Records from 1990 to 2026. Most recent: inspection, 7 August 2026.
Inspection history · 135
7 August 2026
Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8457793
20 May 2026
COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8358757
15 April 2026
Appeal · Administrative Inspection
Administrative · USCG East District · USCG East District (CGD-E) · Activity 8349837
24 February 2026
Vessel Attendance · Drydock Exam · Internal Structural Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8316404
4 February 2026
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8305811
2 January 2026
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 8291545
2 January 2026
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8298741
2 October 2025
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8219948
8 September 2025
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8229198
22 July 2025
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8191442
21 July 2025
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8245421
6 July 2025
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8178037
6 July 2025
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8200304
10 June 2025
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8149769
6 March 2025
Re-Inspection · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8089147
4 December 2024
COI Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8042092
27 June 2024
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7943535
4 April 2024
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7889257
19 December 2023
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7847595
14 December 2023
COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7837573
21 February 2023
Hull Examination · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7641045
11 August 2022
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7530021
29 July 2022
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7522126
13 July 2022
Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7505504
17 June 2022
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7530119
28 April 2022
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7440301
28 April 2022
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7444449
27 April 2022
MTSA Verification · Deficiency Check · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7438628
4 April 2022
Deficiency Check · Special
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7424137
13 January 2022
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7376609
14 October 2021
Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7329200
22 September 2021
Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7318423
22 September 2021
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7341269
24 August 2021
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7296526
9 July 2021
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7249662
29 April 2021
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7195301
1 February 2021
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7141433
21 January 2021
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7128781
14 October 2020
MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7073717
24 August 2020
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7039532
13 July 2020
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7077652
30 April 2020
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6949236
24 January 2020
MTSA Verification · Deficiency Check · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6894550
16 December 2019
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6874910
15 October 2019
Deficiency Check · COI Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6834446
1 August 2019
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6769226
7 June 2019
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6705380
31 May 2019
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6704690
30 May 2019
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6704737
17 April 2019
Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6667794
28 November 2018
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6588437
7 November 2018
Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6572158
12 July 2018
Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6482228
12 July 2018
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6489060
16 May 2018
Administrative Inspection · Re-Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6415370
15 February 2018
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6355258
12 January 2018
Special
Type not classified · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6340310
6 November 2017
Examination of Repairs · MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6301601
22 May 2017
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6152130
9 January 2017
Administrative Inspection · MARPOL Annex I Examination · MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6067900
1 November 2016
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6042283
24 October 2016
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6027164
16 October 2016
Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6024806
20 September 2016
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6014466
18 July 2016
Damage Survey · Examination of Repairs · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5945889
14 April 2016
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5853785
27 March 2016
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5848689
11 January 2016
Deficiency Check · MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5794909
21 December 2015
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5791857
21 December 2015
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5796782
4 November 2015
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5758584
12 October 2015
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5742340
12 October 2015
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5748360
16 September 2015
Re-Inspection · Damage Survey · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5238493
29 August 2015
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5230932
23 June 2014
Spot Check · Internal Structural Exam · COI Inspection · Examination of Repairs · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4896816
25 March 2014
Drydock Extension · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4822930
4 March 2014
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4810098
4 March 2014
Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4810699
17 May 2012
Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4313707
8 May 2012
COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4169555
17 September 2011
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4148896
12 September 2011
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4160629
9 August 2011
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4112087
29 July 2011
Deficiency Check · Periodic Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4098190
9 July 2011
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4078583
28 January 2011
Spot Check · Periodic Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3934374
9 January 2011
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3923839
4 November 2010
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3885798
25 October 2010
MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3877027
24 February 2010
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3685197
12 December 2009
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3649717
23 March 2009
Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3438651
4 February 2009
Deficiency Check · Initial Certification · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3412282
3 February 2009
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3412187
10 October 2008
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3342657
19 September 2008
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3328547
21 August 2008
DAPI Audit
Administrative · USCG East District (dp) · USCG East District (CGD-E) · Activity 3312024
12 August 2008
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3299020
17 December 2007
MTSA Verification
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3118007
17 October 2005
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 2516356
19 July 2005
MTSA Verification
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2438950
11 December 2004
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2260350
23 January 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1991471
24 March 1999
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 170213
24 March 1997
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1107434
30 April 1996
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1409492
11 March 1996
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1438410
22 May 1995
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 870923
1 May 1995
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1460784
21 March 1995
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1430013
1 November 1994
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 865226
15 August 1994
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1416021
5 August 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 864603
5 May 1994
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1396106
8 November 1993
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 960452
19 October 1993
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 846965
10 May 1993
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 828834
13 April 1993
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1408965
22 February 1993
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1145429
17 December 1992
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 962782
27 August 1992
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 933145
20 May 1992
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 952586
19 February 1992
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 948810
20 December 1991
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1267472
21 May 1991
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 916084
29 March 1991
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 928536
7 March 1991
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1211895
7 March 1991
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1212428
6 March 1991
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 918750
1 March 1991
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1240147
28 September 1990
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1236860
16 July 1990
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1214169
24 May 1990
Plan Review "T" Boat
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1227141
30 March 1990
Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1235659
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 May 2026
Resolved
Automatic safety trip control systems must be provided where there is an immediate danger that a failure will result in serious damage, complete breakdown, fire, or explosion. MI observed while conducting PSTPs that the STBD MDE L/O sensor was not working properly.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2026
Resolved 27 May 2026
Resolution: Engine Control Monitor connection on Stbd Main engine was not fully seated. Maintenance reseated ECM connection and oil pressure reads on displays and shutdown performed satisfactory on 27 May 2026.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 20 May 2026
Resolved
Each lifeboat, rigid liferaft, and rescue boat, unless otherwise stated in this paragraph, must carry the equipment listed in this paragraph and specified for it in table 1 to this section under the vessel's category of service. MI observed the hand pump for the inflatable rescue boat to be damaged.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2026
Resolved 27 May 2026
Resolution: The hand pump for the inflatable rescue boat was replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 20 May 2026
Resolved
A power-driven vessel of less than 12 meters in length may, in lieu of the lights prescribed in paragraph (a) of this Rule, exhibit an all-round white light and sidelights. MI observed the all around white light not working as designed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2026
Resolved 27 May 2026
Resolution: All round white light was replaced on rescue boat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 20 May 2026
Resolved
Each Class 1 door on a vessel in ocean service must be designed to withstand a head of water equivalent to the depth from the sill of the door to the margin line but in no case less than 10 feet (3.05 meters). MI observed the escape hatch for the engine room not sealing properly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2026
Resolved 27 May 2026
Resolution: Engine room hatch seal was replaced and water tested sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 2 January 2026
No resolution recorded
The rescue boat launching and recovery arrangement does not comply with 46 CFR 199.160(e) and 199.160(g) because the installed 1,500-lb davit cannot recover the rescue boat with its full complement of persons and equipment; NCDOT must either upgrade the rescue boat/davit system to full regulatory compliance or obtain an approved exemption from CGD East in accordance with 46 CFR § 199.20(d) prior to return to service following the next scheduled drydock.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 31 December 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 October 2025
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Marine Vessel Rules (incorporated by reference, see § 58.03-1), except as otherwise provided by this subchapter. MI observed multiple fuel leaks on the emergency generator fuel system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 13 October 2025
Resolution: Fuel leak repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 October 2025
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Marine Vessel Rules (incorporated by reference, see § 58.03-1), except as otherwise provided by this subchapter. MI observed a leaking fuel shut off valve and racor assembly on the STBD Main Diesel Engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 13 October 2025
Resolution: Fuel leak repaired
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 2 October 2025
Resolved
A self-propelled vessel of 65 feet or more in length, engaged in commercial service and a self propelled vessel that is certified to carry more than 150 passengers are required to have on board an operational Coast Guard Type-approved AIS Class A device. The vessels AIS is inoperable. Complete repairs to the AIS to the satisfaction of the USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 13 October 2025
Resolution: Power supply repaired
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 6 March 2025
Resolved
Where fire detecting or extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation shall meet the requirements of this part. Portside fire pumps smokes while operating. Make repairs and test to the satisfaction of attending CG Marine Inspector.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2025
Resolved 25 April 2025
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 6 March 2025
Resolved
The construction of each lighting fixture for a non-
hazardous location must meet UL 1598A or IEC 60092-306.
Light fixture in MSD space had a broken cover. Replace
cover to the satisfaction of attending CG Marine
Inspector.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2025
Resolved 10 April 2025
Resolution: Installed new light cover
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 6 March 2025
Resolved
In general, compliance with the standards established by
the American Bureau of Shipping, will be considered
satisfactory evidence of the structural efficiency of
the vessel. Frame around the escape scuttle just forward
of frame 39 was found wasted away. Crop and renew frame
to the satisfaction of attending CG Marine Inspector at
winter 2025/26 drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 December 2025
Resolved 12 June 2026
Resolution: MI's verified stiffener in way of hatch was cropped and renewed to good metal.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 11 August 2022
Resolved
Main Steering Gear System # 1 non-operational. While underway with CG MIs # 1 steering gear lossed power and steering controls. Vessel is authorized to dead head without passengers to Hatteras dock for repairs. Submit 2692 and tech report once repaired. IAW 46CFR58.25-10(b)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 August 2022
Resolved 11 August 2022
Resolution: Vessel crew identifed faulty electrical component and replaced. Sea trials conducted. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 July 2022
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03-1), except as otherwise provided by this subchapter.Vulkan coupling failer on the stbd MDE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 July 2022
Resolved 8 August 2022
Resolution: The Vulkan coupling was replaced with a new one. Dock testing and sea trials have been conducted with no problems.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 July 2022
Resolved
Received report from the vessel CAPE POINT that crews discovered a crack on the STBD MDE exhaust manifold. Make permanent repairs to the satisfaction of the attending [name withheld]2692 to DD Nags Head IO.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 August 2022
Resolved 15 July 2022
Resolution: New manifold installed and tested SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 April 2022
Resolved
The Master of the CAPE POINT reported a engine oil leak on the port main engine. The engine was shut down to secure the leak. Provide casual factors leading to the cause of the leak and corrective actions taken to the USCG Marine Inspector. Vessel must be cleared by a USCG Marine Inspector from this office prior to returning to service.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2022
Resolution: Low lube oil testing arrangement was removed and the low lube oil alarm was installed directly to engine removing source of leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 April 2022
Resolved
Low engine oil pressure alarm testing arrangement on main engine was removed due to its design causing material failure of pipe valves causing a leak. Provide plan for a new testing arrangement for review by a Marine Inspector from this office.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2022
Resolved 9 June 2022
Resolution: System was installed to original design.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 27 April 2022
Resolved
Rescue boat davit cable damaged near drum. Replace cable and weight test in accordance with 46CFR199.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 26 May 2022
Resolution: Received paperwork attesting to satisfactory weight test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 April 2022
Resolved
MI received e-mail with reports NCDOT took vessel out of service due to possible STBD keel cooler leak after rise in engine temp noticed while underway carrying passengers 1 Apr 2022. NCDOT maintenance conducted hydro of STBD keel cooler and noticed leak down on gauge and sent the vessel to NCDOT shipyard for haul out/repairs. Make permanent repairs to satisfaction of attending MI and submit a CG-2692 iaw 46cfr70.20-1.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 April 2022
Resolution: Vsl cleared for route and service following rudder repair, keel cooler repair, cutlass bearing replace and satisfactory sea trails.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 13 January 2022
Resolved
Port aft life ring torn / damaged IAW 46CFR199.70.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 February 2022
Resolved 20 January 2022
Resolution: Life ring replaced NEW, all sat.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 13 January 2022
Resolved
Alarm Panel Failure Engine Control Room Mother Board IAW 46CFR62.
Action required: 10 - Deficiency Rectified
Due 13 January 2022
Resolved 13 January 2022
Resolution: Corrected on scene. New mother board installed and PSTPs tested SAT
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 January 2022
Resolved
Port and STBD Shaft electrical bilge pumps found with missing / loose hose clamps IAW 46CFR56.50.50.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 February 2022
Resolved 20 January 2022
Resolution: Brackets replaced/tightened, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 13 January 2022
Resolved
Loose File Cabinet in MSD Space. Properly Secure IAW 46CFR71.30-10
Action required: 10 - Deficiency Rectified
Due 13 January 2022
Resolved 20 January 2022
Resolution: Properly mounted to deck plates.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 January 2022
Resolved
Fire Ext. Brackets # 7 and # 9 wasted. Replace with new IAW 46CFR34.50
Action required: 17 - Rectify deficiencies prior to departure
Due 12 February 2022
Resolved 20 January 2022
Resolution: Fire extingisher bracket replaced (new), all sat.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 13 January 2022
Resolved
Conduct sat drills for rescue boat virtual exam IAW 46CFR71.30-5.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2022
Resolved 20 January 2022
Resolution: MI viewed video of satisfactory drill.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 14 October 2021
Resolved
Vessel has approx. 4 inch hole on port side vent trunk for bow thruster. Crop and renew hull with new steel prior to carrying passengers. Prior to movement to NCDOT Shipyard captain must establish periodic checks of space at intervals sufficient to ensure safety of the vessel crew. repair IAW 46 CFR 72. 01-15
Action required: 17 - Rectify deficiencies prior to departure
Due 15 October 2021
Resolved 22 October 2021
Resolution: Vent trunk cropped and renewed, visual and NDT testing SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 14 October 2021
Resolved
Conduct thorough inspection of hull in areas aft of Bow thruster space at/near main deck on hull, conduct UT as necessary including engine room prior to carrying passengers in accordance with 46 CFR 72.01-15.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 October 2021
Resolved 22 October 2021
Resolution: Recieved tech report of satisfactory inspection of areas in question.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 14 October 2021
Resolved
Refasten plate on underside of vent trunk forward on port side. Currently daylight is visible. Vent trunk is in engine room. Repair prior to carrying passengers in accordance with 46 CFR 72.01-15.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 October 2021
Resolved 22 October 2021
Resolution: Plate has been removed and resealed along with four addtional that were not showing issues.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 14 October 2021
Resolved
Replace or repair chaffed/cracked fuel line connection and fuel tank on the rescue boat prior to carrying passengers in accordance with 46 CFR 199.190(a).
Action required: 17 - Rectify deficiencies prior to departure
Due 15 October 2021
Resolved 22 October 2021
Resolution: Received objective evidence of new tank and fuel line installed.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 14 October 2021
Resolved
Replace wasted retroreflective tape on rescue boat in accordacne with 46 CFR 199.176 (a)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 October 2021
Resolved 28 October 2021
Resolution: Retro material applied to rescue boat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 September 2021
Resolved
Report of vsl has a reduction manuverability due to possible missing stbd rudder. Vsl is allowed to transit to shipyard for trouble shooting and repairs.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 September 2021
Resolution: Received repair proposal, new rudder installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 July 2021
Resolved
Ensure both SSDG's have proper operational oil pressure gauges iaw 46 CFR 110.10-1(b) and ABS 4-2-1/7.17.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 August 2021
Resolution: New gauges installed and operational test conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 July 2021
Resolved
Gray water pipe overhead port side leaking in MSD space, make repairs in kind iaw 46 CFR 56.15-1(b).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 August 2021
Resolution: Grey water fitting replaced with new.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 9 July 2021
Resolved
MSD Space hatch failed water hose test. Make hatch water tight and test all other water tight hatches iaw 46 CFR 72.30-1.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 August 2021
Resolution: Hatch adjusted and tested SAT
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 July 2021
Resolved
Marine Inspector found new non-metallic fuel hose installed. Requested NCDOT to verify compliance with SAE J-1942 fuel rating. NCDOT noted the hose was not for fuel, the current hose is rated for hydraulic systems. Install new SAE J-1942 fuel rated hoses on all fuel systems as required iaw 46 CFR 56.60-25.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 July 2021
Resolution: NCDOT provided evidence of approvals for currently installed lines meeting J-1942 fuel use.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 21 January 2021
Resolved
Provide a means for monitoring lubricating oil on the #1 and #2 generator, current arrangement is a repurposed fuel gauge that does not carry accurate PSI range. Replace with manufacturer approved gauge or similar iaw 46 CFR 110.10-1(b)(1) and ABS 4-2-1/7.17
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 February 2021
Resolved 1 February 2021
Resolution: Gauge replaced with appropriate PSI range.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 21 January 2021
Resolved
Vessels rescue boat motor pull start failed, replace/repair tensioner or swap motor with spare to ensure proper start-up iaw 46 CFR 199.160.
Action required: 10 - Deficiency Rectified
Resolved 21 January 2021
Resolution: Rescue boat motor repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 January 2020
Resolved
Found the port mde has been using excessive amounts of coolant. Identify and repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 February 2020
Resolved 7 February 2020
Resolution: Loose bolts were found on the keel cooler valve allowing coolant to leak into the bilge when the engine was under load. Tightened valve; test sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 January 2020
Resolved
Found two loose nuts on a stbd mde keel cooler valve. Tighten loose nuts and check all other keel cooler valves for tigntness.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 February 2020
Resolved 7 February 2020
Resolution: All keel cooler bolts have been checked for tightness; sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 24 January 2020
Resolved
Found excessive leaking at both rudder post. Adjust as necessary.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 February 2020
Resolved 7 February 2020
Resolution: Adjustments complete; all sat.
08 - Alarms › N/A - No Subsystem › Closing water-tight doors alarm
Issued 15 October 2019
Resolved
Found MSD WTD alarm not functioning properly. Repair door indicator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 October 2019
Resolved 22 October 2019
Resolution: WTD alarm now properly functioning.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 October 2019
Resolved
Found fire pumps capable of producing greater than 150 psi with a 125 psi relief valve installed. Make system comply with CFR.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2019
Resolved 16 December 2019
Resolution: NCDOT granted extension until next scheduled drydock. Manual control procedure accepted by Sector NC.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 April 2019
Resolved
#2 bilge pump found inoperable by crew while testing. Repair/replace motor and prove proper operation.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 April 2019
Resolution: A remanufactured electrial motor was installed on the #2 bilge pump and tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 November 2018
Resolved
Vessel lost its #2 steering pump while in transit from Hatteras to Ocracoke. Replace/ repair steering pump and conduct operational test.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 November 2018
Resolution: NCDOT maintenance department found a fuse had blown on CAPE POINT's steering pump #2 remote control. A new fuse was installed; operational test sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 July 2018
Resolved
Cooling line fitting between the port main engine and aftercooler failed, resulting in a loss of coolant and shutdown of the engine. Complete proper repairs and demonstrate full function test to the satisfaction of attending CG Marine Inspector prior to carrying passengers.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 July 2018
Resolution: Inspected installation of new water inlet elbow and cooling line. Witnessed operational test; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 May 2018
Resolved
Found the stbd transmission display in the EOS OOC. repair display.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2018
Resolved 29 June 2018
Resolution: A new display was installed and tested.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 16 May 2018
Resolved
Found the alternators on port and stbd main engines had been removed leaving open access to the flywheel. Install guards to prevent accidental entanglement.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2018
Resolved 1 June 2018
Resolution: Machinery guards have been installed.
Personnel › Certificates/Documents/Licenses › Medical Fitness Document
Issued 15 February 2018
Resolved
Found the Designated Duty Engineer's medical card expired. Remove mariner from operational positions requiring a merchant Mariner Credential.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 February 2018
Resolved 15 February 2018
Resolution: Mariner was removed from the vessel and his employment in positions requiring a MMC was terminated.
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 16 January 2017
Resolved
Vessel unable to prove/test safety devices on Bow Thruster. Prove proper operation of safety devices to attending CG Marine Inspector.
Action required: 705 - Other - as specified
Due 16 July 2017
Resolved 14 November 2017
Resolution: The vessel class has been re-powered making the bow thrusters obsolete. The bow thrusters are no longer used and are being removed fleet wide.
Electrical › Electric Generation Source (service) › Generator
Issued 24 October 2016
Resolved
Observed a lube oil leak on the #2 SSDG oil filter housing; repair leak.
Action required: 705 - Other - as specified
Due 24 November 2016
Resolved 1 November 2016
Resolution: Maintenance replaced failed o-rings.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 24 October 2016
Resolved
Found exhaust lagging on #2 MDE worn beyond repair IWO turbo flange; renew lagging.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 November 2016
Resolved 1 November 2016
Resolution: Maintenance renewed the exhaust lagging.
Lifesaving › Launching Appliances › Falls
Issued 16 October 2016
Resolved
Received notification that the rescue boat davit cable parted. Renew cable and conduct weight tests.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 October 2016
Resolution: Cable was replaced. Witnessed light weight and full weight tests; all sat.
Communications › Internal Communications System › Sound-powered Telephone
Issued 14 April 2016
Resolved
Found sound powered phone headset to be missing in engine room. Procure headset.
Action required: 705 - Other - as specified
Due 14 May 2016
Resolved 18 July 2016
Resolution: Installed sound powered phone headset.
Engineering › Fuel Oil Service System › Heater
Issued 14 April 2016
Resolved
Found hot start bracket for bow thruster to be broken, replace bracket.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 May 2016
Resolved 14 April 2016
Resolution: Repaired bracket as needed.
Fire Fighting › Fire Pumps › Pressure
Issued 15 January 2016
Resolved
Prove proper operation of both PTO fire pumps. Minimum PSI with two hoses (one highest point and one furthest point) is 50psi with both hoses open at each hose.
Action required: 705 - Other - as specified
Due 28 January 2016
Resolved 28 January 2016
Resolution: Properly tested both PTO fire pumps as needed to prove proper operation.
Fire Fighting › Combustible Materials › Insulation
Issued 15 January 2016
Resolved
Replace missing insulation in engine room and bow thruster room as needed.
Action required: 705 - Other - as specified
Due 15 February 2016
Resolved 28 January 2016
Resolution: Missing insulation in both spaces were added as required and needed.
Engineering › Diesel Engine (propulsion-reduction gear) › Emergency shutdown
Issued 15 January 2016
Resolved
No overspeed alarm for MDE's on panel in control room. Place on as needed.
Action required: 705 - Other - as specified
Due 15 February 2016
Resolved 28 January 2016
Resolution: Overspeed's were added to the control room panel for both MDE's as required. Both tested properly and alarmed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 15 January 2016
Resolved
Junction box for port side automatic bilge pump needs proper packing for wire going into top of box.
Action required: 705 - Other - as specified
Due 28 January 2016
Resolved 28 January 2016
Resolution: Junction box for portside auto bilge pump was packed properly.
Electrical › Electric Generation Source (service) › Generator
Issued 21 December 2015
Resolved
Due to unknown electrical issue with the #1SSG, main breaker, and related switch, vessel is directed to have an electrician troubleshoot and prove proper operation prior to carrying passengers.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 December 2015
Resolved 22 December 2015
Resolution: New circuit breaker installed to the satisfaction of the attending CG Marine Inspector.
Engineering › Sea-water System (primary cooling) › Piping
Issued 17 September 2015
Resolved
Make permanent repairs to A/C salt water line in engine room from fwd bulkhead to sea chest with proper piping for that system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 October 2015
Resolved 30 September 2015
Resolution: Repairs made as required.
Engineering › Sea-water System (primary cooling) › Piping
Issued 17 September 2015
Resolved
Port Main Engine has CPVC piping on secondary shaft cooling line. Replace CPVC with proper type piping for system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 October 2015
Resolved 30 September 2015
Resolution: Repairs made as required.
Engineering › Bilge Water Management System › Piping
Issued 25 March 2014
Resolved
Two holes found on bilge line in MSD room for fuel tank void bilge suction line. Repair or replace as original.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 March 2014
Resolution: This line was replaced and tested as required.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 25 March 2014
Resolved
On port and stbd shaft bolts that hold the collar for cutlass bearings were missing and collars are loose on the shafts. Make repairs as needed prior to final approval from CG-CVC for dry dock extension.
Action required: 705 - Other - as specified
Resolved 31 March 2014
Resolution: Repairs made as needed to the collars on port and stbd side and appear to be satisfactory for continued use.
Electrical › Electric Generation Source (service) › Generator
Issued 17 May 2012
Resolved
Provide a technician's report documenting proper operation of the #1 ship's service generator.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 May 2012
Electrical › Electrical Distribution System (emergency) › Switchboard
Issued 17 May 2012
Resolved
Provided a technicians report documenting that the #1 steering gear pump is provided with power from two circuits and that one of the required circuits must feed from the emergency switchboard IAW 46CFR58.25-65.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 May 2012
Engineering › Steering Gear System › Pump
Issued 17 May 2012
Resolved
Provide a technician's report documenting proper operation of the #1 steering gear pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 May 2012
Engineering › Lubricating Oil Service System › Gauge
Issued 8 May 2012
Resolved
Demonstrate proper operation of gear oil temperature gauge.
Action required: 705 - Other - as specified
Due 8 June 2012
Resolved 13 June 2012
Resolution: Proper operation demonstrated.
Engineering › Fuel Oil Service System › Hose
Issued 8 May 2012
Resolved
Replace fuel lines on emergency generator to comply with Coast Guard approved marine fuel line.
Action required: 705 - Other - as specified
Due 8 June 2012
Resolved 15 August 2012
Engineering › Fuel Oil Service System › Valve
Issued 29 July 2011
Resolved
Label emergency fuel shut off valve.
Action required: 705 - Other - as specified
Resolved 29 July 2011
Resolution: Fuel shut off valve labeled.
Communications › Public Address System › Loudspeaker
Issued 29 July 2011
Resolved
Provide additional PA speaker so Engineer can hear announcements.
Action required: 705 - Other - as specified
Due 29 August 2011
Resolved 7 August 2011
Resolution: PA speaker installed in Engine Control Room.
Fire Fighting › Fire Main › Condition
Issued 28 January 2011
Resolved
Make appropriate repairs to the ENG room fire main by removing drain. Must have permanent repair in place by next dry dock.
Action required: 705 - Other - as specified
Resolved 28 January 2011
Resolution: Drain/Flushing valve removed and schedule 80 nipple and cap installed. Permanent repairs to be completed at the Ship Yard.
Electrical › Electric Supply System (service) › Cable
Issued 28 January 2011
Resolved
Repair shore tie power socket found on the bow within 07 days.
Action required: 705 - Other - as specified
Due 4 February 2011
Resolved 28 January 2011
Resolution: The threads on the Electrical Shore Tie, cleaned and lubricated. Additional education to all crew on the importance of installing the retaining ring.
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 28 January 2011
Resolved
Fuel oil leak on the EDG valve must be repaired prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 January 2011
Resolution: Packing on the leaking valve was tightened, no evidence of continuing leakage.
Lifesaving › Lifeboat › Carriage Requirement
Issued 4 February 2009
Resolved
Install approved lifeboat and proper launch/retrieval device and demonstrate proper lifeboat drill to the satisfaction of the attending marine inspector.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 May 2010
Resolved 27 April 2010
Resolution: Resuce Boat installed and tested, all found satisfactory.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 4 February 2009
Resolved
Install proper operating instruction placard on the fixed fire fighting system.
Action required: 705 - Other - as specified
Due 21 May 2010
Resolved 23 June 2009
Resolution: Placard was replaced by crew.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 21 August 2008
Resolved
No Proof of MIS report submission. No proof of contract with consortium.
Due 2 October 2008
Resolved 24 September 2008
Resolution: documentation submitted company in compliance.
Lifesaving
Issued 1 May 1995
Resolved
PROVIDE A TOOL KIT FOR THE RESCUE BOAT, TO CONSIST OF THE FOLLOWING: 1. ONEHAMMER, 2. ONE 10 INCH ADJUSTABLE WRENCH AND 3. ONE KNIFE. TO BE USED FOR RELEASING RESCUE BOAT. PROVIDE THIS NO LATER THAN 01JUN95.
Condition: Unknown
Due 1 June 1995
Resolved 23 May 1995
Lifesaving
Issued 8 November 1993
Resolved
PROVIDE ABOVE DECK ACCESSIBLE STOWAGE OF CHILDS PFD'S, AND LABLE IN ACCORDANCE WITH 46 CFR 78.47-65.
Condition: Unknown
Due 8 November 1993
Resolved 8 November 1993
Fire Fighting
Issued 19 October 1993
Resolved
PROVIDE REMOTE VENTALATION SHUTDOWN FOR MACHINERY SPACE IN ACCORDANCE WITH 46 CFR 111.103-7, VENTALATION STOP STATIONS.
Condition: Unknown
Due 19 October 1993
Resolved 19 October 1993
Engineering
Issued 19 October 1993
Resolved
PROVIDE CHAFEING GEAR FOR FUEL AND LUBE OIL LINES ON MAIN ENGINE AND SHIPS_x001C_GENERATORS
Condition: Unknown
Due 19 October 1993
Resolved 19 October 1993
Fire Fighting
Issued 19 October 1993
Resolved
PROVIDE HAMMER ON CO2 REMOTE PULL BOX TO ENGINE ROOM.
Condition: Unknown
Due 19 October 1993
Resolved 19 October 1993
Electrical
Issued 19 October 1993
Resolved
MAKE OPERABLE DOOR INTERLOCK SYSTEM FOR #1 STEERING CONTROLLLER
Condition: Unknown
Due 19 October 1993
Resolved 19 October 1993
Electrical
Issued 1 March 1991
Resolved
PROPERLY DEMONSTRATE OVERSPEED TRIP AND ALARM AND FUEL GUAG FOR EMERGENCY GENERATOR, PRIOR TO OPERATION OF VESSEL. TO BE DEMONSTRATED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 1 March 1991
Resolved 1 March 1991
Lifesaving
Issued 30 March 1990
Resolved
CONDUCT A FIRE AND BOAT DRILL.
Condition: Unknown
Due 30 March 1990
Resolved 30 March 1990
Navigation
Issued 30 March 1990
Resolved
POST STABILITY LETTER IN THE PILOT HOUSE.
Condition: Unknown
Due 30 March 1990
Resolved 30 March 1990