Records from 1990 to 2026. Most recent: inspection, 2 July 2026.
Inspection history · 122
2 July 2026
Periodic Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8373538
9 October 2025
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8250138
26 February 2025
Annual Inspection · Cargo Tank Internal · Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8078474
16 January 2025
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8064786
20 May 2024
Administrative Inspection · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7915911
10 May 2024
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7911768
2 May 2024
COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7893598
11 September 2023
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7795547
15 May 2023
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7640791
20 May 2022
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7571518
11 April 2022
In-Service Inspection · Deficiency Check · Periodic Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7424785
16 February 2022
Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7389593
30 June 2021
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7241440
13 April 2021
DAPI Audit · Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7174606
19 January 2021
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7126956
2 January 2021
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7119266
10 February 2020
Annual Inspection · Cargo Tank Internal · Internal Structural Exam · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6890199
5 November 2019
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6855844
16 September 2019
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6816393
31 May 2019
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6699635
13 May 2019
COI Inspection · Administrative Inspection · MTSA Verification · Deficiency Check · In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6683378
8 February 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6622446
28 January 2019
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6615763
26 October 2018
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6570609
23 May 2018
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6421579
27 April 2018
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6398135
29 January 2018
Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6346028
22 May 2017
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6152597
25 January 2017
Periodic Inspection · Deficiency Check · MARPOL Annex I Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6077039
23 March 2016
Annual Inspection · DAPI Audit
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5839104
5 November 2015
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5757867
15 June 2015
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5153831
2 March 2015
Examination of Repairs · Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5077186
10 December 2014
Cargo Tank Internal · COI Inspection · Drydock Exam · MARPOL Annex II Examination · Deficiency Check · In-Service Inspection · Internal Structural Exam · MARPOL Annex I Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5055857
26 February 2014
Periodic Inspection · MTSA Verification
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4806174
23 January 2014
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4790885
13 January 2014
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4782316
25 September 2013
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4724128
16 October 2012
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4467679
1 September 2012
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4432647
14 February 2012
Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4246119
13 December 2011
MARPOL Annex II Examination · DAPI Audit · MTSA/ISPS Verification · MARPOL Annex I Examination · Administrative Inspection · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4206973
22 August 2011
Administrative Inspection · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4124581
24 June 2010
Damage Survey · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3781146
14 May 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3740252
19 February 2010
Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3696239
3 September 2009
Drydock Extension · Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3584208
21 August 2009
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3573003
16 April 2009
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3453796
10 April 2009
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3450214
10 April 2009
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3451537
11 February 2009
MARPOL Annex I Examination · MTSA/ISPS Verification · DAPI Audit · Administrative Inspection · Annual Inspection · Ballast Water Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3416504
22 January 2008
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3132149
18 August 2007
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3032367
3 January 2007
COI Inspection · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2849371
20 October 2006
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2804535
20 September 2006
Damage Survey · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2782754
18 September 2006
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2782822
30 August 2006
Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2764124
29 June 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2695497
12 April 2006
Ballast Water Examination · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2623388
6 July 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2417453
16 March 2005
MTSA Verification · Periodic Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2312000
23 November 2004
Internal Structural Exam · Cargo Tank Internal · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2247096
23 March 2004
Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2029324
23 July 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1902373
11 March 2003
MARPOL Annex I Examination · Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1743972
15 July 2002
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1665557
19 February 2002
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1487487
9 January 2002
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1474928
21 November 2001
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 772154
4 May 2001
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1064368
6 April 2001
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1395674
6 March 2001
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1427982
27 November 2000
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 824946
15 January 2000
COI Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1446868
12 October 1999
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 502879
9 April 1999
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 448431
17 September 1998
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 527015
28 August 1998
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1453511
22 February 1998
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 413083
17 February 1998
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 777186
10 February 1998
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 462614
2 February 1998
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1122451
5 January 1998
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 784065
4 December 1997
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1450107
29 August 1997
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1121516
22 August 1997
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 170969
22 August 1997
Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 784313
5 May 1997
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 513467
24 January 1997
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1101180
25 November 1996
Deficiency Check · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1449979
29 October 1996
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 478396
3 October 1996
Deficiency Check · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1367960
24 August 1996
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 142528
1 June 1996
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 445827
20 November 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 457401
16 October 1995
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 882244
13 October 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 175002
3 October 1995
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 879298
10 June 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 57749
10 June 1995
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 878237
10 February 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 685411
5 January 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 466659
22 November 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 860527
19 October 1994
COI Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1171452
18 July 1994
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1179714
6 December 1993
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1160346
20 October 1993
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1135319
20 May 1993
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 483924
9 February 1993
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1143932
4 December 1992
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1138042
11 August 1992
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 480444
1 June 1992
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 959982
3 April 1992
Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1264700
29 January 1992
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 951837
9 December 1991
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1267851
23 July 1991
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1252208
9 June 1991
Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1217817
18 April 1991
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1226343
25 January 1991
Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 923618
21 December 1990
Initial Certification · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 907067
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 April 2025
Resolved
The inspection shall be such as to insure that the vessel, as regards the structure, boilers, and other pressure vessels and their appurtenances, piping, main and auxiliary machinery, electrical installations, life-saving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, and other equipment is in satisfactory condition and fit for the service for which it is intended. MI observed thermal fluid leak on the #4 cargo pump.
Action required: 10 - Deficiency Rectified
Resolved 21 April 2025
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 April 2025
Resolved
Each device must have a nameplate showing the device's function. MI observed electrical switch with unlabeled breakers.
Action required: 10 - Deficiency Rectified
Resolved 21 April 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 April 2025
Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port required to be marked. MI observed an unmarked lifebuoy on the port side.
Action required: 10 - Deficiency Rectified
Resolved 21 April 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 21 April 2025
Resolved
The inspection shall be such as to insure that the vessel, as regards the structure, boilers, and other pressure vessels and their appurtenances, piping, main and auxiliary machinery, electrical installations, life-saving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, and other equipment is in satisfactory condition and fit for the service for which it is intended. MI observed the port ballast water pump room hatch was not able to close.
Action required: 10 - Deficiency Rectified
Resolved 21 April 2025
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 7 March 2025
Resolved
3 Starboard - Insert Sideshell IWO Frame 40 IWO SSL #8, approximate size is 30" by 30" by 9/16"
Action required: 705 - Other - as specified
Due 7 March 2025
Resolved 24 March 2025
Resolution: Final weld and NDT complete.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 16 January 2025
Resolved
Each barge equipped with an anchor, to comply with 33 CFR 155.230(b)(1), must be fitted with an operable anchoring system that includes a cable or chain, and a winch or windlass.
Vessel's kinder link within their anchor system is currently seized and not operable. The barge shall enact permanent repairs to the satisfaction of the TPO and USCG. Vessel is authorized to maneuver within Port of Galveston area with VTS required assist tugs. For clearance of Issued CG-835 ensure TPO report is submitted to MSU Texas City Domestic Inspection.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 January 2025
Resolution: Vessel provided ABS report verifying vessel has made partial repairs to the satisfaction of the RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 April 2022
Resolved
If your vessel's COI is renewed less often than annually, the marine inspector must check the settings of the safety or relief valves on the pressure vessels, twice every 5 years. No more than 3 years may elapse between any check and its immediate predecessor.
MI was unable to check setting of the safety valve due to installed compressor relief valve IAW MSIB 04-17.
46 CFR 32.35-1
46 CFR 61.10-5(i)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2022
Resolved 10 May 2022
Resolution: Vsl rep obtained new pressure relief valve tested at 250 PSI and installed it on the pressure vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 May 2021
Resolved
Deficiency Code: 13199
Each Reverse-power and reverse-current trips. Each generator arranged for parallel operation must have reverse-power or reverse-current trips. While witnessing test of reverse pwr relay, #1 gen failed to trip.
Barge is restricted from operating gens in parallel mode, until def is rectified.
Cite: 46CFR111.12-11(f)
Action: 705
Action Code: c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 May 2021
Resolved 6 May 2021
Resolution: Reverse pwr relay replaced in kind, tech report uploaded to activity documents tab.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 March 2020
Resolved
Marine inspector observed Halon alarm cage (guard) rusted and not spinning. Repair and prove proper operation to satisfaction of attending USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 8 April 2020
Resolution: Personnel from Fire Protection Service removed and installed new halon alarm siren.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 February 2020
Resolved
Marine Inspector observed 04 heat detectors in generator room blackened, crew stated 3rd party tested utilizing blow torch. Verified testing procedures and procedure state testing shall be utilizing hot water only. Provide 3rd party report attesting proper testing/ operation per manufacturer testing requirements to the satisfaction of USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 8 April 2020
Resolution: Third party FPS Fire Protection Service conducted fire protection system with satisfactory results.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 31 May 2019
Resolved
Hole found on the starboard side of hull, fore peak below deck, above the waterline. ABS to attend repairs and will be cleared via report/pictures to local OCMI, prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2019
Resolved 2 June 2019
Resolution: Affected area was cropped and renewed with an 18' x 18' plate, stbd side, upper rake plate below the anchor. ABS witnessed a NDT and leak test of the welded areas and found to be satisfactory. See Documents for ABS report, # BT3680550
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 15 May 2019
Resolved
Each loading arm and each transfer pipe system, including each metallic hose, must not leak under static liquid pressure at least 1 1/2 times the maximum allowable working pressure. The COTP may consider and approve alternative procedures, methods, or equipment standards to be used by a vessel or facility operator in lieu of any requirements.
Vessel was unable to test the high-pressure cargo trips in the presence of a Coast Guard Marine Inspector in accordance with approved alternative cargo pipe testing procedures. Test in the presence of a Coast Guard Marine Inspector. - 33CFR156.170(c)(4) & 33CFR156.107
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2019
Resolved 11 October 2019
Resolution: Recieved statement of fact attesting to the proper testing of the piping system at 150% of the maximum allowable working pressure using a certified and calibrated pressure gauge.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 15 May 2019
Resolved
Efficient guard rails must be fitted on all exposed parts of the freeboard and superstructure decks and be 39 1/2 inches from the deck.
Two rail stanchions on the starboard side and one on the port were wasted at the base. Repair or replace. - 46CFR42.15–75(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2019
Resolved 17 May 2019
Resolution: Stanchions were repaired to the satisfaction of the attending Marine Inspector.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 13 May 2019
Resolved
The COTP may consider and approve alternative procedures, methods, or equipment standards to be used by a vessel or facility operator in lieu of any requirements.
Vessel is unable to perform all tests outlined in the approved Alternative Cargo Pipe Testing letter dated 06APR01 during annual/COI inspections. Submit request for alternative procedures to comply with 33CFR156.170(c)(4). - 33CFR156.107
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2019
Resolved 11 October 2019
Resolution: Barge representative was able to test the cargo piping system in accordance with 33CFR156. Company does not wish to ask for an alternative at this point.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 13 May 2019
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual and periodic inspections within the periods specified in 31.10-17 (a) and (b) and your Certificate of Inspection must be endorsed. The barge's anniversary date for it's annual inspection was 10FEB19 with the three month window expiring on 10MAY19. The current COI is no longer valid and the barge is not authorized to conduct cargo operations until a new COI is issued to the vessel. Submit an Application for Inspection.
46CFR31.10-17a
Action required: 17 - Rectify deficiencies prior to departure
Due 13 May 2019
Resolved 17 May 2019
Resolution: Vessel received a COI on this date.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 28 January 2019
Resolved
Anchor motor
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2019
Resolution: Received documentation from ABS stating anchor windlass motor was replaced and windlass tested satisfactorily after repair.
Engineering › Diesel Engine (auxiliary) › Silencer (exhaust)
Issued 27 April 2018
Resolved
The applicable standards established by the ABS Steel Vessel Rules may be used as the standard for the design, construction, and testing of main and auxiliary machinery. The expansion joint for one of the ship service generator exhaust system had missing hardware on three of its bolts. Replace missing hardware to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2018
Resolved 23 May 2018
Resolution: Missing hardware for expansion joints was replaced to the satisfaction of the attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 27 April 2018
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. An open circuit breaker slot was exposed inside of a 240V panelboard located in the cargo control room. Cover exposed circuit breaker slot inside of panelboard to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2018
Resolved 23 May 2018
Resolution: Exposed circuit breaker slot in panel board was covered to the satisfaction of the attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Cable
Issued 27 April 2018
Resolved
Electrical installations on vessels must ensure maintenance of system integrity through compliance with the applicable system requirements to which plan review has been approved. A dead ended cable with taped conductors was coiled and secured in the overhead of the halon extinguishing systems room. Properly terminated or remove dead ended cable to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2018
Resolved 23 May 2018
Resolution: Dead ended cable located in the halon extinguishing systems room was properly terminated to the satisfaction of the attending Marine Inspector.
Documentation › Safety/Response Plans/Programs › Ballast Water Management Plan
Issued 27 April 2018
Resolved
The master, owner, operator, agent, or person in charge of any vessel equipped with ballast water tanks that operates in the waters of the United States must follow these practices: (g) Maintain a ballast water management (BWM) plan that has been developed specifically for the vessel and that will allow those responsible for the plans's implementation to understand and follow the vessel's BWM strategy and comply with the requirements of the subpart. The vessel did not have a ballast water management plan. Develop and maintain a ballast water management plan to include all topics listed in 33CFR151.2050(g)(1-7).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2018
Resolved 23 May 2018
Resolution: Vessel developed a ballast water management plan as per 33CFR151.2050(g) to the satisfaction of the attending Marine Inspector.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 29 January 2018
Resolved
Anchor is missing, parted from anchor cable and fell overboard
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 12 February 2018
Resolved 2 February 2018
Resolution: New anchor properly installed.
Electrical › Electric Generation Source (service) › Generator
Issued 9 March 2017
Resolved
Replace missing lagging on #1 SSG. 46 CFR 58.10-10
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Lagging was replaced as needed.
Electrical › Lighting (service) › Lighting Fixture
Issued 9 March 2017
Resolved
Replace burnt out lights throughout all spaces. 46 CFR 111.75
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Lights were replaced as needed and required.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 March 2017
Resolved
Loose wiring on boiler expansion tank #2. 46 CFR 111.01-1
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Wire was tightned as needed.
Engineering › Steam System (auxiliary) › Valve
Issued 9 March 2017
Resolved
Leaking valve handle on boiler expansion tank #1. 46 CFR 56.50
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Valve stem was worked on and no longer leaks.
Engineering › Steam System (auxiliary) › Lagging/Insulation
Issued 9 March 2017
Resolved
Replace missing lagging on thermal fluid heaters. 46 CFR 56.50-15
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Missing lagging was replaced as needed.
Electrical › Lighting (service) › Outlet Box
Issued 9 March 2017
Resolved
Junction box exposed sheath incasing wiring, located on the bow, needs to be replaced. 46 CFR 111.105
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Wire shilding was replaced as needed for this area.
Construction/Loadline › Structures › Deck Plating
Issued 9 February 2017
Resolved
Forward rope locker, outboard side, found 3 holes in main deck to cargo cofferdam, crop out and renew as original to good metal. Worklist item for credit ISE. 46 CFR 31.10-21
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 9 March 2017
Resolution: Repair was completed as required.
Deck/Cargo › Ballast › Tank
Issued 9 February 2017
Resolved
#6 Stbd had excessive water in the ballast tank, remove excess water for a better inspection of bottom of ballast tank. Worklist item towards credit ISE. 46 CFR 31.10-21
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Water was removed and this ballast tank appears to be satisfactory.
Deck/Cargo › Ballast › Tank
Issued 9 February 2017
Resolved
#8 Port ballast tank has two weld cracks on 1st and 2nd frame at the 3rd logitudinal, repair/replace as needed. Worklist item towards credit ISE. 46 CFR 31.10-21
Action required: 705 - Other - as specified
Due 29 March 2017
Resolved 29 March 2017
Resolution: Both cracks on both frames were corrected as required.
Deck/Cargo › Ballast › Tank
Issued 9 February 2017
Resolved
#4 Port has two weld cracks and excessive wear on top ladder rungs, repair/replace as needed. Worklist item towards credit ISE. 46 CFR 31.10-21
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Both weld cracks listed above were repaired/replaced as required.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 9 February 2017
Resolved
Cofferdam piping has a leak, repair pipe/stop leak and renew oil saturated insulation under area as needed. Worklist item towards credit ISE. 46 CFR 31.10-21
Action required: 705 - Other - as specified
Due 29 March 2017
Resolved 29 March 2017
Resolution: Piping leak was corrected and the oil saturated insulation was replaced as needed.
Deck/Cargo › Cargo Heating › General
Issued 9 February 2017
Resolved
The cargo tank(s) have required insulation missing, place all missing insulation back on cargo tank(s) as needed. Worklist item towards credit ISE. 46 CFR 31.10-21
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 17 March 2017
Resolution: Missing insulation was replaced as required.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 9 February 2017
Resolved
Exposed wires on external portion of forward rope locker, remove or place all dead end wires in a proper junction box. Worklist item towards credit ISE. 46 CFR 31.10-21
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 9 March 2017
Resolution: All exposed wires were removed or placed in a proper junction box.
Accommodation/Occupational Safety › Ventilation › General
Issued 2 March 2015
Resolved
Make Temp. repairs to #1 and #2 cargo vent risers to the satisfaction of the Coast Guard Marine Inspector and ABS surveyor. Upon completion of temp. repairs one time voyage to Houston to load cargo and return to Tampa for discharge, after discharge of cargo permanent repairs must be completed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 March 2015
Resolution: Vessel O/O had new vents fabricated and installed.
Deck/Cargo › Cargo Heating › General
Issued 11 February 2015
Resolved
Test Procedures for thermal fluid heater shows test procedures not used by crew/technician. Update procedures to reflect current safety control and alarm set points, the procedures to be followed, and the expected results IAW 46 CFR 61.40-10(a).
Action required: 705 - Other - as specified
Due 10 March 2015
Resolved 10 March 2015
Resolution: Received report of updated Thermal Fluid Heater Procedures from the Vessel Rep [name withheld]
Documentation › Logs/Records › Cargo Record Book (NLS)
Issued 10 February 2015
Resolved
Cargo record book not on board IAW 46 CFR 153.490(a)(i)
Action required: 705 - Other - as specified
Due 10 March 2015
Resolved 10 March 2015
Resolution: Vessel has a new cargo record book onboard.
Deck/Cargo › Cargo Heating › General
Issued 10 February 2015
Resolved
Thermal Fluid Heater could not be tested due to malfunctioned gauge in the fuel pump. IAW 46 CFR 61.30-15
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 February 2015
Resolution: Thermal Fluid Heater Technician came onboard and fixed the gauge prior to testing the Thermal Fluid Heater. All Sat.
Construction/Loadline › Hull › Side Shell
Issued 16 April 2009
Resolved
Examined damages identified by MSU PORT ARTHUR, a 4' x 6' x 12" deep inset on bow near the vsls loaded waterline. Upon review by ABS and CG, vsl is authorized to conduct temporary repairs until the vsls next drydock, Nov/Dec '09, at which time permanent repairs will be made. Vsl will make a report on the first of each month prior to next drydock SSP attesting to the repairs made as per the ABS rpt
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 14 December 2009
Resolved 31 December 2009
Resolution: Vessel made satisfactory repairs to damaged area.
Construction/Loadline › Hull › Side Shell
Issued 10 April 2009
Resolved
Identified a 4' x 6' x 12" deep inset on stbd bow. Proceed to yard facility and repair as original. Vessel is authorized to offload cargo to effect repairs. Vessel is not authorized to load cargo.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 May 2009
Resolved 16 April 2009
Resolution: Deficiency cleared and re-issued with conditions.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 16 March 2005
Resolved
Provide proof of MSC approval of vessel SOPEP.
Action required: 705 - Other - as specified
Due 16 April 2005
Resolved 1 April 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 16 March 2005
Resolved
Provide a 2" extension on the end of line runs in the paint locker.
Action required: 705 - Other - as specified
Due 16 April 2005
Resolved 1 April 2005
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 16 March 2005
Resolved
Repair the cargo tank high level alarms, all cargo operations shall be monitored continuosly throughout the duration of transfer via open gauging until such a time as the high level alarm is repaired.
Action required: 705 - Other - as specified
Due 16 April 2005
Resolved 17 May 2005
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 3 March 2005
Resolved
This vessel is restricted from doing any hot work in the cofferdam void until such a time as all of the sulfur-impregnated insulation has been completly removed from the cargo tanks. If hot work is necessary in this space the owner/operator shall contact the cognizant OCMI to obtain permission.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 30 August 2006
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 23 November 2004
Resolved
Prior to conducting any hot work in the cofferdam provide a letter to the OCMI at MSO Tampa stating your intentions regarding the replacement of the sulfur impregnated insulation on the cargo tanks. This letter should include a timeline for the completion of the job and a scope of work that will mitigate the risks involved with hot work if it is included in the process.
Action required: 705 - Other - as specified
Due 3 January 2005
Resolved 2 January 2005
Resolution: Received an advance copy of the letter via e-mail.
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 9 January 2002
Resolved
Demonstrate proper operation of fixed fire extinguishing system. LEGACY COMPONENT DESC: Operating Controls
Action required: 705 - Other - as specified
Due 9 February 2002
Resolved 19 February 2002
Resolution: Witnessed satisfactory test of fixed fire extinguishing system by City Fire.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 9 January 2002
Resolved
Demonstrate proper operation of high pressure pump trip on cargo pump #2. LEGACY COMPONENT DESC: Relief Valve
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 February 2002
Resolved 19 February 2002
Resolution: Witnessed satisfactory test of high pressure pump trip on cargo pump #2,.
Engineering › Fuel Oil Storage/Transfer System
Issued 9 January 2002
Resolved
Label emergency fuel shut off valves on roof of control room. LEGACY COMPONENT DESC: Valve
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 February 2002
Resolved 19 February 2002
Resolution: Emergency fuel shut off valves have been labled.
Electrical › Lighting (service)
Issued 9 January 2002
Resolved
Repair and replace light covers in thermal fluid heater room. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 February 2002
Resolved 19 February 2002
Resolution: Verified new light covers in place.
Documentation › Manuals/Policy Documentation
Issued 9 January 2002
Resolved
Rewrite test procedures for thermal fluid heater, specifically, accurately describe test for force draft loss. LEGACY COMPONENT DESC: Cargo/Ballast System Instruction Manual
Action required: 705 - Other - as specified
Due 19 March 2002
Resolved 15 July 2002
Resolution: APPROVED UPDATED TFH PROCEDURES AND ISSUED APPROVAL LETTER DATED 15JUL2002.
Documentation › Logs/Records
Issued 9 January 2002
Resolved
Document original cargo pipe thickness gauge readings taken during CG inspection 1/9/2002 . LEGACY COMPONENT DESC: Logbook/Record (unofficial)
Action required: 705 - Other - as specified
Due 9 February 2002
Resolved 19 February 2002
Resolution: Received documentation of cargo pipe thickness readings and placed in vessel file.
Engineering
Issued 9 January 2002
Resolved
Demonstrate proper operation of trouble circuit light on thermal fluid heater #1.
Action required: 705 - Other - as specified
Due 9 February 2002
Resolved 19 February 2002
Resolution: Witnessed satisfactory test of trouble circuit light on thermal fluid heater #1.
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 9 January 2002
Resolved
Demonstrate proper operation of high jacket water temp alarm.
Action required: 705 - Other - as specified
Due 9 February 2002
Resolved 19 February 2002
Resolution: Witnessed satisfactory test of high jacket water temp alarm in engine control room.
Deck/Cargo
Issued 6 April 2001
Resolved
IN PRESENCE OF CG MARINE INSPECTOR, CONDUCT RANDOM ULTRASONIC TESTS ON CARGO LINE.
Condition: Unknown
Due 6 April 2001
Resolved 6 April 2001
Deck/Cargo
Issued 6 April 2001
Resolved
HYDRO TEST CARGO PIPING TO 150 PSI. THE CARGO, MULTEN SULFUR MAY BE USED.
Condition: Unknown
Due 6 April 2001
Resolved 6 April 2001
Deck/Cargo
Issued 6 April 2001
Resolved
IN PRESENCE OF CG MARINE INSPECTOR, OPEN ALL LOADING DISCHARGE HEADERS FOR PIPING INTERNAL INSPECTION.
Condition: Unknown
Due 6 April 2001
Resolved 6 April 2001
Deck/Cargo
Issued 6 March 2001
Resolved
HYDRO TEST CARGO TRANSFER PIPING IAW 33 CFR 156.170 OR SUBMITT ALTERNATE PROCEDURES IAW 33 CFR 156.107 OR A REQUEST FOR EXEMPTION IAW 33 CFR 156.110.
Condition: Unknown
Due 6 March 2001
Resolved 6 March 2001
Engineering
Issued 28 August 1998
Resolved
Provide Service Report upon rebuild and testing of #1 Sea Service Genset including tests of engine safety devices.
Condition: Unknown
Due 2 September 1998
Resolved 3 September 1998
Fire Fighting
Issued 28 August 1998
Resolved
Provide copy of Service Report for fire fighting equipment to include repairs to "Engine Room" Fixed system Time Delay.
Condition: Unknown
Due 2 September 1998
Resolved 3 September 1998
Deck/Cargo
Issued 4 December 1997
Resolved
Submit copy of vender's service report on calibration of fixed gas detection system.
Condition: Unknown
Due 4 December 1997
Resolved 4 December 1997
Engineering
Issued 4 December 1997
Resolved
Submit venders service report of repairs to the Post Harbor Generator low oil pressure shutdown.
Condition: Unknown
Due 9 December 1997
Resolved 9 December 1997
Deck/Cargo
Issued 4 December 1997
Resolved
Submit copy of vender's service report on repairs to the annunciator panel in the engine control room.
Condition: Unknown
Due 4 December 1997
Resolved 4 December 1997
Electrical
Issued 4 December 1997
Resolved
Prove item #5 of TFH test procedures (loss of draft shutdown). Or submit venders service report for repairs to [name withheld].
Condition: Unknown
Due 9 December 1997
Resolved 9 December 1997
Construction/Loadline
Issued 22 August 1997
Resolved
Vsl rubbed against mooring dolphin, fender was missing, bolt sticking out put a gash in #2 stbd ballast tank fwd at 18 ft mark approx. 40" x 1". Vsl to install doubler plate for temp repairs. Vsl to make permanent repairs atnext port TAMMS.
Condition: Unknown
Due 22 August 1997
Resolved 22 August 1997
Documentation
Issued 25 November 1996
Resolved
PROVIDE USCG APPROVED PLANS ON MODIFICATIONS MADE TO CARGO PIPING TO [name withheld].
Condition: Unknown
Due 25 January 1997
Resolved 24 January 1997
Fire Fighting
Issued 3 October 1996
Resolved
RENEW WASTED CABLE PULL RUNS ON FIXED FIRE EXTINGUISHING SYSTEMS.
Condition: Unknown
Due 24 October 1996
Resolved 13 November 1996
Engineering
Issued 3 October 1996
Resolved
AT NEXT YARD AVAILABILITY/MAINTENANCE PERIOD, BUT NO LATER THAN COMPLIANCE DATE, REPLACE EXCESSIVELY LONG FUEL HOSES ON BOTH THERMAL FLUID HEATERS ANDFOUR SHIPS SERVICE DIESEL GENERATORS IN ACCORDANCE WITH 46CFR 56.60- 25(C)(4).
Condition: Unknown
Due 3 October 1996
Resolved 3 October 1996
Fire Fighting
Issued 4 December 1992
Resolved
Provide service certificate for fixed fir fighting showing proper operationof time delay.
Condition: Unknown
Due 28 December 1992
Resolved 28 December 1992
Unknown
Issued 4 December 1992
Resolved
Remove all paint cans and other flammable/combustable materials from stbd deck locker.
Condition: Unknown
Due 4 December 1992
Resolved 4 December 1992
Deck/Cargo
Issued 4 December 1992
Resolved
Submit to MSO Tampa OCMI test pro cedvres of thermal fluid heater for approval.
Condition: Unknown
Due 4 December 1992
Resolved 4 December 1992
Engineering
Issued 9 December 1991
Resolved
PROVE INTERLOCK ON STBD BOILER, MINIMUM FUEL PRESSURE SWITCH STBD BOILER.
Condition: Unknown
Due 28 February 1992
Resolved 28 February 1992
Fire Fighting
Issued 9 December 1991
Resolved
PROVIDE COPY OF F/F EQUIPMENT SERVICING REPORT.
Condition: Unknown
Due 28 February 1992
Resolved 28 February 1992
Construction/Loadline
Issued 9 December 1991
Resolved
PROVIDE DIVER'S REPORT AND PROPOSAL FOR REPAIRS TO SKEG/RUDDER
Condition: Unknown
Due 28 February 1992
Resolved 28 February 1992
Construction/Loadline
Issued 9 December 1991
Resolved
PAINT INLOAD LINE.
Condition: Unknown
Due 28 February 1992
Resolved 28 February 1992
Unknown
Issued 18 April 1991
Resolved
MAKE PERMANENT REPAIRS IN WAY OF #3 BALLAST TANK BETWEEN FRAMES 41 AND 42 PORT SIDE AT NEXT DRYDOCK.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991