Records from 1989 to 2023. Most recent: inspection, 21 November 2023.
Inspection history · 102
21 November 2023
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7828315
7 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7810737
2 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7801995
7 September 2023
Load Line/Change of Employment
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7786925
5 July 2023
Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7741069
17 June 2023
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7717014
16 June 2023
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7718949
27 March 2023
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7657894
26 March 2023
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7656921
25 March 2023
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7662740
23 January 2023
In-Service Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7625690
2 September 2022
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7552683
8 July 2022
Damage Survey
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7503286
30 March 2022
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7421481
19 January 2022
Deficiency Check · Drydock Extension
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7382875
19 January 2022
In-Service Inspection · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7385396
16 July 2021
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 7261099
22 January 2021
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7128812
5 January 2021
In-Service Inspection · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7169152
25 August 2020
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7042879
13 April 2020
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6941066
10 April 2020
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6938068
10 April 2020
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6941787
18 March 2020
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6928895
23 December 2019
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6878345
27 November 2019
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6863990
9 September 2019
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6809104
23 August 2019
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6792523
8 July 2019
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6742407
8 January 2019
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6607346
10 December 2018
Deadweight Survey · Examination of Repairs · Welding Related Inspections Qualification Testing · Administrative Inspection · COI Inspection · Construction Oversight
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6596755
18 June 2018
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6448205
17 May 2018
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6417146
27 April 2018
Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6400772
31 January 2018
Examination of Repairs · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6379186
8 September 2017
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6262363
3 July 2017
Periodic Inspection · Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6221099
1 June 2017
Drydock Extension
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6162093
15 May 2017
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 6379670
15 February 2017
Administrative Inspection · Examination of Repairs · Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6093225
29 June 2016
Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5923312
19 January 2016
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5799921
22 December 2015
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5785928
21 December 2015
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5785365
10 July 2015
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5183245
26 June 2015
Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5162859
30 March 2015
Plan Review (Other than "T") · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5092770
26 March 2015
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5091024
28 July 2014
Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4936422
14 May 2014
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4858829
8 April 2014
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4831489
10 January 2014
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4780730
20 December 2013
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4772204
17 December 2012
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4503740
5 June 2012
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4334508
16 May 2012
Internal Structural Exam · Drydock Exam · Deficiency Check · Examination of Repairs
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4313642
14 December 2011
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 4207950
7 December 2011
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4204096
6 December 2011
Permit to Proceed
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4202557
3 December 2011
Permit to Proceed
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 4200733
18 October 2011
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 4170543
29 September 2011
COI Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 4155311
15 June 2010
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3766983
23 May 2010
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3756460
14 April 2010
Type not recorded
No type recorded · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 3725608
13 April 2010
Type not recorded
No type recorded · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 3726764
11 May 2009
Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3472119
1 May 2009
Type not recorded
No type recorded · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3466149
9 January 2009
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3389707
9 January 2008
Annual Inspection · MTSA Verification
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3127894
13 June 2006
Internal Structural Exam · Hull Examination · COI Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2678100
20 September 2005
Uninspected Other
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 2497388
26 July 2005
Periodic Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2447806
7 September 2004
Periodic Inspection · MTSA Verification
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2188928
11 August 2003
Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1873326
30 September 2002
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1681984
30 August 2002
Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1669980
19 July 2001
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1472642
6 July 2001
Hull Examination
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1426625
18 August 2000
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1439103
30 April 2000
Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1395433
18 June 1999
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1415203
20 November 1998
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 805644
2 September 1998
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1462689
3 February 1998
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1105578
15 September 1997
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 786512
3 September 1997
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 785137
3 July 1997
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 779380
9 March 1997
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 11715
27 June 1996
Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1085669
5 March 1996
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 885787
28 February 1996
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 388398
22 January 1996
Damage Survey
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 879826
11 January 1996
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 123036
20 June 1995
Hull Examination · Examination of Repairs · COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1187093
7 June 1995
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 379164
15 November 1994
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 145920
5 October 1990
Type not recorded
No type recorded · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 906992
14 September 1990
Deadweight Survey
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1236129
10 September 1990
Type not recorded
No type recorded · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1217399
30 August 1990
Type not recorded
No type recorded · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 922291
15 September 1989
Type not recorded
No type recorded · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1209694
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 March 2023
Resolved
Vessel suffered hull damage IWO the #1S B/T sideshell on 25MAR23 as a result of a mechanical failure leading to an allision. Two localized areas of cracks, in the sideshell (<15" dia.), were discovered; one outboard of the swash bulhead located at FR-40, and the other outboard of a deepweb frame located at FR-44 (for reference; these are located approx 6' above the upper catwalk in the #1S B/T). Vessel also sustained sharp inset(s) to the above-mentioned swash bulkhead and webframe. Additionally, the vertical sideshell stringers located between these structures (FR's-41,42,and 43 respectively) were also significantly distorted and/or broken. All above damage has been "temporarily" repaired at Fraser Shipyards in Superior, WI. Make permanent repairs (crop/renew to original) to all damage noted above at the next drydock period (July 2023). Repairs must be completed and approved by USCG/ABS prior to post-drydock sailing.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 August 2023
Resolved 21 November 2023
Resolution: CG-835 cleared and saved as a special note due to the vessel being sold for scrap.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 22 January 2021
Resolved
Make permanent repairs to hull fracture in way of #8 STBD ballast tank, bottom plate to side shell (Notch) connection. Currently a cement box was authorized for temporary repairs until next years Dry dock, at which permanent repairs will be made.
Action required: 705 - Other - as specified
Due 30 January 2022
Resolved 21 November 2023
Resolution: CG-835 cleared and written as a Special Note due to the vessel being sold for scrap.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 10 April 2020
Resolved
pinhole leak in a a main ballast line port side in the ballast pump room between the hull and the valve.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 April 2020
Resolved 14 April 2020
Resolution: Replaced ballast line between hull and valve
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 30 April 2019
Resolved
Temp repairs have been made in #1stbd bal. tank due to hull and framing damage in area of frames 18-43 from a previous grounding in APR18. These repairs are detailed in Act# 6596755 entry date 29APR19. These repairs should be verified annually for adequacy until next scheduled DD in 2022. All temp repairs are to be removed and properly repaired at next DD. Careful eval of the hull from frames 18-43 should also be completed at DD and renewed as per attending CG Inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 July 2022
Resolved 21 November 2023
Resolution: CG-835 cleared and written as a Special Note due to the vessel being sold for scrap.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 December 2018
Resolved
Megger readings revealed grounds in the cargo hold lighting circuits. These grounds are to be traced and properly repaired. Until these grounded circuits are repaired the vessel is prohibited from utilizing the cargo hold lighting and it must remain locked out and tagged out until permanent repairs are verified by an attending CG Marine Inspector. To be completed within 30 days of this 835s issuance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 July 2019
Resolved 18 March 2020
Resolution: Wiring was removed and secured. Plans for new updated cargo hold lighting will be implemented at a later date.
Deck/Cargo › Ballast › Valves
Issued 18 June 2018
Resolved
Ballast system automation system has stopped working properly. Permanent repairs are to be made to the programming to allow for proper operation. Vessel will have until 1DEC18 to make permanent repairs. Until repairs are made the vessel's ballast system shall be operated as follows: ballast tanks are to be manually sounded during ballasting operations. The electronic level sensors and computer system are not to be used. Valves are to be opened and closed via traditional manual means.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 December 2018
Resolved 8 January 2019
Resolution: System operational
Construction/Loadline › Hull › Side Shell
Issued 17 April 2018
Resolved
Two small cracks were noted inside the stbd notch wing 8 feet from the bottom and 9 feet from the stern. The area was noted to be leaking water while the #8 ballast tank was being filled. The surrounding metal/material was found in adequate condition. A drill stop repair was completed and inspected. The repair is temporary and will be required to have an insert as a permanent repair to be completed by 31MAR19.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2019
Resolved 31 March 2019
Resolution: This area was removed due to notch modifications. New steel plating has been installed. Cleared 835.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 26 March 2018
Resolved
Two grey water pipes that penetrate the collision bulkhead shall be fitted w/screw down valves that are operable from above the freeboard deck and valves shall be fitted inside forepeak tank. Or the piping is to be removed and the bulkhead inserted.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 April 2018
Resolved 27 April 2018
Resolution: Vessel removed piping and cropped/renewed areas of collision bulkhead were pipe penetrations were. Air lanced and visually inspected SAT.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 26 March 2018
Resolved
Vessel has a new type II MSD system on board that is not yet installed. Prior to replacement of the existing MSD system the local OCMI is to be notified of work being completed and plans/drawings submitted as appropriate.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 6 June 2019
Resolution: A new and approved Type II MSD was installed and found adequate.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 26 March 2018
Resolved
Due to recent cargo hold slope plate renewals in hold #3 the vessel is to have the cargo hold inspected by a licensed mariner upon the vessel achieving full ballasting of the #s 4,5, and 6 ballast tanks. The hold is to be inspected for deforemation and/or leaks. Results of inspection are to be immediatly documented and reported to MSD Sturgeon Bay or closest OCMI if failures are observed.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 1 April 2018
Resolution: Inspection revealed on small weeping weld that was repraired. 835 cleared.
Deck/Cargo › Ballast › Special Ballast Arrangements
Issued 26 March 2018
Resolved
Vessel has installed a new ballast water automation upgrade. The ballast tank level sensors require verification to ensure they properly reflect tank levels. Demonstrate proper operation to attending MI. All tank levels to be verified manualy until this 835 is cleared.
Condition: Invalid
Action required: 705 - Other - as specified
Due 25 June 2018
Resolved 18 June 2018
Resolution: Resolved 835 in order to issue new 835 with updated conditions.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 26 March 2018
Resolved
Replace broken emergency lighting fixture at gate 44 in the cargo unloading tunnel. Demonstrate proper operation to attending CG inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 17 May 2018
Resolution: Witnessed E-lighting function properly. Deficiency cleared.
Construction/Loadline › Hull › Hull Plating
Issued 8 September 2017
Resolved
Make repairs to hull IWO #5 port ballast tank. Two cracks have been identified near the 24' mark.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 September 2017
Resolved 8 September 2017
Resolution: ABS and Duty MI visually inspected and pressed tanks up w/water to test repairs. Test was SAT and deficiency was cleared.
Communications › Alarms/Indicators › General Alarm
Issued 3 July 2017
Resolved
General alarm signals in way of barge bow lower level non operational
Due 17 August 2017
Resolved 23 August 2017
Communications › Alarms/Indicators › General Alarm
Issued 3 July 2017
Resolved
General alarm contact maker on nav bridge non operational for alarms on barge
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 August 2017
Engineering › Diesel Engine (auxiliary) › Crankshaft
Issued 3 July 2017
Resolved
Machinery guard missing on main service generator timing wheel
Due 4 September 2017
Resolved 23 August 2017
Construction/Loadline › Hull › Transverse Frame
Issued 3 July 2017
Resolved
Deck Beam in way of frames #32, 31, 28, and 29 show signs of significant wastage crop and renew during winter lay up
Due 1 April 2018
Resolved 26 March 2018
Resolution: Frames were repaired and found adequate. An additional frame was croped due to wastage as well. All appeared sat.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 23 February 2017
Resolved
USCG Marine Inspector to witness visual and NDT (vacuum box or air wand) testing on steel renewal within CH 2, 3, and 4 in way of cargo slope plating identified by ABS belt gauging prior to the vessel departing Basic Marine in Escanaba, MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2017
Resolution: Attended vessel, inspected, tested and verified repairs.
Communications › Alarms/Indicators › General Alarm
Issued 26 June 2015
Resolved
The GE alarm could not be sounded for the barge berthing on the tug's bridge.
Action required: 705 - Other - as specified
Due 23 July 2015
Resolved 17 December 2015
Resolution: Witnessed local and remote operation, all sat.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 26 June 2015
Resolved
Several ladder treads for the ladder leading from the main deck to the forecastle on the STBD side are cracked/broken.
Action required: 705 - Other - as specified
Due 23 July 2015
Resolved 17 December 2015
Resolution: New treds installed, all sat.
Lifesaving › Immersion Suits › Marking
Issued 26 June 2015
Resolved
Stowage location for immersion suits and Life Jackets in the accommodation spaces were not labeled.
Action required: 705 - Other - as specified
Due 16 July 2015
Resolved 17 December 2015
Resolution: Verifed stowage signage, all sat.
Accommodation/Occupational Safety › Potable Water System › General
Issued 30 March 2015
Resolved
Vessel is to support electrical wiring and install bug screeen on potable water venting.
Action required: 705 - Other - as specified
Due 30 April 2015
Resolved 30 April 2015
Accommodation/Occupational Safety › Potable Water System › General
Issued 16 April 2014
Resolved
Install potable water tank for forward house in accordance with FDA Regulations, per 46 CFR 91.25-40, 46 CFR 91.25-50, and The Commissioner of Food and Drugs regulations 21 CFR 1250.82
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2015
Resolved 28 April 2015
Resolution: Sector Lake MI approved the plans.
Lifesaving › Inflatable Liferafts › Carriage Requirement
Issued 16 April 2014
Resolved
Install an additional six man life raft at the stern of the vessel per 46 CFR 199.261(e).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 July 2014
Resolved 25 July 2014
Resolution: A new USCG six man approved life raft was installed and fitted on the vessel aft stbd side in way of the stern notice and considered to be in acceptable location, with one existing life raft mounted near the forward house.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 16 April 2014
Resolved
Install 35 foot Embarkation Ladders for forward & aft life rafts on the port & starboard sides (total of four ladders) as required by 46 CFR 199.110(f).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 July 2014
Resolved 28 July 2014
Resolution: Received an e-mail from company rep reflecting new Jacob ladders installed and fitted on the vessel as required by the 835.
Lifesaving › Inflatable Liferafts › Carriage Requirement
Issued 16 April 2014
Resolved
Provide/update Emergency Instructions & Muster list as required by 46 CFR 199.80
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 May 2014
Resolved 21 April 2014
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 16 April 2014
Resolved
Provide/update Training Materials for Crewmembers 46 CFR 199.180(a)(2).
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 May 2014
Resolved 21 April 2014
Construction/Loadline › Structures › Transverse Bulkhead
Issued 11 April 2014
Resolved
Cut, Crop, & re-new wasted steel in way lower section of the #7 port ballast tank aft bulkhead as required by 46 CFR 97.15
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 11 April 2014
Resolved 21 April 2014
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 11 April 2014
Resolved
Paint the forward port and stbd navigation light backing black as required by Inland Navigation Rules.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 April 2014
Resolved 21 April 2014
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 11 April 2014
Resolved
Properly pipe all forward house gray water drains into a holding tank or reconnect drain lines into a CG approved Type I or II Marine Sanitation D as required by 33 U.S. Code 1322.
Action required: 705 - Other - as specified
Due 11 May 2014
Resolved 21 April 2014
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 19 December 2012
Resolved
Repair broken light on the aft port side ring buoy, per 46 CFR 199.70
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 December 2012
Resolved 19 December 2012
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 19 December 2012
Resolved
Install protective guards around the engine exhaust pipes located aft port side per 46 CFR 58.10-5
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 19 December 2012
Resolved
Remove plastic trash bag, laying against the forward heaters exhaust piping per 46 CFR 91.25.10
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 16 January 2013
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 19 December 2012
Resolved
Fix or remove the disassembled electric motor and pump (bell & gosset) within the forward port side of the bow thruster compartment per 46 CFR 56.50-80.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Electrical › Lighting (emergency) › Lighting Fixture
Issued 19 December 2012
Resolved
Fix the non-operational E-light located in the fwd laundry room per 46 CFR 112.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Construction/Loadline › Structures › End Bulkhead
Issued 19 December 2012
Resolved
Cut, crop, & re-new the wasted steel and make proper repairs to the WTD between the Bow Thruster and Center unloading tunnel per 46 CFR 97.15
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 December 2012
Resolved
Cut, crop, & renew the section of pipe wasted on the discharge side of the GE cooling water pump (lower aft port side of the pump room) per 46 CFR 97.15
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 16 January 2013
Construction/Loadline › Structures › End Bulkhead
Issued 19 December 2012
Resolved
Cut, crop, & renew the steel structural members wasted more than 25% of original, port side aft lower pump room in way of the unloading buckets per 46 CFR 97.15
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 16 January 2013
Resolution: UT submitted to attending MI, reviewed. Original .500 all readings submitted were above .400 therefore 835 cleared.
Engineering › Pressure Vessel › Relief Valve
Issued 19 December 2012
Resolved
Install a Pressure Relief Valve on Air Receiver located in the aft Port Machinery Room. The relief valve must be on the pressure vessel and have the release capacity per 46 CFR 54.15-10.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Resolution: Relief valve renewed, replaced with FC Kingston Co. Mfg J12, Fig 118CSS Size 1/4, set at 150 psi, rated at SCFM.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 19 December 2012
Resolved
Install a electrical cover plate where missing in the forward laundry room per 46 CFR 111.81.b
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 19 December 2012
Resolved
Install a electrical cover plate where missing on the unloading generator per 46 CFR 111.81.b
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Electrical › Lighting (emergency) › Lighting Fixture
Issued 19 December 2012
Resolved
Install a emergency egress light in the aft pump room per 46 CFR 112.15-1(b).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Engineering › Fuel Oil Service System › Piping
Issued 19 December 2012
Resolved
Makes repairs to correct fuel oil leaks on several systems as pointed out by attending MI's per 46 CFR 91.25-10.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 1 February 2013
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 19 December 2012
Resolved
Place missing Portable Fire Extinguishers within fire extinguisher brackets where missing as required by 46 CFR 91.25-10.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 16 January 2013
Engineering › Fuel Oil Service System › Hose
Issued 7 December 2011
Resolved
Replace cracking fuel hose on fuel tank for heater in lower pump room.
Action required: 705 - Other - as specified
Due 7 January 2012
Resolved 7 June 2012
Resolution: New hose installed on lower heater unit running back to fuel tank. Deficency cleared.
Construction/Loadline › Structures › Machinery Space Opening
Issued 7 December 2011
Resolved
Properly seal openings in water tight bulkhead between hydraulic room and port weather tunnel.
Action required: 705 - Other - as specified
Due 7 December 2011
Resolved 7 June 2012
Resolution: Examined bulkehad benetrations - all in apparent good order. Deficency cleared.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 3 December 2011
Resolved
Issued PTP for failed turbo on STBD MDE. Vessel shall repair prior to departure from Stoneport Mi.
Action required: 705 - Other - as specified
Resolved 5 June 2012
Resolution: 835 was erroneously issued to the barge and not the tug.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 29 September 2011
Resolved
Install emergency lighting in the cargo tunnel.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 8 December 2011
Resolution: Determined that vessel has accomodations for only 6 personnel and emergency lighting is not required.
Communications › Alarms/Indicators › General Alarm
Issued 29 September 2011
Resolved
Install general alarm bells in cargo tunnel.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 8 December 2011
Resolution: Determined that the vessel has accomodations for only 6 personnel and general alarm/indicator is not required in the cargo tunnel.
Stability › Watertight Integrity › General
Issued 29 September 2011
Resolved
Replace forward and aft gaskets on water tight doors to cargo tunnel. Existing gaskets are cracked and hard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 7 December 2011
Resolution: Gaskets were replaced. Chalk testest and dogs adjusted. All SAT
Electrical › Electrical Distribution System (service) › Junction Box
Issued 29 September 2011
Resolved
Install missing cover on junction box servicing Shenandoah furnace.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 7 December 2011
Resolution: Cover installed on junction box
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 29 September 2011
Resolved
Remove oil soaked rags from #1 and #2 ships service diesel generator valve covers. These are a fire hazard.
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 7 December 2011
Resolution: Oil soak rags have been removed. Reminded crew of the importance to keep fire hazards to a minimum.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 29 September 2011
Resolved
Install insulation on exposed exhaust piping manifolds on all three ships service diesel generators and prime movers.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 7 December 2011
Resolution: New insulation was purchased and put on exhaust piping manifolds x3
Electrical › Electric Generation Source (service) › Generator
Issued 29 September 2011
Resolved
Cummins #1 and #2 ships service generators are improperly rated for this installation. Ambient operating temperature is rated for 40 C and should be 50 C. Provide documentation of de-rating of generators.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 31 March 2013
Resolved 25 March 2013
Resolution: Per 46 CFR Sub J dated Oct 1994 111.01-15(b) documentation was provided by operator and reflected the generator spaces did not exceed 40 Degrees during FY 2012 operating season. Requirement cleared.
Electrical › Lighting (service) › Lighting Fixture
Issued 29 September 2011
Resolved
Replace protective cover on overhead lighting fixture in vicinity of bench grinder in machine shop.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 7 December 2011
Resolution: Plastic light cover was installed on overhead light
Electrical › Lighting (service) › Conductor
Issued 29 September 2011
Resolved
Throughout the vessel, light fixtures are missing covers, lights are missing and broken and wiring is improperly terminated. Replace missing covers, renew fixtures and remove or mark dead end wires.
Condition: Improper/Lack of Maintenance
Due 11 October 2011
Resolved 7 December 2011
Resolution: Light fixture covers have been replaced/added/renewed. Dead end wires removed.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 29 September 2011
Resolved
Provide total aggregate horsepower rating of installed machinery in generator space to document threshold requirement for fixed firefighting installation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 2 November 2011
Resolution: Received email from CE [name withheld] with requested information.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 29 September 2011
Resolved
Repair fuel oil leak at 'T' junction in supply piping to heater, port side, lower pump room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 7 December 2011
Resolution: T junction fuel leak has been fixed.
Fire Fighting › Means of Escape › Corridors
Issued 29 September 2011
Resolved
Provide documentation of plan approval at time of conversion to a barge, addressing two required means of escape from crew working areas (machinery shop, pump room, generator space) or provide proposal to change vessel configuration to meet required means of escape from these spaces.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 7 December 2011
Resolution: New hatch installed. Inspected hatch, from outside and inside affected space. all sat
Operations/Management › Drills/Instruction › Not Conducted
Issued 29 September 2011
Resolved
Complete emergency drills fire and abandon ship.
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 7 December 2011
Resolution: Fire, Securty drills conducted.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 29 September 2011
Resolved
Aggregate rating of generator sets in machinery space is 2905 BHP. Fixed firefighting protection is required for this space. As an alternative, documentation may be provided proving why fixed firefighting protection has not been required for this space. Requirement to be resolved prior to vessel being placed in service for 2012 operating season.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2012
Resolved 7 December 2011
Resolution: [name withheld] agreed with the regulatory interpretation stated in the appeal from Bay Engineering on behalf of the vessel owner. Requirement cleared without prejudice.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 9 January 2009
Resolved
Provide six (6) type I PFD's prior to underway permissively manned operations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 3 April 2009
Lifesaving › Immersion Suits › Serviceable
Issued 9 January 2009
Resolved
Provide six (6) Immersion Suits for crewmembers prior to underway permissively manned operations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 3 April 2009
Lifesaving › Lifebuoys › Quantity
Issued 9 January 2009
Resolved
Provide 2 Ring Life Buoys (with lights, and lines) 46 CFR 199.640(i) 2.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 3 April 2009
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 9 January 2009
Resolved
Provide approved electrical matting in front and in back of all switch boards. 46 CFR 111.30-11
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 3 April 2009
Accommodation/Occupational Safety › Washroom/Toilet › Number Per Persons
Issued 9 January 2009
Resolved
Provide proof of proper operation and arrangements of washrooms and toilets in accordance with 46 CFR 92.20.25 prior to permissively manned operations.
Condition: Unknown
Due 31 March 2009
Resolved 3 April 2009
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 9 January 2009
Resolved
Provide proof of proper lighting, heating and ventilation in accommodation spaces in accordance with 46 CFR 92.20-5 prior any manned operations.
Condition: Unknown
Due 31 March 2009
Resolved 3 April 2009
Lifesaving › Inflatable Liferafts › Servicing
Issued 9 January 2009
Resolved
Service liferafts and install in approved locations on barge prior to permissively manning the barge. 46 CFR 199.190 (g) and 46 CFR 199.110.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 3 April 2009
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 9 January 2009
Resolved
Provide embarkation ladders for liferafts on the barge. 46 CFR 199.110(f). Complete prior to any permissively manned operations.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 3 April 2009
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 9 January 2009
Resolved
Provide emergency lighting at the barge liferaft embarkation stations as required by 46 CFR 199.110(c) & 46 CFR 111.75-16. Complete before any permissively manned operations.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 3 April 2009
Electrical › Lighting (service) › Lighting Fixture
Issued 9 January 2009
Resolved
Provide protective guards for lighting fixtures in engineering spaces and the walking tunnels that meet 46 CFR 111.75-20 current light bulbs are unprotected.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 3 April 2009
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 June 2006
Resolved
Numerous electrical issues presented: Unsupported/protected wires identified through out vessel, non-drip proof switch boards, wire nuts and cable runs over knife edges. Required correction IAW applicable regulations.
Action required: 705 - Other - as specified
Due 10 July 2006
Resolved 6 July 2006
Resolution: Inspected vessel identifying appropriate corrective action taken. Instructed o/o of required plan review of modification to installed system as well as discussion of applicable regulations.
Engineering › Thrusters › Motor
Issued 13 June 2006
Resolved
Prove proper operation of installed 398 cat for bow thruster prior to commercial operation. Replace broken gauges and cracked fuel line.
Action required: 705 - Other - as specified
Due 17 August 2006
Resolved 17 August 2006
Resolution: Witnessed satisfactory operation and tests of system with replacement of inop components.
Documentation › Certificates/Documents › Great Lakes Load Line Certificate
Issued 13 June 2006
Resolved
Prior to commercial operations provide this office with valid class documents: Certification of Class, Load Line Certificate, Cargo Gear.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 August 2006
Resolved 20 September 2006
Resolution: Received copies of certs and scanned to MISLE
Engineering › Non-conventional Propulsion/Steering › Housing (cycloidal)
Issued 13 June 2006
Resolved
Prior to commercial operations prove proper operation of tug emergency releasing from barge.
Action required: 705 - Other - as specified
Due 17 August 2006
Resolved 10 October 2006
Construction/Loadline › Penetrations › Gasket
Issued 13 June 2006
Resolved
Prior to commercial cargo operations prove proper operation of all watertight doors after 5 visits doors have not been corrected - Replace gaskets as necessary and add or remove shims required.
Action required: 705 - Other - as specified
Due 17 August 2006
Resolved 10 October 2006
Documentation › Markings/Placards › Hull Identification Number (HIN)
Issued 13 June 2006
Resolved
Affix home port and vessel name to stern as required by 46 CFR 67.117 & .123
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 September 2006
Resolved 10 October 2006
Accommodation/Occupational Safety › Occupational Safety › Lifeline
Issued 13 June 2006
Resolved
Install lifelines on starboard rear access to tug and outboard cut-away.
Action required: 705 - Other - as specified
Due 20 September 2006
Resolved 10 October 2006
Accommodation/Occupational Safety › Ventilation › General
Issued 13 June 2006
Resolved
Plum dryer vent to tunnel as previously installed with a means of closure.
Action required: 705 - Other - as specified
Due 20 September 2006
Resolved 10 October 2006
Operations/Management › Drills/Instruction › Not Conducted
Issued 13 June 2006
Resolved
Complete emergency drills to the satisfaction of the attending CGMI.
Action required: 705 - Other - as specified
Due 20 September 2006
Resolved 10 October 2006
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 13 June 2006
Resolved
Prove proper operation of all ring buoy water lights.
Action required: 705 - Other - as specified
Due 20 September 2006
Resolved 10 October 2006
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 13 June 2006
Resolved
Provide this office with copy of Class Certificate and Cargo Gear Certificate within time line provided by class.
Due 20 September 2006
Resolved 14 September 2006
Engineering › Diesel Engine (auxiliary)
Issued 30 August 2002
Resolved
Make permanent repairs to fuel return line bracket from bow thruster engine.
Condition: Unknown
Due 30 September 2002
Resolved 30 September 2002
Resolution: FUEL RETURN LINE BRACKET REPAIRED.
Lifesaving
Issued 19 July 2001
Resolved
Install machinery guards at couplings for large compressors and ballast prime pump prior to the compliance date.
Condition: Unknown
Due 19 July 2001
Resolved 19 July 2001
Engineering
Issued 19 July 2001
Resolved
Insulate exhaust manifolds, turbo chargers and exhaust piping on both ship service generators and bow thruster prior to the compliance date.
Condition: Unknown
Due 19 July 2001
Resolved 19 July 2001
Electrical
Issued 19 July 2001
Resolved
Demonstrate operation of the conveyor emergency shutdown system prior to the compliance date.
Condition: Unknown
Due 19 July 2001
Resolved 19 July 2001
Electrical
Issued 19 July 2001
Resolved
Replace globes and guards on lighting fixtures in store rooms prior to the compliance date.
Condition: Unknown
Due 19 July 2001
Resolved 19 July 2001
Lifesaving
Issued 19 July 2001
Resolved
Securely mount the domestic hot water heater in fire pump space prior to the compliance date.
Condition: Unknown
Due 19 July 2001
Resolved 19 July 2001
Electrical
Issued 19 July 2001
Resolved
Demonstrate proper operation of over speed trips on all generator drive engines prior to the compliance date.
Condition: Unknown
Due 19 July 2001
Resolved 19 July 2001
Electrical
Issued 19 July 2001
Resolved
Provide nameplate on second ships service generator and cargo system electrical generators, with electrical ratings, prior to the compliance date.
Condition: Unknown
Due 19 July 2001
Resolved 19 July 2001
Deck/Cargo
Issued 19 July 2001
Resolved
Demonstrate proper operation of the tug-barge controls, communications and disconnect machinery prior to the compliance date.
Condition: Unknown
Due 19 July 2001
Resolved 19 July 2001
Accommodation/Occupational Safety
Issued 18 June 1999
Resolved
PRESSURE RELIEF VALVE ON AIR RECEIVER #1 PLUGGED, INOPERABLE AT OR BELOW MAWP, CORRECTED DURING INSPECTION.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Electrical
Issued 18 June 1999
Resolved
BROKEN AND MISSING GLOBES AND GUARDS ON LIGHTING FIXTURES THROUGHOUT ACCOMMODATIONS AND WORK SPACES, CORRECTED DURING INSPECTION.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Fire Fighting
Issued 18 June 1999
Resolved
PROVIDE SAFE MEANS OF STOWAGE FOR SPARE PORTABLE FIRE EXTINGUISHERS, BEFORETHE COMPLIANCE DATE.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Electrical
Issued 18 June 1999
Resolved
CONDUCT OPERATIONAL TESTS OF ALARMS AND SHUTDOWNS FOR LOW LUBE OIL, HIGH TEMPERATURE AND OVERSPEEDS FOR BOTH ELECTRICAL GENERATOR SETS, BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Lifesaving
Issued 18 June 1999
Resolved
PROPVIDE PROPERLY REGISTERED AND OPERATIONAL CATEGORY 1 406 MHZ EPIRB BEFORE THE COMPLIANCE DATE, MEANWHILE VESSEL TO MAINTAIN 2 HOUR COMUNICATIONS WITH USCG GROUP SAULT STE MARIE, MI OR OPERATE NOT MORE THAN 3 MILES FROM THE GEAT LAKES SHORELINE.
Condition: Unknown
Due 25 June 1999
Resolved 23 July 1999
Accommodation/Occupational Safety
Issued 18 June 1999
Resolved
PRESSURE RELIEF ON AIR RECEIVER #2 INOPERABLE, CORRECTED.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Electrical
Issued 2 September 1998
Resolved
PROVIDE GUARDS FOR GLOBES ON LIGHTING FIXTURES IN BERTHING AREAS, BOWTHRUSTER ROOM AND AFT WORKSHOPS BEFORE COMPLIANCE DATE.
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Deck/Cargo
Issued 2 September 1998
Resolved
PERMANANTLY ATTACH FUEL/OIL CONTAINMENT ON TOWING VESSEL BEFORE COMPLIANCE DATE.
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Electrical
Issued 2 September 1998
Resolved
REPAIR JURY-RIGGED FLOOR LAMPS ON PORT SIDE END OF HATCH CRANE PRIOR TO THECOMPLIANCE DATE.
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Lifesaving
Issued 2 September 1998
Resolved
RELOCATE RING BUOY NEAR STB QTR TO MORE ACCESSIBLE LOCATION PRIOR TO COMPLIANCE DATE.
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Documentation
Issued 2 September 1998
Resolved
PROVIDE CURRNET COPY OF 46 CFR SUB I PRIOR TO COMPLIANCE DATE.
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Lifesaving
Issued 2 September 1998
Resolved
PROVIDE PROPER NUMBER OF DISTRESS SIGNALS AS PER 46 CFR PART 28.145 PRIOR TO THE COMPLAINCE DATE.
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Electrical
Issued 2 September 1998
Resolved
REPAIR EXPLOSION PROOF LIGHT FIXTURE IN PAINT LOCKER PRIOR TO COMPLIANCE DATE.
Condition: Unknown
Due 2 September 1998
Resolved 2 September 1998
Construction/Loadline
Issued 3 July 1997
Resolved
Replace gaskets on fore and aft cargo tunnel watertight doors, and chalk test when completed.
Condition: Unknown
Due 3 July 1997
Resolved 3 July 1997
Electrical
Issued 3 July 1997
Resolved
Test high temperature, low lubrication oil pressure, and overspeed automatic shutdowns of ship's service generator. Provide affidavit to OCMISault Ste. Marie when completed, or test in presence of any Coast Guard marine inspector.
Condition: Unknown
Due 3 July 1997
Resolved 3 July 1997
Navigation
Issued 3 July 1997
Resolved
Install an echo depth-sounding device on assisting tug.
Condition: Unknown
Due 3 July 1997
Resolved 3 July 1997
Documentation
Issued 27 June 1996
Resolved
Arrange for the American Bureau of Shipping to endorse the Load Line Certificate.
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Documentation
Issued 27 June 1996
Resolved
Obtain copy of current stability letter referenced on the load line certificate (27APR92).
Condition: Unknown
Due 27 June 1996
Resolved 27 June 1996
Documentation
Issued 27 June 1996
Resolved
Obtain required annual renewal sticker on the Certificate of Documentation.
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Lifesaving
Issued 27 June 1996
Resolved
Install flame screen on vent to paint locker (port side on the focsle).
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Documentation
Issued 27 June 1996
Resolved
Arrange for ABS surveyor to conduct overdue cargo gear survey.
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Lifesaving
Issued 27 June 1996
Resolved
Replace burned out battery in one PFD waterlight._x001C_
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Lifesaving
Issued 27 June 1996
Resolved
Properly label three immersion suits with the name of the barge._x001C_
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Construction/Loadline
Issued 22 January 1996
Resolved
Crop and renew fractured side shell above #1 port ballast tank in the vicinity of frame #37 to the satisfaction of the attending ABS marine surveyor or CG marine inspector, prior to leaving the port of Escanaba.
Condition: Unknown
Due 22 January 1996
Resolved 22 January 1996