Records from 2013 to 2020. Most recent: inspection, 14 December 2020.
Inspection history · 20
14 December 2020
Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7111317
7 November 2020
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7104145
26 October 2020
Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7085047
15 July 2020
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7007065
7 February 2020
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6904626
15 November 2019
Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6865704
19 June 2019
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6718233
29 January 2019
Hull Examination · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6610522
10 September 2018
Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6537157
29 August 2018
Deficiency Check · Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6526778
23 August 2018
Administrative Inspection · In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6520824
21 June 2018
Deficiency Check · Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6451515
21 June 2018
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6452220
4 June 2018
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6433551
14 August 2017
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6256358
17 May 2017
Deficiency Check · COI Inspection · MTSA Verification · Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6148114
5 January 2017
Hull Examination · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6069457
5 January 2017
Construction Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6078502
13 October 2016
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6045333
11 April 2016
Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5851520
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 15 November 2019
Resolved
Verification of vessel compliance with applicable stability requirements. Vessel has an increased weight of 3800 lbs, MSC issued stability letter needs to review additional weight for compliance to already issued stability letter.
Action required: 705 - Other - as specified
Due 20 December 2019
Resolved 15 July 2020
Resolution: MSC issued a letter stating that vessel's current stability letter remains valid.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 19 June 2019
Resolved
All escape hatches and other emergency exits shall be
marked on both sides using at least 1-inch letters:
"Emergency Exit, Keep Clear", unless such markings
are deemed unnecessary by the Officer in Charge,
Marine Inspection. Galley / crew office escape scuttle
not marked on either side. Mark escape scuttle as
required.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2019
Resolved 28 June 2019
Resolution: Escape hatch properly labeled.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 19 June 2019
Resolved
Each lighting fixture globe, lens, or diffuser must have
a guard or be made of high strength material, except
in an accommodation space, radio room, galley, or
similar space where it is not subject to damage.
Overhead 4 ft light in port A/C space has a crack
cover. Replace cracked cover.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2019
Resolved 28 June 2019
Resolution: Lamp cover replaced.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 10 September 2018
Resolved
Vsl is broadcasting invalid MMSI, invalid IMO # and Invalid Call Sign
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 19 November 2018
Resolution: While running a query in VIVS, all information had been updated and AIS was broadcasting the proper information.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear, Timing
Issued 21 June 2018
Resolved
Prove proper operation of both engines. Conduct sea trials to verfiy operation.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 June 2018
Resolved 22 June 2018
Resolution: Proved proper operation of both engines. Conducted sea trials to verfiy operation.
Engineering › Bilge Water Management System › Pump
Issued 4 June 2018
Resolved
Prove proper operation of PTO bilge pump prior to carrying passengers. 46CFR182.25-10
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2018
Resolved 4 June 2018
Resolution: Vessel rep. proved proper operation of PTO bilge pump.
Stability › Watertight Integrity › General
Issued 4 June 2018
Resolved
Ensure all watertight door indicators are operational. 46CFR170.255(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 25 June 2018
Resolution: Watertight door indicators were repaired and found to be fully operational.
Electrical › Electric Supply System (service) › Cable
Issued 4 June 2018
Resolved
Remove or enclose in J-box all dead end wires as discussed. 46CFR183.10-20(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 25 June 2018
Resolution: All dead ended cables were found terminated in junction boxes or removed.
Stability › Watertight Integrity › General
Issued 4 June 2018
Resolved
Make soft patch on aft weatherdeck watertight. 46CFR171.124
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 25 June 2018
Resolution: Soft patch was re-sealed and tested with water hose.
Stability › Watertight Integrity › General
Issued 4 June 2018
Resolved
Make hole in deck IWO aft bar watertight. 46CFR171.124
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 25 June 2018
Resolution: Pipe below aft bar was made weather tight with rubber cap and hose clamp.
Stability › Watertight Integrity › General
Issued 4 June 2018
Resolved
Repair holed deck drain pipe. 46CFR171.124
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 25 June 2018
Resolution: Approximately 18" section of wasted pipe was cut away and replaced.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 4 June 2018
Resolved
Conduct MOB drill. 46CFR115.404
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 1 August 2018
Electrical › Electric Generation Source (service) › Power Requirement
Issued 14 August 2017
Resolved
Provide Load Management Plan for winter electrical load, including breaker lockout/tagout procedures, to ensure loads do not exceed the capabilities of each generator.
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 12 September 2017
Resolution: Reviewed load management plan and lock-out/tag-out procedure and posting of placard with procedure captured.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 14 August 2017
Resolved
Prove accuracy of voltmeters, ammeters, and frequency meter on main switchboard.
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 12 September 2017
Resolution: Verified attending electrician attested to calibration and accuracy of gauges.
Electrical › Electric Generation Source (service) › Generator
Issued 14 August 2017
Resolved
Prove accuracy of temperature gage installed on stbd generator prime mover.
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 12 September 2017
Resolution: Verified new gage installed and reading accurately.
Engineering › Sea-water System (primary cooling) › Piping
Issued 18 May 2017
Resolved
Repair or renew leaking suction piping for port MDE raw water (pump discharge side).
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 2 June 2017
Resolution: Examined newly installed piping for laeks - all sat.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 18 May 2017
Resolved
Provide approved plan for HVAC #2 discharge sub-panel and prove installation meets plan to the satisfaction of attending marine inspector. Until cleared keep sufficient HVAC units off-line to keep load below panel rating. 16 Jun: OCMI approved extension of compliance date to 16 Aug 2017.
Action required: 705 - Other - as specified
Due 16 August 2017
Resolved 15 August 2017
Resolution: Examined new 225 amp breaker installed on switchboard for #2 HVAC panel and sub-panel. Determined installation matches the updated plans.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 18 May 2017
Resolved
Replace missing perforated metal panels for E/R structural fire protection.
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 14 June 2017
Resolution: Replaced missing panels.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 18 May 2017
Resolved
Properly plug or double numerous holes in WTB vestibule between E/R and lazarette to the satisfaction of attending marine inspector.
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 14 June 2017
Resolution: Plug welded holes and NDT satisfactory.
Fire Fighting › Fire Hoses › Condition
Issued 18 May 2017
Resolved
Renew weeping fire hose for main deck aft fire station and conduct service pressure hydro test to the satisfaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 June 2017
Resolved 1 June 2017
Resolution: Examined new UL-19 fire hose and witnessed satisfactory service pressuer test.
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 18 May 2017
Resolved
Provide repair proposal and make permanent repairs to holes in port side longitudinal sewage tank boundary to the satisfaction of attending marine inspector. (Use of a doubler will be accepted for a permanent repair.)
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 31 May 2017
Resolution: Rcvd approvaal of propsal to leave epoxy sealant in place until next scheduled drydock, then crop & renew as original. Added Inspection Note.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder Head
Issued 11 April 2016
Resolved
STBD engine had a piston shoot through the engine block leaving the engine inoperable
Condition: Improper/Lack of Maintenance
Due 30 April 2016
Resolved 26 May 2016
Resolution: New engine installed, operationally tested. ALL SAT.