MAURY USCG vessel records
← All vessels

CLIPPER CITY

CLIPPER CITY is a 1985 passenger vessel (inspected). The Coast Guard has recorded 19 inspections since 2016, most recently in June 2026, along with 66 deficiencies, 1 operational control and 3 casualty investigations between 2006 and 2013.

Records from 2006 to 2026. Most recent: inspection, 24 June 2026.

Built
1985
Last inspected
24 June 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 24 June 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDE8676
256329
Flag
UNITED STATES
Maury page id
psix-256329

Documentation record

Registered dimensions (L × B × D)103.1 ft × 27.0 ft × 7.3 ft
Registered tonnagegross 99 / net 95
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHAGLUND BOAT WORKS, INC · GREEN COVE SPRINGS, FL, UNITED STATES · built 1985
Hull materialSteel
PropulsionAuxiliary Sail
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationValid · issued 17 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it95 - Regulatory (Subpart C or D), Net Ton
99 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 19

24 June 2026 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8413398
10 June 2026 Damage Survey · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8397619
16 December 2025 Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8284083
2 September 2025 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8224835
4 September 2024 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7995522
3 July 2024 Annual Inspection · Internal Structural Exam · Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7948013
25 May 2024 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7919332
22 June 2023 Annual Inspection · Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7723651
23 June 2022 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7485091
27 January 2022 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7815399
23 June 2021 COI Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7233702
9 January 2020 Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7219362
18 September 2019 Administrative Inspection · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6809668
29 April 2019 Deficiency Check · Hull Examination · Examination of Repairs · Drydock Extension · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6699426
22 October 2018 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6565599
18 January 2018 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6339591
17 April 2017 Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6211813
28 September 2016 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6011249
20 July 2016 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5962246

Deficiency record · 66

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 June 2026 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Vessel's engine overheated while sailing south of Governor's Island. Submit repair plan and conduct sea trials prior to carriage of passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 June 2026
Resolution: Attended vessel to assess repair to the raw water impellor. Sea trials complete. All Sat.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 10 June 2026 Resolved
The design, materials, and construction of masts, posts, yards, booms, bowsprits, and standing rigging on a sailing vessel must be suitable for the intended service. Vessel suffered damage to the dolphin striker and bowsprit due to an allision with the pier in the Atlantic Basin. Submit repair plan for affected areas to the satisfaction of the OCMI. 46 CFR 177.330
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 June 2026
Resolution: MI attended vessel, and cleared defs.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 2 September 2025 Resolved
Three hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant; and(2) Three hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant.Vessel missing the three orange smoke distress signals onboard. Vessel restricted to daylight operations until flares or approved substitutes per 180.68(c) are acquired to the satisfaction of the OCMI. 46 CFR 180.68(b)
Action required: 705 - Other - as specified
Resolved 3 October 2025
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 September 2025 Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch. Fire pump found to be operating at pressure less than minimum. Rectify within 30 days. 46 CFR 181.10-1(c) OLD T
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 October 2025
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 2 September 2025 Resolved
At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. Life line incorrectly attached to ring buoy grab ling. Correct within 14 days. 46 CFR 180.70(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 2 September 2025 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:(1) Charts of large enough scale to make safe navigation possible;(2) U.S. Coast Pilot or similar publication;(3) Coast Guard Light List. Vessel must replace outdated publications within 14 days. 46 CFR 184.420 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 September 2025 Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Multiple bulkhead penetrations found to not be watertight. Complete within 14 days. 46 CFR 179.320(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 September 2025 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Reinstall deck plates in 2nd VOID space within 14 days. 46 CFR 176.830(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 September 2025 Resolved
The means provided for pumping bilges shall be tested by operation. Forepeak bilge suction valve found seized. Repair within 14 days. 46 CFR 176.25-20(7) OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 September 2025 Resolved
[Cable and wiring must] be installed with metal supports spaced not more than 610 millimeters (24 inches) apart. Reinstall brackets located in 2nd VOID within 14 days. 46 CFR 183.330(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 September 2025 Resolved
Electrical equipment on a vessel must be installed and maintained to: Minimize accidental personnel contact. distribution panel in 2nd VOID must have blanks installed and the extension cord removed from the space within 14 days. 46 CFR 183.200(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 September 2025 Resolved
A battery charger intended for connection to a commericial supply voltage shall employ a transformer of the isolating type. An ammmeter that is readily visible shall be included in the battery charging circuit. Remove portable battery charger within 14 days. 46 CFR 183.05-20(f) OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 September 2025 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following:Inspection of the condition of the superstructure, masts, and similar arrangements constructed on the hull, and on a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Replace or repair the following items within 14 days: Foresail sheet block, main sheet, fwd throat halyard, main throat halyard, jib sheet halyard. Additionally rebed main sheet collar on boom and reinstall missing mast wedges at mast partner. 46 CFR 176.802
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 April 2026
Resolution: Repaired, observed by CIV MI
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 September 2025 Resolved
Replace port generator exhaust prior to next drydock.
Action required: 705 - Other - as specified
Resolved 10 April 2026
Resolution: Exhaust line replaced
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 2 September 2025 Resolved
Reinstall check valves for bilge suctions where missing prior to next drydock.
Action required: 705 - Other - as specified
Resolved 10 April 2026
Resolution: New check valves installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 September 2025 Resolved
The fuel systems for the main propulsion engines... shall be checked. Remove fuel from flame impingement ball within 14 days. 46 CFR 176.25-10(5) OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 October 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 September 2025 Resolved
Fuel lines shall be accessible, protected from mechanical injury, and effectively secured against excessive movement and vibration. Support/secure fuel return tubing over the main diesel engine within 14 days. 46 CFR 182.20-40(b)(2) OLD T.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 September 2025 Resolved
The circuit breaker, required by paragraph (c) of this section, must be interlocked with the vessel's power sources so that shore power and the vessel's power sources may not be operated simultaneously. Modify interlock on switchboard to prevent generator and shorepower from being operated at the same time within 14 days. 46 CFR 183.390(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 2 September 2025 Resolved
When operating a vessel on a body of water where the discharge of untreated sewage is prohibited by the Environmental Protection Agency under 40 CFR 140.3, the operator must secure each Type III device in a manner which prevents discharge of sewage. Lock sewage overboard valve within 14 days. 46 CFR 159.7(c)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 October 2025
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 5 August 2024 Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. The valve must be operable from a safe place outside the space where the valve is installed. MI observed fuel shut off valve wiring broke during testing of remote shut off valve. Repair/replace prior to having passengers on board. 46 CFR 182.455(b)(4)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 6 August 2024
Resolution: 6AUG24 receieved video evidence of fuel shut off wiring replaced and repaired.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 5 August 2024 Resolved
Master shall instruct each crew member, as to the duties that the crew member is expected to perform in an emergency in accordance with this part. During crew questioning for fire drill procedures MI identified inconsistencies with training and procedures. Conduct training for all crew members as required. 46 CFR 185.420
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 August 2024 Resolved
The number and identification of the items stowed inside, and their sizes(adult or child), must be marked in clearly legible letters and numbers on each container for life jackets. Letters and Numbers must be 2inches high. All life jacket containers missing the required markings, mark containers to the requirement. 46 CFR 185.604(f)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 August 2024 Resolved
Fuel lines must be protected from damage and must meet SAE J-1942. Main Engine diesel fuel supply line was found chaffed to internal steel protective wire. Replace fuel line. 46 CFR 182.720
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 12 September 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 August 2024 Resolved
Fire hydrants must be provided with spanner wrenches. Aft fire station was found with out spanner wrench, provide station with wrench. 46 CFR 181.310 (b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 August 2024 Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Main engine belt guard was loose, replace missing bolt. 46 CFR 177.960
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 August 2024 Resolved
Flexible nonmetallic hose may be used in vital and nonvital systems where permitted. Main engine raw water cooling flexible hose showing signs of wear. Replace. 46 CFR 182.720
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 August 2024 Resolved
Exhaust pipe’s watertight integrity must be maintained. MI observed salt build-up around exhaust pipe. Repair during dry-dock. 46 CFR 182.430(f)
Action required: 705 - Other - as specified
Resolved 8 September 2024
Resolution: Recieved objective photographic evidence.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 August 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to: minimize accidental personnel contact with energized parts. MI observed spares energized in distribution panel in E/R void space. 46 CFR 183.200 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 August 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to: Minimize accidental personnel contact with energized parts. MI observed blanks in distribution panel in void 2. Repair/replace. 46 CFR 183.200(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 August 2024 Resolved
Each lighting fixture globe, lens, or diffuser must have a guard or be made of high strength material, except in an accommodation space, radio room, galley, or similar space where it is not subject to damage. MI observed multiple light fixtures without guards. Repair/replace. 46 CFR 183.410 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 11 September 2024
Resolution: Guards replaced
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 5 August 2024 Resolved
A hatch cover must: be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Repair/replace. 46 CFR 179.360 (b)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 5 August 2024 Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. VSL must submit sail plan and dead weight survey to MSC within 7 days. 46 CFR 176.840
Action required: 705 - Other - as specified
Due 13 August 2024
Resolved 6 September 2024
Resolution: Observed submittion from Navarq via email correspondence to MSC
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 August 2024 Resolved
Each remote valve control must be marked in clearly legible letters, at least 25 millimeters (1 inch) high, indicating the purpose of the valve and the way to operate it. MI observed no marking for fuel shut off. 46 CFR 185.608
Action required: 705 - Other - as specified
Due 13 August 2024
Resolved 22 August 2024
Resolution: Office received objective evidence to clear the deficiency.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 August 2024 Resolved
Provide third party rigging inspection report and provide information on slings being installed. 46 CFR 176.840
Action required: 705 - Other - as specified
Due 13 August 2024
Resolved 3 April 2025
Resolution: Internal rigging inspection completed in lieu of 3rd party rigging survey
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 August 2024 Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Develop preventative maintenance plan. 46 CFR 176.840
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 August 2024
Resolved 14 April 2025
Resolution: O/O developed a PMP
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 July 2024 Resolved
If your vessel is not operated on international voyages and does not meet the conditions in paragraph (d) of this section, it must undergo a drydock and internal structural examination as follows unless it has been approved to undergo an underwater survey (UWILD) per § 176.615 of this part:(1) A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years... Marine Inspector observed that vessel did not undergo required drydock. Vessel is restricted from carriage of passengers until satisfactory drydock examination. 46 cfr 176.600
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 April 2025
Resolution: See activity 7995522
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2023 Resolved
All vessels must be provided with bilge pumps in accordance with Table 182.25-10(a) Bilge pump not working in service space aft of engine room. Temporary electrical submersible installed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2023
Resolved 5 July 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2023 Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces... Several bilge alarms did not indicate the space alarming or did so only breifly. Ensure alarm indicates space continuously or on a continous cycle.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2023
Resolved 30 June 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 22 June 2023 Resolved
The owner and managing operator of a vessel shall ensure that the vessel complies with the laws and regulations applicable to the vessel including certificates issued by the FCC. Vessel's Bridge to Bridge and Radiotelphony certificate are expired.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2023
Resolved 3 July 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2023 Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Vessel has several wires that are worn or are not proper marine cables.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2023
Resolved 30 June 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 22 June 2023 Resolved
A hinged watertight bulkhead door must be fitted with a quick action closing devise operable from both sides of the door and indicator lights at the operating station showing whether the door is open or closed. Vessel must reinstall watertight door indicator at the operating station.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2023
Resolved 30 June 2023
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 25 June 2022 Resolved
Preventative Maintenance plan was not on board. Initial rigging survey required. 46CFR176.402(c)(1) NVIC 02-16
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 August 2022
Resolution: PMP is updated and on board.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 23 June 2022 Resolved
Portable fire extinguishers shall be maintained in accordance with NFPA 10. Annual servicing of portable fire extinguishers required.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 June 2022
Resolution: Extinguishers serviced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 June 2022 Resolved
All vessels shall be provided with satisfactory arrangement for draining any water tight compartment. Multiple void spaces were unable to be pumped with bilge system. 46CFR182.25-1
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 June 2022
Resolution: Bilge system functions properly
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 23 June 2022 Resolved
A visual and audible bilge high alarm must be provided at the operating station. Audible alarm did not function.46CFR182.530(a) Rectify within 7 days
Action required: 705 - Other - as specified
Resolved 24 August 2022
Resolution: Vessel installed bilge high level alarms
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 June 2022 Resolved
All electrical installations shall be to the satisfaction of the [name withheld] open ended wires, open junction boxes, and various other shock hazards throughout the vessel. 46CFR183.01-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 August 2022
Resolution: Vessel removed all electrical hazards through out vessel.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 June 2022 Resolved
Sail Requirements. Fwd stbd and port shrouds have mousing and cotter pins not installed correctly. Preventative Maintenance plan was not on board. Initial rigging survey required. 46CFR176.402(c)(1) NVIC 02-16
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 June 2022
Resolution: Cotter pins and mousing installed. Added PMP to seperate def for tracking.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 June 2022 Resolved
Life jacket must be approved in accordance with either §160.002, §160.005, or §160.055 in subchapter Q of this chapter. 5 Adult life jackets retro reflective tape was not functional.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 August 2022
Resolution: Vessel has all lifejackets on board with proper reflective tape
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 23 June 2022 Resolved
Vessel missing light list and coast pilot publications.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 August 2022
Resolution: Coast pilot and light list on board
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 June 2022 Resolved
Cable and wire for power and lighting circuits must: (3)- Meet 111.60-1 in subchapter J. Port generator cable, to the switchboard, is under rated and Electrical cable from switchboard to main distribution panel, in the engine room, are under rated. Rectify within 7 days. 46 CFR 183.340 (d)
Action required: 705 - Other - as specified
Resolved 24 August 2022
Resolution: Proper wiring verified installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 September 2019 Resolved
Both fire hoses are chaffed. The forward hose is leaking. Installed hoses were 75 feet in length. Hoses shall be 50 feet in length. Replace both hoses. 46CFR181.15-10
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2019
Resolution: vessel acquired 2 new hoses.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 18 September 2019 Resolved
Fuel shutoff valves do not shut. Demonstrate that valves can be shut from outside the space. 46CFR182.20-40(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2019
Resolution: crew adusted valves and demonstrated function
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 September 2019 Resolved
Exhaust pipe was missing lagging and had a 2 inch hole from corrosion. Exhaust was leaking into E/R causing hazard for crew. 46 CFR 182.20-20
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2019
Resolution: slip fittings were re-assembled and new lagging was applied to the exhaust pipe. Operational tested: no leak detected.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 18 September 2019 Resolved
Bilge detection system would not alarm when submerged in water or when manually operated. Demonstrate proper operation. 46 CFR 182.530
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2019
Resolution: All bilge alarms were demonstrated to be in working order.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 18 September 2019 Resolved
Make main deck and watertight bulkheads watertight. Wire runs, pipe penetrations, and holes in main deck port side near poop deck near ladder were not watertight. 46 CFR 177.13
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2019
Resolution: Vessel welded plates removed pipes which penetrated the deck.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 September 2019 Resolved
02 ring buoys on poop deck were not serviceable. Light for ring buoy was not in approved bracket. Lanyard for ring buoy light was deteriorated. Replace 02 ring buoys,stow light in approved bracket, and renew lanyard. 46 CFR 180.70
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2019
Resolution: vessel placed on board 02 new ring buoys, renewed lanyard, and installed light holder.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 September 2019 Resolved
Isolation valve for collision void was missing handle. Install handle so crew can have positive control of the valve. 46 CFR 177.13
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2019
Resolution: handle was replaced and operation was witnessed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 September 2019 Resolved
30 adult life jackets were no longer serviceable. Vessel restricted to carriage of 132 adults until life jackets are replaced. 46 CFR 180.71(a)
Action required: 705 - Other - as specified
Resolved 23 September 2019
Resolution: vessel acquired and labled 35 new life jackets.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 September 2019 Resolved
All fire extinguishers must be of an approved type. 03 brackets in saloon were not approved marine grade. 46 CFR 181.30-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2019
Resolved 23 September 2019
Resolution: Vessel installed approved holders
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 18 September 2019 Resolved
Emergency escape hatch labeling was faded. Renew labeling of all escape hatches. 46 CFR 185.606
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2019
Resolved 3 October 2019
Resolution: Vessel painted egress signs and submitted photos.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 September 2019 Resolved
Junction box in collision void was not covered and had exposed wires. Remove dead wires or cover junction box.46 CFR 183.01-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2019
Resolved 23 September 2019
Resolution: junction box cover was installed
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 September 2019 Resolved
Aft fire hose reel was corroded. Replace hose reel. 46 CFR 181.15-5(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2019
Resolved 23 September 2019
Resolution: both hose reels were replaced with new equipment
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 18 September 2019 Resolved
First aid kit was expired. Crew replaced with approved kit. 46CFR184.710
Action required: 10 - Deficiency Rectified
Resolved 18 September 2019
Resolution: Crew procured a new firt aid-kit
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 October 2018 Resolved
A vessel must carry one floating waterlight unless it is limited to daytime operations. Life buoy light was inoperable.
Action required: 10 - Deficiency Rectified
Resolved 29 April 2019
Resolution: Life buoy light was replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 22 October 2018 Resolved
When, in accordance with 178.210 if this chapter, a vessel must be provided with a stability letter, the stability letter must be posted under glass or other suitable transparent material such that all pages are visible, at the operating station of the vessel. Vessel's stability letter was not posted.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 April 2019
Resolution: The stability letter was posted.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 October 2018 Resolved
Demonstrate appropriate sizing of starboard whisker stay turnbuckle.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 April 2019
Resolution: Appropriate sizing of the turnbuckle was demonstrated.

Casualty record · 3

1 May 2006Routine · role: Involved in a Marine Casualty · activity 2644662
13 October 2006Routine · role: Sighted in Area · activity 2800427
15 September 2013Routine · role: Involved in a Marine Casualty · activity 4716396
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.