Inspection history · 38
28 August 2023
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7778939
13 July 2023
Administrative Inspection · Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7741611
7 September 2022
Administrative Inspection · Examination of Repairs · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7553777
22 August 2022
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7541029
22 August 2022
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7542782
15 March 2022
Examination of Repairs · Administrative Inspection · Internal Structural Exam · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7412069
20 December 2021
Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7376995
24 March 2021
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7162330
16 June 2020
MARPOL Annex I Examination · Drydock Exam · Internal Structural Exam · MARPOL Annex VI Survey · Hull Examination · COI Inspection · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6978052
8 July 2019
Periodic Inspection · Deficiency Check · Security Plan Review - VSP · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6742561
20 July 2018
Administrative Inspection · Deficiency Check · Damage Survey · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6485672
23 May 2017
Administrative Inspection · Internal Structural Exam · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6153481
4 October 2016
Administrative Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6016182
4 August 2016
Administrative Inspection · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5962689
23 June 2015
Deficiency Check · MTSA Verification · Annual Inspection · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5162959
15 April 2015
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5103717
17 February 2015
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5075440
15 September 2014
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4980629
20 August 2014
Deficiency Check · Administrative Inspection · Examination of Repairs · MTSA/ISPS Verification · Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4954910
27 June 2014
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4905888
10 June 2014
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4884699
8 June 2014
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4890538
25 July 2013
Deficiency Check · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4665489
4 June 2012
Deficiency Check · Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4333795
4 October 2011
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4166386
2 July 2010
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3788745
21 June 2010
Internal Structural Exam · Drydock Exam · Initial Certification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3773232
26 January 2010
COI Inspection · Administrative Inspection · MARPOL Annex I Examination · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3670250
11 June 2008
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3234185
21 October 2006
MTSA Verification
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2805163
12 October 2006
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2798997
8 June 2006
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2676271
20 April 2006
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2629169
15 April 2006
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2625298
9 September 2004
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2191125
5 August 2004
MTSA Verification
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2157091
13 December 2002
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1718693
6 December 2002
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1718597
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 28 April 2022
Resolved
The Starboard side machinery space fire damper was missing the pin used to ensure the ventilation remains in the closed position during an emergency. All fire equipment shall be in suitable condition. Replace pin and show proper perpetration to the attending Marine Inspector.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 12 May 2022
Resolved 9 May 2022
Resolution: Verified new retaining pin installed. 835 cleared.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 28 April 2022
Resolved
All 16 exterior void manhole gaskets were worn and wasted. It is the responsibility of the Master to assure that all exposed opening in the hull of the vessel be made properly watertight. Replace to the satisfaction of the attending Marine Inspection.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2022
Resolved 9 May 2022
Resolution: verified new gaskets installed on exterior hatches. 835 cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 April 2022
Resolved
Vessel shall see that there is no accumulation of oil that could pose a fire hazard. Starboard generator exhaust gasket has excessive soot accumulation in way of lagging. Remove lagging and identify the location of the leak. Repair shall be in made to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2022
Resolved 9 May 2022
Resolution: verified installation of new exhaust gaskets. 835 cleared.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 28 April 2022
Resolved
It is the responsibility of the Master to assure that all exposed opening in the hull of the vessel be made properly watertight. Starboard engine keel cooler through hull flange connection is leaking and piping below cut off valve is deteriorated. Descale the piping and determine the amount of wastage, rectify the leak to the satisfaction of the Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2022
Resolved 9 May 2022
Resolution: witnessed repairs made to flange. 835 cleared.
09 - Working and Living Conditions › 092 - Working Conditions › Other (mooring)
Issued 8 July 2019
Resolved
Aft Bit is showing signs of wastage and needs to be replaced in kind.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2019
Resolved 13 August 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 July 2019
Resolved
Excess cable not in use on the spare generator breaker needs to be removed to minimize any hazards. Cleared on the spot.
Action required: 10 - Deficiency Rectified
Resolved 5 August 2019
Construction/Loadline › Hull › Stiffener
Issued 15 June 2017
Resolved
Satisfactorily address all damaged structural framing and brackets in the #2 Port Wing Void no later than the scheduled ABS Class Intermediate Hull Dry-docking. 12Jul18 +/- 3 months
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 July 2018
Resolved 20 July 2018
Resolution: Visually inspected weld repairs and NDT.
Construction/Loadline › Penetrations › Gasket
Issued 15 April 2015
Resolved
Renew gaskets on all void covers
Due 1 June 2015
Resolved 25 June 2015
Resolution: All void cover gaskets were replaced with new gaskets.
Construction/Loadline › Structures › Superstructure
Issued 15 April 2015
Resolved
Crop and renew wasted areas on stair runners on port and starboard bow.
Condition: Improper/Lack of Maintenance
Due 1 June 2015
Resolved 25 June 2015
Resolution: Port and stbd stair runners were cropped and renewed.
Construction/Loadline › Hull › Weld
Issued 15 April 2015
Resolved
Remove paint on welds and conduct dye pen test at the inset on port side of engine room.
Condition: Damaged By Earlier Event
Due 1 June 2015
Resolved 25 June 2015
Resolution: Dye pen test was conducted port side bulkhead engine space. All SAT.
Construction/Loadline › Structures › Superstructure
Issued 15 April 2015
Resolved
Remove Bondo patch and crop and renew wasted steel on top of the CO2 house on corner at aft exhaust and vent stack.
Condition: Damaged By Earlier Event
Due 1 June 2015
Resolved 25 June 2015
Resolution: Bondo patch was removed and wasted steel was cropped and renewed.
Construction/Loadline › Hull › Transverse Frame
Issued 15 April 2015
Resolved
Affect repairs to the following areas: Crop and insert distorted portions of transverse bottom frame #1 and 2 in port #1 inboard compartment; crop and insert outboard 4' area of upper chord of frame 20 #3 port wing tank and the after 5' lengths of side longitudinal frame #'s 1-4; Make available for inspection via cleaning/descaling #8 port wing tank localized frames longitudinals.
Condition: Improper/Lack of Maintenance
Due 1 June 2015
Resolved 30 June 2015
Resolution: Due date was passed due, but vessel was in drydock. All steel has been cropped and renewed, wing tank inspected, found sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 20 August 2014
Resolved
Fixed CO2 system flexible loops were cracked and unserviceable. CO2 System shall be maintained in a serviceable condition IAW 46 CFR 95.15. Barge restricted from carrying packaged hazardous cargo until deficiency is cleared.
Action required: 705 - Other - as specified
Due 27 August 2014
Resolved 21 August 2014
Resolution: CO2 system completed serviced by 3rd party. Unservicable hoses were replaced.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 20 August 2014
Resolved
Portable fire extinguisher was not mounted in the engine room. All fire extinguisher are required to be mounted with an approved bracket IAW 46 CFR 95.50-20
Action required: 705 - Other - as specified
Due 20 September 2014
Resolved 21 August 2014
Resolution: Fire extinguisher was properly mounted.
Electrical › Electric Supply System (service) › Battery Installation
Issued 20 August 2014
Resolved
Battery terminals were connected with wing nuts and loose. Battery terminals shall be properly secured to minimize risk of explosion IAW 46 CFR 110
Action required: 705 - Other - as specified
Due 20 September 2014
Resolved 21 August 2014
Resolution: Battery terminals were secured properly.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 20 August 2014
Resolved
Deck rail was cracked on stbd aft corner; conduct repairs to railing to ensure safety of crew IAW 46 CFR 92.25-5
Action required: 705 - Other - as specified
Due 20 September 2014
Resolved 21 August 2014
Resolution: Cracked railing was replaced with new.
Accommodation/Occupational Safety › Ventilation › General
Issued 20 August 2014
Resolved
Cargo ventilation fans were inoperable; repair or replace to ensure all fans are operational IAW 46 CFR 92.15-10. Barge restricted from carrying packaged hazardous cargo until deficiency is rectified.
Action required: 705 - Other - as specified
Due 20 September 2014
Resolved 17 October 2014
Resolution: Tested ventilation fans, all sat.
Construction/Loadline › Structures › Door
Issued 10 June 2014
Resolved
Prove proper repair of port side aft hydraulic loading ramp prior to loading cargo. Prove proper temporary repairs prior to getting underway. All to the satisfaction of the attending Marine Inspector.
Action required: 705 - Other - as specified
Resolved 20 August 2014
Resolution: repairs were completed, ovbserved satisfactory operation of loading ramp.
Construction/Loadline › Structures › Door
Issued 10 June 2014
Resolved
Prove fitness of all loading door hydraulic hoses prior to departure (both fwd & aft doors) to the satisfaction of the attending Marine Inspector.
Action required: 705 - Other - as specified
Resolved 20 August 2014
Resolution: All hoses were renewed, operation test conducted with no issues.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 5 June 2012
Resolved
Provide a portable type B-II fire extinguisher in the generator room IAW 46 CFR 95.50.
Action required: 17 - Rectify deficiencies prior to departure
Due 16 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 June 2012
Resolved
Properly secure all wires in the overhead around the exterior portion of the barge IAW 46 CFR 111.60-5.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Electrical › Lighting (service) › Lighting Fixture
Issued 5 June 2012
Resolved
Properly mount the light fixture in the generator room by the small generator IAW 46 CFR 111.75-20.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Electrical › Electric Supply System (service) › Battery Installation
Issued 5 June 2012
Resolved
Properly secure the covers to the battery boxes in the generator room IAW 46 CFR 111.15-5.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Construction/Loadline › Structures › Door
Issued 5 June 2012
Resolved
Provide dogging wrenches for the watertight doors going to the CO2 and Generator Rooms IAW 46 CFR 93.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 5 June 2012
Resolved
Make draft marks a contrasting color to the hull IAW 46 CFR 97.40-10.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 June 2012
Resolved
Properly mount the wires inthe control box and provide a blank cover for the open hole in the control box in the port aft Ramp Control Room IAW 46 CFR 111.81-3.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 4 June 2012
Resolved
Properly label all circuit directories in all panel boards with circuit designation, circuit load description, and the rating of the overcurrent protective device IAW 46 CFR 111.40-11.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 4 June 2012
Resolved
Properly mount the covers for distribution panels L1 and P1 IAW 46 CFR 111.40-1.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 4 June 2012
Resolved
Properly install the Ramp Power Hydraulic Unit Controller IAW 46 CFR 111.70-3.
Action required: 705 - Other - as specified
Due 5 July 2012
Resolved 16 July 2012
Resolution: Corrected to the satisfaction of the attending Marine Inspector.
Engineering › Fuel Oil Service System › Piping
Issued 29 January 2010
Resolved
Repair f/o leak on day tank supply pipe.
Action required: 705 - Other - as specified
Due 7 February 2010
Resolved 30 January 2010
Resolution: F/o leak repaired.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 29 January 2010
Resolved
Blank all openings in main electrical switchboard.
Action required: 705 - Other - as specified
Due 14 February 2010
Resolved 5 June 2012
Resolution: All openings in the main electrical switchboard were blanked off.
Electrical › Electric Supply System (service) › Transformer
Issued 29 January 2010
Resolved
Renew wasted dripshield on electrical transformer IWO machinery space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2010
Resolution: Dripshield replaced.
Construction/Loadline › Structures › Door
Issued 29 January 2010
Resolved
Service seized dogs and hinges on watertight door IWO CO2 space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2010
Resolution: Dogs and hinges serviced.
Engineering › Fuel Oil Service System › Valve, Control
Issued 29 January 2010
Resolved
Remove seized deck plug IWO emergency f/o shut-off for day tank. Ensure f/o shut-off valve cycles properly after it is removed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2010
Resolution: Deck plug removed and f/o shut-off valve cycled.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 29 January 2010
Resolved
Label emergency f/o shut-off valve for day tank.
Due 7 February 2010
Resolved 30 January 2010
Resolution: F/o shut-off valve labeled.
Construction/Loadline › Structures › Door
Issued 29 January 2010
Resolved
Service seized dogs on hatches IWO port fwd and aft hydaulic door control spaces.
Due 7 February 2010
Resolved 30 January 2010
Resolution: Seized dogs serviced.
Fire Fighting › Ventilation Systems › Ducts
Issued 29 January 2010
Resolved
Install dampners IWO intake and exhaust ventilation trunks for machinery space. No machinery shall be operated while underway.
Action required: 705 - Other - as specified
Due 1 March 2010
Resolved 20 July 2010
Resolution: Dampers were installed on the intake and exhaust ventillation trunks for the machinery space.
Engineering › Fuel Oil Service System › Hose
Issued 26 January 2010
Resolved
Renew f/o supply hose on day tank.
Action required: 705 - Other - as specified
Due 7 February 2010
Resolved 30 January 2010
Resolution: F/o supply hose replaced.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 26 January 2010
Resolved
Renew wasted horn on fixed CO2 system IWO machinery space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2010
Resolution: Horn replaced on fixed CO2 system.