Records from 2005 to 2025. Most recent: inspection, 30 July 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 20
30 July 2025
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8199441
30 July 2025
Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8200015
21 April 2025
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8120059
21 February 2024
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7868112
26 June 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7724776
15 May 2023
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7688834
13 January 2023
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7621244
1 August 2022
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7528301
10 August 2021
Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7284485
17 August 2020
Annual Inspection · MTSA Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7035557
26 February 2020
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6916416
8 January 2020
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6882127
11 February 2019
Deficiency Check · DAPI Audit · Administrative Inspection · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6623811
8 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6504374
30 July 2018
Annual Inspection · MTSA Verification · Deficiency Check · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6502704
7 August 2017
Deficiency Check · Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6235454
9 March 2017
Deficiency Check · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6101978
22 February 2017
Deadweight Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6092811
9 February 2017
Hull Examination · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6069083
15 August 2016
Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5973557
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 July 2025
Resolved
13101 - Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. While conducting rounds of the engine compartment, after mooring, the vessel's crew observed the starboard shaft had uncoupled from the flange holding it to the gear. While underway the shaft slipped and the vessel began taking on water. A tow plan for the vessel must be submitted in writing to the USCG at [email withheld]. The shaft must be fixed and Coast Guard Marine Inspectors must attend and witness sea trials prior to carrying passengers.
46 CFR 119.200
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 August 2025
Resolution: MI attended the vessel and completed sea trials successfully.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 March 2024
Resolved
Piping the temperature of which exceeds 150 degrees Fahrenheit must be insulated where necessary to prevent injuries.
The vessel repowered in 2011, which included installation of new grid coolers and associated piping which was not a replacement in kind (see MSC letter E1-1100883). This makes this installation subject to the
requirements in "new" K. The return piping on the keel
cooler installation is exceeding 150F during normal
operating conditions, and thus requires insulation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2024
Resolved 19 March 2024
Resolution: Lagging was installed on piping.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 March 2024
Resolved
At least one ring buoy must be fitted with a floating waterlight approved in accordance with 161.010.
Batteries for floating waterlight for ring buoy were expired and not of the proper type.
Action required: 10 - Deficiency Rectified
Due 6 March 2024
Resolved 6 March 2024
Resolution: Waterlight battery was replaced with the proper type that had an in-date expiry.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 6 March 2024
Resolved
At every vessel inspection all observed fire hazards must be corrected.
A flexible hose for a lube oil line for the port main engine reduction gear is chaffed and leaking.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: O/O replaced gear hose.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 6 March 2024
Resolved
Vessels which carry >150 passengers shall meet the structural fire protection requirements of 72.05 as determined by the OCMI.
In the forward bar there are two multi-cable transits in the deck (A class fire boundary) that are not properly sealed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: Miulti-cable transit was sealed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 March 2024
Resolved
At every vessel inspection all hazardous situations must be corrected and all protective devices must be in satisfactory condition.
There is an electrical breaker box near the forward head, starboard side, that is missing multiple securing screws on its protective cover plate.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: Electrical box cover was re-secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 March 2024
Resolved
Dry pipe exhausts are permitted if suitably insulated.
The lagging on the exhaust for the port main engine has become partially detached and requires securing to adequately insulate/shield the hot surface.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 2 April 2024
Resolution: Received photographic evidence of new lagging installed.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 6 March 2024
Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, as indicated by the vessel’s stability letter, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 1 inch numbers and letters at the entranceway to that deck.
The max passenger count labels for upper deck are incorrect (one reads 310 and another 116, neither of which corresponds to the stability letter).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: Upper deck passenger count has been relabeled.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 March 2024
Resolved
Each inspection shall include inspection and testing of fire confining appliances (such as fire screen doors).
The port forward door is not properly sealing when closed (section of gasket appears to be missing).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: Door gasket was replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2024
Resolved
At each inspection the owner or managing operator shall be prepared to have ready for inspection the operation of the main propulsion machinery both ahead and astern.
The starboard dripless shaft seal is leaking upwards of 1 gpm at certain running conditions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 2 April 2024
Resolution: A service technician from Coastal Seal attended the vessel and replaced the seal elements in the the seal housing.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 May 2023
Resolved
07110 - At each inspection the fire fighting equipment of all vessels shall be inspected and all deficiencies found shall be corrected. The vessel had 09 portable fire extinguishers on board that had not been inspected since April 2022. Annual inspections must be conducted for all portable fire extinguishers.
46 CFR 176.25-25(a)
701c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2023
Resolution: Received photographic evidence of the annual inspections.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 13 January 2023
Resolved
Repairs or alterations to hull, machinery, or equipment that effects safety of the vessel must not be made without the approval of the cognizant Officer in Charge Marine Inspection (OCMI) except in emergency. At the commencement of vessel hull and internal structure exam the following worklist items were outlined for repair or replacement as original.
Provide shaft Bearing report for assessment
Prep and prepare rub rail for paint and repair as original any pitting or holes IAW NVIC 7-68 as a guide.
Repair as original deck plate supports, support legs for Grey water tank in galley.
Clean bilges in way of: fwd. hold, galley, engine room and steering space for completion of inspection in these areas.Lead ballast needs to be removed in order to properly inspect hull aft of steering gear.
Re-Coat Potable water tank and clean out suction line.
MSD SPACE:Clean up steel under port side tank, outboard for further inspection. Old pump installation wiring/cables need to be removed or properly ended. There is approximately a 2 inch hole, portside, where steel is wasted. clean up wiring and make fire tight in fwd MSD tank space.
46CFR 176.700(c)
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 19 April 2023
Resolution: All items were repaired/replaced or rectified during yard attendence.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 August 2022
Resolved
Piping used in a vital system must meet § 56.60 in subchapter F of this chapter. Vessel had a rubber hose patch installed in galley bilge piping system. 46 CFR 119.710
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 August 2022
Resolution: Received photo evidence of pipe being replaced on bilge line.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 1 August 2022
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected. Larg engine battery foound stowed on vessels main deck under PFE. 46 CFR 115.830
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 August 2022
Resolution: Vessel operator provided photographic evidence of removal of unused battery.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 1 August 2022
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck. Emergency Lights in male and female heads on main deck were inoperable. 46 CFR 120.432
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 August 2022
Resolution: Replacement emergency lights installed in spaces.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 August 2022
Resolved
Tubular gauge glasses, if fitted to diesel fuel tanks, must be of heat resistant materials, adequately protected from mechanical damage, and provided at the tank connections with devices that will automatically close in the event of rupture of the gauge or gauge lines. Sight glass was made of plastic. 46 CFR 119.440(a)(7)
Due by end of credit drydock in February 2023
Action required: 705 - Other - as specified
Due 26 July 2023
Resolved 6 March 2024
Resolution: The plastic sight glass tubes were removed and the connections to the fuel tank plugged.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 10 August 2021
Resolved
Each ring life buoy on a vessel must be approved IAQ 160.050 in subchapter Q or this chapter. Port bridge ring buoy grab line was wasted and needs replacement.
46 CFR 117.70(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 19 August 2021
Resolution: Confirmed new grabline installed on ring buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 August 2021
Resolved
Each life jacket must be approved IAW either 160.002, 160.005 or 160.055 in subchapter Q of this chapter. Over half of vessel PFDs onboard had non SOLAS retroflective tape. Prove that retroflective materal meets type I under 46 CFR 164.018-9 or replace with approved material.
46 CFR 117.71(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2021
Resolved 19 August 2021
Resolution: Confirmed SOLAS retro tape placed on all lifejackets.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 August 2020
Resolved
At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached.
Deficiency: 1 out of the 3 required ring life buoys on board has dry-rotten grab lines.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 August 2020
Resolved 26 August 2020
Resolution: New ring buoy was added.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 17 August 2020
Resolved
Each lighting fixture and lampholder must be fixed. A fixture must not be supported by the screw shell of a lampholder.
Deficiency: The light fixture located at the steering compartment broke off the mount and the light switch box was missing its cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2020
Resolved 26 August 2020
Resolution: New fixture was added.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 January 2020
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its COI giving consideration to provisions for the seaworthy of the hull, protection against fire, and ventilation of enclosed spaces.
Provide written specifications describing the details of any repairs (repair proposal) to address all the damages and corrective actions for the following deficiencies:
1. starboard rudder post
2. port and starboard vents (steering compartment)
3. Temporary clamps (grease trap)
4. Temporary patch on a pipe (galley)
*** Repairs or alterations that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. ***
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2020
Resolved 23 January 2020
Resolution: provided photographic proof of meeting requirements for all 4 deficiencies (see attached photos)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2019
Resolved
Each vessel must be provided with a bilge pump in accordance with 46 CFR 56.50. All vessels shall be provided with a satisfactory bilge pumpingplant capapble of pumping from and draining any watertight compartment. Multiple bilge stations unable to provide suction from the space. 46 CFR 119.520(a) / 46 CFR 56.50(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2019
Resolution: Marine Inspector witnessed proper operation of all of the vessels fixed bilge system work as required.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2019
Resolved
At each inspection for certification the bilges and other spaces may be examined to see that there is no excessive accumulation of oil debris or other matter that might clog bilge pumping systems. The bilge in the galley had excess water/grease/debris theat could block bilge system and did not allow for proper inspection. 46 CFR 115.830(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2019
Resolution: Vessel cleaned bilge area and provided a new draining system to keep washdown from galley floor from going directly into the bilge.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 8 August 2018
Resolved
Vsl is broadcasting: Invalid IMO #.
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 September 2018
Resolved 18 October 2018
Resolution: Vessel met all requirements for AIS broadcasting.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 July 2018
Resolved
Stowage location for child size lifejackets on Deck 2 not labeled.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2018
Resolved 8 August 2018
Resolution: Proper labeliing of child life jacket stowage location provided.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 30 July 2018
Resolved
Distribution Panel located in the galley not labeled with associated electrical switch and openings need covered on panel, starboard side near female head.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2018
Resolved 8 August 2018
Resolution: All unused breaker space properly covered and labeling applied to distribution panel.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 30 July 2018
Resolved
Exhaust ventilation in galley not connected to emergency shut down.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 8 August 2018
Resolution: Galley Exhaust Motor re-wired to panel connected to ships ventilation shutdown.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 August 2017
Resolved
Electrical wiring to E/R hi water alarm connection not properly connected. Ensure wiring is properly connected to hi water alarm using proper pressure type connectors.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 August 2017
Resolved 8 August 2017
Resolution: Wiring to the hi water alarm was rewired with proper connections.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 7 August 2017
Resolved
Circuit breaker panel in pilot house not properly secured and missing a switch. Properly secure panel and blank or install missing switch.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 August 2017
Resolved 8 August 2017
Resolution: Owner/operator installed blank and propelry secured panel.
Fire Fighting › Firemans Outfit › Axe
Issued 7 August 2017
Resolved
Vessel missing fire axe. Provide proper fire axe and properly mark with vessel's name.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 August 2017
Resolved 8 August 2017
Resolution: Owner/operator provided properly marked fire axe.
Stability › Incline Test › General
Issued 9 February 2017
Resolved
Vessel has removed fixed concrete ballast and re-installed fixed lead ballast. As per MSC requirements a deadweight survey is required. Perform survey in presence of CGMI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 February 2017
Resolved 22 February 2017
Resolution: Witnessed deadweight survey.