Records from 2001 to 2026. Most recent: inspection, 13 January 2026.
Documentation record
Registered dimensions (L × B × D)250.0 ft × 50.0 ft × 14.0 ft
Registered tonnagegross 1,234 / net 1,234
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS · ASHLAND CITY, TN, UNITED STATES · built 2001
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHACKBERRY, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 29 May 2026 · expires 30 June 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1234 - Simplified, Gross Ton
1234 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 40
13 January 2026
Administrative Inspection · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8295666
4 February 2025
Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8074534
28 January 2025
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8071148
13 February 2024
Examination of Repairs · Administrative Inspection · COI Inspection · Cargo Tank Internal · Drydock Exam · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7864843
5 December 2022
Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7604354
18 April 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7433279
29 November 2021
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7358787
4 November 2020
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7089627
8 November 2019
Drydock Exam · MTSA Verification · Cargo Tank Internal · Examination of Repairs · Administrative Inspection · Internal Structural Exam · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6852302
19 November 2018
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6583368
13 November 2018
MTSA Verification · Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6580039
30 November 2017
Administrative Inspection · MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6315858
7 October 2016
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6020373
20 June 2016
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5913450
10 June 2016
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5903462
23 October 2015
COI Inspection · Internal Structural Exam · Administrative Inspection · Cargo Tank Internal
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5749638
2 April 2015
Administrative Inspection · Deficiency Check · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5095125
18 March 2015
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5086134
29 October 2014
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5014605
27 December 2013
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4774709
26 September 2012
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4450604
3 November 2011
Administrative Inspection · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4181783
3 November 2011
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4181858
16 September 2011
MTSA Verification · Cargo Tank Internal · Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4146741
23 August 2011
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4133906
4 January 2011
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3920637
30 August 2010
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3837874
17 June 2009
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3506392
9 April 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3180873
9 April 2008
Damage Survey · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3180876
20 February 2008
Periodic Inspection · MTSA Verification · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3150370
21 November 2007
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3122515
8 September 2006
MTSA Verification · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2772841
14 June 2006
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2681515
26 August 2005
MTSA Verification · Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2475177
21 March 2005
Administrative Inspection
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2315902
5 November 2004
Periodic Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2235340
23 March 2004
Cargo Tank Internal · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2029782
18 December 2002
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1721314
28 September 2001
Initial Construction-Excluding Oversight · Initial Certification · Hull Examination
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1420596
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 15 November 2018
Resolved
During Annual Examination, Marine Inspectors discovered that the vessel name change on the COD did not reflect the vessl name on the COI and on the Barge. Vessel allowed 30 days to make teporary updates on the barge, and make pemanent repairs at the vessel's next ship yard period 2019.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2018
Resolved 19 November 2018
Resolution: They submitted pictures to prove that the temporary name change on the vessel has been completed.
Construction/Loadline › Hull › Transverse Frame
Issued 10 June 2016
Resolved
Small fraacture located in the bow rake approximately 4" above the bilge knuckle, 3' fwd of the bulkhead.
Action required: 705 - Other - as specified
Due 10 July 2016
Resolved 20 June 2016
Resolution: Cropped and renewed all repairs in the bow rake to the satisfaction of the attending marine inspector.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 18 March 2015
Resolved
Barge is carrying sulphuric acid. MI identified possible leak and associated odors around port containment return line piping. Submit a writtten plan outlining procedure for identifying substance and origin of associated leak. Include necessary clean up plans and permanent repairs. Plan is to be submitted prior to movement.
Action required: 705 - Other - as specified
Due 18 March 2015
Resolved 1 April 2015
Resolution: Gouged and welded weld seams in cargo piping on port manifold. Completed hydro test of repairs. All repairs completed to the satisfaction of the attending marine inspector.
Construction/Loadline › Hull › Side Shell
Issued 3 November 2011
Resolved
After offloading cargo, make permanent repairs to the damage on the Port Stern corner. Approx size of damage is 8' x 3.5' x 6'. No further cargo operations are authorized after offloading.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 November 2011