MAURY USCG vessel records
← All vessels

NM 979

NM 979 is a 1981 tank barge. The Coast Guard has recorded 25 inspections since 1991, most recently in November 2001, along with 10 deficiencies.

Records from 1991 to 2001. Most recent: inspection, 21 November 2001.

Built
1981
Last inspected
21 November 2001
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

294569
Flag
UNITED STATES
Maury page id
psix-294569

Inspections, by type

…with no type recorded7
Years with a record 11 calendar years (1991–2001)
The 25 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 25 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)195.0 ft × 35.0 ft × 12.0 ft
Registered tonnagegross 687 / net 687
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDRAVO CORPORATION · NEVILLE ISLAND, PA, UNITED STATES · built 1981
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 13 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it687 - Simplified, Gross Ton
687 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspected as a tow unit · 8

Inspection history · 25

21 November 2001 Hull Examination · In-Service Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1393834
2 August 2001 COI Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1403439
7 October 2000 Re-Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1467701
3 August 1999 COI Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1395237
7 June 1999 Examination of Repairs
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1461166
11 September 1998 Re-Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1413403
19 May 1998 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1126234
20 April 1998 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 789018
24 March 1998 Damage Survey
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 787140
22 March 1998 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 118061
26 September 1997 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 784314
30 October 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1441125
14 October 1996 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1100101
26 September 1995 COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1189761
5 September 1995 Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 529527
11 August 1995 Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 83762
11 August 1994 Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 865670
29 March 1994 Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 462011
27 September 1993 COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 842413
14 December 1992 Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 962787
21 August 1992 Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 943359
28 May 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1267933
1 April 1992 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1265158
10 March 1992 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 146499
15 October 1991 COI Inspection · Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 938414

Deficiency record · 10

Construction/Loadline › Hull
Issued 21 November 2001 Resolved
PROVIDE A STRUCTURAL ANALYSIS OF THE CONDITION OF THE BARGE SIGNED BY A PROFESSIONAL ENGINEER LEGACY COMPONENT DESC: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 February 2002
Resolved 30 January 2002
Resolution: SURVEYOR JOHN COLLETTI CONDUCTED A DRYDOCK SURVEY SUBMITTED HIS FINDINGS AND COMPLETED A REPAIR SPECIFICATION.
Construction/Loadline › Hull
Issued 21 November 2001 Resolved
BARGE TO REMAIN FLEETED AT DTC ENVIROMENTAL AWAITING CLEANING, PRESENTATION OF A MARINE CHEMIST GAS FREE CERTIFICATE AND SURRENDER THE COI AS REQUESTED BY BARGE REPRESENATIVE. LEGACY COMPONENT DESC: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 January 2003
Resolved 24 September 2002
Resolution: VESSEL WAS SATISFACTORILY CLEANED AND A MARINE CHEMIST CERTIFICATE WAS PRESENTED, VESSEL DEACTIVATED.
Construction/Loadline › Hull
Issued 20 November 2001 Resolved
MAKE REPAIRS TO TANK BARGE IN ACCORDANCE WITH REPAIR SPECIFICATIONS AS DRAFTED BY JOHN P. COLLETTI DATED 21JAN02.VESSEL TO REQUEST A PERMIT TO PROCEED PRIOR TO DEPARTING PITMS ZONE. LEGACY COMPONENT DESC: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2002
Resolved 28 June 2002
Resolution: OWNERS HAVE ELECTED TO HAVE THE BARGE CLEANED, GAS FREE AND TO SURRENDER THE COI.
Construction/Loadline
Issued 2 August 2001 Resolved
MAKE PERMANENT REPAIRS TO INSET/FRACTURE IN SIDE SHELL AT MAIN DECK JUST OUTBOARD OF #3 PORT WING TANK HATCH BY CROP AND RENEW BY 31OCT01 DRYDOCK DUE DATE. TEMPORARY REPAIRS VIA GOUGE AND WELD HAVE BEEN MADE.
Condition: Unknown
Due 31 March 2002
Resolved 11 September 2002
Resolution: BARGE DEACTIVATED.
Construction/Loadline
Issued 24 March 1998 Resolved
MAKE PERMANENT REPAIRS TO FRACTURE IN WAY OF FORWARD RAKE, PORT CORNER, JUST BELOW THE HEADLOG. VESSEL MAY OFFLOAD PRESENT CARGO, BUT SHALL NOT ONLOAD CARGO UNTIL REPAIRS HAVE BEEN COMPLETED.
Condition: Unknown
Due 24 March 1998
Resolved 24 March 1998
Deck/Cargo
Issued 15 October 1991 Resolved
PROVIDE APPROVED PLANS FOR VAPOR COLLECTION SYSTEM FROM MSC.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Deck/Cargo
Issued 15 October 1991 Resolved
PROVIDE PROOF THAT THE ELECTRICAL INSTALLATION FOR VAPOR COLLECTION SYSTEM MEETS ALL REQUIREMENTS OF 46CFR SUBPART 39.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Deck/Cargo
Issued 15 October 1991 Resolved
MAKE CHANGES TO THE OIL TRANSFER PROCEDURES AS REQUIRED BY 46CFR39.30- 1(B)(3).
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Deck/Cargo
Issued 15 October 1991 Resolved
PROVIDE PROOF THAT THE PRESSURE/VACUUM RELIEF VALVE INSTALLED ON THE VAPOR COLLECTION SYSTEM MEETS THE REQUIREMENTS OF 46CFR39.20-11.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Deck/Cargo
Issued 15 October 1991 Resolved
TEST THE LIQUID OVERFILL PROTECTION REQUIRED BY 46CFR39.20.9.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.