Records from 1989 to 1998. Most recent: inspection, 23 January 1998.
Inspection history · 31
23 January 1998
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 780215
6 January 1998
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 38407
25 June 1997
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 40673
5 June 1997
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1368257
2 June 1997
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1107932
16 April 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1364082
24 February 1997
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 13710
11 October 1996
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1355981
27 September 1996
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1434462
6 June 1996
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1374643
3 May 1996
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1414623
9 February 1996
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 220617
9 February 1996
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1371285
26 January 1996
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 147104
17 October 1995
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 683338
9 May 1995
Deficiency Check · Damage Survey · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1353732
22 April 1995
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 43635
6 April 1995
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1371066
28 February 1995
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1355146
1 September 1994
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1380060
29 August 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 684499
30 June 1994
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1354798
18 April 1994
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1412630
25 August 1993
Deficiency Check · MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1354454
7 April 1993
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 838974
1 June 1992
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1415753
12 May 1992
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 958093
30 April 1992
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 954469
10 April 1992
COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 945063
2 July 1990
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1224063
10 November 1989
Initial Certification · Plan Review "T" Boat · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1230529
Electrical
Issued 16 April 1997
Resolved
Renew the broken electrical conduit at the base of the mast.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Navigation
Issued 16 April 1997
Resolved
Install a Category I 406 Mhz EPIRB in a float free arrangement.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Lifesaving
Issued 16 April 1997
Resolved
Provide a Coast Guard approved waterlight for each survival craft attached with an 18 foot lanyard.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Unknown
Issued 16 April 1997
Resolved
Double clamp the strainers on the bilge suction hoses in the port and stbd forward compartments.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Construction/Loadline
Issued 16 April 1997
Resolved
Provide and properly install a suitable stainer for each fixed bilge pump suction hose in the port and stbd center compartments, and provide a suitable stainer for the hand portable bilge/fire pump suction hose.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Fire Fighting
Issued 16 April 1997
Resolved
Provide onboard two serviceable B-II fire extinguishers.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Electrical
Issued 16 April 1997
Resolved
Install an emergency disconnect switch in the ungrounded conductors betweenthe starting batteries and the outboard motors.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Lifesaving
Issued 16 April 1997
Resolved
Properly secure the lifefloat and buoyant apparatuses to each sea painter with the proper size weak links.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Engineering
Issued 16 April 1997
Resolved
Provide portable gasoline tanks that meet the requirements of ABYC H-25 in accordance with 46 CFR 182.458.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Construction/Loadline
Issued 27 September 1996
Resolved
PERMANENTLY REPAIR AFT END OF STARBOARD RAILING.
Condition: Unknown
Due 27 September 1996
Resolved 27 September 1996
Construction/Loadline
Issued 27 September 1996
Resolved
PERMANENTLY REPAIR CRACKS AND DELAMINATION ON PORT SIDE OF FWD LADDER.
Condition: Unknown
Due 27 September 1996
Resolved 27 September 1996
Lifesaving
Issued 3 May 1996
Resolved
Install pendants on starboard and center buoyant apparatus in accordance with 46 CFR 160.010-3.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Lifesaving
Issued 3 May 1996
Resolved
Repair deteriorated areas on all buoyant apparatus in accordance with manufacturer's instructions.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Lifesaving
Issued 3 May 1996
Resolved
Install retroreflective tape on three life preservers in accordance with 46 CFR 180.25-25.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Fire Fighting
Issued 3 May 1996
Resolved
Provide new approved brackets for B-II portable fire extinguishers at helm.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Lifesaving
Issued 3 May 1996
Resolved
Provide life preserver placards in accordance with IFR 46 CFR 185.516.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Lifesaving
Issued 3 May 1996
Resolved
Install retroreflective tape on ring buoy in accordance with IFR 46 CFR 185.604(i).
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Lifesaving
Issued 3 May 1996
Resolved
Provide documentation of weekly maintenance and inspection in accordance with IFR 46 CFR 185.720.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Construction/Loadline
Issued 3 May 1996
Resolved
Label watertight hatches "WATERTIGHT HATCH-KEEP CLOSED" in accordance with IFR 46 CFR 185.610.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Lifesaving
Issued 3 May 1996
Resolved
Stencil life float with number of persons allowed in accordance with 46 CFR180.20-5.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Documentation
Issued 3 May 1996
Resolved
Provide documentation of sixty minutes of supervisor training in accordancewith 46 CFR 16.
Condition: Unknown
Due 3 May 1996
Resolved 3 May 1996
Documentation
Issued 9 February 1996
Resolved
Provide preemployment test results for Louis Banto and Augustine Martinez. Louis Banto and Augustine Martinez may not work in a covered position without negative test results.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Accommodation/Occupational Safety
Issued 9 May 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, MAKE REPAIRS AS ORIGINAL TO FORWARD STARBOARD HAND RAIL.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Construction/Loadline
Issued 9 May 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, MAKE PROPER REPAIRS TO STARBOARD MOUNT FOR FORWARD CROSS MEMBER.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Construction/Loadline
Issued 9 May 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, REMOVE SOFT PATCH AND MAKE AVAILABLEFOR INSPECTION DAMAGED AREA IN PORT HULL.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Construction/Loadline
Issued 9 May 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, MAKE HULL REPAIRS IN ACCORDANCE WITHAPPROVED REPAIR PROPOSAL.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Construction/Loadline
Issued 9 May 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, MAKE REPAIRS TO THE COLLISION BULKHEADS.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Engineering
Issued 9 May 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, MAKE AVAILABLE FOR INSPECTION GOOSENECK WHERE DENTED BY CLEANING TO BARE METAL.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Construction/Loadline
Issued 9 May 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, SUBMIT FOR APPROVAL REPAIR PROPOSAL FOR SOFT PATCH IN PORT HULL.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Construction/Loadline
Issued 6 April 1995
Resolved
PROVIDE ADEQUATE LENGTH OF HOSES FOR THE PORTABLE HAND PUMP.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Lifesaving
Issued 6 April 1995
Resolved
PROVE PROPER OPERATION OF ONE OF THE B/A'S WATERLIGHT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Documentation
Issued 6 April 1995
Resolved
PROVIDE FOR EXAMINATION BY AN ATTENDING COAST GUARD MARINE INSPECTOR THE VESSEL'S STABILITY LETTER. _x001C_ _x001C_
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Construction/Loadline
Issued 6 April 1995
Resolved
REMOVE CONNECTION BETWEEN MSD AND FIXED HAND BILGE PUMP SO THAT THE BILGE PUMP IS SOLELY FOR PUMPING THE BILGES.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Fire Fighting
Issued 6 April 1995
Resolved
PROVIDE FOR INSPECTION A BI PORTABLE FIRE EXTINGUISHER CURRENTLY SERVICED.
Condition: Unknown
Due 17 May 1995
Resolved 17 May 1995
Accommodation/Occupational Safety
Issued 28 February 1995
Resolved
REPAIR, REPLACE OR RENEW PORT WINDSHIELD.
Condition: Unknown
Due 28 February 1995
Resolved 28 February 1995
Accommodation/Occupational Safety
Issued 28 February 1995
Resolved
REPAIR, REPLACE OR RENEW PORT GUARD RAIL.
Condition: Unknown
Due 28 February 1995
Resolved 28 February 1995
Lifesaving
Issued 1 September 1994
Resolved
PROVIDE PROPER WEAK LINK FOR BUOYANT APPERATUS IN ACCORDANCE WITH 46 CFR 180.20-1.
Condition: Unknown
Due 19 September 1994
Resolved 19 September 1994
Lifesaving
Issued 1 September 1994
Resolved
PROVIDE PADDLES FOR LIFE FLOAT IN ACCORDANCE WITH 46 CFR 180.15-1(a).
Condition: Unknown
Due 19 September 1994
Resolved 19 September 1994
Navigation
Issued 30 June 1994
Resolved
PROVE PROPER OPERATION OF PORT RUNNING LIGHT. VESSEL RESTRICTED TO DAYLIGHT OPERATIONS ONLY.
Condition: Unknown
Due 30 June 1994
Resolved 30 June 1994
Lifesaving
Issued 30 June 1994
Resolved
PROPERLY LABEL BUOYANT APPARATUS.
Condition: Unknown
Due 30 June 1994
Resolved 30 June 1994
Lifesaving
Issued 30 June 1994
Resolved
PROPERLY LABEL PFD STORAGE.
Condition: Unknown
Due 30 June 1994
Resolved 30 June 1994
Lifesaving
Issued 30 June 1994
Resolved
CONDUCT UNDERWAY EMERGENCY DRILLS WITH VESSEL CREW PRIOR TO CARRYING PASSENGERS FOR HIRE, AND SUBSEQUENTLY IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 30 June 1994
Resolved 30 June 1994
Electrical
Issued 30 June 1994
Resolved
PROVIDE EMERGENCY LIGHTING.
Condition: Unknown
Due 30 June 1994
Resolved 30 June 1994
Navigation
Issued 30 June 1994
Resolved
PROVIDE MAGNETIC COMPASS.
Condition: Unknown
Due 30 June 1994
Resolved 30 June 1994
Documentation
Issued 25 August 1993
Resolved
PROVIDE CURRENT FCC RADIO SAFETY CERTIFICATE. VESSEL IS LIMITED TO OPERATENOT MORE THAT 1000FT SHORE.
Condition: Unknown
Due 14 September 1993
Resolved 14 September 1993
Engineering
Issued 25 August 1993
Resolved
PROVIDE METAL FUEL TANKS, AS PER 46 CFR 182.15-25, TO REPLACE THE PLASTIC FUEL TANKS CURRENTLY ONBOARD.
Condition: Unknown
Due 14 September 1993
Resolved 14 September 1993
Lifesaving
Issued 25 August 1993
Resolved
PROVIDE SEVEN MORE APPROVED ADULT TYPE LIFE PRESERVERS ON BOARD VESSEL AS PER 46 CFR 180.25-5. VESSEL IS RESTRICTED TO THE CARRIAGE OF 45 PASSENGERSUNTIL THE APPROVED LIFE PRESERVERS ARE ON BOARD.
Condition: Unknown
Due 14 September 1993
Resolved 14 September 1993
Documentation
Issued 25 August 1993
Resolved
PROVIDE EVIDENCE OF COMPLIANCE WITH RANDOM DRUG TESTING REGULATIONS (46 CFR16.230). FAILURE TO COMPLY WILL RESULT IN REVOCATION OF THE VESSEL'S CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 14 September 1993
Resolved 14 September 1993
Engineering
Issued 10 April 1992
Resolved
REPLACE THE TWO PLASTIC PORTABLE GAS CANS WITH METAL PORTABLE GAS CANS MEETING THE MINIMUM STANDARDS OF ABYC H.25 RULE (I.E. ASTM OR UL APPROVED).
Condition: Unknown
Due 10 April 1992
Resolved 10 April 1992