MAURY USCG vessel records
← All vessels

MARY M MILLER

Built
1985
Last inspected
7 August 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 7 August 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDJ6013
248395
Flag
UNITED STATES
Maury page id
psix-248395

Documentation record

Registered dimensions (L × B × D)90.7 ft × 30.0 ft × 6.1 ft
Registered tonnagegross 95 / net 79
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMARINE BUILDERS, INC · UTICA, IN, UNITED STATES · built 1985
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portLOUISVILLE, KY
Endorsements, as the file codes themcw_un
DocumentationValid · issued 22 June 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it79 - Regulatory (Subpart C or D), Net Ton
95 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 20 inspections, each with its date, unit and type; 27 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 20

7 August 2026 In-Service Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8412228
13 April 2026 Deficiency Check · Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8345510
26 June 2025 Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8167257
16 November 2024 In-Service Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8034700
9 April 2024 COI Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7892358
15 February 2024 Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7859072
14 December 2023 Deficiency Check · Construction Oversight · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7839090
12 October 2023 Internal Structural Exam · Drydock Exam · Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7807454
28 June 2023 Deficiency Check · Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7725374
30 May 2023 In-Service Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7700402
7 April 2022 Periodic Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7426330
13 April 2021 Annual Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7173389
12 June 2020 Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6966871
14 January 2019 COI Inspection · Deficiency Check · Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6609814
24 July 2018 Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6489519
9 May 2017 Administrative Inspection · In-Service Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6142466
4 April 2017 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6117536
6 March 2017 MTSA/ISPS Verification · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6090113
13 February 2017 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6087498
23 February 2016 MTSA Verification · DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5820365

Deficiency record · 27

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 April 2026 Resolved
Nonconducting mats are required on the deck in front of each switchboard. Switchboards in generator space do not have nonconducting mats. Install mats in front of each switchboard.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 April 2026
Resolution: mats were installed.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 13 April 2026 Resolved
Pilothouse bridge has numerous open wires under the operating console. Terminate or cap wires.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 April 2026
Resolution: All wires have been terminated and capped off.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 November 2024 Resolved
Each vessel that relies on electricity to power to power the following loads must be arranged so that the loads can be energized from two sources of electricity: 1. The vital systems... 2. Interior lighting except for decorative lights; 3. Communication systems including a PA system...; 4. Navigation equipment and lights. The vessel's port generator is exceeding 60HZ whenever placed under load. Prove proper operation of the port generator prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 November 2024
Resolved 20 November 2024
Resolution: Provided proper operation of the port generator, with normal operations, then with a Full load.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 April 2024 Resolved
Clean port generator, identify any leaks.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2024
Resolved 30 April 2024
Resolution: Rebuilt fuel oil pump installed and tested satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 15 April 2024 Resolved
Illustrations and instructions in English, and any other appropriate language as determined by the OCMI, must be posted in each passenger cabin and in spaces occupied by persons other than crew, and must be conspicuously displayed at each muster station. The illustrations and instructions must include information on - The method of donning lifejackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2024
Resolved 16 April 2024
Resolution: The illustrations and instructions have been posted on - The method of donning lifejackets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 June 2023 Resolved
46CFR120.200 Outlet connection was missing blank cover and an exposed low volt communication wire end exposed were both found in the snack shack directly under the navigation bridge on the 3ed deck.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 August 2023
Resolved 27 July 2023
Resolution: Replaced cover
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 April 2022 Resolved
Vessel is required to have a reachrod on the weatherdeck capable of operating the screw-down valve on the bilge piping system. Currently, the reachrod is in-operable. Repair/replace reachrod.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2022
Resolved 22 April 2022
Resolution: The reachrod is operational
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 April 2022 Resolved
Type I PFDs must have at least 31 square inches of retroreflective material on front and back. Multiple PFDs throughout the vessel had degraded retro or an inadequate amount of retro material. Replace/repair to servicable conditions.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2022
Resolved 22 April 2022
Resolution: Replaced retro of PFD's.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 January 2019 Resolved
Remove pressure vessel inspection plugs to facilitate 5 year internal inspection.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2019
Resolved 4 June 2019
Resolution: Pressure guage, relief valve and plug removed to see internals, all satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 27 July 2018 Resolved
Raw water pump for air conditioning heat exchanger was leaking excessively resulting in approximately 3" of water in the starboard engine room bilge. Valve to sea suction had to be secured to stop the leak. Vessel cannot operate with sea suction to heat exchanger pump open until pump is repaired and leak is eliminated.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2018
Resolved 27 July 2018
Resolution: MI verified vessel leak was properly repaired
09 - Working and Living Conditions › 091 - Living Conditions › Cleanliness
Issued 27 July 2018 Resolved
Excess equipment, tools, gear, trash, and parts are scattered throughout the engineering spaces. Items need to be properly stowed/secured for operations during all possible river conditions.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2018
Resolved 6 August 2018
Resolution: All gear adrift in eng room secured.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 24 July 2018 Resolved
Vessel fire pump was seized and not opperable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2018
Resolution: Fire pump was replaced and tested satisfactory.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 24 July 2018 Resolved
Two batteries were found stored in the bilge of the engine room and sewage room unsecured or protected from exposure.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2018
Resolved 27 July 2018
Resolution: Batteries were removed from the vessel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 July 2018 Resolved
Power strip is being utilized as permanent wiring solution for oven, fan, and refrigerator in sewage/storage room.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 July 2018
Resolution: Power strip was removed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 July 2018 Resolved
Three life jackets were found in wasted condition.
Action required: 10 - Deficiency Rectified
Due 24 July 2018
Resolved 24 July 2018
Resolution: Three new life jackets were brought on board.
Fire Fighting › Fire Pumps › Pressure
Issued 14 July 2017 Resolved
Prove proper operation of fire pump without having to bleed air from system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: Vent line installed on seachest piping, fire pump tested satisfactory several times without bleeding air from system.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 14 July 2017 Resolved
Conduct required training; maoverboard, fire, abandon ship, security drills. Ensure all training and drills properly logged.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: Training and drills conducted and logged.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 14 July 2017 Resolved
Install additional extinguishers in all service areas and generator room.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: Additional extinguishers installed.
Fire Fighting › Nozzles › Type
Issued 27 June 2017 Resolved
Replace fire hose nozzle on 2nd deck that needs an adapter with a nozzle that is able to be used on all fire hoses without an adapter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: New nozzle installed that matches and fits all hoses onboard.
Fire Fighting › Fire Hydrants › Material
Issued 27 June 2017 Resolved
Install missing spanner at fire hydrant on 3rd deck, ensure 2nd deck securely fastened.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: Spanners installed and properly fastened.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 27 June 2017 Resolved
Ensure 575 adult & 58 child properly maintained life jackets are on board.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: All lifejackets inspected repaired or replaced and properly stowed and labeled.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 27 June 2017 Resolved
Repair aft portion of rail port & stbd 2nd deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: Both sections repaired.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 27 June 2017 Resolved
Repair/ replace/ prove proper operation of emergency lighting above forward port door on 2nd deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: New light installed and tested satisfactory.
Construction/Loadline › Structures › Door
Issued 27 June 2017 Resolved
Replace broken door 2nd deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: New door installed.
Electrical › Lighting (service) › Lighting Fixture
Issued 27 June 2017 Resolved
Repair/ replace/ prove proper operation of 2 broken lights 3rd deck under bridge wings.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2017
Resolution: Light fixtures replaced, properly mounted and tested satisfactory.
Fire Fighting › Fire Hoses › Condition
Issued 2 March 2016 Resolved
Properly replace 02 holed fire hoses.
Due 16 March 2016
Resolved 16 March 2016
Resolution: Replaced.
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 23 February 2016 Resolved
Properly install missing fire clips for 02 deck stbd side two windows.
Due 16 March 2016
Resolved 16 March 2016
Resolution: Clips were properly installed.

Recorded names · 1

GEORGIA QUEEN (2011). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.