Inspection history · 36
19 February 2026
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8312362
8 January 2026
Vessel Attendance · Examination of Repairs · Hull Examination · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8285691
14 August 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8210309
14 August 2025
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8212476
20 November 2024
Administrative Inspection · Annual Inspection · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8037684
8 January 2024
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7828273
12 December 2023
Internal Structural Exam · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7827989
14 November 2023
In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7807599
6 October 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7804528
11 August 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7766106
21 November 2022
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7597643
1 November 2022
COI Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7546990
30 October 2022
Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7586433
15 September 2022
Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7504439
10 May 2022
In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7446844
25 January 2022
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7363810
4 February 2021
Damage Survey · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7135912
4 February 2021
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7136343
14 December 2020
Examination of Repairs · DAPI Audit · Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7111305
30 September 2020
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7041682
7 January 2020
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6866139
22 September 2019
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6835668
20 September 2019
Damage Survey · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6816741
20 September 2019
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6835444
8 January 2019
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6592796
10 December 2018
Deficiency Check · In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6595307
8 December 2018
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6597672
7 September 2018
Internal Structural Exam · Drydock Exam · Administrative Inspection · Examination of Repairs · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6534327
13 August 2018
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6512124
9 January 2018
Excursion Permit
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6334902
10 October 2017
COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6286462
24 January 2017
Excursion Permit
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6076863
10 January 2017
Administrative Inspection · DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6062673
15 September 2016
Examination of Repairs · Welding Related Inspections Qualification Testing · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6001251
2 July 2016
Type not recorded
No type recorded · Station Sand Key · USCG Southeast District (CGD-SE) · Activity 5928001
6 January 2016
Annual Inspection · DAPI Audit
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5791284
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 16 March 2026
Resolved
46 CFR 185.726 (e)
Each battery without an expiration date indicated on it or for which the owner or managing operator does not have a record of the expiration date, used in an item of lifesaving equipment, must be replaced during the annual inspection. MI observed that all 05 float light batteries didn't have expiration date and had wrong battery as per manufacturer instructions.
CODE 705: Vessel is restricted to daytime operations.
Action required: 705 - Other - as specified
Resolved 20 April 2026
Resolution: Batteries were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 March 2026
Resolved
46 CFR 185.604(h)
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018 or other standard specified by the Commandant MI observed multiple adult size life jackets that need new Type I retroreflective material.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2026
Resolved 20 April 2026
Resolution: Type I retroreflective material was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 March 2026
Resolved
46 CFR 182.100
All machinery and equipment must be installed and
maintained in such a manner as to afford adequate
protection from causing fire, explosion, machinery
failure, and personnel injury. MI observed both steering
ram hose connections had small leaks.
Action required: 10 - Deficiency Rectified
Due 16 March 2026
Resolved 16 March 2026
Resolution: Connections were tightened.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 9 March 2026
Resolved
46CFR176.500(b)
Vessel must undergo an annual inspection as specified in paragraph (b)(1) of this section. Vessel must undergo an annual inspection within 3 months before or after the each anniversary date. Vessels anniversary date was 19SEP2024, and vessel is past 3 months from said date.
Vessel shall not operate with passengers until an annual inspection has been complete.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 March 2026
Resolution: Completed annual inspetion.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 March 2026
Resolved
46 CFR 182.200 (a)
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. O/O is replacing both main engines. Engines are being replaced in kind. Vessel must demonstrate operation of new main engines to the satisfaction of attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 March 2026
Resolution: Witnessed operational test of new engines.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 January 2025
Resolved
46 CFR 181.405(c); 705c
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Inspector observed missing fire detection system on top deck for passenger accommodations. Restricted to no overnight voyages until installed.
Action required: 705 - Other - as specified
Resolved 9 February 2025
Resolution: Reviewed photographs sent by vessel rep [name withheld]
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 January 2025
Resolved
46 CFR 181.120(a); 16c
Fire extinguishing equipment installed on a vessel in excess of the requirements of §§ 181.400 and 181.500 must be maintained in accordance with a recognized industry standard acceptable to the Commandant (CG-ENG-4). Inspector observed 01 extra fire extinguisher not serviced.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 February 2025
Resolution: Reviewed photos sent by vessel rep [name withheld]
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 January 2025
Resolved
46 CFR 185.604(b); 16c
Each ring life buoy must be marked in clearly legible block capital letters with the vessel's name. Inspector observed vessel's name not marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 February 2025
Resolution: Reviewed photos sent by vessel rep [name withheld]
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 January 2025
Resolved
46 CFR 182.410 (d)1; 16c
Double hose clamping is required where practicable. Inspector observed fuel service hoses in machinery spaces not attached with double hose clamps.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 February 2025
Resolution: Reviewed photos sent by vessel rep [name withheld]
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 January 2025
Resolved
46 CFR 179.320(c); 16c
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Inspector observed 02 penetrations in STBD void and within machinery spaces.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 February 2025
Resolution: Reviewed photos sent by vessel rep [name withheld]
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 January 2025
Resolved
46 CFR 183.200(b); 16c
Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Inspector observed exposed wires terminating without connections.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 February 2025
Resolution: Reviewed photos sent by vessel rep [name withheld]
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 December 2023
Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements and capable of operating at constant marine load without exceeding its design limitations.
MI observed a water leak on the port main engine where the exhaust header at turbo charger meets the exhaust piping (wet system).
Repair by next planned drydock on 08JAN23.
46 CFR 182.05-1(a)
Action required: 705 - Other - as specified
Due 8 January 2024
Resolved 1 February 2024
Resolution: MI observed installation of newly fabricated exhaust riser. Turbo charger was replaced with new. Ran port main engine for approximately five minutes and observed proper functioning with no leaks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 December 2023
Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended.
MI observed damaged and missing exhaust pipe lagging for the port auxiliary generator.
Repair by next planned drydock on 08JAN23.
46 CFR 182.10-1
Action required: 705 - Other - as specified
Due 8 January 2024
Resolved 1 February 2024
Resolution: MI observed new exhaust lagging wrap for port auxiliary generator.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 6 October 2023
Resolved
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Vessel shall install system to the satisfaction of attending USCG Marine Inspector.
46 CFR 181.405(c) - 50C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 November 2023
Resolved 12 December 2023
Resolution: MI verified proper operation of interconnected fire detection system.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 October 2023
Resolved
Flammable items not otherwise covered by the regulations of this subchapter, such as rechargeable batteries, including lithium ion batteries utilized for commercial purposes, must be handled, stored, and operated in a way that mitigates the risk of hazardous conditions. Vessel shall develop plan to the satisfaction of attending USCG Marine Inspector.
46 CFR 185.364 - 50C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 November 2023
Resolved 12 December 2023
Resolution: MI verified vessel operators had restriction policy/procedures in place for allowing customers to plug in portable devices.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 6 October 2023
Resolved
Vessels described by 46 CFR 175.110(d) must submit plans to the cognizant OCMI, in accordance with 46 CFR 176.700, for the installation and use of monitoring device to ensure the wakefulness of the watchmen required in paragraph (a) of this section. Vessels with a keel laid date after March 28, 2022, must include plans for the monitoring device(s) within the plan submissions required in 46 CFR 177.202. The Coast Guard will work with the vessel operators to determine a reasonable implementation schedule once the plans are accepted. The monitoring device(s) must: (1) Ensure the wakefulness of the crew in the event that the watchman required in paragraph (a) of this section is unresponsive; (2) Remain operable during the nighttime watch; and (3) Be arranged to ensure proper coverage of the passenger accommodation spaces, common areas, and spaces with potential fire hazards.
46 CFR 185.410(b) - 50C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 November 2023
Resolved 12 December 2023
Resolution: MI verified proper operation of watchman monitoring system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 August 2023
Resolved
(d) Where rigid nonmetallic material (plastic) is permitted for use in piping systems by this section, the following restrictions apply:
(ii) One or more metallic shutoff valves must be installed adjacent to the fitting in one of the following ways:
(A) Only one metallic shutoff valve must be installed if it is operable from above the bulkhead deck;
(B) If two metallic shutoff valves are installed, one on either side of the bulkhead, they need not be operable from above the bulkhead deck provided immediate access to both is possible; or
(C) Where both plastic and metallic materials are used in piping that penetrates a bulkhead, and the two materials exist entirely on opposite sides of the bulkhead, a metallic shutoff valve must be installed at the bulkhead in the metallic part of the system, with the valve being capable of operation from above the bulkhead deck, or locally if immediate access is possible;MI observed no shutoff valves on either side of the through bulkhead fitting.
46 CFR 182.720 (d)(ii)
Action required: 705 - Other - as specified
Due 19 August 2023
Resolved 24 August 2023
Resolution: Vessel installed metallic shutoff valves on both sides of bulkhead.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 August 2023
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI.
Vessel notified USCG Sector St. Petersburg that the vessel had a broken waterline in engine room causing flooding while outbound from John's Pass.
The vessel shall make satisfactory repairs and contact USCG MI to attend the vessel.
46 CFR 176.700
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 August 2023
Resolved 12 August 2023
Resolution: Vessel representative made satisfactory repairs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 November 2022
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets. Letters and numbers must be at least 50 millimeters (2 inches) high. Symbols must be at least 100 mm (4 inches) square.
During inspection Life jacket storage did not have any labeling.
46 CFR 185.604(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2022
Resolved 10 November 2022
Resolution: Vessel representative [name withheld] contacted SSP Dispatch via email with pictures showing the labeling has been put in place for the life jackets.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 November 2022
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions.
First-aid kit on board the vessel did not have a tourniquet.
46 CFR 184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2022
Resolved 10 November 2022
Resolution: Vessel representative [name withheld] contacted SSP Dispatch via email with pictures showing the deficiencies have been rectified.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 November 2022
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge , Marine Inspection.
During inspection multiple electrical wires had been pulled out of their holders or cable runs and were hanging low enough to become a hazard on the 2nd deck.
46 CFR 183.01-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2022
Resolved 10 November 2022
Resolution: Vessel representative [name withheld] contacted SSP Dispatch via email with pictures showing the deficiencies have been rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 November 2022
Resolved
All vessels except non self propelled vessels shall be provided with a suitable steering apparatus.
Helm wheel was not tight and had tape on nut holding it on. Helm was loose and wobbling during operation.
46 CFR 183.30-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2022
Resolved 10 November 2022
Resolution: Vessel representative [name withheld] contacted SSP Dispatch via email with pictures showing the deficiencies have been rectified.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 30 October 2022
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without OCMI approval.
Vessel master notified USCG Sector St. Pete after the vessel allegedly ran aground in the channel at John's Pass, St. Pete, FL on October 30, 2022. The vessel returned to the dock and the master stated that the starboard shaft was vibrating on the return trip. A diver confirmed that the starboard (4 blade) propeller was bent at a 90 degree angle on three of the four blades.
The operator shall make satisfactory repairs or replace the propeller in kind and contact USCG MI to attend for a sea trial after repairs are complete.
46 CFR 176.700
Action required: 17 - Rectify deficiencies prior to departure
Due 30 October 2022
Resolved 1 November 2022
Resolution: A marine inspector attended the vessel and witnessed main engine operation while underway. An ISE was completed by the MI with no deficiencies noted.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 January 2022
Resolved
The intent of this part is to insure that the scantlings, material, fastenings, workmanship and arrangements of each vessel are such as to provide for the safe operation in accordance with the terms of its Certificate of Inspection. Primary consideration shall be given to the provision of a seaworthy hull.
The 1, 2 and 3 overhead longitudinal main deck support frames located inboard from the hatch in the forward starboard compartment were found fractured at the weld to the collision bulkhead.
46 CFR 177.01-5 (Old-T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2022
Resolved 24 February 2022
Resolution: The operator cropped and renewed the weld using like and in kind filler metal.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 January 2022
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc.
The Starboard side generator is missing its belt guard.
46 CFR 177.35-15 (Old-T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2022
Resolved 24 February 2022
Resolution: The operator placed an original OEM guard over the generator belt.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 January 2022
Resolved
It is intended that all machinery be installed an maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure and personnel injury.
The wet exhaust on the Starboard side main engine has a leak on the inboard side.
46 CFR 182.01-5 (Old-T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2022
Resolved 24 February 2022
Resolution: The operator removed the lagging and tightened the metal clamp holding the rubber gasket in this area. The main engine was tested and is no longer leaking. The lagging was placed back over the area.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 January 2022
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure.
The wiring to the air conditioning unit water pump has twist-on wire nuts to make the connection, and it is not inside of an enclosure.
46 CFR 183.340(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2022
Resolved 24 February 2022
Resolution: The operator installed a UL listed enclosure for the conductor connection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 February 2021
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without OCMI approval. Vessel master notified USCG Sector St. Pete after vessel allegedly ran aground in the channel at John's Pass, St. Pete, FL on Feb. 4, 2021. The vessel returned to the dock and the master stated that the starboard shaft was vibrating on the return trip. A diver confirmed that the starboard (4 blade) propeller was bent at a 90 degree angle on two of the four blades. The operator shall make satisfactory repairs or replace the propeller in kind and contact USCG MI to attend for a sea trial after repairs are complete.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 February 2021
Resolved 5 February 2021
Resolution: O/O replaced prop and MI verified proper installation and conducted sea trials, all SAT.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 22 January 2021
Resolved
Repairs or alterations to the hull that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. Identified fractured welds in the overhead stiffners located port side #1 forward space. Overhead stiffners located at the cross deck, stiffners #1, #2, #3; numbering of stiffners from outboard to inboard. Forward welds on stiffners fractured, aft welds appeared satisfactory. Operator to renew in kind. 46 CFR 176.700
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2021
Resolved 28 January 2021
Resolution: The operator cropped and renewed the fractured welds. Operator used 5356 filler metal (MIG) for repair weld. Reviewed photos submitted of the weld with no deficiencies noted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 7 January 2020
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied a any point in and direction. The starboard deck rail, above the engine room is cracked. Repair as original.
46 CFR 177.900(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2020
Resolved 10 January 2020
Resolution: Rail repaired and found satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 January 2020
Resolved
Whenever damage or deterioration to hull plating g or structural members that may affect the seaworthiness of a vessel is discovered the cognizant OCMI may require the vessel to effect permanent repairs. The port generator exhaust is cracked where the pipes meets the hull. Repair as original.
46 CFR 176.600(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2020
Resolved 10 January 2020
Resolution: Area repaired as original.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 January 2020
Resolved
All cable and wire must: be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner to avoid chafing and other damage. The hot water heater electrical supply wires were supported by other wires and not their own metal supports.
46 CFR 183.340(b)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2020
Resolved 10 January 2020
Resolution: Operator installed supports.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 September 2019
Resolved
Propulsion machinery must be suitable in type and design
for propulsion requirements of the hull in which it is
installed and capable of operating at constant marine
load under such requirements without exceeding its
designed limitations.
Vessel's port main engine experienced electric starter
failure. Repair and prove proper operation in the
presence of a USCG Marine Inspector.
IAW: 46 CFR 182.200(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 September 2019
Resolution: Vessel representative replaced port main diesel engine electric starter.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 January 2019
Resolved
Distribution panel was not drip proof protected.
46CFR183.10-10
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2019
Resolved 10 January 2019
Resolution: Owner provided evidence of covers over distribution panel to ensure it is drip proof.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2019
Resolved
Packing sleeve leak on shaft. Raw water pipe leak on starboard engine.
46CFR176.800
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2019
Resolved 10 January 2019
Resolution: Owner provided evidence of tightened shaft sleeve packing and raw water pipe.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 December 2018
Resolved
Provide operational test of port main transmission to the satisfaction of the Marine Inspector prior to the carry of passengers.
IAW 46 CFR 182.200
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 December 2018
Resolution: O/O installed rebuilt transmission for port engine and conducted satisfactory operational test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 September 2018
Resolved
Piping used in a vital system must be composed of ferrous metal except when non-metallic piping material is permitted by 46 CFR 185.720(e). Found non metallic materials used in bilge piping system (flex hose). Make repairs to bilge piping as original or as required. 46 CFR 182.710(c)(1).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2018
Resolved 3 October 2018
Resolution: Operator completed bilge piping repairs using 1.5 inch stainless steel in port side tool void. Use of stainless steel was previously accepted for same repair on starboard side.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 13 August 2018
Resolved
A vessel must be provided with a main steering gear that is
of adequate strength and capable of steering the vessel at all service speeds. Make repairs and prove proper operation of steering gear. 46 CFR §182.610.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 August 2018
Resolution: Replaced steering gear pump; witnessed satisfactory operation.
Lifesaving › Lifefloat › Serviceable
Issued 10 October 2017
Resolved
Replace 02 life floats in kind and reduce manning to 40 pax 4 crew iaw 46CFR180,10-5.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 3 November 2017
Resolution: New life floats installed to the satisfaction of attending inspectors.
Fire Fighting › Remote Fuel Shutoff › General
Issued 10 October 2017
Resolved
Repair/Replace port fuel shutoff iaw 46CFR182.20-4(3) prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 October 2017
Resolution: Repair made to port fuel shut off prior to departure of attending marine inspectors.
Engineering › Bilge Water Management System › Valve
Issued 10 January 2017
Resolved
Provide valve handle for stbd side a/c void through hull fitting. 46 CFR 179.350
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 24 January 2017
Resolution: Handle provided and installed to the Inspector satisfaction.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 January 2017
Resolved
Provide globe for lighting in port side tool room. 46 CFR 183.410
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 24 January 2017
Resolution: Globe provided and installed to the Inspector satisfaction.
Operations/Management › Passenger Operations › Safety Orientation
Issued 10 January 2017
Resolved
Label upper deck capacity (63). 46 CFR 185.602(g)
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 24 January 2017
Resolution: Label placed at stairway going towards upper deck to the Inspector satisfaction.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 10 January 2017
Resolved
Provide voyage plan for overnight voyages. 46 CFR 185.503
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 24 January 2017
Resolution: Voyage Plan provided to the Inspector satisfaction.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 25 November 2016
Resolved
Remove temporary repair to cracked weld on starboard MDE exhaust piping. Make permanent repairs to the satisfaction of the attending CG Marine Inspector.
Action required: 705 - Other - as specified
Due 9 December 2016
Resolved 9 December 2016
Resolution: Weld was ground back and area; new weld tested satisfactorily with no leaks.
Construction/Loadline › Penetrations › Pipe Flange
Issued 15 September 2016
Resolved
Crop and renew wasted and holed aft bulkhead at main engine exhaust piping penetration, port and starboard sides.
Action required: 705 - Other - as specified
Resolved 11 October 2016
Resolution: Piping cropped and renewed as original; witnessed satisfactory weld test.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 15 September 2016
Resolved
Make repairs to cracked cap rail main deck starboard side aft.
Action required: 705 - Other - as specified
Resolved 22 September 2016
Resolution: Crack ground back and welded using 5356 wire; inspected satisfactory.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 15 September 2016
Resolved
Crop and renew wasted and holed starboard side aft engine room bulkhead as identified.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New 5086 aluminum alloy plate inserted and welded using 5356 wire; inspected satisfactory.
Engineering › Bilge Water Management System › Piping
Issued 15 September 2016
Resolved
Prove integrity of starboard side engine room aft bilge pipe at flange.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New pipe, gasket and bolts installed; inspected satisfactory.
Construction/Loadline › Hull › Side Shell
Issued 15 September 2016
Resolved
Crop and renew wasted side shell plating starboard side engine room as identified.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New 5086 aluminum plate inserted and welded using 5356 wire; inspected satisfactory.
Construction/Loadline › Structures › Door
Issued 15 September 2016
Resolved
Make repairs to cracked weld main deck forward door and cracked weld above door frame as identified.
Action required: 705 - Other - as specified
Resolved 31 October 2016
Resolution: Crack ground back and welded using 5356 wire; inspected satisfactory.
Construction/Loadline › Structures › Deck Plating
Issued 15 September 2016
Resolved
Crop and renew wasted and holed main deck plating forward in way of anchor.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New aluminum plate inserted using aluminum backing plates for 100% penetration; inspected satisfactory.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 15 September 2016
Resolved
Crop and renew port engine room aft bulkhead in area of excessive pitting as identified.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New 5086 aluminum alloy plate inserted and welded using 5356 wire; inspected satisfactory.
Construction/Loadline › Hull › Stringer
Issued 15 September 2016
Resolved
Make repiars to cracked internal side shell weld, port side engine room as identified.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: Ground back and welded using 5356 wire; inspected satisfactory.
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 15 September 2016
Resolved
Make repairs to cracked welds on framing under port MDE.
Action required: 705 - Other - as specified
Resolved 11 October 2016
Resolution: Ground back and welded using 5356 wire; inspected satisfactory.
Construction/Loadline › Hull › Side Shell
Issued 15 September 2016
Resolved
Crop and renew wasted and pitted side shell in port side engine room as identified.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New 5086 aluminum alloy plate inserted and welded using 5356 wire; inspected satisfactory.
Construction/Loadline › Hull › Side Shell
Issued 15 September 2016
Resolved
Crop and renew wasted and pitted side shell long frames in port engine room as identified.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New aluminum frames alloy plate inserted and welded using 5356 wire; inspected satisfactory.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 15 September 2016
Resolved
Crop and renew wasted and pitted port side forward engine room bulkhead as identified.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New 5086 aluminum plate inserted and welded using 5356 wire; inspected satisfactory.
Construction/Loadline › Hull › Side Shell
Issued 15 September 2016
Resolved
Crop and renew wasted and pitted side shell in port side fuel tank compartment as identified.
Action required: 705 - Other - as specified
Resolved 19 October 2016
Resolution: New 5086 aluminum plate inserted and welded using 5356 wire; inspected satisfactory.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 January 2016
Resolved
Properly place belt guards on generators IAW 46 CFR 177.960.
Action required: 705 - Other - as specified
Due 17 February 2016
Resolved 17 February 2016
Documentation › Markings/Placards › Capacity Marking
Issued 6 January 2016
Resolved
Re-stencil marking for top deck passenger capacity.
Action required: 705 - Other - as specified
Due 17 February 2016
Resolved 17 February 2016
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 6 January 2016
Resolved
Ensure new blank is properly installed in stbd electrical panel IAW 46 CFR 183.200.
Action required: 705 - Other - as specified
Due 17 February 2016
Resolved 17 February 2016
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 6 January 2016
Resolved
Ensure hole in port side engine exhaust is welded properly IAW 46 CFR 182.220.
Action required: 705 - Other - as specified
Due 17 February 2016
Resolved 17 February 2016