Records from 2006 to 2025. Most recent: inspection, 27 October 2025.
Inspection history · 34
27 October 2025
Construction Oversight · Examination of Repairs · Vessel Attendance
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8259324
8 July 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8166373
7 January 2025
Hull Examination · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8056613
9 November 2024
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8032690
25 October 2024
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8024716
1 May 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7896789
5 May 2023
Deficiency Check · MTSA Verification · In-Service Inspection · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7675333
7 February 2023
Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7630638
5 January 2023
Hull Examination · Administrative Inspection · Examination of Repairs · Deficiency Check · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7616439
9 November 2022
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7588906
1 June 2022
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7459794
3 August 2021
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7265295
7 July 2021
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7313520
17 February 2021
Examination of Repairs · Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7153681
19 January 2021
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7126467
4 August 2020
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7018960
24 October 2019
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6840968
21 May 2019
MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6689712
14 March 2019
Examination of Repairs · In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6642557
25 February 2019
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6631876
27 January 2019
Security Breach
Type not classified · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6615979
12 September 2018
Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6538783
11 May 2018
Deficiency Check · Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6412542
9 May 2018
COI Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6404891
18 April 2018
Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6398272
12 January 2018
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6338530
18 June 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6179268
18 June 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6179282
17 June 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6178784
6 April 2017
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6119653
28 March 2017
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6113198
2 March 2017
Drydock Extension
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6097476
9 December 2016
MTSA Verification · Security Breach
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6055175
22 March 2016
Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5838381
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 8 July 2025
Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard drill be held under simulated emergency conditions specified by the inspector. Ladder utilized during man overboard drill was too long. Bottom of ladder was below waterline creating an unsafe condition to crew. Shorten ladder or provide alternate arrangements for recovery of man overboard to satisfaction of attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 July 2025
Resolved 11 July 2025
Resolution: Operator updated MOB procedures to the satisfaction of marine inspector.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 July 2025
Resolved
For portable fire extinguishers, the inspections, maintenance procedures and hydrostatic pressure tests required by NFPA 10, (incorporated by reference, see § 114.600 of this chapter) with the frequency specified by NFPA 10. Where at least monthly manual inspections are conducted, the date the manual inspection was performed and the initials of the person performing the inspection shall be recorded. Vessel could not provide proof of required monthly inspections. Provide satisfactory evidence of inspection record keeping to satisfaction of attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 July 2025
Resolved 22 July 2025
Resolution: Comapny SOP updated to require monthly inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 July 2025
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Light for the STBD ring buoy was damaged, had expired battery, and deteriorated line. Replace to satisfaction of attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 July 2025
Resolved 23 July 2025
Resolution: Life buoy and light were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 July 2025
Resolved
Each lifejacket must be approved under approval series 160.002, 160.005, 160.055, 160.155, 160.176, or 160.255 in subchapter Q of this chapter, or other standard specified by the Commandant, all of which require retroreflective tape. The vessel's stock of life preservers was found to have retro-reflective tape that was substantially degraded. The retro-tape on life preservers should be replaced with tape meeting the type I material standard found in subpart 164.018 of this chapter. Limited to daylight operations only.
Action required: 705 - Other - as specified
Resolved 23 July 2025
Resolution: PFDs were re-marked with retro tape.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 July 2025
Resolved
Each lifejacket must be approved under approval series 160.002, 160.005, 160.055, 160.155, 160.176, or 160.255 in subchapter Q of this chapter, or other standard specified by the Commandant, all of which require retroreflective tape. The vessel's stock of life preservers was found to have retro-reflective tape that was substantially degraded. The retro-tape on life preservers should be replaced with tape meeting the type I material standard found in subpart 164.018 of this chapter. 46 CFR 180.25-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 July 2025
Resolved 23 July 2025
Resolution: Operator replaced all retro-reflective material on all PFD's
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 July 2025
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment under all practical conditions. Bilge suction line in lazarette not drawing suction. Repair to an operational condition to the satisfaction of attending marine inspector. 46CFR182.25-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 July 2025
Resolved 22 July 2025
Resolution: Verified bilge pickup drew suction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 1 May 2024
Resolved
Exhaust shall be gas-tight throughout its length and shall be properly supported by non-combustible hangers or blocks. STBD exhaust manifold in vessel's tank room had an exhaust leak which left a pile of soot on the deck. This issue needs to be addressed/repaired.
46 CFR 182.20-20
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2024
Resolved 30 May 2024
Resolution: Operator fixed exhaust leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 May 2024
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. STBD fuel shutoff valve did not close/seat all the way, which could allow fuel flow after actuated.
46 CFR 182.20-40(b)(3)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 1 May 2024
Resolution: Owner/Operator repaired the fuel shutoff valve during the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 May 2024
Resolved
Each small battery installation must be located in a well ventilated space and protected from falling objects. Both MDE battery storage covers were missing stanchion/legs which allows natural ventilation and prevents the battery cables from being bent/pinched. This cover issue needs to be addressed/repaired.
46 CFR 120.354(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2024
Resolved 15 May 2024
Resolution: Operator installed a new battery box cover.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 1 May 2024
Resolved
Where rigid nonmetallic material is permitted for use in piping systems, the following restrictions shall be adhered to. An acceptable metallic shutoff valve is installed adjacent to the through deck or through bulkhead fitting. This valve shall be operable from above the bulkhead deck. If two valves are installed, one on either side of the bulkhead, the valves need not be operable from above the bulkhead deck provided immediate access to both is possible. Where both plastic and metallic pipes are used in a bulkhead penetrating system and where the two materials exist entirely on opposite sides of the bulkhead, the required shutoff valve shall be installed at the bulkhead in the metallic part of the system, and may be locally operated provided immediate access is possible. The PVC piping that penetrates the aft bulkhead tank room, and connects to a metallic pipe in the lazarette, is missing required valves.
46 CFR 182.40-1(a)(1)(ii)
Action required: 705 - Other - as specified
Due 29 January 2025
Resolved 11 July 2025
Resolution: Operator installed necessary positive closure devices to the satisfaction of marine inspector.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 5 May 2023
Resolved
On a vessel on a protected route, a watertight coaming with a height of at least 75 millimeters (3 inches) must be provided under each weathertight door in a cockpit or a well. Two 2" holes were found in aft door coaming.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2023
Resolved 1 June 2023
Resolution: REPAIRED IN KIND
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2023
Resolved
Connections must be made to battery terminals with permanent type connectors. Spring clips or other temporary type clamps are prohibited. One wingnut was found securing cables to the pilot house battery.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2023
Resolved 10 May 2023
Resolution: O/O sent pictures of correct nuts on battery terminals.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 5 May 2023
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Galley microwave was plugged into surge protector portable cord.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 5 May 2023
Resolution: Microwave was unplugged, removed, and/or will be rerouted to direct 110V oulet.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 5 January 2023
Resolved
Sea inlets and discharges, such as in closed systems required for the operation of main and auxiliary machinery, shall be fitted with a shutoff valve located as near to the shell plating as practicable. Both main engines and both generators are fitted with non-integral keel coolers with no shutoff valves installed. Shutoff valves to be installed prior to 2025 Hull Exam credit. 46 CFR 56.50-95(d)(1)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 January 2025
Resolved 11 July 2025
Resolution: Repair to the satisfaction of attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 August 2021
Resolved
The minimum capacity of the power fire pump shall be 50 GPM at no less than 60 PSI. Fire pump output was less than 60 PSI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2021
Resolution: Fire pump output was greater than 60 PSI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 August 2021
Resolved
Fuel shutoff valves shall be installed at the fuel supply lines. Remote fuel shutoff on starboard side failed to operate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2021
Resolution: shutoff on starboard side tested, sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 August 2021
Resolved
Life preservers shall be marked with the vessel's name. Not all life preservers marked with the vessel's name.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 August 2021
Resolved 4 August 2021
Resolution: life preservers marked with the vessel's name.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 August 2020
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection & one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment, preferably from an accessible position on the weather deck. Both remote fuel shut off controls are located within the compartment. 46 CFR 182.20-40(b)(3)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 August 2020
Resolved 18 August 2020
Resolution: Attended vessel and observed newly installed fuel shutoff valves outside of E/R space.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 4 August 2020
Resolved
Penetrations and openings in watertight bulkheads must have a means to make them watertight. MTWB between engine room and lazarette has an unsealed penetration on the upper port side.
46 CFR 171.114
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 August 2020
Resolved 18 August 2020
Resolution: Attended vessel and observed filled penetration.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 August 2020
Resolved
All lights, receptacles & switches exposed to the weather shall be watertight & on vessels operating in salt water, shall be constructed of corrosion-resistant material. The second deck exterior lights were found with fractured plastic covers. 46 CFR 183.05-35(b)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 August 2020
Resolved 18 August 2020
Resolution: Attended vessel and observed newly installed light covers.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 4 August 2020
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets. The lifejacket stowage locations on the main deck doesn't match the number of lifejackets stored in that location. 46 CFR 122.604(f)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 4 August 2020
Resolution: Stowage locations properly labeled.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 12 September 2018
Resolved
Vsl is broadcasting no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 22 October 2018
Resolution: While running a query in VIVS, all information had been updated and AIS was broadcasting the proper information.
Construction/Loadline › Structures › Superstructure
Issued 11 May 2018
Resolved
Make repairs to handrail on second deck aft STBD side to the satisfaction of attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 May 2018
Resolved 6 June 2018
Resolution: Cracked handrail was re-welded and repaired.
Fire Fighting › Fire Main › Condition
Issued 9 May 2018
Resolved
Replace wasted discharge piping IWO fire pump.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2018
Resolved 24 May 2018
Resolution: Discharge piping IWO fire pump replaced.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 9 May 2018
Resolved
Repair/replace damaged fire insulation above stbd main engine.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2018
Resolved 24 May 2018
Resolution: Fire insulation above stbd MDE replaced.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 9 May 2018
Resolved
Repair/replace e-lighting above generator.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2018
Resolved 24 May 2018
Resolution: E-lighting above generator repaired.
Electrical › Electric Supply System (service) › Cable
Issued 9 May 2018
Resolved
Terminate/remove dead ended cable in lazarette.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2018
Resolved 24 May 2018
Resolution: Dead-ended cable in lazarette removed.
Construction/Loadline › Structures › Deck Plating
Issued 9 May 2018
Resolved
Repair holes in overhead lazerette.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2018
Resolved 24 May 2018
Resolution: Holes in lazarette repaired.
Construction/Loadline › Hull › Bottom Plating
Issued 9 May 2018
Resolved
Make #3 void available for inspection
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2018
Resolved 24 May 2018
Resolution: #3 Void made available for inspection.
Construction/Loadline › Structures › Deck Plating
Issued 9 May 2018
Resolved
Repair deck in male head.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2019
Resolved 24 May 2018
Resolution: Deck in male head repaired.
Electrical › Electric Supply System (service) › Battery Installation
Issued 9 May 2018
Resolved
Repair wasted stbd battery box.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2018
Resolved 24 May 2018
Resolution: Starboard battery box repaired.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 9 May 2018
Resolved
Submit periodic safety test procedures to MSC for approval.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2018
Resolved 6 June 2018
Resolution: PSTPs submitted to MSC for approval.
Construction/Loadline › Hull › Side Shell
Issued 16 January 2018
Resolved
At next hull exam make permanent repairs to 02 inserts that were allowed as temporary repairs after relocating the main engine exhaust. 04 inserts were made on the aft side shell plate of the lazarette (02 gen/02 main eng). The temp inserts referenced are located outboard. Permanent repairs must cover two frame bays and extend doen to the chine or to good metal.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 April 2019
Resolved 27 February 2019
Resolution: Approved two inserts, 3ft X 18in, inspected sat.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 6 April 2017
Resolved
Repair exhaust leak on the port side in lazzarette for main engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 April 2017
Resolved 3 May 2017
Resolution: Exhaust leak was repaired.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 6 April 2017
Resolved
Provide a means of proper recovery of MOB. Prove proper operation with MOB drill.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 27 April 2017
Resolved 3 May 2017
Resolution: Platform was installed on ladder.
Accommodation/Occupational Safety › Heating › Piping
Issued 6 April 2017
Resolved
Replace missing lagging on the exhaust for both main diesel engines in the tank room and lazarette.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 April 2017
Resolved 3 May 2017
Resolution: Missing lagging was replaced.
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 6 April 2017
Resolved
Repair/replace jacket water gauge on both main deisel engines.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 April 2017
Resolved 16 May 2017
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 6 April 2017
Resolved
Vessel missing forward and aft draft marks. Permanently mark at next drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2019
Resolved 25 February 2019
Resolution: Permanently marked Draft marks.
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 6 April 2017
Resolved
Rug may not pass underneath doors.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 27 April 2017
Resolved 3 May 2017
Resolution: A break in the rug was added under stairway doors.
Electrical › Electrical Distribution System (service) › Switch
Issued 22 March 2016
Resolved
Provide face plate for light switch in forward compartment.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2016
Resolved 22 March 2016
Resolution: Corrected on the spot. Installed a face plate.
Engineering › Bilge Water Management System › Pump
Issued 22 March 2016
Resolved
Prove proper operation of bilge pumping system.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 April 2016
Resolved 5 April 2016
Resolution: Bilge system was disassembled at the manifold and cleaned out, new check valve was installed, all VSL compartments were filled with water and both the port and starboard pumps were used to alternately pump out compartments SAT
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 22 March 2016
Resolved
Install A-60 insulation on door, bulkhead, and overhead in Furnace Room prior to operating furnace.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2016
Resolved 5 April 2016
Resolution: New insulation (A-60) was installed on all sides of the boiler room sat.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 22 March 2016
Resolved
Update upper deck passenger limit marking in accordance with COI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2016
Resolved 5 April 2016
Resolution: Upper decks passenger markings were labeled correctly sat.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 22 March 2016
Resolved
Re-label life jackets with vessel name.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2016
Resolved 5 April 2016
Resolution: All life jackets needing the name on them were re-labeled sat.