Fighting
Issued 9 July 1988 Resolved
UPON APPROVAL OF HALON SYSTEM SUBMIT REVISED FIRE CONTROL PLAN TO MSO HAMPTON ROADS FOR APPROVAL.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Lifesaving
Issued 9 July 1988 Resolved
MAKE RING BUOYS WITH WATERLIGHT AND SELF-ACTIVATED SMOKE SIGNAL CAPABLE OF QUICK RELEASE FROM BRIDGE.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Lifesaving
Issued 9 July 1988 Resolved
REPLACE VESSEL'S 30 FITZ-WRIGHT EXPOSURE SUITS WITH EXPOSURE SUITS THAT ARE PROPERLY MARKED WITH USCG APPROVAL NUMBER.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Engineering
Issued 9 July 1988 Resolved
SUBMIT PLANS FOR APPROVAL OF PORT AND STBD WASTE HEAT BOILERS;UPON RECEIPT OF APPROVED PLANS, SUBMIT COPY TO MSO HAMPTON ROADS.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Engineering
Issued 9 July 1988 Resolved
UPON RECEIPT OF PLAN APPROVAL OF WASTE HEAT BOILERS, NOTIFY LOCAL [name withheld] CAN BE STAMPED WITH USCG SEAL. IF BOILERS ARE NOT DOWN-GRADED,MAKE AVAILABLE FOR 1 1/2 MAWP HYDROSTATIC TEST.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Construction/Loadline
Issued 9 July 1988 Resolved
CLEAN AND MAKE READY FOR INSPECTION #1P & #2S DOUBLE BOTTOM BALLAST TANKS.
Condition: Unknown
Due 9 July 1988
Resolved 9 July 1988
Unknown
Issued 13 July 1987 Resolved
TEST RELIEF VALVES FOR TUG AND BARGE S/S AIR RECEIVERS AND TUG ECONOMIZER RELIEF VALVES.
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Unknown
Issued 13 July 1987 Resolved
PERFORM OVERSPEED AND LOW LUBE OIL TRIPS OR BARGE PRIME MOVERS (CAT 399 DIESELS).
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Unknown
Issued 13 July 1987 Resolved
MAKE ALL CARGO TANKS AVAILABLE FOR INSPECTION AT NEXT DRYDOCK BUT IN NO CASE LATER THAN SIX MONTHS FROM THIS DATE.
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Unknown
Issued 13 July 1987 Resolved
CALIBRATE ALL RUDDER ANGLE INDICATORS TO MATCH DEGREES ON RUDDER STOCK.
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Electrical
Issued 10 July 1986 Resolved
REMOVE THE WIRING LUGS ON THE ENGINE ROOM CONTROL ROOM'S GEN'L ALARM DISTRIBUTION CKT AND CONNECT IN ACCORDANCE WITH SUBCHAPTER "J" (USCG REPS).
Condition: Unknown
Due 10 July 1986
Resolved 10 July 1986
Engineering
Issued 10 July 1986 Resolved
PROVE PROPER OPERATION OF HIGH OXYGEN AUDIBLE ALARM. VISUAL ALARM TESTED SATISFACTORY, BUT NO AUDIBLE.
Condition: Unknown
Due 10 July 1986
Resolved 10 July 1986
Accommodation/Occupational Safety
Issued 10 July 1986 Resolved
PROVIDE A RELIEF VALVE WITH HAND RELIEF CAPABILITY ON THE S/S AIR RECEIVER IN THE STARBOARD ENGINE ROOM, SET AT A PRESSURE NO GREATER THAN THE MAWP OFTHE AIR RECEIVER.
Condition: Unknown
Due 10 July 1986
Resolved 10 July 1986
Electrical
Issued 10 July 1986 Resolved
PROVIDE CIRCUIT DIAGRAMS FOR THE MAIN AND 2 DISTRIBUTION GENERATOR ALARM DISTRIBUTION BOXES.
Condition: Unknown
Due 10 July 1986
Resolved 10 July 1986
Engineering
Issued 10 July 1986 Resolved
RESET AND SEAL THE BOILER SAFETY VALVE FOR THE AUXILIARY BOILERS IN THE STARBOARD ENGINE ROOM AND AFT MACHINERY (INCLUDING THE CHEEK PLATES).
Condition: Unknown
Due 10 July 1986
Resolved 10 July 1986
Engineering
Issued 10 July 1986 Resolved
EITHER PERMANENTLY SEAL BY WELD THE BOLTED ACCESS PLATE TO THE INDEPENDENT EMERGENCY GENERATOR FUEL OIL DAY TANK OR PROVIDE DOCUMENTATION THAT THIS INSTALLATION WAS ACCEPTABLE TO PLAN APPROVAL.
Condition: Unknown
Due 10 July 1986
Resolved 10 July 1986
Electrical
Issued 17 July 1985 Resolved
EFFECT PERMANENT REPAIRS TO THE BARGE GENERATOR OVER SPEED DEVICE AND PROVEOPERATION TO THE SATISFACTION OF THE COGNIZANT [name withheld] 31JUL85.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Electrical
Issued 17 July 1985 Resolved
IF THE BARGE GENERATOR IS USED BEFORE ITEM E1 IS SATISFIED A LIVE WATCH WILL BE PROVIDED DURING GENERATOR OPERATION.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Deck/Cargo
Issued 12 June 1984 Resolved
ALL BUTTERFLY VALVES IN THE INERT GAS SYS CARGO TK FRESH AIR PURGE SYS & CARGO TK SLOPS PIPING ARE TO BE OPENED
Condition: Unknown
Due 12 June 1984
Resolved 12 June 1984

Ownership record