Records from 1991 to 2001. Most recent: inspection, 21 November 2001.
Documentation record
Registered dimensions (L × B × D)195.0 ft × 35.0 ft × 12.0 ft
Registered tonnagegross 687 / net 687
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDRAVO CORPORATION · NEVILLE ISLAND, PA, UNITED STATES · built 1981
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 13 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it687 - Simplified, Gross Ton
687 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 25
21 November 2001
Hull Examination · In-Service Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1393834
2 August 2001
COI Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1403439
7 October 2000
Re-Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1467701
3 August 1999
COI Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1395237
7 June 1999
Examination of Repairs
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1461166
11 September 1998
Re-Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1413403
19 May 1998
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1126234
20 April 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 789018
24 March 1998
Damage Survey
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 787140
22 March 1998
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 118061
26 September 1997
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 784314
30 October 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1441125
14 October 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1100101
26 September 1995
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1189761
5 September 1995
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 529527
11 August 1995
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 83762
11 August 1994
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 865670
29 March 1994
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 462011
27 September 1993
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 842413
14 December 1992
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 962787
21 August 1992
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 943359
28 May 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1267933
1 April 1992
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1265158
10 March 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 146499
15 October 1991
COI Inspection · Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 938414
Construction/Loadline › Hull
Issued 21 November 2001
Resolved
PROVIDE A STRUCTURAL ANALYSIS OF THE CONDITION OF THE BARGE SIGNED BY A PROFESSIONAL ENGINEER LEGACY COMPONENT DESC: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 February 2002
Resolved 30 January 2002
Resolution: SURVEYOR JOHN COLLETTI CONDUCTED A DRYDOCK SURVEY SUBMITTED HIS FINDINGS AND COMPLETED A REPAIR SPECIFICATION.
Construction/Loadline › Hull
Issued 21 November 2001
Resolved
BARGE TO REMAIN FLEETED AT DTC ENVIROMENTAL AWAITING CLEANING, PRESENTATION OF A MARINE CHEMIST GAS FREE CERTIFICATE AND SURRENDER THE COI AS REQUESTED BY BARGE REPRESENATIVE. LEGACY COMPONENT DESC: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 January 2003
Resolved 24 September 2002
Resolution: VESSEL WAS SATISFACTORILY CLEANED AND A MARINE CHEMIST CERTIFICATE WAS PRESENTED, VESSEL DEACTIVATED.
Construction/Loadline › Hull
Issued 20 November 2001
Resolved
MAKE REPAIRS TO TANK BARGE IN ACCORDANCE WITH REPAIR SPECIFICATIONS AS DRAFTED BY JOHN P. COLLETTI DATED 21JAN02.VESSEL TO REQUEST A PERMIT TO PROCEED PRIOR TO DEPARTING PITMS ZONE.
LEGACY COMPONENT DESC: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2002
Resolved 28 June 2002
Resolution: OWNERS HAVE ELECTED TO HAVE THE BARGE CLEANED, GAS FREE AND TO SURRENDER THE COI.
Construction/Loadline
Issued 2 August 2001
Resolved
MAKE PERMANENT REPAIRS TO INSET/FRACTURE IN SIDE SHELL AT MAIN DECK JUST OUTBOARD OF #3 PORT WING TANK HATCH BY CROP AND RENEW BY 31OCT01 DRYDOCK DUE DATE. TEMPORARY REPAIRS VIA GOUGE AND WELD HAVE BEEN MADE.
Condition: Unknown
Due 31 March 2002
Resolved 11 September 2002
Resolution: BARGE DEACTIVATED.
Construction/Loadline
Issued 24 March 1998
Resolved
MAKE PERMANENT REPAIRS TO FRACTURE IN WAY OF FORWARD RAKE, PORT CORNER, JUST BELOW THE HEADLOG. VESSEL MAY OFFLOAD PRESENT CARGO, BUT SHALL NOT ONLOAD CARGO UNTIL REPAIRS HAVE BEEN COMPLETED.
Condition: Unknown
Due 24 March 1998
Resolved 24 March 1998
Deck/Cargo
Issued 15 October 1991
Resolved
PROVIDE APPROVED PLANS FOR VAPOR COLLECTION SYSTEM FROM MSC.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Deck/Cargo
Issued 15 October 1991
Resolved
PROVIDE PROOF THAT THE ELECTRICAL INSTALLATION FOR VAPOR COLLECTION SYSTEM MEETS ALL REQUIREMENTS OF 46CFR SUBPART 39.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Deck/Cargo
Issued 15 October 1991
Resolved
MAKE CHANGES TO THE OIL TRANSFER PROCEDURES AS REQUIRED BY 46CFR39.30- 1(B)(3).
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Deck/Cargo
Issued 15 October 1991
Resolved
PROVIDE PROOF THAT THE PRESSURE/VACUUM RELIEF VALVE INSTALLED ON THE VAPOR COLLECTION SYSTEM MEETS THE REQUIREMENTS OF 46CFR39.20-11.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Deck/Cargo
Issued 15 October 1991
Resolved
TEST THE LIQUID OVERFILL PROTECTION REQUIRED BY 46CFR39.20.9.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991