Records from 2017 to 2023. Most recent: inspection, 13 October 2023.
Inspection history · 15
13 October 2023
Internal Structural Exam · COI Inspection · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7807897
22 November 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7598320
26 January 2022
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7385820
16 January 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7381179
16 January 2022
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7382286
16 January 2022
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7426011
15 November 2021
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7351447
14 January 2021
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7124724
11 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7110293
14 November 2019
Administrative Inspection · Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6855380
6 August 2019
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7057648
5 November 2018
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6573468
20 October 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6291834
10 October 2017
Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6284629
9 January 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6068315
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 October 2023
Resolved
Air-cooled propulsion and auxiliary diesel engines installed below deck, as permitted by § 182.420, must be fitted with air supply ducts or piping from the weather deck. The ducts or piping must be so arranged and supported to be capable of safely sustaining stresses induced by weight and engine vibration and to minimize transfer of vibration to the supporting structure. Support bracket for port side generator observed to be disconnected.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2023
Resolved 24 October 2023
Resolution: Received evidence of SAT repairs.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 23 October 2023
Resolved
The EPIRB test required by paragraph (a) shall be logged or otherwise documented, as applicable. Monthly EPIRB tests not documented.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 24 October 2023
Resolved 24 October 2023
Resolution: Conducted training with crew.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 October 2023
Resolved
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Vessel to submit plans for installation within 30 days.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 November 2023
Resolved 30 January 2024
Resolution: Interconnected detection system installed and tested.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 13 October 2023
Resolved
All accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks are ready for inspection.
Rudder room, aft port corner, beams are warped and should be straighten out. Re-weld cracked welds and welds that were no fully penetrated.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2023
Resolved 16 October 2023
Resolution: All beams straightened out and rewelded to satisfaction of marine inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 October 2023
Resolved
Bilge pipe piercing with the collision bulkhead must be fitted with screw down valve located on the fwd side of the collision bulkhead.
Forepeak reach rod handle is sheared off and no longer connected to valve.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 November 2023
Resolved 16 October 2023
Resolution: Handle reattached to reach rod to satisfaction of marine inspector.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 13 October 2023
Resolved
All accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks are ready for inspection.
Forepeak, fwd void, contains a cracked weld on the port side, near cylindrical support.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2023
Resolved 16 October 2023
Resolution: Rewelded to satisfaction of marine inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 October 2023
Resolved
A bilge suction must be fitted with a suitable strainer.
Below the passenger space, starboard side bilge pick up is missing the strainer.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2023
Resolved 16 October 2023
Resolution: Strainer attached to bilge pick up to satisfaction of marine inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 October 2023
Resolved
Fuel shutoff valves, installed so as to close against the fuel flow to stop fuel flow when servicing accessories.
Fuel shutoffs in engines room, 03, has to operate as designed. 02 fuel shutoffs were leaking and 01 was free-wheeling and not properly closing as intended.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 November 2023
Resolved 16 October 2023
Resolution: Fuel shutoff adjusted and repaired to satisfaction of marine inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 13 October 2023
Resolved
A hatch exposed to the weather must be watertight.
Hatch on main deck, starboard side, connecting to the engine room has water leaking into the engine through a loose/rusty bolt.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2023
Resolved 16 October 2023
Resolution: Repaired to satisfaction of marine inspector.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 13 October 2023
Resolved
All accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks are ready for inspection.
Engine room contains 02 cracked skips welds in the aft, overhead section.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2023
Resolved 16 October 2023
Resolution: Rewelded to satisfaction of marine inspector.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 26 January 2022
Resolved
Vessel has not been maintaining monthly test/inspection log for EPIRB.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 26 January 2022
Resolved 26 January 2022
Resolution: Conducted training with master on how to conduct proper EPIRB testing.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 January 2022
Resolved
Name was not stenciled on starboard life buoy.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 26 January 2022
Resolved 26 January 2022
Resolution: Replaced with new life buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 26 January 2022
Resolved
Batteries were expired in multiple floating water lights.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 26 January 2022
Resolved 26 January 2022
Resolution: Replaced with new batteries.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 January 2022
Resolved
Gage on fire monitor pump did not operate.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 26 February 2022
Resolved 3 February 2022
Resolution: Witnessed functional gage.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 18 November 2019
Resolved
The master of the vessel shall ensure that: Each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly, using the integrated test circuit and output indicator, to determine that it is operative. The EPIRB test required by paragraph (a) shall be logged or otherwise documented, as applicable; Vessel was not logging monthly EPIRB inspections; Ensure that monthly
EPIRB inspections are logged as per 46 CFR 185.728(a)(c); To the satisfaction of the Coast Guard by 02DEC19.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 December 2019
Resolved 19 November 2019
Resolution: Received conformation from the Vessel Rep that he held a meeting with all crewmembers about conducting monthly EPIRB checks, and logging them.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 18 November 2019
Resolved
Vessel General Permit (VGP) applies to discharges incidental to the normal operation of all non-recreational vessels of 79 feet or greater in length; Vessel did not have a Permit Authorization and Record of Inspection (PARI) form onboard and did not submit annual report to EPA; Obtain PARI form and submit annual report to the EPA as per 40 CFR 122.2; To the satisfaction of the Coast Guard by 02DEC19.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 December 2019
Resolved 19 November 2019
Resolution: Received verbal confirmation from Vessel Rep about receipt of the provided forms and guidance.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 14 November 2019
Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve; Lifefloat onboard vessel had extensive cracking around the exterior; Replace lifefloat as per 46 CFR 180.175(a); To the satisfaction of the Coast Guard by 02DEC19.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 December 2019
Resolved 19 November 2019
Resolution: Received photographs of the replacement life float from vessel rep.
Communications › Radio Communications › EPIRB
Issued 9 January 2017
Resolved
Vessel's hydrostatic release on the EPIRB was expired
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2017
Resolved 8 February 2017
Resolution: Vessel installed new hydro release
Lifesaving › Rigid Liferafts › Weak Link
Issued 9 January 2017
Resolved
The weak link painter line for both life floats was designed for 11-20 persons. Vessel's had 3 - 12 person liferaft in tandom.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2017
Resolved 8 February 2017
Resolution: Crew installed weak line that was for greater than 21 persons on both sets of life floats
Engineering › Sea-water System (primary cooling) › Piping
Issued 9 January 2017
Resolved
Salt water cooling piping for the #4 main engine was leaking due to a cracked weld. Make repairs prior to operating #4 main.
Action required: 705 - Other - as specified
Due 9 January 2017
Resolved 8 February 2017
Resolution: Piping was rewelded. Ran main engine for 5 minutes with no leaking under static test
Operations/Management › Drills/Instruction › Not Conducted
Issued 9 January 2017
Resolved
Vessel hasn't worked in 4 months and only a captain was onboard for annual inspection. Conduct all drills prior to getting underway.
Action required: 705 - Other - as specified
Due 9 January 2017
Resolved 8 February 2017
Resolution: Drills be conducted by the crew prior to sail and follow-up at earliest time with Marine Inspector
Operations/Management › Equipment Service/Testing › EPIRB
Issued 9 January 2017
Resolved
Vessel is not logging maintenance, servicing and EPIRB testing in log book while warm stacked.
Action required: 705 - Other - as specified
Due 9 January 2017
Resolved 8 February 2017
Resolution: logs had been filled for the previous month and will maintain logging with in warm statck status