Records from 2002 to 2026. Most recent: inspection, 4 May 2026.
Inspection history · 25
4 May 2026
Examination of Repairs · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8367577
30 April 2026
Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8355427
3 March 2025
COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8084144
16 September 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8001928
22 May 2024
Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7917306
5 April 2023
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7663045
14 September 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7559031
16 February 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7397472
26 May 2021
Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7207554
6 May 2021
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7190372
5 March 2020
Internal Structural Exam · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6918944
6 December 2019
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6879148
4 November 2019
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6849382
16 September 2019
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6812878
1 October 2018
Damage Survey · Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6567205
26 September 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6549366
10 January 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6335463
21 August 2017
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6247574
18 July 2017
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6222033
4 April 2017
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6118065
7 February 2017
Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6088092
30 November 2016
In-Service Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6049759
23 July 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5952226
23 July 2016
Damage Survey · In-Service Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5952910
6 June 2016
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5898694
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 April 2026
Resolved
"The general construction of the vessel must be such as to minimize fire hazards insofar as it is reasonable and practicable." MI observed gasket peeling from stbd E/R hatch for ventilation closure.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2026
Resolved 7 May 2026
Resolution: Observed proper repair and installation of gasket.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 April 2026
Resolved
"Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel, and free from exposure to water splash or spray." MI observed battery bank fastener with incorrect hardware in stbd E/R.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2026
Resolved 7 May 2026
Resolution: Observed battery bank properly secured with proper equipment.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 April 2026
Resolved
"Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock" MI observed electrical cracked 110V switch box in stbd E/R.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2026
Resolved 7 May 2026
Resolution: Observed new installed swith box.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 April 2026
Resolved
"...The piping must be properly supported by noncombustible hangers or blocks." MI observed broken bracket for the wet exhaust in the port E/R.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2026
Resolved 7 May 2026
Resolution: Observed repaired bracket and exhaust properly secured.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 April 2026
Resolved
MI observed popped weld in the port fuel space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2026
Resolved 7 May 2026
Resolution: Observed proper v and weld completed.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 5 April 2023
Resolved
The construction and arrangement of a vessel must allow
the safe operation of the vessel in accordance with the
terms of its Certificate of Inspection giving
consideration to provisions for a seaworthy hull. A
cracked weld was noted in the STBD fore peak at the
joint between deck plating and a transverse frame.
Submit repair plan and complete repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 April 2023
Resolution: Cracked weld was grinded out and re-welded.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 5 April 2023
Resolved
The construction and arrangement of a vessel must allow
the safe operation of the vessel in accordance with the
terms of its Certificate of Inspection giving
consideration to provisions for a seaworthy hull. A
cracked weld was noted on the forward transverse
bulkhead in the STBD generator room. Submit repair plan
and complete repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 April 2023
Resolution: Cracked weld wad re-welded and tested with dye penetrant. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 April 2023
Resolved
All observed hazardous situations must be corrected. Two
bottom steps from the upper deck to main deck were
unstable and require weld repairs to ensure passenger
safety. One step has a crack in the middle and one has a
joint that is not fully welded. Submit repair plan and
complete repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 April 2023
Resolution: New steps were installed. All sat.
01 - Certificates & Documentation › 012 - Crew Certificates › Record of employment
Issued 5 March 2020
Resolved
Vessel must provide drug and alcohol program enrollment certificates for crew.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 March 2020
Resolved 9 March 2020
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 5 March 2020
Resolved
The name of the vessel must marked on some clearly visible exterior part of the port and starboard and stern of the vessel. The hailing port of the vessel must be clearly visible on the stern. Vessel is not marked with name on port and starboard bow or hailing port on the stern.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 March 2020
Resolved 9 March 2020
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 5 March 2020
Resolved
Piping for vital systems must be metallic. Bilge piping check valves are currently PVC.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2020
Resolved 9 March 2020
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 5 March 2020
Resolved
Starboard side generator has oil leak and excess oil and lube underneath.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2020
Resolved 16 March 2020
Resolution: No oil noticed under the STBD generator, Inspector test ran generator and found all SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 5 March 2020
Resolved
Remove or relocate excess oil storage out of machinery spaces.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 March 2020
Resolved 16 March 2020
Resolution: Excess oil was removed out of all machinery spaces.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 4 November 2019
Resolved
VESSELS OF AT LEAST 5 NET TONS, ENGAGING IN COASTWISE TRADE SHALL HAVE A CERTIFICATE OF DOCUMENTATION
(C.O.D.). THE VESSELS C.O.D. WAS EXPIRED AND A NEW ONE HAD NOT BEEN APPLIED FOR.
46CFR67.7
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 November 2019
Resolved 16 December 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 16 September 2019
Resolved
The owner or managing operator shall make a vessel available for drydock examinations, internal structural examinations, and underwater surveys (UWILD) required by this section. The vessel missed its dry dock and internal structural examination date. DD/ISE must be completed prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 September 2019
Resolved 4 November 2019
Resolution: Vessel is currently in process of completing DD/ISE per MISLE Case # 6849382.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 1 October 2018
Resolved
Excessive corrosion identified under the sewage tank. Repair pitted wet deck, transition plates and inboard side shells in laz.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 November 2018
Resolution: Repair work complete.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 30 November 2016
Resolved
Prove proper operation of #3 jet drive controls.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2016
Resolved 7 December 2016
Resolution: Attened vessel.
Engineering › Reduction Gearing/Clutches › Hose
Issued 30 November 2016
Resolved
Replace hydraulic hose on #2 jet drive on ram for bucket control.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2016
Resolved 7 December 2016
Resolution: Attened vessel.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 30 November 2016
Resolved
Fabricate and install fire damper for heater room.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 December 2016
Resolved 30 December 2016
Resolution: Complete
Construction/Loadline › Hull › Hull Plating
Issued 23 July 2016
Resolved
Crop and renew 6'x2' inset in the port bow.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 July 2016
Construction/Loadline › Structures › Deck Plating
Issued 23 July 2016
Resolved
Crop and renew 7'x4' upset area of port bow deck in way of the man overboard ladder.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 July 2016
Communications › Radio Communications › EPIRB
Issued 23 July 2016
Resolved
Re-mount EPIRB in float free position and replace expired registration decal.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 July 2016
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 23 July 2016
Resolved
Verify Validity or renew Comunications act Safety Radio and Bridge to Bridge Telephony Certificates.
Condition: Invalid
Action required: 705 - Other - as specified
Due 6 August 2016
Resolved 28 July 2016
Construction/Loadline › Hull › Transverse Frame
Issued 23 July 2016
Resolved
Vee and weld all cracked welds in the port forward void including 3 welds in Bay 1, 1 weld in Bay 2, and 2 welds in Bay 3.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 28 July 2016
Stability › Watertight Integrity › General
Issued 6 June 2016
Resolved
Affect temporary repairs for STBD quarter deck plate cracks. Make hull water tight.
Action required: 705 - Other - as specified
Due 6 June 2016
Resolved 6 June 2016
Resolution: Corrected by welders on the spot.
Stability › Watertight Integrity › General
Issued 6 June 2016
Resolved
Crop and renew STBD quarter deck plate.
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Inspector attended the vessel and verified that the STBD quarter deck plate had been properly cropped and renewed.
Engineering › Diesel Engine (propulsion-electric) › Exhaust Manifold
Issued 6 June 2016
Resolved
Replace damaged exhaust lagging on all propulsion engines.
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Inspector attended the vessel and verified the exhaust lagging on the propulsion engines had been properly replaced.
Documentation › Logs/Records › Logbook (official)
Issued 6 June 2016
Resolved
Ensure proper logging of all monthly EPIRB tests.
Action required: 705 - Other - as specified
Due 6 July 2016
Resolved 15 June 2016
Resolution: Inspector attended vessel and ensured logging of monthly EPIRB tests were documented.