Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)101.4 ft × 24.0 ft × 8.9 ft
Registered tonnagegross 98 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPROGRESSIVE SHIPBUILDERS · HOUMA, LA, UNITED STATES · built 1986
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portGULFPORT, MS
Endorsements, as the file codes themcw_un
DocumentationValid · issued 11 November 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton 66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 22 inspections, each with its date, unit and type; 17 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 1 other vessel inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 February 2026Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump outlet shall be fitted with a pressure gage. MI identified an inoperable pressure gauge.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 25 February 2026
Resolved 25 February 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 February 2026Resolved
Each vessel must be provided with a visual and audible alarm at the operating station to indicate a high water level in each of the following normally unmanned spaces. MI observed high water alarm was neither audible or visual for the steering gear lazarette.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 25 February 2026
Resolved 25 February 2026
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 February 2024Resolved
The settings of the safety or relief valves on all pressure vessels must be examined twice every 5 years. The vessels PRV's were beyond 3 yrs since last test.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2024
Resolved 16 April 2024
Resolution: Vessel sent in pics of new replaced safety relief valves.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 February 2024Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J–1942 or USCG Type A1, A2, B1, or B2 flexible hose. Vessel had 2 hoses on the stbd generator that were not type approved.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2024
Resolved 16 April 2024
Resolution: Vessel sent in pics of new approved fuel hoses.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 February 2024Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. All of the vessels Racor fuel filters had large amounts of growth in them. 01 had visible cracking of the bottom bowl and must be replaced.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2024
Resolved 16 April 2024
Resolution: Vessel sent in pics of new filters along with new metallic filter bottoms.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 27 February 2024Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. Several life float pennants were found worn.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2024
Resolved 16 April 2024
Resolution: Vessel sent in pics of new pennants on life float.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 February 2024Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Found one recepticle in the galley that had the hot and neutral wires switched and one in the tool room with a open ground.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2024
Resolved 11 March 2024
Resolution: Vessel sent inphotos of the new recepticles with a tester plugged in indicating sat results.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 27 February 2024Resolved
All portions of machinery bulkheads must be watertight below the bulkhead deck. Vessel had 01 penetrations on the aft engine room bulkhead, stbd side that was not watertight.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2024
Resolved 16 April 2024
Resolution: Vessel sealed up machinery penetration.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 May 2023Resolved
Vessels bilge alarms did not have an audible alarm.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 4 May 2023
Resolved 4 May 2023
Resolution: Vessel repaired audible alarm and tested in the presence of attending MI. Cleared on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 December 2022Resolved
Proper installation and testing of main engines, auxiliary engines, and propulsion engine control systems shall be conducted to the satisfaction of the attending marine inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2023
Resolved 26 April 2023
Resolution: Conducted satisfactory DVTP's on the vessel with the exception of 1 which will be conmducted during the annual exam on 04May23. Activity # 7624422.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2019Resolved
Identified a leak on the vessels port MDE raw water pump. Vessel is to repair or replace the raw water pump.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2019
Resolved 13 January 2020
Resolution: Vessel replaced R/W pump.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 6 December 2017Resolved
Vessel required to post a Fire Control PLan that is accessible to crew and passengers. Vessel did not have a Fire Control Plan posted. Provide/post a Fire Control Plan.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 2 February 2018
Resolution: Fire plan completed and posted.
Stability › Watertight Integrity › Coaming
Issued 30 November 2016Resolved
Adjust laz escape hatch so that it properly secures.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 December 2016
Resolved 13 December 2016
Resolution: Escape hatch adjusted to properly secure.
Fire Fighting › Remote Fuel Shutoff › General
Issued 30 November 2016Resolved
Adjust fuel shut off valve so that it completely opens when activated.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 December 2016
Resolved 30 November 2016
Resolution: Adjusted to work properly.
Exhaust on starboard main engine missing hose clamp. Apply a hose clamp to make secure.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 December 2016
Resolved 13 December 2016
Resolution: Hose clamp added.
Deck/Cargo › Holds/Tanks › Tank Pressure Monitoring Device
Issued 30 November 2016Resolved
Guage inoperable on the hydraulic steering system. Replace or repair guage.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 December 2016
Resolved 13 December 2016
Resolution: New guage installed.
Stability › Watertight Integrity › General
Issued 30 November 2016Resolved
WTD light when opened not operating.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 December 2016
Resolved 13 December 2016
Resolution: Light at operating station working properly.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.