MAURY USCG vessel records
← All vessels

AMPARO PAOLA

AMPARO PAOLA is a 1983 freight ship. The Coast Guard has recorded 31 inspections since 2016, most recently in February 2023, along with 26 deficiencies — 1 with no resolution recorded — and 3 operational controls.

Records from 2016 to 2023. Most recent: inspection, 2 February 2023.

Built
1983
Last inspected
2 February 2023
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 2 February 2023
…with no type recorded5
Operational controls None recorded without a removal date
Years with a record 8 calendar years (2016–2023)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8203634
238252
Flag
MEXICO
Maury page id
psix-238252

Documentation record

Tonnage as PSIX records it13810 - Dead Weight, Metric Ton
9299 - Convention (Subpart B), Gross Ton
18691 - Displacement, Metric Ton
3033 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 31

2 February 2023 Deficiency Check · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7623901
26 January 2023 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7627449
21 January 2023 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7624910
12 November 2022 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7592366
11 May 2022 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7444962
5 February 2022 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7387825
27 September 2021 Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7318632
29 July 2021 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7266261
2 December 2020 Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7103845
1 December 2020 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7104851
16 November 2020 PSC B
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7092401
24 August 2020 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7041642
23 June 2020 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6985412
15 May 2020 Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6953640
28 April 2020 PSC A
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6944065
12 February 2020 Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6907880
31 January 2020 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6902220
21 January 2020 PSC A
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6891027
13 September 2019 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6811318
8 August 2019 Ballast Water Examination · PI Safety Exam · ISPS III Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6776516
19 July 2019 Deficiency Check · MARPOL Annex I Examination · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6754998
19 July 2019 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6767813
22 June 2019 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6721837
28 May 2019 Ballast Water Examination · Deficiency Check · Administrative Inspection · ISPS III Exam · PII Safety Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6691604
7 October 2018 ISPS III Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6553819
30 January 2018 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6346013
8 October 2017 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6283506
22 September 2017 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6272614
8 September 2016 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5995610
6 June 2016 Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5898991
14 April 2016 Deficiency Check · ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5850383

Deficiency record · 26

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 February 2023 No resolution recorded
The Condition of the ship and its equipment shall be maintained to confirm with the provisions of the present regulations to ensure the ship in all aspects will remain fir to proceed to sea without danger to the ship or persons on board. PSCO observed the following the steering: Pump Combination Nos. 2 & 3: 1. Steering Gear was found to function normally through a full range of motion in Follow-Up and Non-Follow-Up modes in both Steering Systems Nos. 1 & 2. 2. Steering Gear was operationally tested in Auto-Pilot in both Steering Systems Nos. 1 & 2 and considered satisfactory. Pump Combination Nos. 1 & 2: 1. Steering Gear was operationally tested through a full range of motion in Follow-Up and Non-Follow-Up modes in both Steering Systems Nos. 1 & 2 and found as follows: 1. System No. 1, Follow-Up Mode - Port Rudder satisfactory, however the Starboard Rudder was found to hunt over 2-3 degrees for a period of 1-2 seconds before settling on the given command. 2. System No. 1, Non-Follow-Up Mode - Starboard Rudder satisfactory, however the Port Rudder was found out of alignment by approximately 5 degrees to starboard. 3. System No. 2, Follow-Up Mode - Port Rudder satisfactory, however the Starboard Rudder was found to hunt over 2-3 degrees for a period of 1-2 seconds before settling on the given command. 4. System No. 2 - Non-Follow-Up Mode - Satisfactory through full range of motion 2. Steering Gear was operationally tested in Auto-Pilot in both Steering Systems Nos. 1 & 2 and considered satisfactory. Pump Combination 1 & 3: 1. Steering Gear was operationally tested through a full range of motion in Follow-Up and Non-Follow-Up modes in both Steering Systems Nos. 1 & 2 and found as follows: 1. System No. 1, Follow-Up Mode - Unsatisfactory. Port and Starboard Rudders were found out of alignment. 2. System No. 1, Non-Follow-Up Mode - Unsatisfactory. Port and Starboard Rudders were found out of alignment. 3. System No. 2, Follow-Up Mode - Satisfactory through full range of motion 4. System No. 2 - Non-Follow-Up Mode - Unsatisfactory. Port and Starboard Rudders were found out of alignment.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 29 July 2021 Resolved
After any survey of the ship under Regulations 7, 8, 9, or 10 of this Chapter has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. PSCO noted lagging on both main engines was oil soaked.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2021
Resolved 27 September 2021
Resolution: Vessel replaced lagging.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 November 2020 Resolved
After survey of the ship, no change shall be made to machinery covered by survery without sanction of the Administration; Starbord main engine cylinder head #4 is leaking oil through seals.
Action required: 15 - Rectify deficiencies by next port
Due 16 November 2020
Resolved 2 December 2020
Resolution: ABS classification society survey report recieved.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 April 2020 Resolved
The machinery associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. The mounting hardware for the salt water cooling piping is deteriorated and does not meet design specifications.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 7 May 2020
Resolved 10 May 2020
Resolution: Pipe was replaced by a new piece. Operationally tested and considered satisfactory by class.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 28 April 2020 Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards shall be ensured. Numerous light fixture installations throughout the vessel are missing covers.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 7 May 2020
Resolved 10 May 2020
Resolution: Plastic covers on applicable light fixtures were replaced by new pieces.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 January 2020 Resolved
74SOLAS(UNAM) II-2/33(a) In a ship in which oil fuel is used the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO observed a leacking seal on fuel oil transfer pumpleading to a plastic container containing approximately 3 liters of fuel oil.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2020
Resolved 12 February 2020
Resolution: Class report received. Fuel oil pump was overhauled, mechanical seal repaired as per engine log book records. The fuel oil pump was tested with no leaks and oberserved working satisfactory.
14 - Pollution Prevention › 141 - MARPOL Annex I › Suspected of discharge violation
Issued 19 July 2019 Resolved
Oil filtering equipment referred to in paragraph 1 of this regulation shall be of a design approved by the administration and shall be such as will ensure that any oil mixture discharged into the sea after passing through the system has an oil content not exceeding 15 ppm. In considering the design of such equipment, the administration shall have regard to the specification recommended by the organization. Vessel is fitted with a MEPC A.393X OWS and a MEPC 107(49) OCM. Crew is unable to process bilge water to less than 15 ppm. Multiple functional issues were noted during 5 hours of testing. 1) The sample line from the discharge piping of the OWS was clogged and did not provide a sample to the OCM, allowing for unmonitored bilge water to be discharged to overboard valve, when the sample line was cleared, the OCM read “EE” proving that the OWS is not processing bilge water. 2) The MEPC 107(49) OCM does not match oil record book entries. Most notably, the last recorded operation on 16MAY19 from 1900-2300 is not in the OCM history. 3) When the OCM alarmed over 15 ppm, the did not stop and allowed water to be delivered to the overboard valve. MARPOL Annex I/14.6 30abc
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 20 July 2019
Resolved 30 July 2019
Resolution: Crew pumped out and cleaned bilge water holding tank, back flushed OWS, replaced all OWS filters, cleared sample line, and installed 3-way valve. PSCO witnessed successful ops check of OWS.
14 - Pollution Prevention › 141 - MARPOL Annex I › Suspected of discharge violation
Issued 19 July 2019 Resolved
The oil record book, whether part of the ship’s official logbook or otherwise, shall be in the form specified in appendix III to this Annex [MARPOL 17.1]. Additionally, the ORB Part I shall be completed on each occasion, on a tank to tank basis if appropriate, whenever any of the following machinery space operations take place in the ship; discharge of dirty ballast or cleaning water from oil fuel tanks, collection and disposal of oil residues, discharge overboard or disposal otherwise of bilge water which has accumulated in machinery spaces, and bunkering of fuel or bulk lubricating oil [MARPOL 17.2]. Oil record book code entries do not align with Appendix III of MARPOL Annex I. Codes pre-date 2006 amendments. Additionally, crew is not recording bilge well to bilge tank transfers as well as transfers from sludge tank to bilge tank. Furthermore, OWS operations do not align with daily sounding logs and recorded data on the OCM. MARPOL Annex I/17.1 MARPOL Annex I/17.2 30abc
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 20 July 2019
Resolved 24 July 2019
Resolution: Confirmed new ORBs on board as well as guidance on proper record keeping.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 19 July 2019 Resolved
The company should ensure that all personnel involved in the company’s safety management system have an adequate understanding of relevant rules, regulations, codes and guidelines [ISM 6.4]. Additionally, the company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company [ISM 10.1]. In meeting these requirements, the company should ensure that; inspections are held at appropriate intervals [ISM 10.2.1], any non-conformity is reported with its possible cause, if known [ISM 10.2.2]. The objective evidence delineated in deficiencies #1 and #2 attests to the vessel's company failing to ensure that the engineering crew-members had an adequate understanding of how to properly operate the onboard oily water separator in accordance with the appropriate operating procedures while abiding by the relevant rules and regulations. Additionally, the Chief Engineer and Second Engineer informed PSCOs that they received no training pertaining to the newly installed Oil Content Meter (MEPC 107(49)). Also, as denoted in deficiencies #1 and #2, crew did not provide any evidence that inspections and scheduled maintenance were held at appropriate intervals for the OWS. 74 SOLAS (14) IX/3.1 ISM Code 6.4 ISM Code 10.1 & 10.2 30abc
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 20 July 2019
Resolved 24 July 2019
Resolution: Confirmed with Master that a follow up ISM audit will be conducted NLT 30AUG19.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 19 July 2019 Resolved
Oil residue (sludge) tanks shall be provided and shall have no discharge connections to the bilge system, oily bilge water holding tank, tank top or oily water separators. PSCO identified a permanent connection from sludge pump discharge piping to the bilge tank. MARPOL Annex I/12.3.3 17ac
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 20 July 2019
Resolved 24 July 2019
Resolution: Confirmed that the piping from sludge pump to bilge tank is blanked.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 19 July 2019 Resolved
The hull, superstructure, structural bulkheads, decks and and deckhouses shall be constructed of steel, having in mind the risk of fire. PSCO’s observed a penetration above Engine Control Room (ECR) to engine room without any insulation, thus compromising the Category “A” boundary. 74 SOLAS II-2/Part D/ 51 (a) 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 July 2019
Resolved 24 July 2019
Resolution: Confirmed the fire boundary has been repaired.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 19 July 2019 Resolved
Fire door in the main vertical zone bulkheads and stairway enclosures shall be of self-closing type. Hold-back hooks, not subject to control station release, will not be permitted. PSCO's identified hold back hooks located on multiple fire doors in the stairwell and main vertical zone compromising the fire boundary integrity. 74 SOLAS II-2/23(f) 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 19 July 2019
Resolution: Crew removed hold hooks and line from fire doors.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 28 May 2019 Resolved
CODE:07117 OIL FUEL PIPES SHALL BE OF STEEL OR OTHER APPROVED MATERIAL PROVIDED THAT RESTRICTED USE OF FLEXIBLE PIPES SHALL BE PERMISIBLE IN POSITIONS WHERE THE ADMINISTRATION IS SATISFIED THAT THEY ARE NECESSARY. SUCH FLEXIBLE PIPES AND END ATTACHMENTS SHALL BE APPROVED FIRE-RESISTANT MATERIALS OF ADEQUATE STRENGTH AND SHALL BE CONSTRUCTED TO THE SATISFACTION OF THE ADMINISTRATION. PSCO OBSERVED A FUEL OIL SPRAY COMING FROM THE STARBOARD #4 CYLINDER HIGH PRESSURE FUEL LINE COMING FROM THE FUEL PUMP. CITE:74SOLAS/CH.II-2/REG.33(a)(viii) ACTION TAKEN:17abc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 May 2019
Resolution: High pressure fuel hose was tightened and is no longer leaking. Received report from ABS.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 28 May 2019 Resolved
CODE:07126 IN A SHIP WHICH OIL FUEL IS USED, THE ARRANGEMENTS FOR THE STORAGE DISTRIBUTION AND UTILIZATION OF THE OIL FUEL SHALL BE SUCH AS TO ENSURE THE SAFETY OF THE SHIP AND PERSONS ON BOARD. PSCO OBSERVED APPROXIMATELY 30 GALLONS OF OIL AND FUEL OIL AND FUEL OIL UNDER THE MAIN ENGINES. CITE:74SOLAS/CH.II-2/REG.33(a) ACTION TAKEN:17abc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 May 2019
Resolution: Received class report from ABS, all oil remvoed.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 May 2019 Resolved
CODE:07105 FIRE DOORS IN MAIN VERTICAL ZONE BULKHEADS AND STAIRWAY ENCLOSURES, SHALL BE OF THE SELF-CLOSING TYPE. HOLD-BACK HOOKS, NOT SUBJECT TO CONTROL STATION RELEASE, WILL NOT BE PERMITED. PSCO OBSERVED THE FIRE DOORS IN THE STAIRWELL AND MAIN VERTICAL ZONE WERE EQUIPPED WITH HOLD BACK HOOKS AND WERE NOT SELF-CLOSING. CITE:74SOLASII-2/23(f) ACTION TAKEN:17abc
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 May 2019
Resolution: Received class report from ABS, all hold back hooks removed and required fire doors made self closing.
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 28 May 2019 Resolved
CODE:01117 EVERY SHIP OF 400 GROSS TONNAGE AND ABOVE IS SUBJECT TO SURVEY. AFTER ANY SURVEY OF THE SHIP, NO CHANGE BE MADE IN THE STRUCTURE, EQUIPMENT, SYSTEMS, FITTINGS ARRANGEMENTS OR MATERIAL COVERED BY THE SURVEY. IOPP CERTIFICATE STATES THAT THE VESSEL IS EQUIPPE WITH AN OIL CONTENT METER MEETINTG RESOLUTION A.393. PSCO OBSERVED AN OIL CONTENT METER MEETING RESOLUTION MEPC 107.49 INSTALLED. CITE:MARPOL(73/78)ANNEXI/CH.2REG6.4.2 ACTION TAKEN:50abc
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2019
Resolved 30 July 2019
Resolution: Crew provided corrected IOPP Supplement Form A to attending [name withheld] confirmed equipment installed matched IOPP Supplement Form A.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 28 May 2019 Resolved
CODE:15106 A VESSEL EQUIPED WITH A BALLAST WATER TANK THAT OPERATES IN THE WATERS OF THE UNITED STATES MUST MAINTAIN A BALLAST WATER MANAGEMENT PLAN THAT WILL ALLOW THOSE RESPONSIBLE FOR THE PLANS IMPLEMENTATION TO UNDERSTAND AND FOLLOW THE VESSEL'S BALLAST WATER MANAGEMENT STRATEGY AND COMPLY WITH THE REQUIREMENTS OF THIS SUBPART. VESSEL'S BALLAST MANAGEMENT PLAN DOES NOT REFERENCE THE MUST UP-TO-DATE VERSION OF THE US REGULATIONS. VESSEL IS PAST COMPLIANCE DATE AND SHALL NOT DISCHARGE BALLAST IN US WATERS. CITE:33CFR151.2050(g) ACTION TAKEN:50c
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 July 2019
Resolution: BWM Plan has updated information.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 7 October 2018 Resolved
0611 The normal equipment of every lifeboat shall consist of a food ration for each person the life boat is certified to carry kept in airtight receptacles. Food rations storage was not air tight. 74 SOLAS III reg. 11.a.xii
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 7 October 2018
Resolution: Replaced punctured food ration.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 7 October 2018 Resolved
0520 Cargo ships of 1600 GT and upward the administration shall ensure that the lighting of the alleyways, stairways and exits is such that the access of all persons to the launching stations and stowage postions of lifebaots and liferafts is not impeded. PSCO observed 02 extinguished emergency lights on the meain deck by the cargo pump room. 74 SOLAS III reg. 38 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 7 October 2018
Resolution: Emergency lights were replaced and worked properly.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 8 October 2017 Resolved
0725-Fixed fire fighting. Condition of ship and equipment shall be maintained to conform w/provisions of present regulations;ensure vessel remain fit for sea w/out danger to vessel or crew. PSCO observed disconnected hose from main service manifold to CO2 bottle. 74SOLAS(09)CON. 1/11.4
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 October 2017
Resolved 8 October 2017
Resolution: Corrected on the spot.
Operations/Management › Vessel Safety Management › Company Responsibilities/Authority
Issued 8 October 2017 Resolved
2515- Company responsibility and authority. Company should establish procedures to maintain confomity w/relevant rules and regulations established by company. Further inspection of fire fighting maintenance logs showed that actual inspection of CO2 lines are not being made monthly with other CO2 rooms maintenance procedures. 74SOLAS(09)1X/3.1; ISM CODE A.10.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 8 December 2017
Resolved 30 January 2018
Resolution: PSCO boarded vessel and found all documentation in order.
Lifesaving › Launching Appliances › Davit
Issued 8 October 2017 Resolved
0613- Stowage of lifeboats; Where davits are recovered by action of the fall by power, safety devices shall be fitted which will automatically cut-off the power before the davits come against the stops. PSCO observed davit limit switch inoperable. 74SOLAS(09)III/36(k)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 November 2017
Resolved 8 October 2017
Resolution: Corrected on the spot.
Electrical › Electric Generation Source (emergency) › Generator
Issued 14 April 2016 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. Vessel's emergency generator has a fuel leak. SOLAS 04 CHI-Reg11 (17ABC).
Due 14 April 2016
Resolved 15 April 2016
Resolution: Repairs were made and ABS attested to repairs.
Engineering › Steering Gear System › Hydraulic Hose
Issued 14 April 2016 Resolved
The condition of the ship and its equipment shall be maintained to conform with provisions of the present regualtions. Vessel's #3 steering pump has a hydraulic leak. SOLAS 04 CHI Reg11 (17abc).
Due 14 April 2016
Resolved 15 April 2016
Resolution: Repairs were made and ABS attested to repairs.
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 14 April 2016 Resolved
Where necessary non-conducting mats or gratings shall be provided at the front and rear of the switchboard. (SOLAS 04 CHII-I REG45 (17C).
Action required: 17 - Rectify deficiencies prior to departure
Due 14 April 2016
Resolved 15 April 2016
Resolution: Vessel purchased new nonconducting mats for their engine control room.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 14 April 2016 Resolved
Maintnance, testing, and inspections shall be carried out based on the guidelines developed by the organization and in a manner having due regard to ensuring the reliability of fire fighting systems. Vessel has no procedures for testing smoke alarms. SOLAS 04 CHII-2 Reg14.2.2 (50AB).
Due 14 May 2016
Resolved 6 June 2016
Resolution: Received report from ABS testing procedures are approved.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.