Records from 1987 to 2026. Most recent: inspection, 31 March 2026.
Inspection history · 90
31 March 2026
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8316548
27 October 2025
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8259202
20 May 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8139668
11 March 2025
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8091539
21 January 2025
Deficiency Check · Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8067636
29 February 2024
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7872392
11 January 2024
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7848423
14 August 2023
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7769069
16 March 2023
Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7652410
2 March 2023
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7644639
19 January 2023
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7621183
16 June 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7479490
10 May 2022
Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7448221
10 January 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7377847
8 November 2021
Administrative Inspection · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7347235
18 August 2021
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7284408
2 March 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7151028
21 January 2021
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7128505
3 March 2020
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6918971
3 October 2019
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6828525
16 April 2019
Drydock Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6664565
12 February 2019
Annual Inspection · Drydock Extension
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6624036
19 November 2018
Internal Structural Exam · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6583871
23 October 2018
Type not recorded
No type recorded · USCGC HAMMERHEAD (WPB 87302) · USCG Northeast District (CGD-NE) · Activity 6567615
9 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6505839
5 March 2018
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6364902
9 July 2017
Type not recorded
No type recorded · Station Manasquan Inlet · USCG East District (CGD-E) · Activity 6203919
15 February 2017
Internal Structural Exam · Examination of Repairs · Hull Examination · Plan Review "T" Boat
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6087288
21 December 2016
DAPI Audit · Administrative Inspection · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6056648
16 March 2016
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5834177
2 June 2014
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4876849
12 March 2014
Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4813937
30 July 2012
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4395922
17 February 2012
DAPI Audit · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4246457
15 December 2009
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3650032
3 March 2009
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3426736
6 March 2008
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3158692
19 December 2007
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3117684
28 February 2007
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2877899
7 May 2006
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2644908
7 May 2006
Examination of Repairs · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2692377
21 March 2006
Annual Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2643457
1 December 2005
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2542606
1 April 2005
Annual Inspection · Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2324701
1 April 2004
Periodic Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2040061
16 December 2003
Hull Examination · Internal Structural Exam
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1982109
13 August 2003
Type not recorded
No type recorded · Station Sandy Hook · USCG Northeast District (CGD-NE) · Activity 1874999
21 February 2003
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1747254
18 December 2002
Administrative Inspection
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1720405
8 July 2002
In-Service Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1642658
22 March 2002
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1496002
7 March 2002
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1491915
12 December 2001
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1077085
31 July 2001
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1070999
28 March 2001
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1061328
22 March 2000
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 816389
30 November 1999
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1046681
4 October 1999
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1044624
9 April 1999
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1123192
8 March 1999
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 804868
28 June 1998
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 107737
30 March 1998
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 787474
21 January 1998
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1116306
15 June 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 170563
24 March 1997
Deficiency Check · Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1091722
29 March 1996
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1078957
22 March 1996
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1077607
22 March 1996
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1089334
8 December 1995
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1190086
26 March 1995
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 862974
9 October 1994
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 74220
16 May 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 860239
29 March 1994
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 858922
4 March 1994
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 857816
25 March 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 835263
20 March 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1258433
6 March 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1257746
21 March 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 901509
8 March 1991
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 908894
14 June 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 915890
27 March 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 913087
13 March 1990
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 905402
1 February 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1217387
20 March 1989
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1196997
23 February 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1345198
1 February 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 892978
16 March 1988
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1336584
24 February 1988
COI Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1030088
27 March 1987
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1004979
2 February 1987
Initial Certification
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1313125
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 31 March 2026
Resolved
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Vessel does not have an interconnected fire detection system onboard. Vessel is restricted to a limited coastwise route until detection system is installed and tested to satisfaction of MI. 46 CFR 181.405(c)
Action required: 705 - Other - as specified
Resolved 30 April 2026
Resolution: Smoke detection system installed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 31 March 2026
Resolved
The lifeline and pendants must be as furnished by the manufacturer with the approved life float or buoyant apparatus. Replacement lifelines and pendants must meet the requirements in Subpart 160.010 of this chapter. Lifeline and inner basket bights on four of five life floats are deteriorated and/or severed. Repair or replace life floats to satisfaction of MI. 46 CFR 180.175 (f)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2026
Resolved 30 April 2026
Resolution: 2 life floats replaced with 50 person IBA.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 31 March 2026
Resolved
The minimum capacity of the power fire pump shall be at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump outlet shall be fitted with a pressure gage. Fire pump pressure gauge found inoperable during testing. Repair/replace gauge. 46 CFR 181.10-1(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2026
Resolved 30 April 2026
Resolution: Gauge was blocked. Cleaned and tested sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 31 March 2026
Resolved
Every vessel subject to Part III of Title III of the Communications Act must have a detailed inspection of the radio installation by an FCC-licensed technician in accordance with § 80.59 once every five years. Vessel’s Safety Radiotelephony certificate was found expired. Renew certificate to satisfaction of MI. 47 CFR 80.903
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2026
Resolved 30 April 2026
Resolution: New certificate issued.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 31 March 2026
Resolved
Where life preservers are stowed so that they are not readily visible to passengers, the containers in which they are stowed shall be marked “life preservers” and with the number contained therein, in at least 1-inch letters and figures. Life preserver stowage inside the accommodation space is not marked with the number of life preservers contained. Install appropriate markings to satisfaction of MI. 46 CFR 180.25-15(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2026
Resolved 30 April 2026
Resolution: Markings added to stowage.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 31 March 2026
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Vessel carries two types of lifejackets onboard and do not currently have donning instructions for each type. Post new instructions to satisfaction of MI. 46 CFR 185.516 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2026
Resolved 30 April 2026
Resolution: New instructions posted.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 31 March 2026
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Electric fan in steering gear/lazarette was found with corroded housing and becoming detached from duct due to continued pressure from entry/egress ladder. Repair/replace fan to satisfaction of MI. 46 CFR 183.01-15 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2026
Resolved 30 April 2026
Resolution: Old electric fan was permanently removed.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 31 March 2026
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible. Vessel is currently utilizing Garmin Chart Plotter that does not meet NVIC 01-16 Change 3 equivalency requirements for electronic charting systems and does not have paper charts onboard. Place up-to-date charts onboard for planned operating areas to satisfaction of MI. 46 CFR 184.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2026
Resolved 30 April 2026
Resolution: Charts updated.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 March 2026
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Grounding wire in steering gear/lazarette space on starboard side was found detached. Reattach to satisfaction of MI.
46 CFR 183.01-15 (a), 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2026
Resolved 30 April 2026
Resolution: Grounding wire reattached.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 26 February 2025
Resolved
Wood deck in galley cabinet above port generator had significant wood rot and angel hair present in frames above generator. Verify repairs completed iaw submitted/discussed plans from drydock.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2025
Resolved 11 March 2025
Resolution: verified repairs for the deck directly above the port generator; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 26 February 2025
Resolved
Upper deck hand rails had moderate play on port and starboard aft railings. Secure railing mounts prior to carrying passengers on the upper deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2025
Resolved 11 March 2025
Resolution: all hand rails were inspected and were in good working order during the COI inspection. Cleared def.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 21 January 2025
Resolved
Natural ventilation vent into port side of lazarette had protective screen half missing. Replace screen.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2025
Resolved 11 March 2025
Resolution: Verified installation at coi inspection; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 21 January 2025
Resolved
Rag found in vertical PVC pipe in lazarette. Remove rag and cap off PVC pipe.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2025
Resolved 11 March 2025
Resolution: Verified removal at coi inspection; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 29 February 2024
Resolved
MI discovered 15' of deck rail on the port side upper deck unstable. Multiple screws and brackets lifted allowing significant play in the railing when pressure applied. Require repairs to deck rails prior to carriage of passengers on upper deck.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 April 2024
Resolved 16 April 2024
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 29 February 2024
Resolved
Missing signage for max psgrs allowed on upper deck at aft ladder. Vsl restricted from allowing psgrs access to upper deck until signage is posted.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 April 2024
Resolved 16 April 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 March 2023
Resolved
A BATTERY CHARGER INTENDED FOR CONNECTION TO A COMMERCIAL SUPPLY VOLTAGE SHALL EMPLOY A TRANSFORMER OF THE ISOLATING TYPE. AN AMMETER THAT IS READILY VISIBLE SHALL BE INCLUDED IN THE BATTERY CHARGER CIRCUIT.
OBSERVED INOPERABLE/MISSING BATTERY CHARGER AMMETER ON THE AFT BULKHEAD ON THE PORT SIDE OF THE ENGINE ROOM (BEHIND THE PORT GENERATOR).
REQUIRE REPAIR/REPLACE OF THE AMMETER TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
46 CFR 183.05-20(f)
50C
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2023
Resolved 26 April 2023
Resolution: O/O provided photographic evidence of new ammeter installation.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 2 March 2023
Resolved
THE BRIDGE-TO-BRIDGE ACT AND THE REGULATIONS OF THIS PART APPLY TO EVERY POWER-DRIVEN VESSEL OF 20 METERS OR OVER IN LENGTH WHILE NAVIGATING.
OBSERVED INVALID FCC BRIDGE-TO-BRIDGE CERTIFICATE ON BOARD VESSEL.
VESSEL IS REQUIRED TO UPDATE AND PROVIDE VALID CERTIFICATE TO THE ATTENDING MARINE INSPECTOR.
47 CFR 80.1001(a)
50C
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2023
Resolved 28 March 2023
Resolution: Vessel master provided valid Bridge-to-Bridge certificate for vessel.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 21 January 2021
Resolved
Nonmetallic material is permitted for use in piping systems with certain restrictions... Penetrations through watertight bulkheads must be accomplished using an acceptable metallic fitting and an acceptable metallic shutoff valve is installed adjacent to the through deck or through bulkhead fitting that is operable from above the bulkhead deck. Alternatively, two valves can be installed, one on each side of the bulkhead, that do not need to be operable from above the bulkhead deck as long as immediate access to both valves is possible. Install suitable valve arrangement for the nonmetallic sewage piping that leads from both heads and penetrates the watertight bulkhead between the engine room and lazarette compartments, or install all metallic piping for the system. - 46CFR "Old T" 182.40-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 February 2021
Resolved 2 March 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 21 January 2021
Resolved
Remove dead end piping that extends from engine room to the lazarette through the watertight bulkhead and seal penetration. - 46CFR171.114
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 February 2021
Resolved 2 March 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 21 January 2021
Resolved
Seal penetration of control cable that penetrates the watertight bulkhead between the lazarette and engine room on port side. - 46CFR171.114
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 February 2021
Resolved 2 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 3 March 2020
Resolved
Label all the lifefloat paddles with the vessels name. Some paddles were unmarked or worn and require new labels. 46 CFR 185.604(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 21 January 2021
Resolution: Lifefloat paddles were marked with vessel's name.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 3 March 2020
Resolved
The lifefloat light needs to be properly connected around the body of the lifefloat. 46 CFR 180.175(f) (4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 3 March 2020
Resolution: Corrected on the spot.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 3 March 2020
Resolved
Properly connect the lifefloats to the painter line. 46 CFR 180.137c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 2 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 March 2020
Resolved
Affix new retro-reflective tape on 08 adult life jackets. 46 CFR 108. 71 (c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 3 March 2020
Resolution: Corrected on the spot.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 3 March 2020
Resolved
Install a 3'-6' line to the waterlight attached to the life ring. The line installed was observed less than 3'. 46 CFR 180.70(d) (2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 21 January 2021
Resolution: Waterlight was installed with 3 foot line secured around the lifering buoy.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 March 2020
Resolved
Install new fuel vent screens on fuel tank vents. 46 CFR 182.20-35(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 21 January 2021
Resolution: Flame screens were installed on fuel tanks vents.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 March 2020
Resolved
Repair or renew shore power cable connections. 46 CFR 183.10-20(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 2 March 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 March 2020
Resolved
Remove and cap or prove operation of 02 overboard valves that were found inoperable. 46 CFR 171.119(b-c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 21 January 2021
Resolution: All overboard valves were proven to be operable.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 March 2020
Resolved
Properly terminate or remove the unused 120v and 220v cabling under the cook top and near the battery charger.
The termination should be within an electrical
enclosure. 46 CFR 183,340
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2020
Resolved 21 January 2021
Resolution: Did not observe any 120v or 220v cabling underneath the cook top or near a battery charger. O/O may have already removed the cables.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 3 March 2020
Resolved
The vessel was missing 01 day flare and is required to carry 12 flares total. Procure an additional flare. 46 CFR 180.68(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 2 March 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 3 March 2020
Resolved
Access to the upper deck shall be labeled with the maximum allowed passengers per the stability letter. 46 CFR 185.602(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2020
Resolved 21 January 2021
Resolution: Signs were installed on ladderwells leading to upperdeck stating a 50 person maximum.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 3 March 2020
Resolved
The fire pump gauge was found inoperable and a leak was discovered on the flex hose above the pump. The gauge
and flex hose shall be replaced and proven to operate
and not leak. 46 CFR 181.10-l(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2020
Resolved 2 March 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 March 2020
Resolved
Wire nut connections where found around the vessel including connections under the control station and
connecting the bilge alarm float wires. The connections
shall meet the connection requirements per the regs
which would include use of a compression type fitting. 46 CFR 183.05-50(b) (2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 March 2020
Resolution: Operator stated he removed all wire nut connections.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 3 March 2020
Resolved
The high bilge light indicator was found inoperable. Prove operation of the visual indicator for the high
bilge alarm for the tank space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 March 2020
Resolved 2 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 3 March 2020
Resolved
The hydrostatic release for the EPRIP has a service life of 2 yrs once installed. It is the vessels operator's
responsibility to mark the hydrostatic release
appropriately during the time of the install. USCG noted
on 12FEB19 that the year was unmarked and informed the
operator that the year was required to be marked to show
a 2 year service period. The operator marked the same
hydrostatic release for FEB 2022 which exceeds the 2
year allowance for service. The hydrostatic release
shall be proven to be marked appropriately from the date
installed or purchased. Alternatively the hydrostatic
release shall be replaced. 46 CFR 185.740(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2020
Resolved 18 March 2020
Resolution: Operator provided documentation showing a purchase date of 12JAN19 for the hydrostatic release.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 3 October 2019
Resolved
MIs found that the emergency lighting in the lower accommodation space/bunkroom does not automatically actuate upon failure of the main lighting system. Provide adequate emergency lighting that automatically actuates upon failure of the main lighting system that lights the line of escape. 705 prior to carriage of overnight passengers. 46 CFR 184.30-5 (a)
Action required: 705 - Other - as specified
Due 3 October 2019
Resolved 3 March 2020
Resolution: New DC lights were installed with internal batteries that activate when power drops.
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 3 October 2019
Resolved
Freezers in bunk room are blocking aisles required as part of a means of escape. Remove freezers from bunk room. 46 CFR 177.30-7
Action required: 705 - Other - as specified
Due 3 October 2019
Resolved 3 March 2020
Resolution: Freezers were re-located.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 3 October 2019
Resolved
Emergency escape markings are illegible. Re-mark
emergency escape "EMERGENCY EXIT, KEEP CLEAR"
in clearly legible letters at least 2 inches high. 46 CFR 185.606
Action required: 705 - Other - as specified
Due 3 October 2019
Resolved 3 March 2020
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 October 2019
Resolved
MIs found significant rust and corrosion around the bottom of the high pressure CO2 cylinders. Replace CO2 cylinders or provide a written report from a certified fire protection professional attesting to their suitability for continued service and a plan to mitigate further corrosion. 46 CFR 176.810 (b)(2)
Action required: 705 - Other - as specified
Resolved 18 October 2019
Resolution: Tech attended on 11OCT19
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 October 2019
Resolved
Fire hoses are not attached to fire hydrant at all times. Attach fire hoses to fire hydrants. 46 CFR 181.15-10 (g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2019
Resolved 1 November 2019
Resolution: fire hoses are attached
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 October 2019
Resolved
Fire hydrants do not have spanner wrenches. Provide a spanner wrench for each hose station on the vessel. 46 CFR 181.310 (d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2019
Resolved 1 November 2019
Resolution: wrenches were aquired
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 12 February 2019
Resolved
Single side band radio would not power up. Prove proper operation. Restricted to 20 miles.
Action required: 705 - Other - as specified
Resolved 10 May 2019
Resolution: Recieved documentation of operational radio.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 12 February 2019
Resolved
Bilge alarm for bunk space was not audible and tank space did not have light illuminated.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2019
Resolution: Bilge alarm was witnessed during previous def check.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 12 February 2019
Resolved
Light in forward part of main deck accomodation does not have a guard. Replace guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2019
Resolved 10 May 2019
Resolution: Guard was installed and verified in previous def check.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 February 2019
Resolved
Dead end wire in engine room in vicinity of CO2 siren. Terminate in electrical enclosure or remove.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2019
Resolved 15 May 2019
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: : Invalid Call Sign, no static draft information, no dimension information (AIS Antenna Position ABCD values equals 0), and not broadcasting an AIS Ship Type.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 10 May 2019
Resolution: AIS was verified to be correct.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 5 March 2018
Resolved
Child size life jackets must be stowed in a location that is appropriately marked and seperated from adult life jackts.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 April 2018
Resolved 5 April 2018
Resolution: Received image from owner dtd 17MAR2018; cleared deficiency.
Engineering › Bilge Water Management System › Interface Detector
Issued 5 March 2018
Resolved
High level indicator light at operation station is not operational for bunk space
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 April 2018
Resolved 5 April 2018
Resolution: Received image from owner dtd 17MAR2018; cleared deficiency.
Engineering › Diesel Engine (auxiliary) › Pump, High Pressure (fuel injection)
Issued 5 March 2018
Resolved
Portside auxiliary engine return and supply lines are cracked and wasted.
Action required: 705 - Other - as specified
Due 4 April 2018
Resolved 10 May 2019
Resolution: outstanding def from 1 yr ago. fuel hoses appeared to be replaced
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 16 March 2016
Resolved
Replace all childrens' life jackets. Children passengers limited to 10 until replaced.
Due 30 March 2016
Resolved 6 April 2016
Engineering › Bilge Water Management System › Valve
Issued 16 March 2016
Resolved
Install screw down valve on bilge line piercing collsion bulkhead.
Due 30 March 2016
Resolved 6 April 2016
Stability › Incline Test › General
Issued 2 June 2014
Resolved
Due to the vessel's re-power in 2013 and the lack of lightship values available to the Marine Safety Center, vessel is required to conduct a new stability test. See activity #4876849 for details.
Action required: 705 - Other - as specified
Due 30 April 2015
Resolved 1 July 2015
Resolution: New stability letter was issued.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 12 March 2014
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Due 26 March 2014
Resolved 7 May 2014
Resolution: All current employees are now enrolled in the company''s drug program.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 12 March 2014
Resolved
Vessel is required to have guards around moving machinery such as fly wheels that maybe a hazard to crew members. The mechanical bilge impeller must be manually engaged near this fly wheel. vessel must provide a guard to prevent a crew member injury. 46CFR177.960
Action required: 705 - Other - as specified
Due 12 April 2014
Resolved 7 May 2014
Resolution: Vessel installed a guard around the fly wheel.
Documentation › Logs/Records › Logbook (official)
Issued 17 February 2012
Resolved
Vessel to provide log with drills, training and lifesaving maintenance entries. Prove to satisfaction of attending Marine Inspector within 30 days.
Action required: 705 - Other - as specified
Due 29 March 2012
Resolved 14 March 2012
Resolution: Provided log book with entries.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 17 February 2012
Resolved
Marine inspector found alcohol test kits to be expired. Prove to attending marine inspector that proper
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 March 2012
Resolved 14 March 2012
Resolution: Showed DOT approved alcohol test strips that are within experation dates for master and crew.
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 February 2012
Resolved
In tank room stbd side electric fuel pump wire connectors are incorrect. Change out connectors to proper type and size.
Action required: 705 - Other - as specified
Due 29 April 2012
Resolved 14 March 2012
Resolution: Marine inspector checked wire connections for stbd fuel pump. All sat.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 17 February 2012
Resolved
Renew fuel tank straps on both saddle tanks (forward straps). Strap connection points on forward straps rotted out.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 May 2012
Resolved 29 May 2012
Resolution: Saddle tank straps replaced.
Electrical › Electrical Distribution System (service) › Cable
Issued 17 February 2012
Resolved
Starter cable for stbd engine starter has too much wire exposed at connection point to starter.
Action required: 705 - Other - as specified
Due 29 April 2012
Resolved 14 March 2012
Resolution: Wire for starter had insulation running length of wire to connection point. all sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 March 2009
Resolved
Secure all wiring in berthing compartment.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: All wire runs in berthing inspected and found to be secured as required.
Electrical › Electric Supply System (service) › Battery Installation
Issued 3 March 2009
Resolved
Battery cables chafing against battery box.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: Battery box cables have been rerouted to that they can not chafe. Install sat.
Electrical › Lighting (service) › Lighting Fixture
Issued 3 March 2009
Resolved
Engine room light extinguished.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: All lights in engine room functioning properly.
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 March 2009
Resolved
Raw water hose for vessel washdown system not double clamped.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: Raw water hose double clamped as required.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 3 March 2009
Resolved
Replace broken BII fire extinguisher.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: BII fire extinguisher replaced in kind with new unit.
Lifesaving › Lifebuoys › Serviceable
Issued 3 March 2009
Resolved
Replace life ring buoy, upper deck starboard side. Current life ring buoy is deteriorated and unserviceable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: Ring life buoy has been replaced with new life buoy, properly marked and with retro. Install sat.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 3 March 2009
Resolved
Provide verification of Drug and Alcohol Program enrollment of all personnel in a safety sensitve position.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: Owner provided list of vsl personnel currently enrolled.
Operations/Management › Drills/Instruction › Not Conducted
Issued 3 March 2009
Resolved
Conduct and Log drills onboard vessel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: Conducted u/s MOB and fire drills. Good response time and knowledge by new crew members. Drills logged as required.
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 6 March 2008
Resolved
Prove proper operation of SSB radio prior to sailing beyond 20nm.
Action required: 705 - Other - as specified
Resolved 5 August 2008
Resolution: Rcvd fax notification of from FCC tech stating that SSB is installed an tested sat.
Communications › Alarms/Indicators › Bilge Alarm
Issued 6 March 2008
Resolved
Prove proper operation of bilge alarms.
Action required: 705 - Other - as specified
Due 13 March 2008
Resolved 13 March 2008
Resolution: Operator replaced bilge visual alarm panel. Tested sat.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 28 February 2007
Resolved
Make proper repairs to fwd accomadation ladder, bottom rung cracked.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2007
Resolution: Rung re-newed.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 28 February 2007
Resolved
Properly label emergency escape hatches.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2007
Resolution: Hatched labled.
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 28 February 2007
Resolved
Demonstrate proper operation of emergency F/P.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2007
Resolution: Pump operationally tested, all sat. (Bad impeller)
Navigation › Piloting/Steering › Magnetic Compass
Issued 28 February 2007
Resolved
Provide light for compass.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2007
Resolution: Light installed.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 21 March 2006
Resolved
Install vent closures for E/R vent on 02 deck, to be closed in the event of a fire.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2006
Resolution: hinged wooden dampners installed, sat
Accommodation/Occupational Safety › Heating › Piping
Issued 21 March 2006
Resolved
Replace broken support brackets for hot water pipes (heated rail) port side E/R.
Due 21 April 2006
Resolved 6 April 2006
Resolution: corrected.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 March 2006
Resolved
Remove or tagout deadend wires in overhead of pilot house.
Due 21 April 2006
Resolved 6 April 2006
Resolution: Wires tagged out with no power source.
Lifesaving › Lifefloat › Float Free
Issued 21 March 2006
Resolved
22 person lifefloats stacked 5 high on 02 deck, exceeds 4 ft height allowance.
Due 31 May 2006
Resolved 22 May 2006
Resolution: All l/fs are float free and able to be removed by crew during Abondship drill, no other location suitable for placing 5th l/f. Discrepancy recinded.
Stability › Watertight Integrity › General
Issued 1 December 2005
Resolved
Properly seal lazerette bulkhead, 5 bolt holes on stbd side.
Due 1 January 2006
Resolved 12 December 2005
Resolution: Corrected
Stability › Watertight Integrity › General
Issued 1 December 2005
Resolved
Properly seal all bulkhead penetrations below deck on stbd side created for new boat cable run (forepeak blower)
Due 1 January 2006
Resolved 12 December 2005
Resolution: Corrected
Electrical › Electrical Distribution System (service) › Conductor
Issued 1 December 2005
Resolved
Check bonding strap for stbd MSD tank, minor pitting and corrosion. Clean all contacts.
Due 1 January 2006
Resolved 12 December 2005
Resolution: Corrected. Owner cleaned bonding connections and checked for stray current.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 December 2005
Resolved
Tagout or remove old vent blowers with wires hanging in bilge (lazerette and forepeak)
Due 1 January 2006
Resolved 12 December 2005
Resolution: Blowers removed
Engineering › Freshwater System (intermediary cooling) › Valve
Issued 1 December 2005
Resolved
Replace seized ball valve for port generator r/w feed
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 December 2005
Resolution: New valve installed
Engineering › Bilge Water Management System › Hose
Issued 1 December 2005
Resolved
Replace broken hose clamp on engine driven bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 December 2005
Resolution: corrected
Electrical › Electric Supply System (service) › Cable
Issued 1 December 2005
Resolved
Properly secure/tagout exposed wires on 2nd deck.
Due 1 January 2006
Resolved 12 December 2005
Resolution: removed.
Communications › Radio Communications › EPIRB
Issued 1 April 2005
Resolved
Provide proof of EPIRB registration and hydrostatic release for EPIRB.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 April 2005
Resolved 14 April 2005
Resolution: Verified EPIRB registration and hydro release.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 April 2005
Resolved
Correct all dead-end wiring and grounding wires in engine room.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 April 2005
Resolved 14 April 2005
Resolution: Verified that all dead end wiring is corrected.
Electrical › Electric Supply System (service) › Battery Installation
Issued 1 April 2005
Resolved
Provide proper lining in port and stbd outboard battery boxes.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 April 2005
Resolved 14 April 2005
Resolution: Verified installation of new battery boxes in port and stbd outboard positions. Boxes are plywood construction with two layers of fiberglass matte with epoxy saturation.
Engineering › Bilge Water Management System › Pump
Issued 1 April 2005
Resolved
Prove proper operation of engine driven bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 April 2005
Resolved 14 April 2005
Resolution: Verified operation of new engine driven bilge pump.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 1 April 2005
Resolved
Perform satisfactory Fire, Man Overboard and Abandon Ship drills.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 April 2005
Resolved 14 April 2005
Resolution: Got vessel underway and performed all drills, all sat.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 8 April 2004
Resolved
Coi was not properly posted.
Condition: Unknown
Due 8 April 2004
Resolved 8 April 2004
Resolution: Witnessed proper posting of COI.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 8 April 2004
Resolved
COI not posted as required.
Condition: Unknown
Due 8 April 2004
Resolved 8 April 2004
Resolution: Witnessed proper posting of COI.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 8 April 2004
Resolved
Provide new copy of Coast Pilot on board.
Condition: Unknown
Due 8 April 2004
Resolved 8 April 2004
Resolution: New Coast Pilot on board.
Engineering › Bilge Water Management System › Interface Detector
Issued 8 April 2004
Resolved
#1 and #5 visual alarm for high level detection not working properly.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 April 2004
Resolved 8 April 2004
Resolution: Witnessed proper operation of #1 and #5 visual and audible alarms for high level indicators.
Accommodation/Occupational Safety › Occupational Safety
Issued 8 April 2004
Resolved
due to vessel port main being overhauled during inspection the u/w drills and verification of fire pump, bilge fixed main and other operational tests not conducted this date.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 April 2004
Resolved 8 April 2004
Resolution: Attended vessel to conduct all u/w drills and conduct verification of all operational u/w tests of equipment as well as op check of port main in proper operation on the vessel, all sat.
Navigation › Piloting/Steering
Issued 7 March 2002
Resolved
PROVIDE MISSING CHART #11009 FOR VESSEL ROUTE. LEGACY COMPONENT DESC: Marine Charts
Due 7 April 2002
Resolved 21 March 2002
Resolution: Sighted new chart # 11009.
Documentation › Markings/Placards
Issued 7 March 2002
Resolved
PASSENGERS ARE NOT PERMITTED ON THE UPPER DECK AS PER THE VESSEL STABILITY LETTER. PROVIDE AND NO PASSENGERS OR CREW ONLY SIGN FOR THE VESSEL'S UPPER DECK. LEGACY COMPONENT DESC: Capacity Marking
Due 7 April 2002
Resolved 21 March 2002
Resolution: Conducted measurement of upper deck based on length of rail criteria for maximum passenger count of upper deck. See narrative for specfics.
Lifesaving › Lifebuoys
Issued 7 March 2002
Resolved
PROVIDE A LINE AND METALLIC HOOK FOR RING FLOAT LIGHT. LEGACY COMPONENT DESC: Self-igniting Lights
Due 7 April 2002
Resolved 21 March 2002
Resolution: Sighted new line and new metallic hook for ring float light.
Personnel › Certificates/Documents/Licenses
Issued 7 March 2002
Resolved
PROVIDE SENIOR DECK HAND LETTER OF DESIGNATION. LEGACY COMPONENT DESC: Letter of Instruction/Designation - PIC
Due 7 April 2002
Resolved 21 March 2002
Resolution: Sighted Letter of Designation for Senior Deckhand.
Engineering › Bilge Water Management System
Issued 7 March 2002
Resolved
LABEL ENGINE ROOM BILGE MANIFOLD VALVES. LEGACY COMPONENT DESC: Manifold
Due 7 April 2002
Resolved 21 March 2002
Resolution: Sighted engine room bilgemanifold valves labeled with permanent marker.
Engineering › Sea-water System (primary cooling)
Issued 7 March 2002
Resolved
PROVIDE DOUBLE HOSE CLAMPS FOR VARIOUS MDE AND SSDG HOSES. LEGACY COMPONENT DESC: Piping
Due 7 April 2002
Resolved 21 March 2002
Resolution: Sighted double hose clamps for various MDE and SSDG Hoses.
Electrical
Issued 12 December 2001
Resolved
INSTALL METAL STRAP SUPPORTS ON ALL WIRING, IN ENGINE ROOM.
Condition: Unknown
Due 7 April 2002
Resolved 21 May 2002
Electrical
Issued 12 December 2001
Resolved
REPLACE WITH NEW, THE LIGHT SWITCH COVER IN #2 COMPT.
Condition: Unknown
Due 8 March 2002
Resolved 7 March 2002
Resolution: Corrected. All sat.
Construction/Loadline
Issued 12 December 2001
Resolved
CROP AND RENEW ROTTEN SECTION OF MAIN DECK IN BOW COMPT, IWO VENT PIPE AND WINCH SYSTEM.
Condition: Unknown
Due 8 March 2002
Resolved 7 March 2002
Resolution: Corrected. All sat.
Electrical
Issued 12 December 2001
Resolved
REPLACE WITH NEW, THE ELECTRIC RECEPTACLE IN STEERING COMPT.
Condition: Unknown
Due 8 March 2002
Resolved 7 March 2002
Resolution: Corrected. All sat.
Fire Fighting
Issued 28 March 2001
Resolved
VESSEL NOT TO USE GALLEY GRILL AT ALL, UNTIL FIXED GALLEY HOOD EXTINGUISHING SYSTEM INSTALLED AND INSPECTED.
Condition: Unknown
Due 28 March 2001
Resolved 28 March 2001
Lifesaving
Issued 22 March 2000
Resolved
PROVIDE WATERLIGHT FOR LIFE RING ON UPPER DECK.
Condition: Unknown
Due 10 April 2000
Resolved 11 April 2000
Electrical
Issued 22 March 2000
Resolved
RENEW OUTLET BOX COVER ON AFT BULKHEAD OF ENGINE ROOM IN WAY OF LADDER.
Condition: Unknown
Due 10 April 2000
Resolved 11 April 2000
Navigation
Issued 22 March 2000
Resolved
PROVE PROPER OPERATION OF MAST LIGHT.
Condition: Unknown
Due 10 April 2000
Resolved 11 April 2000
Fire Fighting
Issued 22 March 2000
Resolved
VESSEL TO SUBMIT PROPOSAL FOR INSTALLATION OF DRY OR WET FIRE EXTINGUISHERING SYSTEM, IAW 46 CRF 181.425(b) AND 181.400(d)
Condition: Unknown
Due 8 April 2001
Resolved 7 March 2002
Resolution: This requirement is cleared due to removal of installed galley grill.
Engineering
Issued 22 March 2000
Resolved
PROVE PROPER OPERATION OF PORT GENERATOR TEMPERATURE GAUGE.
Condition: Unknown
Due 10 April 2000
Resolved 11 April 2000
Lifesaving
Issued 22 March 2000
Resolved
VESSEL TO PROVIDE LIFE JACKET LIGHTS FOR DESIRED NUMBER OF PASSENGERS CARRIED ON OCEANS ROUTE IAW 46 CFR 180.75.
Condition: Unknown
Due 10 April 2000
Resolved 11 April 2000
Fire Fighting
Issued 9 April 1999
Resolved
PROVIDE PROOF OF SATISFACTORY HYDROSTATIC TEST OF CO2 FLEX HOSES
Condition: Unknown
Due 9 May 1999
Resolved 15 April 1999
Lifesaving
Issued 30 March 1998
Resolved
PRIOR TO OPERATING WITH CHILDREN (UNDER 90 LBS) PROVIDE 15 CHILD APPROVED PFD'S.
Condition: Unknown
Due 30 April 1998
Resolved 15 April 1998
Fire Fighting
Issued 30 March 1998
Resolved
PRIOR TO OPERATING, PROVIDE 3 B-II PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 30 April 1998
Resolved 15 April 1998
Documentation
Issued 30 March 1998
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 15 April 1998
Resolved 15 April 1998
Lifesaving
Issued 30 March 1998
Resolved
PRIOR TO OPERATING, PROVIDE NEW BATTERIES FOR ALL WATERLIGHTS.
Condition: Unknown
Due 30 April 1998
Resolved 15 April 1998
Navigation
Issued 24 March 1997
Resolved
PRIOR TO OPERTAING, PROVIDE CHARTS OF ENTIRE OPERATING AREA._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Navigation
Issued 24 March 1997
Resolved
PRIOR TO OPERATING, PROVIDE REQUIRED PUBS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Lifesaving
Issued 24 March 1997
Resolved
PRIOR TO OPERTAING WITH CHILDREN, (90LBS), PROVIDE 15 CHILD APPROVED PFD'S._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Fire Fighting
Issued 22 March 1996
Resolved
PROVE PROPER OPERATION OF FIRE PUMP PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 4 April 1996
Resolved 4 April 1996
Construction/Loadline
Issued 8 December 1995
Resolved
REPAIR 24 INCH CRACKS PORT AND STBD BOW IN FIBERGLASS ALONG DECK LINE AFT OF PULPIT
Condition: Unknown
Due 8 December 1995
Resolved 8 December 1995
Electrical
Issued 8 December 1995
Resolved
PROVIDE BLANK COVER FOR POWER PANEL BREAKER IN ENGINE ROOM TRUNK
Condition: Unknown
Due 8 December 1995
Resolved 8 December 1995
Engineering
Issued 8 December 1995
Resolved
REPLACE FUEL OIL HOSES ON STBD GENERATOR
Condition: Unknown
Due 8 December 1995
Resolved 8 December 1995
Construction/Loadline
Issued 8 December 1995
Resolved
SISTER FRAMES #6&7 STBD SIDE AND #7 FRAME PORT SIDE IN ACCOMMODATIONS SPACE
Condition: Unknown
Due 8 December 1995
Resolved 8 December 1995
Engineering
Issued 8 March 1991
Resolved
INSTALL NON CORROSIVE 30X30 MESH SCREEN ON FLO VENTS (PORT AND STBD).
Condition: Unknown
Due 8 March 1991
Resolved 8 March 1991
Construction/Loadline
Issued 27 March 1990
Resolved
MAKE PROPER REPAIR TO WATERTIGHT BULKHEAD BETWEEN ENGINEROOM AND LAZARETTE WHERE GENERATOR EXHAUST LINE PENETRATES BULKHEAD.
Condition: Unknown
Due 27 March 1990
Resolved 27 March 1990
Fire Fighting
Issued 27 March 1990
Resolved
PROVIDE DRY CHEMICAL FIRE EXTINGUISHER (B-II) FOR LAZARETTE.
Condition: Unknown
Due 27 March 1990
Resolved 27 March 1990
Navigation
Issued 27 March 1990
Resolved
PROVIDE AN APPROVE LIGHT BULB FOR STERN LIGHT.
Condition: Unknown
Due 27 March 1990
Resolved 27 March 1990
Fire Fighting
Issued 13 March 1990
Resolved
PROVIDE DRY CHEMICAL FIRE EXTINGUISHER FOR LAZARETTE.
Condition: Unknown
Due 13 March 1990
Resolved 13 March 1990
Navigation
Issued 13 March 1990
Resolved
PROVIDE APPROVED LIGHT BULB FOR STERN LIGHT.
Condition: Unknown
Due 13 March 1990
Resolved 13 March 1990
Construction/Loadline
Issued 13 March 1990
Resolved
MAKE PROPER REPAIR TO WATERTIGHT BULKHEAD BETWEEN ENGINEROOM AND LAZARETTE IN WAY OF GENERATOR EXHAUST LINE.
Condition: Unknown
Due 13 March 1990
Resolved 13 March 1990
Lifesaving
Issued 23 February 1989
Resolved
ATTACH WATERLIGHT TO RING BUOY LINE ATTACHED.
Condition: Unknown
Due 23 February 1989
Resolved 23 February 1989
Navigation
Issued 23 February 1989
Resolved
TIDE TABLES, CURRENT TABLE AND LIGHT LIST ARE ALL OUT DATED AND NEED REPLACING.
Condition: Unknown
Due 23 February 1989
Resolved 23 February 1989
Lifesaving
Issued 23 February 1989
Resolved
RING BUOYS (3) NEED NEW GRAB LINES ATTACHED DUE TO DETERIORATION OF MATERIAL.
Condition: Unknown
Due 23 February 1989
Resolved 23 February 1989
Electrical
Issued 24 February 1988
Resolved
MARK OR STENCIL A RED ONE INCH LETTER "E" ON ALL EMERGENCY LIGHTS, THROUGH-OUT THE VESSEL.
Condition: Unknown
Due 24 February 1988
Resolved 24 February 1988
Accommodation/Occupational Safety
Issued 24 February 1988
Resolved
PROVIDE AN OPERATIONAL TEST OF THE SAFETY RELIEF VALVE FOR THE PRESSURE VESSEL (AIR RECEIVER LESS THAN 5 CU.FT. INTERNAL VOLUME) IN THE PRESENCE OFUSCG INSPECTOR.
Condition: Unknown
Due 24 February 1988
Resolved 24 February 1988
Accommodation/Occupational Safety
Issued 24 February 1988
Resolved
PROVIDE AN OPERATIONAL TEST OF ALL SAFETY'S ON OIL FIRED PACKAGE HEATING UNIT.
Condition: Unknown
Due 24 February 1988
Resolved 24 February 1988
Accommodation/Occupational Safety
Issued 24 February 1988
Resolved
PROVIDE LOW NATURAL VENT TO FUEL TANK SPACE, WHERE MISSING.
Condition: Unknown
Due 24 February 1988
Resolved 24 February 1988
Accommodation/Occupational Safety
Issued 24 February 1988
Resolved
PROVIDE LOW NATURAL VENT TO LAZARETTE SPACE WHERE MISSING.
Condition: Unknown
Due 24 February 1988
Resolved 24 February 1988