Records from 1985 to 2026. Most recent: inspection, 9 June 2026.
Inspection history · 81
9 June 2026
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8378521
6 October 2025
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8247251
4 June 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8150688
10 February 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8077164
21 March 2024
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7879929
4 October 2023
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7803328
16 August 2023
Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7769704
11 August 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7765727
8 June 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7710207
7 February 2023
Appeal · Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7633501
26 January 2023
Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7627283
18 January 2023
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7623432
31 May 2022
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7460520
21 November 2021
Type not recorded
No type recorded · Station Cape May · USCG East District (CGD-E) · Activity 7355219
2 June 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7186473
6 January 2021
Internal Structural Exam · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7120293
4 June 2020
Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6967676
30 December 2019
Damage Survey · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6880460
15 April 2019
COI Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6661333
15 February 2019
Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6626578
9 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6505758
12 June 2018
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6434927
6 June 2017
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6163608
16 March 2017
Drydock Exam · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6105542
13 June 2016
Administrative Inspection · DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5905913
21 March 2014
Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4831814
22 May 2012
DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4320116
14 December 2011
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4208222
19 March 2010
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3698281
28 April 2009
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3462329
31 March 2008
Hull Examination · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3174427
8 May 2007
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2924858
15 March 2006
Hull Examination · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2604349
25 April 2005
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2342688
28 January 2005
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2282689
23 April 2004
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2043060
19 November 2003
Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1950611
25 April 2003
Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1780406
8 January 2003
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1727173
9 May 2002
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1614886
12 January 2002
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1481702
12 January 2002
Type not recorded
No type recorded · Station Fort Myers Beach · USCG Southeast District (CGD-SE) · Activity 1524129
20 November 2001
COI Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1410710
5 January 2001
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1458828
15 November 1999
Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1408402
9 November 1999
Deficiency Check · Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1421759
10 May 1999
Plan Review "T" Boat
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 798056
16 March 1999
Plan Review "T" Boat
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1100554
22 January 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1122583
1 December 1998
MARPOL Annex V Examination · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 806521
26 October 1998
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 805023
21 July 1998
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1129728
2 June 1998
Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 793184
4 December 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1113314
6 December 1996
Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1186419
4 December 1996
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 879115
1 December 1995
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 874724
26 April 1995
Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 864541
13 April 1995
Hull Examination · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1173244
20 December 1994
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 861936
15 August 1994
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 870366
18 March 1994
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1166095
9 September 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 833641
29 June 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 165467
29 June 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 223399
15 April 1993
Hull Examination · COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 840599
4 March 1992
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1316422
11 September 1991
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1246632
31 July 1991
Drydock Extension
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 935676
11 March 1991
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 912496
2 April 1990
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1216274
8 March 1990
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 910056
17 January 1990
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 922392
13 March 1989
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 893674
15 June 1988
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1200944
12 February 1988
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1021077
26 March 1987
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1327180
19 March 1987
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1324789
9 April 1986
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1307077
10 September 1985
Credit Drydock
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1296163
27 March 1985
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 981107
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 June 2025
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. Vessels high level bilge alarm in compartment #2 was inoperable. Install new bilge alarm to the satisfaction of attending marine inspector.
46 CFR 182.530
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2025
Resolution: Provided proof of working bilge alarm
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 4 June 2025
Resolved
Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light. Two paddles in in one life float were rotted and broken. Replace broken or rotted paddles.
46 CFR 180.175(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 24 June 2025
Resolution: New paddles installed.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 4 June 2025
Resolved
Each paddle must be of at least 1,220 millimeters (4 feet) in length, lashed to the life float to which it belongs and buoyant. Two paddles were not of sufficient length. Replace with paddles of at least 4 feet in length.
46 CFR 180.175(f)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 24 June 2025
Resolution: New paddles installed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 February 2025
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel giving consideration to provisions for a seaworthy hull. Vessel has two six-inch cracks on starboard side of keel amid ship. Submit repair proposal.
46 CFR 177.100
Action required: 705 - Other - as specified
Resolved 8 April 2025
Resolution: Witnessed completed repair.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 11 June 2023
Resolved
All ducts shall be...reasonably gastight from end to end. One gasket on the ventilation cover on the starboard side of the vessel was inadequate.
Cite: 46 CFR 182.20-45(d) "OLD T"
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 June 2023
Resolved 23 June 2023
Resolution: Satisfactory evidence from vsl visit and pictures from vsl POC.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 June 2023
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Vessel had two types of life jackets on board, but only a donning placard for one type of lifejacket posted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2023
Resolved 20 June 2023
Resolution: Saw additional donning placard onboard.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 8 June 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. Vessel's first aid kit did not contain ammonia inhalants.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2023
Resolved 20 June 2023
Resolution: Saw ammonia towlettes onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 June 2023
Resolved
Each life jacket carried on a vessel on oceans, coastwise, or Great Lakes route, must have a life jacket light approved in accordance with § 161.012 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.112. Six infant life jackets & 18 Adult life jackets did not have approved lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2023
Resolved 26 June 2023
Resolution: Received photo of installed lights.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 8 June 2023
Resolved
For items not covered by standards in this subchapter, inspection shall be in accordance with standards acceptable to the Officer in Charge, Marine Inspection, as good marine practice. 4 cages and 2 domes were missing on various lighting fixtures.
Cite: 46 CFR 176.25-1(a) "OLD T"
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2023
Resolved 20 June 2023
Resolution: Satisfactory evidence to clear deficiency during vsl visit.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 June 2023
Resolved
For items not covered by standards in this subchapter, inspection shall be in accordance with standards acceptable to the Officer in Charge, Marine Inspection, as good marine practice. There were two exposed electrical wires in the lazarette.
Cite: 46 CFR 176.25-1(a) "OLD T"
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2023
Resolved 20 June 2023
Resolution: Satisfactory evidence to clear deficiency during vsl visit.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 June 2023
Resolved
For items not covered by standards in this subchapter, inspection shall be in accordance with standards acceptable to the Officer in Charge, Marine Inspection, as good marine practice. An electrical circuit for the the air compressor for one of the ship's horns was inoperable. The O/O stated an electrician will attend the vessel the week of 11JUNE2023. Provide electrician's report to our office following visit identifying the root cause of the issue and the solution.
Cite: 46 CFR 176.25-1 "OLD T"
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2023
Resolved 11 August 2023
Resolution: Received pictures and electricians report
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 31 May 2022
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate.
(CITE: 46 CFR §180.64)
Action required: 705 - Other - as specified
Due 14 June 2022
Resolved 6 June 2022
Resolution: Cleared via photo.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 31 May 2022
Resolved
Each life float and buoyant apparatus must be individually attached to the painter by a line meeting §180.175(f)(3) (ii), (iii), and (iv) and long enough that each life float or buoyant apparatus can float without contacting any other life float or buoyant apparatus in the group. The painter line currently in service is too short to meet this requirement. Replace painters with sufficient line to comply.
(CITE: 46 CFR §180.137)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2022
Resolved 6 June 2022
Resolution: Cleared via photo
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 31 May 2022
Resolved
Each portable fire extinguisher must be mounted in accordance with the manufacturers specifications to assure it is secured from falling or dismounting while remaining easily accessible to the crew. The portable extinguishers on the vessel are only supported by hangers the do not prevent sideways motion or accidentally being knocked off their mounts. Secure Portable Fire Ext to prevent excess movement.
(CITE: 46 CFR §181.500 & .520)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2022
Resolved 6 June 2022
Resolution: Cleared via photo
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 2 June 2021
Resolved
Noted UV damaged covering on 22-man Life-Float (LF). Determine approved repair procedures & repair damaged area of LF. CITE: 46 CFR §180.10-5 (Old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2021
Resolved 9 July 2021
Resolution: O/O used manufacture approved LF repair kit and sent in photos
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 2 June 2021
Resolved
Improper routing of painter for stacked LFs could cause weak link not to release LFs. Re-route LF painter to ensure proper operation of weak link. CITE: 46 CFR §180.20-1 (Old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2021
Resolved 9 July 2021
Resolution: Photographic evidence of proper routing was sent in and deemed sat
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 2 June 2021
Resolved
A separate circuit, fused at the main distribution panel shall be provided for ea radio-phone installation. Both VHF-DSC radios are currently on the same power supply. Re-wire VHF-DSC radios so that at least one (the primary) radio is on a dedicated power supply. CITE: 46 CFR §183.05-25 (Old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2021
Resolved 9 July 2021
Resolution: Radio tech report received to verify VHF DSC on own circuit
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 2 June 2021
Resolved
All ventilation & engines must automatically shutdown when CO2 is discharged, however, the generators are not automatically shut down. Ensure generator engines shut down with main engines when CO2 system is discharged in the engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2021
Resolved 9 July 2021
Resolution: It was determined that amount of CO2 (150lbs) on board was suffecient to extinguish generators as per NVIC 6-72.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 January 2021
Resolved
Vessel shall be ready for inspections of the hull structure. Engine room air intakes channels had significant delignification over both port and starboard engine. Clean, inspect, and seal damaged area. 46 CFR 176.802.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 February 2021
Resolved 2 June 2021
Resolution: Owner cleaned and epoxied the delignification over air intakes.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 4 June 2020
Resolved
Life float grab lines need repair and cracking in foam shell.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2020
Resolved 24 August 2020
Resolution: Grab lines have been repaired.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 April 2019
Resolved
Reconnect bonding wire to both shafts to the satisfaction of the attending marine inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2019
Resolved 30 May 2019
Resolution: Received photo showing reconnection of bonding wire to the shafts
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: No dimension information (AIS Antenna Position ABCD values equals 0).
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 6 November 2018
Resolution: AIS information updated.
Engineering › Fuel Oil Service System › Filter
Issued 12 June 2018
Resolved
Install caps or plugs in fuel water separators.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 12 July 2018
Resolution: caps were installed.
Electrical › Lighting (service) › Lighting Fixture
Issued 12 June 2018
Resolved
Install diffusers on all light fixtures in the engineroom.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 12 July 2018
Resolution: Covers were installed in engine room.
Electrical › Electric Supply System (service) › Cable
Issued 12 June 2018
Resolved
Remove extension cord on air compressor and install outlet within the vicinity of the air compressor
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 12 July 2018
Resolution: Most dead-end wires were removed.
Lifesaving › Lifefloat › Serviceable
Issued 12 June 2018
Resolved
Repair life floats IAW manufactures instructions.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 12 July 2018
Resolution: Lifeloat was replaced with a 22 man lifefloat. Overall persons count reduced by 3
Construction/Loadline › Structures › Transverse Bulkhead
Issued 12 June 2018
Resolved
Repair holes in watertight bulkhead between tank space and engine room.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2018
Resolved 12 July 2018
Resolution: The through bulkhead holes appeared water tight.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 14 June 2016
Resolved
Make proper penetration of collision bulkhead for hydraulic winch piping. Must be metallic piping or have proper bulkhead fittings.
Action required: 705 - Other - as specified
Due 28 June 2016
Resolved 7 November 2016
Resolution: Metallic bulkhead fitting installed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 14 June 2016
Resolved
Seal various bulkhead penetrations (i.e. copper piping, wiring) with acceptable sealant.
Action required: 705 - Other - as specified
Due 28 June 2016
Resolved 7 November 2016
Resolution: Penetrations sealed with 3M Fireblock
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 14 June 2016
Resolved
Prove proper operation of single side band radio. Vessel is restricted to limited coastwise route.
Action required: 705 - Other - as specified
Resolved 7 November 2016
Resolution: Verified operation of SSB.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 14 June 2016
Resolved
Replace fuel line penetrating the engine room fwd bulkhead with an acceptable material.
Action required: 705 - Other - as specified
Due 28 June 2016
Resolved 7 November 2016
Resolution: Fuel line was a small 1/8" vacuum line no longer in use and was rwemoved.
Fire Fighting › Fire Pumps › Arrangement
Issued 14 June 2016
Resolved
Replace fire/bilge pump discharge flex hose with an approved type (J1942) and fittings (J1475)
Action required: 705 - Other - as specified
Due 28 June 2016
Resolved 7 November 2016
Resolution: Proper hose and fittings installed.
Electrical › Electric Generation Source (service) › Generator
Issued 22 May 2012
Resolved
PROVE PROPER OPERATION OF PORT SIDE GENERATOR PRIOR TO USE.
Action required: 705 - Other - as specified
Resolved 4 June 2012
Engineering › Diesel Engine (propulsion-direct drive) › Pump, Positive Displacement
Issued 22 May 2012
Resolved
PROVER PROPER REPAIR TO MAINE DIESEL ENGINE RAW WATER PUMP.
Condition: Improper Installation
Due 29 May 2012
Resolved 4 June 2012
Construction/Loadline › Structures › Manhole
Issued 22 May 2012
Resolved
PROVE PROPER OPERATION OF LAZARETTE SCUTTLE.
Due 29 May 2012
Resolved 4 June 2012
Engineering › Bilge Water Management System › Valve
Issued 22 May 2012
Resolved
PROVE PROPER OPERATION OF BILGE PIPING VALVE ON AFT SIDE OF COLLISION BULKHEAD.
Due 29 May 2012
Resolved 4 June 2012
Fire Fighting › Fixed Fire Detection System › Power Supply
Issued 25 July 2007
Resolved
Make secondary power source for fire detection system operable.
Action required: 705 - Other - as specified
Due 8 August 2007
Resolved 26 July 2007
Resolution: Witnessed proper operation of secondary power source.
Electrical › Electrical Distribution System (service) › Cable
Issued 8 May 2007
Resolved
Install metal reinforced hangers for wiring in E/R at least every 24 inches.
Action required: 705 - Other - as specified
Due 25 May 2007
Resolved 30 May 2007
Resolution: Hangers installed as required.
Fire Fighting › Fire Hydrants › Condition
Issued 8 May 2007
Resolved
Label fire station on main deck.
Action required: 705 - Other - as specified
Due 25 May 2007
Resolved 30 May 2007
Resolution: Fire station has been properly labeled.
Electrical › Electrical Distribution System (service) › Cable
Issued 8 May 2007
Resolved
Remove dead end wires in lazarette compartment.
Action required: 705 - Other - as specified
Due 25 May 2007
Resolved 30 May 2007
Resolution: Dead end wires removed.
Fire Fighting › Fixed Fire Detection System › Approval
Issued 8 May 2007
Resolved
Submit plans for fire detection system for approval.
Action required: 705 - Other - as specified
Due 25 May 2007
Resolved 24 May 2007
Resolution: Received plans from Eastern Fire.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Block
Issued 25 April 2006
Resolved
Owner had the head changed on the port generator. At this time generator not operable. Before using owner must prove proper operation to attending Marine Inspector.
Action required: 705 - Other - as specified
Resolved 5 May 2006
Resolution: MI witnessed generator running and under load, all sat.
Construction/Loadline › Structures › Scuttle
Issued 25 April 2006
Resolved
Watertight scuttles on weatherdeck inop.
Action required: 705 - Other - as specified
Due 9 May 2006
Resolved 5 May 2006
Resolution: Watertight scuttles made operable. Attending MI witnessed proper operation.
Lifesaving › Lifefloat › Painter
Issued 21 April 2005
Resolved
Painters connecting lifefloats nos 1&2 and 2&3 no longer serviceable.
Action required: 705 - Other - as specified
Due 28 April 2005
Resolved 9 May 2005
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 21 April 2005
Resolved
Lifeline on ring no longer serviceable
Action required: 705 - Other - as specified
Due 28 April 2005
Resolved 9 May 2005
Navigation › Piloting/Steering › Magnetic Compass
Issued 21 April 2005
Resolved
Compass light inoperable.
Action required: 705 - Other - as specified
Due 28 April 2005
Resolved 9 May 2005
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 21 April 2005
Resolved
No emergency radio broadcast placard posted.
Action required: 705 - Other - as specified
Due 28 April 2005
Resolved 9 May 2005
Engineering › Pressure Vessel › Foundation
Issued 28 January 2005
Resolved
Air compressor not bolted down properly
Action required: 705 - Other - as specified
Resolved 17 March 2005
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Valve
Issued 28 January 2005
Resolved
Raw water intake valve, not of marine grade, replace with marine quality.
Action required: 705 - Other - as specified
Resolved 17 March 2005
Resolution: Replaced valve with marine grade quality 1 inch ball valve.
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 28 January 2005
Resolved
Guard for PTO and alternator missing.
Action required: 705 - Other - as specified
Resolved 17 March 2005
Resolution: Fabricated new guard and installed.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 28 January 2005
Resolved
Hose is rubbing on stering gear when actuated. Causing it to chafe through.
Action required: 705 - Other - as specified
Resolved 17 March 2005
Resolution: Replaced worn hose in lazarrete and moved out of way of steering.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 28 January 2005
Resolved
Both aft cutlass bearings show signs of serious deterioration. Shaft clearance is out of tolerance.
Action required: 705 - Other - as specified
Resolved 17 March 2005
Resolution: Replaced both aft cutlass bearings.
Lifesaving
Issued 20 November 2001
Resolved
REPLACE OUTDATED EPIRB HYDROSTATIC RELEASE. VSL RESTRICTED TO WITHIN 3 MILES OF SHORE.
Condition: Unknown
Due 6 December 2001
Resolved 12 December 2001
Documentation
Issued 20 November 2001
Resolved
PROVIDE FCC RADIO LOGBOOK.
Condition: Unknown
Due 3 December 2001
Resolved 12 December 2001
Navigation
Issued 20 November 2001
Resolved
REPAIR PORT NAV LIGHT.
Condition: Unknown
Due 3 December 2001
Resolved 12 December 2001
Electrical
Issued 20 November 2001
Resolved
PROVIDE BLANKS FOE VACANT BREAKERS ON ELECTRICAL PANEL.
Condition: Unknown
Due 3 December 2001
Resolved 12 December 2001
Fire Fighting
Issued 5 January 2001
Resolved
SERVICE ALL PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 8 January 2001
Resolved 8 January 2001
Fire Fighting
Issued 5 January 2001
Resolved
SERVICE FIXED FIRE FIGHTING SYSTEM.
Condition: Unknown
Due 8 January 2001
Resolved 8 January 2001
Navigation
Issued 9 November 1999
Resolved
REMOUNT PORT SIDE HYDRAULIC RAM.
Condition: Unknown
Due 15 November 1999
Resolved 22 November 1999
Fire Fighting
Issued 10 May 1999
Resolved
CONDUCT INSTALLATION PRESSURE TESTS AND INSPECTION OF CO2 SYSTEM.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Fire Fighting
Issued 16 March 1999
Resolved
EXAMINE FIXED FIRE FIGHTING EXTINGUISHING SYSTEM IN MACHINERY SPACE AT NEXTCG INSPECTOR VISIT.
Condition: Unknown
Due 16 March 1999
Resolved 16 March 1999
Construction/Loadline
Issued 4 December 1997
Resolved
RECONFIGURE UPPER DECK RAILING TO COMPLY W/46CFR177.900 FOR EXCURSION VESSELS.
Condition: Unknown
Due 4 December 1997
Resolved 4 December 1997
Engineering
Issued 4 December 1997
Resolved
REPAIR LEAK IN FUEL FILL FOR PORT FUEL TANK.
Condition: Unknown
Due 10 December 1997
Resolved 10 December 1997
Documentation
Issued 18 March 1994
Resolved
VESSEL MAY NOT CARRY ANY PASSENGERS MORE THAN 1000 FT FROM LAND UNTIL NEW FCC RADIOTELEPHONY CERTIFICATE ISSUED.
Condition: Unknown
Due 23 March 1994
Resolved 23 March 1994
Lifesaving
Issued 18 March 1994
Resolved
PROVIDE 10 ADDITIONAL ADULT PFD'S, TOTAL PERSONS ALLOWED REDUCED TO 142 UNTIL PROVIDED.
Condition: Unknown
Due 23 March 1994
Resolved 23 March 1994
Electrical
Issued 8 March 1990
Resolved
INSTALL PROPER GUARD OVER FLYWHEELS ON GENERATOR.
Condition: Unknown
Due 8 March 1990
Resolved 8 March 1990
Lifesaving
Issued 8 March 1990
Resolved
PROVIDE 1 RING BUOY FIT FOR SERVICE.
Condition: Unknown
Due 8 March 1990
Resolved 8 March 1990
Fire Fighting
Issued 8 March 1990
Resolved
HAVE 6-YEAR SERVICING PERFORMED ON 3 B-II STORED PRESSURE DRY CHEMICAL FIRE EXTINGUISHERS.
Condition: Unknown
Due 8 March 1990
Resolved 8 March 1990
Navigation
Issued 8 March 1990
Resolved
REPLACE BULBS IN THE PORT, STARBOARD, MASTHEAD AND STERN LIGHT WITH THE CORRECT TYPE BULB.
Condition: Unknown
Due 8 March 1990
Resolved 8 March 1990