Inspection history · 13
11 March 2008
ISPS III Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3162520
3 March 2008
PII Safety Exam · ISPS II Exam · MARPOL Annex I Examination · ISM Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3157721
15 December 2006
PII Safety Exam · Deficiency Check · ISPS II Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2841292
23 February 2006
ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2593018
16 January 2006
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2567458
12 January 2006
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2565607
2 February 2005
ISPS II Exam · PII Safety Exam
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2281823
29 October 2002
Security Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1700827
18 December 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 171693
4 August 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 652262
26 July 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 42645
23 December 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 169182
28 January 1991
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 341570
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 3 March 2008
Resolved
During the operational test of the vessels oil water separator it was discovered that the separator system allowed oil through the system and into the overboard discharge line. A Port State Control Officer witnessed oil residue draining from a petcock valve located between the separator system stop valve and overboard discharge line.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 8 March 2008
Resolution: Received Confirmation of Class letter dated 08MAR08 from [name withheld] that Oil Water Seperator was functionally tested and found in satisfactory working condition.
Personnel › Training › Fire Fighting Basic
Issued 3 March 2008
Resolved
Vessel has failed two fire drills as evidenced by attending PSCOs, the vessel must successfully complete a fire drill prior to departure from port.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 March 2008
Resolution: Port State Control Officer witnessed a successful fire drill.
Documentation › Logs/Records › Oil Record Book
Issued 3 March 2008
Resolved
Vessels oil record book does not incorporate the revised Annex I regulations. Vessel is to obtain a oil record book which is in compliance with MARPOL Annex I.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 10 March 2008
Resolution: PSCO witnessed new oil record book is in Compliance with MARPOL Annex I.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 3 March 2008
Resolved
Vessel's loadline is not marked in contrasting color to the hull of the vessel. Vessel shall paint the loadline markings in a contrasting color prior to departure from the port of Galveston.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 6 March 2008
Resolution: Vesse''s loadlines are now marked in contrasting colors to the hull IAW 1969 ICLL CHI Reg. 8
Fire Fighting › Firemans Outfit › Self-Contained Breathing Apparatus
Issued 3 March 2008
Resolved
Three SCBAs were fund with less than 30 minutes of air supply, vessel must ensure all required air bottles ready for use prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 March 2008
Resolution: Port State Control Officer found the vessel to have all the proper SCBA bottles full and ready for use.
Engineering › Diesel Engine (auxiliary) › Block
Issued 3 March 2008
Resolved
Protective guards missing from rotating machinery on vessel's generator. Guards need to be installed to protect crew from rotating machinery prior to departure from the port of Galveston.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 6 March 2008
Resolution: Vessels discharge valve from purifiers to the port fuel oil day tank are no longer leaking fuel from the valve packing IAW SOLAS 74 (2004 ConEd.) Chapter II-2 Reg 4
Fire Fighting › Fire Pumps › Gland Sealing
Issued 3 March 2008
Resolved
Vessels main fire pump sea chest valve and starboard emergency fire pump shaft packing have excessive water leakage.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 8 March 2008
Resolution: Port State Control Officer witnessed the proper operation of the vessels main and emergency fire pump.
Engineering › Fuel Oil Service System › Valve
Issued 3 March 2008
Resolved
Vessels discharge valve from the purifiers to the port fuel oil day tank has excessive leakage of fuel oil from the valve packing.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 6 March 2008
Resolution: Vessels discharge valve from purifiers to the port fuel oil day tank are no longer leaking fuel from the valve packing IAW SOLAS 74 (2004 ConEd.) Chapter II-2 Reg 4
Construction/Loadline › Markings › Load Line Mark
Issued 15 December 2006
Resolved
Load line marks are indistinguishable from hull. Load line marks need to be in contrasting colors from hull.
Action required: 705 - Other - as specified
Due 15 January 2007
Resolved 16 December 2006
Resolution: GL cleared vsl to depart port.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 15 December 2006
Resolved
Numerous protective guards missing for rotating machinery on stbd generator & both emergency fire pumps. Guards need to be in place to protect crew from rotating machinery.
Action required: 705 - Other - as specified
Due 15 January 2007
Resolved 16 December 2006
Resolution: Class surveyor cleared vsl for departure.
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 15 December 2006
Resolved
Noted excess wiring that served no purpose iwo emergency fire pump. Wiring poses safety & fire hazard.
Action required: 705 - Other - as specified
Due 15 January 2007
Resolved 16 December 2006
Resolution: Class surveyor cleared vsl for departure.
Fire Fighting › Fire Pumps › Capacity
Issued 15 December 2006
Resolved
Main fire pump only delivers 10-20 psi, which produces an inadequate flow of water. Main fire pumps need to provide adequate water pressure.
Action required: 705 - Other - as specified
Due 15 December 2006
Resolved 16 December 2006
Resolution: Class surveyor cleared vsl for departure.
Fire Fighting › Emergency Fire Pumps › Power Source
Issued 15 December 2006
Resolved
Vsl has two emergency fire pumps that are battery started. Stbd emergency fire pump unable to start due to batteries w/o charge. Noted numerous leaks on port emergency fire pump. Emergency fire pumps need to be available for immediate use.
Action required: 705 - Other - as specified
Due 15 December 2006
Resolved 16 December 2006
Resolution: Class surveyor cleared vsl for departure.
Accommodation/Occupational Safety › Heating › Metal Protection
Issued 15 December 2006
Resolved
Lagging on exhaust piping on stbd emergency fire pump has frayed. Lagging needs to be in place to protect personel from hot surfaces.
Action required: 705 - Other - as specified
Due 15 January 2007
Resolved 16 December 2006
Resolution: Class surveyor cleared vsl for departure.
Construction/Loadline › Hull › Side Shell
Issued 15 December 2006
Resolved
Freeing ports missing several safety bars that have broken off due to excessive corrosion. Safety bars need to be in place to protect personnel from falling overboard.
Action required: 705 - Other - as specified
Due 15 January 2007
Resolved 16 December 2006
Resolution: Class surveyor cleared vsl to depart port.
Engineering › Steering Gear System › Ram Seal
Issued 15 December 2006
Resolved
Observe excessive leak on stbd rudder post packing. Approximate leak 1 gallon per 12 hours.
Action required: 705 - Other - as specified
Due 15 January 2007
Resolved 16 December 2006
Resolution: Class surveyor cleared vsl for departure.
Electrical › Electric Generation Source (service) › Panelboard
Issued 23 February 2006
Resolved
Vessel must install guards/ handrails in front of the main electrical switchboard in the engine control room. There were no guards installed.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 December 2006
Documentation › Safety Management System › Emergency Drill/Exercise Programs
Issued 2 February 2005
Resolved
Request external ISM audit by Certificate Issuing Authority (focus to be given on Training and drills). Results to be provided and reviewed by local OCMI prior to departure from Bollinger Shipyard, Texas City, TX.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 February 2005
Resolution: Received copy of Class Report.
Navigation › Piloting/Steering › Marine Charts
Issued 2 February 2005
Resolved
Charts not current
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 January 2006
Resolution: Vessel has current charts onboard.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 2 February 2005
Resolved
Vessel does not have current tables onboard.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 January 2006
Resolution: Vesesl has new current talbes onboard
Navigation › Piloting/Steering › US Coast Pilot
Issued 2 February 2005
Resolved
Vessel did not have current US Coast Pilot/Sailing Directions onboard.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 January 2006
Resolution: Vessel has current US Coast Pilot/Sailing Directrions onboard
Documentation
Issued 28 January 1991
Resolved
33 CFR 155.740(a) VESSELS OIL TRANSFER PROCEDURES WERE NOT AVAILABLE FOR_x001C_ INSPECTION
Condition: Unknown
Due 18 May 2002
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past