Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
747 - Regulatory (Subpart C or D), Gross Ton
747 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-2969
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2015
Resolved 22 October 2015
Resolution: Installed new stud at 12 o'clock on flange face.
Stability › Watertight Integrity
Issued 27 April 2004Resolved
Vessel is to offload cargo and proceed to shipyard for repair as agreed upon in the requirements of the Permit To Proceed issued by OCMI Louisville at the request of the barge owner/operators.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 June 2004
Resolved 1 June 2004
Resolution: Proper repairs made and air tests satisfactory.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 29 August 2002Resolved
Prior to offloading cargo make permanent repairs to cargo pump to the satisfaction of the attending marine inspector. LEGACY COMPONENT DESC: Cargo Pump
Condition: Unknown
Due 22 September 2002
Resolved 29 August 2002
Resolution: Test conducted of new pump to 2200 psi & 2700 psi
Construction/Loadline › Structures
Issued 11 April 2002Resolved
Several external frames were damaged on the starboard, aft side of #3 cargo tank. An empty barge had broken loose and ran up the starboard aft section. Owner of barge is required to make permanent repairs and to inspect the #3 starboard void for any damage. Complete prior to onloading. LEGACY COMPONENT DESC: Cargo tank top
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2002
Resolved 11 June 2002
Resolution: Repairs Completed and #3 Cargo Tank Air Tested satisfactorily.
Deck/Cargo › Cargo Heating
Issued 11 April 2002Resolved
Steam piping on starboard aft side of barge was damage by a loose empty barge. The steam line was sheered off at the deck. Make permanent repairs to the steam lines. LEGACY COMPONENT DESC: steam piping
Condition: Damaged By Earlier Event
Due 31 May 2002
Resolved 11 June 2002
Resolution: Damaged piping renewed, fitted, and air tested satisfactorily.
Deck/Cargo › Vapor Control Systems
Issued 11 April 2002Resolved
Vapor header valve and piping was damaged when an empty barge broke loose and hit the PPG 500 on the starboard aft side. The vapor header valve was damged and needs to be renewed. Also the piping was pushed over and stressed. No apparent fractures were present, but piping required to be renewed. LEGACY COMPONENT DESC: Piping/Hoses
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2002
Resolved 11 June 2002
Resolution: Vapor header valve and piping renewed, inspected, and air tests satisfactorily.
Engineering
Issued 20 June 2001Resolved
repair fuel line on transfer day tank.
Condition: Unknown
Due 26 June 2001
Resolved 26 June 2001
Deck/Cargo
Issued 20 June 2001Resolved
Replace missing winch on cargo vent header
Condition: Unknown
Due 26 June 2001
Resolved 26 June 2001