MAURY USCG vessel records
← All vessels

INNER HARBOR SPIRIT

INNER HARBOR SPIRIT is a 1985 passenger vessel (inspected). The Coast Guard has recorded 20 inspections since 2016, most recently in July 2025, along with 31 deficiencies and 5 casualty investigations between 2005 and 2025.

Records from 2005 to 2025. Most recent: inspection, 30 July 2025.

Built
1985
Last inspected
30 July 2025
Documentation
Case Pending · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 30 July 2025
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WSL2937
240063
Flag
UNITED STATES
Maury page id
psix-240063

Documentation record

Registered dimensions (L × B × D)113.0 ft × 31.0 ft × 4.0 ft
Registered tonnagegross 96 / net 69
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBLOUNT MARINE CORPORATION · WARREN, RI, UNITED STATES · built 1985
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portBALTIMORE, MD
Trade endorsementsCoastwise, unrestricted
DocumentationCase Pending · issued 15 January 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it96 - Regulatory (Subpart C or D), Gross Ton
69 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

20 inspections, each with its date, unit and type; 31 deficiencies with the resolution recorded against each; 1 other recorded name, with years; 5 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 20

30 July 2025 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8199441
30 July 2025 Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8200015
21 April 2025 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8120059
21 February 2024 Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7868112
26 June 2023 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7724776
15 May 2023 In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7688834
13 January 2023 Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7621244
1 August 2022 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7528301
10 August 2021 Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7284485
17 August 2020 Annual Inspection · MTSA Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7035557
26 February 2020 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6916416
8 January 2020 Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6882127
11 February 2019 Deficiency Check · DAPI Audit · Administrative Inspection · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6623811
8 August 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6504374
30 July 2018 Annual Inspection · MTSA Verification · Deficiency Check · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6502704
7 August 2017 Deficiency Check · Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6235454
9 March 2017 Deficiency Check · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6101978
22 February 2017 Deadweight Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6092811
9 February 2017 Hull Examination · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6069083
15 August 2016 Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5973557

Deficiency record · 31

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 July 2025 Resolved
13101 - Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. While conducting rounds of the engine compartment, after mooring, the vessel's crew observed the starboard shaft had uncoupled from the flange holding it to the gear. While underway the shaft slipped and the vessel began taking on water. A tow plan for the vessel must be submitted in writing to the USCG at [email withheld]. The shaft must be fixed and Coast Guard Marine Inspectors must attend and witness sea trials prior to carrying passengers. 46 CFR 119.200
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 August 2025
Resolution: MI attended the vessel and completed sea trials successfully.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 March 2024 Resolved
Piping the temperature of which exceeds 150 degrees Fahrenheit must be insulated where necessary to prevent injuries. The vessel repowered in 2011, which included installation of new grid coolers and associated piping which was not a replacement in kind (see MSC letter E1-1100883). This makes this installation subject to the requirements in "new" K. The return piping on the keel cooler installation is exceeding 150F during normal operating conditions, and thus requires insulation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2024
Resolved 19 March 2024
Resolution: Lagging was installed on piping.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 March 2024 Resolved
At least one ring buoy must be fitted with a floating waterlight approved in accordance with 161.010. Batteries for floating waterlight for ring buoy were expired and not of the proper type.
Action required: 10 - Deficiency Rectified
Due 6 March 2024
Resolved 6 March 2024
Resolution: Waterlight battery was replaced with the proper type that had an in-date expiry.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 6 March 2024 Resolved
At every vessel inspection all observed fire hazards must be corrected. A flexible hose for a lube oil line for the port main engine reduction gear is chaffed and leaking.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: O/O replaced gear hose.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 6 March 2024 Resolved
Vessels which carry >150 passengers shall meet the structural fire protection requirements of 72.05 as determined by the OCMI. In the forward bar there are two multi-cable transits in the deck (A class fire boundary) that are not properly sealed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: Miulti-cable transit was sealed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 March 2024 Resolved
At every vessel inspection all hazardous situations must be corrected and all protective devices must be in satisfactory condition. There is an electrical breaker box near the forward head, starboard side, that is missing multiple securing screws on its protective cover plate.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: Electrical box cover was re-secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 March 2024 Resolved
Dry pipe exhausts are permitted if suitably insulated. The lagging on the exhaust for the port main engine has become partially detached and requires securing to adequately insulate/shield the hot surface.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 2 April 2024
Resolution: Received photographic evidence of new lagging installed.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 6 March 2024 Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, as indicated by the vessel’s stability letter, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 1 inch numbers and letters at the entranceway to that deck. The max passenger count labels for upper deck are incorrect (one reads 310 and another 116, neither of which corresponds to the stability letter).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: Upper deck passenger count has been relabeled.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 March 2024 Resolved
Each inspection shall include inspection and testing of fire confining appliances (such as fire screen doors). The port forward door is not properly sealing when closed (section of gasket appears to be missing).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2024
Resolved 19 March 2024
Resolution: Door gasket was replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2024 Resolved
At each inspection the owner or managing operator shall be prepared to have ready for inspection the operation of the main propulsion machinery both ahead and astern. The starboard dripless shaft seal is leaking upwards of 1 gpm at certain running conditions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 2 April 2024
Resolution: A service technician from Coastal Seal attended the vessel and replaced the seal elements in the the seal housing.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 May 2023 Resolved
07110 - At each inspection the fire fighting equipment of all vessels shall be inspected and all deficiencies found shall be corrected. The vessel had 09 portable fire extinguishers on board that had not been inspected since April 2022. Annual inspections must be conducted for all portable fire extinguishers. 46 CFR 176.25-25(a) 701c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2023
Resolution: Received photographic evidence of the annual inspections.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 13 January 2023 Resolved
Repairs or alterations to hull, machinery, or equipment that effects safety of the vessel must not be made without the approval of the cognizant Officer in Charge Marine Inspection (OCMI) except in emergency. At the commencement of vessel hull and internal structure exam the following worklist items were outlined for repair or replacement as original. Provide shaft Bearing report for assessment Prep and prepare rub rail for paint and repair as original any pitting or holes IAW NVIC 7-68 as a guide. Repair as original deck plate supports, support legs for Grey water tank in galley. Clean bilges in way of: fwd. hold, galley, engine room and steering space for completion of inspection in these areas.Lead ballast needs to be removed in order to properly inspect hull aft of steering gear. Re-Coat Potable water tank and clean out suction line. MSD SPACE:Clean up steel under port side tank, outboard for further inspection. Old pump installation wiring/cables need to be removed or properly ended. There is approximately a 2 inch hole, portside, where steel is wasted. clean up wiring and make fire tight in fwd MSD tank space. 46CFR 176.700(c)
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 19 April 2023
Resolution: All items were repaired/replaced or rectified during yard attendence.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 August 2022 Resolved
Piping used in a vital system must meet § 56.60 in subchapter F of this chapter. Vessel had a rubber hose patch installed in galley bilge piping system. 46 CFR 119.710
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 August 2022
Resolution: Received photo evidence of pipe being replaced on bilge line.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 1 August 2022 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected. Larg engine battery foound stowed on vessels main deck under PFE. 46 CFR 115.830
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 August 2022
Resolution: Vessel operator provided photographic evidence of removal of unused battery.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 1 August 2022 Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck. Emergency Lights in male and female heads on main deck were inoperable. 46 CFR 120.432
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 August 2022
Resolution: Replacement emergency lights installed in spaces.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 August 2022 Resolved
Tubular gauge glasses, if fitted to diesel fuel tanks, must be of heat resistant materials, adequately protected from mechanical damage, and provided at the tank connections with devices that will automatically close in the event of rupture of the gauge or gauge lines. Sight glass was made of plastic. 46 CFR 119.440(a)(7) Due by end of credit drydock in February 2023
Action required: 705 - Other - as specified
Due 26 July 2023
Resolved 6 March 2024
Resolution: The plastic sight glass tubes were removed and the connections to the fuel tank plugged.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 10 August 2021 Resolved
Each ring life buoy on a vessel must be approved IAQ 160.050 in subchapter Q or this chapter. Port bridge ring buoy grab line was wasted and needs replacement. 46 CFR 117.70(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 19 August 2021
Resolution: Confirmed new grabline installed on ring buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 August 2021 Resolved
Each life jacket must be approved IAW either 160.002, 160.005 or 160.055 in subchapter Q of this chapter. Over half of vessel PFDs onboard had non SOLAS retroflective tape. Prove that retroflective materal meets type I under 46 CFR 164.018-9 or replace with approved material. 46 CFR 117.71(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2021
Resolved 19 August 2021
Resolution: Confirmed SOLAS retro tape placed on all lifejackets.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 August 2020 Resolved
At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. Deficiency: 1 out of the 3 required ring life buoys on board has dry-rotten grab lines.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 August 2020
Resolved 26 August 2020
Resolution: New ring buoy was added.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 17 August 2020 Resolved
Each lighting fixture and lampholder must be fixed. A fixture must not be supported by the screw shell of a lampholder. Deficiency: The light fixture located at the steering compartment broke off the mount and the light switch box was missing its cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2020
Resolved 26 August 2020
Resolution: New fixture was added.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 January 2020 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its COI giving consideration to provisions for the seaworthy of the hull, protection against fire, and ventilation of enclosed spaces. Provide written specifications describing the details of any repairs (repair proposal) to address all the damages and corrective actions for the following deficiencies: 1. starboard rudder post 2. port and starboard vents (steering compartment) 3. Temporary clamps (grease trap) 4. Temporary patch on a pipe (galley) *** Repairs or alterations that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. ***
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2020
Resolved 23 January 2020
Resolution: provided photographic proof of meeting requirements for all 4 deficiencies (see attached photos)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2019 Resolved
Each vessel must be provided with a bilge pump in accordance with 46 CFR 56.50. All vessels shall be provided with a satisfactory bilge pumpingplant capapble of pumping from and draining any watertight compartment. Multiple bilge stations unable to provide suction from the space. 46 CFR 119.520(a) / 46 CFR 56.50(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2019
Resolution: Marine Inspector witnessed proper operation of all of the vessels fixed bilge system work as required.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2019 Resolved
At each inspection for certification the bilges and other spaces may be examined to see that there is no excessive accumulation of oil debris or other matter that might clog bilge pumping systems. The bilge in the galley had excess water/grease/debris theat could block bilge system and did not allow for proper inspection. 46 CFR 115.830(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2019
Resolution: Vessel cleaned bilge area and provided a new draining system to keep washdown from galley floor from going directly into the bilge.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 8 August 2018 Resolved
Vsl is broadcasting: Invalid IMO #.
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 September 2018
Resolved 18 October 2018
Resolution: Vessel met all requirements for AIS broadcasting.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 July 2018 Resolved
Stowage location for child size lifejackets on Deck 2 not labeled.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2018
Resolved 8 August 2018
Resolution: Proper labeliing of child life jacket stowage location provided.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 30 July 2018 Resolved
Distribution Panel located in the galley not labeled with associated electrical switch and openings need covered on panel, starboard side near female head.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2018
Resolved 8 August 2018
Resolution: All unused breaker space properly covered and labeling applied to distribution panel.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 30 July 2018 Resolved
Exhaust ventilation in galley not connected to emergency shut down.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 8 August 2018
Resolution: Galley Exhaust Motor re-wired to panel connected to ships ventilation shutdown.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 August 2017 Resolved
Electrical wiring to E/R hi water alarm connection not properly connected. Ensure wiring is properly connected to hi water alarm using proper pressure type connectors.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 August 2017
Resolved 8 August 2017
Resolution: Wiring to the hi water alarm was rewired with proper connections.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 7 August 2017 Resolved
Circuit breaker panel in pilot house not properly secured and missing a switch. Properly secure panel and blank or install missing switch.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 August 2017
Resolved 8 August 2017
Resolution: Owner/operator installed blank and propelry secured panel.
Fire Fighting › Firemans Outfit › Axe
Issued 7 August 2017 Resolved
Vessel missing fire axe. Provide proper fire axe and properly mark with vessel's name.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 August 2017
Resolved 8 August 2017
Resolution: Owner/operator provided properly marked fire axe.
Stability › Incline Test › General
Issued 9 February 2017 Resolved
Vessel has removed fixed concrete ballast and re-installed fixed lead ballast. As per MSC requirements a deadweight survey is required. Perform survey in presence of CGMI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 February 2017
Resolved 22 February 2017
Resolution: Witnessed deadweight survey.

Casualty record · 5

29 July 2005Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 2444283
29 July 2012Routine · role: Involved in a Marine Casualty · 1 injured · activity 4398736
18 August 2013Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4697077
27 April 2014Routine · role: Involved in a Marine Casualty · activity 4845448
30 July 2025Routine · role: Involved in a Marine Casualty · activity 8199441
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

LADY BALTIMORE (2005). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.