Records from 1990 to 2025. Most recent: inspection, 1 November 2025.
Documentation record
Registered dimensions (L × B × D)188.6 ft × 45.0 ft × 16.0 ft
Registered tonnagegross 1,093 / net 394
ITC dimensions (L × B × D)188.6 ft × 45.0 ft × 16.0 ft
ITC tonnagegross 1,093 / net 394
BuilderNOLA FLEET MANAGEMENT INC · HARVEY, LA, UNITED STATES · built 1990
Hull materialSteel
PropulsionNot recorded
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portRIO VISTA, CA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 23 April 2026 · expires 31 May 2027
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it394 - Convention (Subpart B), Net Ton
1093 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
1 November 2025
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8264757
11 July 2022
Load Line/Change of Employment
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7492335
6 December 2012
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4513946
1 December 2012
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4513932
10 February 2007
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2870660
19 February 2004
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2009131
26 October 2003
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1938256
18 March 1998
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1112405
10 October 1996
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 840185
29 July 1996
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1087700
6 July 1995
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1357233
30 September 1994
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1179604
2 September 1994
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 861898
27 October 1993
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 829210
8 September 1993
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1366895
23 November 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1379725
4 September 1992
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 942788
11 March 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 946872
6 September 1991
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 938103
10 September 1990
Initial Certification · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1224399
Construction/Loadline
Issued 30 September 1994
Resolved
Repain vessel name on bow port and starboard, repaint vessel name and homport on stern.
Condition: Unknown
Due 30 September 1994
Resolved 30 September 1994
Engineering
Issued 30 September 1994
Resolved
Install emergency fuel shut-off operable from the main deck.
Condition: Unknown
Due 30 September 1994
Resolved 30 September 1994
Engineering
Issued 30 September 1994
Resolved
Renew fuel tank vent screen.
Condition: Unknown
Due 30 September 1994
Resolved 30 September 1994
Construction/Loadline
Issued 8 September 1993
Resolved
MAKE PERMANENT REPAIRS TO DAMAGE IN WAY OF STARBOARD BOW RAKE SIDE SHELL PLATE, SIDE CHORD, AND LONGITUDINAL ANGLE FRAME.
Condition: Unknown
Due 8 September 1993
Resolved 8 September 1993
Construction/Loadline
Issued 4 September 1992
Resolved
REWELD FRACTURE WELDS IN THE PORT SKEG AT THE TOP AND INBOARD SIDE.
Condition: Unknown
Due 8 October 1992
Resolved 8 October 1992
Unknown
Issued 4 September 1992
Resolved
REPAINT MARKINGS FOR DRAFTS, LOADLINE AND VESSEL NAME.
Condition: Unknown
Due 8 October 1992
Resolved 8 October 1992
Lifesaving
Issued 4 September 1992
Resolved
PROVIDE RING BUOY WITH LINE PRIOR TO OPERATING FREIGHT BRAGE.
Condition: Unknown
Due 8 October 1992
Resolved 8 October 1992