Records from 1990 to 2026. Most recent: inspection, 20 January 2026.
Inspection history · 62
20 January 2026
Internal Structural Exam · Drydock Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8298451
15 January 2026
Deficiency Check · Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8296149
7 January 2025
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8060870
18 January 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7851571
9 January 2024
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7863240
12 December 2022
COI Inspection · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7601952
11 October 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7575592
3 February 2022
Annual Inspection · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7389437
11 March 2021
Annual Inspection · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7146018
2 March 2021
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7149107
30 October 2020
Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7070139
10 March 2020
Deficiency Check · Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6920698
29 October 2018
Annual Inspection · Internal Structural Exam · Deficiency Check · Administrative Inspection · Examination of Repairs · Construction Oversight · Drydock Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6570894
11 December 2017
DAPI Audit · Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6322077
12 October 2017
Administrative Inspection · Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6286453
26 May 2017
Deficiency Check · Annual Inspection · DAPI Audit · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6181711
1 April 2016
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 5839750
30 October 2015
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 5234032
30 January 2012
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 4234261
1 December 2011
Drydock Exam · Hull Examination · Internal Structural Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 4199057
18 December 2009
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 3652303
3 April 2009
Annual Inspection · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 3445598
4 December 2007
COI Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 3109303
28 November 2007
Hull Examination
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 3106110
22 February 2007
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2876319
28 February 2006
Hull Examination
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2592928
12 January 2006
Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2565737
7 December 2005
Re-Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2547994
17 February 2005
Re-Inspection · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2294343
4 February 2004
Examination of Repairs · Hull Examination
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1999886
7 January 2004
Annual Inspection
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1977041
3 December 2002
MARPOL Annex V Examination · COI Inspection
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1708471
13 February 2002
Hull Examination
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1492434
6 February 2002
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1492402
23 June 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 38611
4 June 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 231951
24 February 2000
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1454770
3 December 1999
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1386640
28 November 1999
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 811317
5 March 1999
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 803340
11 January 1999
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1378555
12 February 1998
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1110080
16 January 1998
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 776016
2 December 1997
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 786129
27 November 1996
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1092671
18 January 1996
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 878256
6 December 1995
Re-Inspection · Plan Review "T" Boat
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1193304
12 December 1994
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 835104
7 December 1994
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 829123
26 August 1994
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1177082
20 December 1993
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 852561
20 December 1993
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1162941
22 April 1993
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1146697
12 March 1993
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 840506
3 March 1993
Damage Survey
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 840390
1 February 1993
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1140938
4 January 1993
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1142240
1 July 1992
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1263223
23 January 1992
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 945395
19 December 1990
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 943807
19 December 1990
Initial Certification · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1222928
19 December 1990
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1258573
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 January 2026
Resolved
Port aft electronic submersible bilge pump only works in manual mode. Mark pump switch at operating station as manual only or repair automatic mode.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 January 2026
Resolved 4 February 2026
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 January 2026
Resolved
Apply new Type II retroreflective material to the ring life buoy and life floats.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 January 2026
Resolved 4 February 2026
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 7 January 2025
Resolved
The hydrostatic release for the Cat 1 EPIRB is expired. Provide a new hydrostatic release and mark to expire two years after install. Vessel restricted to operating within three miles from shore.
Action required: 705 - Other - as specified
Resolved 7 January 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 January 2024
Resolved
Both port and starboard fuel supply line shutoff valves located at the tank connection are corroded and unable to fully close. Replace the port and starboard tank connection fuel shutoff valves.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 January 2024
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 18 January 2024
Resolved
Mark the vessel's name and hailing port in four inch minimum letters on the stern.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 January 2024
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 12 December 2022
Resolved
Provide a valid FCC Safety Radio Certificate.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 December 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 December 2022
Resolved
Attach the floating waterlight to the ring life buoy with a lanyard (3' - 6') and corrosion resistant clip.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 December 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 December 2022
Resolved
Clearly mark the vessel's name on the ring life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 December 2022
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 3 February 2022
Resolved
Make stern light operational prior to operating at night or during periods of reduced visibility.
Action required: 705 - Other - as specified
Resolved 9 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 February 2022
Resolved
Permanently mount the aft submersible bilge pump float switch in the starboard hull.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 February 2022
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 11 March 2021
Resolved
The battery for the Emergency Position Indicating Radiobeacon was expired. Vessel restricted to operating within 3 miles from shore.
Action required: 705 - Other - as specified
Resolved 11 March 2021
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 11 March 2021
Resolved
Vessel did not have an appropriate sounding producing device for its length.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 March 2021
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 30 October 2020
Resolved
Identified cracking (approx. 6”) in the gelcoat/FRP on the transom at the port and starboard tunnel corners. Grind back to good FRP and renew.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 30 October 2020
Resolved
Holes were drilled in the head floor/wall to pass bilge hoses and electric cables through. Plug holes to prevent deck water from entering the port hull.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2020
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 March 2020
Resolved
Provide 3 fire buckets with lanyards and label “Fire Bucket”, each bucket shall be 2 1/2 gallons.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2020
Resolution: 3 Buckets supplied
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 10 March 2020
Resolved
Provide deck course rails at intervals no less than 12” at embarkation locations. 3 of the 4 locations were missing rail courses.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 April 2020
Resolution: courses installed
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 10 March 2020
Resolved
Replace weak link that is properly sized for installed life float (15 pax), weak link does not have indication tag.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 April 2020
Resolution: link installed
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 6 March 2019
Resolved
Life Floats must be linked together with line around body of float when using a single painter line. Line shall be the same size and type as painter line and be long enough so that each Life Float can be deployed at a time.
Action required: 705 - Other - as specified
Due 13 March 2019
Resolved 13 March 2019
Resolution: Life Floats properly linked together.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 6 March 2019
Resolved
Weak link on painter line for life floats shall be connected to the vessel. Weak link is currently connected to the Life Float.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 March 2019
Resolution: Weak link reconfigured and installed properly.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 6 March 2019
Resolved
Provide access for crew member to be able to secure port-side positive shutoff valve for submersible bilge pump. Currently unable to access the area behind head.
Action required: 705 - Other - as specified
Resolved 13 March 2019
Resolution: Access panel added.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 6 March 2019
Resolved
Provide 02 additional red hand-held flares.
Action required: 705 - Other - as specified
Resolved 13 March 2019
Resolution: All required flares provided onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 March 2019
Resolved
Provide a corrosion resistant clip for water-light lanyard for ring buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 March 2019
Resolution: Clip provided.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 6 March 2019
Resolved
Demonstrate operation of magnetic compass light.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 March 2019
Resolution: Compass light operational.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 6 March 2019
Resolved
Demonstrate operation of anchor light (all around white). Vessel is restricted to daylight operations.
Action required: 705 - Other - as specified
Due 13 March 2019
Resolved 16 March 2019
Resolution: Light operational.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 6 March 2019
Resolved
Demonstrate operation of forward bilge pump and automatic indicator light. Unable to operate pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 March 2019
Resolution: Pump operational.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 6 March 2019
Resolved
Post all pages of COI and Stability Letter.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 March 2019
Resolution: COI and Stability Letter posted.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 6 March 2019
Resolved
Provide currently publications for area of operation (light list, Coast Pilot, Tide tables, and currents).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 March 2019
Resolution: All publications on board and up to date.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 6 March 2019
Resolved
Update Emergency Procedures to reflect vessel arrangement.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 March 2019
Resolution: Emergency procedures updated.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 6 March 2019
Resolved
Supply VHF radio with a GPS input.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 April 2019
Resolution: GPS operational on VHF.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 March 2019
Resolved
Provide ammonia inhalants (10) for first aid kit.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 March 2019
Resolution: Ammonia inhalants supplied and stored in First Aid kit.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 March 2019
Resolved
Ground fuel tanks to a common ground, wire shall be 14AWG and green.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 March 2019
Resolution: Both tanks grounded.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 March 2019
Resolved
Provide deck courses for each embarkation/debarkation area at intervals not greater than 12 inches.
Action required: 705 - Other - as specified
Due 13 March 2019
Resolved 16 March 2019
Resolution: All deck courses installed at embarkation stations.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 6 March 2019
Resolved
Seal all areas on the weather deck to prevent water ingress into the hull (Trunks and Head).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 March 2019
Resolution: Trunks sealed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 March 2019
Resolved
Wire connects on battery terminals shall be installed with the largest gauge wire on the bottom.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 March 2019
Resolution: Terminals connected properly.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 1 March 2019
Resolved
Submersible bilge pump discharge line must have a positive shutoff valve installed at the hull penetration.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 March 2019
Resolution: Positive shutoff valve installed at the hull penetration.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 October 2018
Resolved
Repair/replace Port and STBD stringers in forward compartments, FRP is delaminated and wood is rotted.
Prior to credit dryddock.
Action required: 705 - Other - as specified
Resolved 16 November 2018
Resolution: All stringers have been replaced with treated wood and covered with FRP.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 October 2018
Resolved
Repair/replace deck beams and shelf's on outboard hull, wood is rotted.
Prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 16 November 2018
Resolution: All deck beams and shelf's were replaced with treated wood and covered/coated with FRP.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 October 2018
Resolved
Repair/replace hull frames on both Port and STBD sides, plywood is rotted.
Prior to credit dryddock.
Action required: 705 - Other - as specified
Resolved 16 November 2018
Resolution: All hull frames in both Port and STBD hulls were replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 October 2018
Resolved
Grind out to good glass on identifies areas on external hull, blistering located on STBD hull.
**Prior to credit dryddock.
Action required: 705 - Other - as specified
Resolved 16 November 2018
Resolution: All areas on hull have been properly repaired.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 October 2018
Resolved
Grind out to good glass on internal STBD hull just forward of glass bottom, FRP is delaminated.
**Prior to credit dryddock.
Action required: 705 - Other - as specified
Resolved 16 November 2018
Resolution: Area was repaired after the viewing hull glass was removed and glassed over with FRP and utilized a balsa core.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 October 2018
Resolved
Repair Port transom triangle stringer, delaminated area identified.
**Prior to credit dryddock.
Action required: 705 - Other - as specified
Resolved 16 November 2018
Resolution: Both transoms were removed and replaced with same layup schedule, balsa core was replaced with 2 3/4in sheets of treated plywood.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 29 October 2018
Resolved
Repair/replace STBD transom, core is rotted due to ingress if water.
Prior to credit dryddock.
Action required: 705 - Other - as specified
Resolved 16 November 2018
Resolution: Both transoms were removed and replaced with same layup schedule, balsa core was replaced with 2 3/4in sheets of treated plywood.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 October 2018
Resolved
Install fuel tanks built to 46CFR182.440 standards and fill to 95% capacity to demonstrate leak free installation.
**Prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 6 March 2019
Resolution: New tanks from Corinthian Catamarans and pressed with 95% fuel with no observed leaks.
Communications › Alarms/Indicators › Bilge Alarm
Issued 15 December 2017
Resolved
Provide visual indicators at operating station to indicate automatic bilge pump operation.
Action required: 705 - Other - as specified
Due 15 January 2018
Resolved 11 January 2018
Resolution: Float switches removed.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 15 December 2017
Resolved
Deck rail courses at embarcation stations must be installed at no more than 12 inch intervals.
Action required: 705 - Other - as specified
Due 22 December 2017
Resolved 11 January 2018
Resolution: Additional rail courses added.
Engineering › Bilge Water Management System › Pump
Issued 12 December 2017
Resolved
Demonstrate operation of aft starboard bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2017
Resolution: Pump re wired, operational.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 12 December 2017
Resolved
Install fire extinguishers in approved carrier or to satisfaction of Marine Inspector.
Action required: 705 - Other - as specified
Due 22 December 2017
Resolved 15 December 2017
Resolution: Adequate carriers installed.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 12 December 2017
Resolved
Install floating water light in approved/manufacture recommended stowage arrangement.
Action required: 705 - Other - as specified
Due 18 December 2017
Resolved 15 December 2017
Resolution: Manufacture devices used.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 12 December 2017
Resolved
Remove securing devices for PFD stowage locations. Must not be capable of being locked.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2017
Resolution: Locking devices were modified.
Fire Fighting › Remote Fuel Shutoff › General
Issued 12 December 2017
Resolved
Label fuel shutoffs for port/STBD tanks.
Action required: 705 - Other - as specified
Due 18 December 2017
Resolved 15 December 2017
Resolution: Fuel shutoffs labeled.
Documentation › Certificates/Documents › FCC SSL
Issued 12 December 2017
Resolved
Provide FCC marine radio operator permit for crew member.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2017
Resolution: Permit obtained by owner.,
Documentation › Certificates/Documents › Proof of Consortium Enrollment (DAPI)
Issued 12 December 2017
Resolved
Provide proff of pre-emplyment testing prior to acting as crew member.
Action required: 705 - Other - as specified
Resolved 18 December 2017
Resolution: Proof of testing provided.
Engineering › Gasoline Engine (propulsion) › Ignition Wire (4 cycle)
Issued 12 December 2017
Resolved
Demonstrate proper operation of main propulsion and conduct underway MOB drill to satisfaction of USCG.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2017
Resolution: Vessel got underway and completed drills.
Construction/Loadline › Hull › Hull Plating
Issued 12 October 2017
Resolved
Grind out delaminated/damaged glass in identified areas in hull (port and starboard quarters and area forward of port side glass bottom) Submit repair proposal to local OCMI prior to beginning repairs.
Action required: 705 - Other - as specified
Resolved 10 November 2017
Resolution: Conducted repairs to hull and deck.
Lifesaving › Lifefloat › Netting
Issued 26 May 2017
Resolved
Life float is missing the center platform and net. Repair/renew.
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 5 June 2017
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 26 May 2017
Resolved
Grabline is wasted and must be replaced.
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 5 June 2017
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 26 May 2017
Resolved
First aid kit is incomplete. provide all contents.
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 5 June 2017
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 26 May 2017
Resolved
FCC safety Radio cert is missing. Provide new cert.
Due 9 June 2017
Resolved 5 June 2017
Documentation › Safety/Response Plans/Programs › Waste Management Plan
Issued 26 May 2017
Resolved
Vessel does not have a waste management plan. Provide/post.
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 5 June 2017
Navigation › Piloting/Steering › Marine Charts
Issued 26 May 2017
Resolved
All vessel charts and navigation publications are expired. Update or renew.
Due 9 June 2017
Resolved 5 June 2017
Lifesaving › Hand Flares › Storage
Issued 26 May 2017
Resolved
Flare storage must be in a brightly colored watertight container that is marked. Provide new container.
Due 9 June 2017
Resolved 5 June 2017
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 18 December 2009
Resolved
Acquire valid alcohol testing equipment to satisfy 2hr requirement
Due 31 December 2009
Resolved 21 January 2010
Documentation › Certificates/Documents › Certificate of Inspection
Issued 18 December 2009
Resolved
Post Certificate of Inspection and Stability letter in a conspicuous place.
Due 18 December 2009
Resolved 21 January 2010
Engineering › Bilge Water Management System › Interface Detector
Issued 18 December 2009
Resolved
Install separate bilge alarm indicator for each space starboard and port.
Due 31 January 2010
Resolved 21 January 2010
Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 April 2009
Resolved
Vessel owner/operator failed to make vessel available for annual inspection within 3 months before or after the anniversary date (12/4/2012). Vessel is restricted from the carriage of passengers until a satisfactory exam is completed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 April 2009
Resolved 7 April 2009
Engineering › Fuel Oil Service System › Valve, Control
Issued 3 April 2009
Resolved
Replace port side fuel shutoff valve handle.
Due 7 April 2009
Resolved 14 April 2009
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 7 December 2005
Resolved
Repair/replace two lifejackets rejected by Marine Inspector. Vessel restricted to the carriage of 47 passengers until complete.
Action required: 705 - Other - as specified
Due 8 January 2006
Resolved 12 January 2006
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 7 December 2005
Resolved
Provide 60 ft lifeline for vessels ring life buoy and 3ft lanyard for strobe light.
Action required: 705 - Other - as specified
Due 8 January 2006
Resolved 12 January 2006
Lifesaving › Lifefloat › Paddle
Issued 7 December 2005
Resolved
Provide paddles for vessel's lifefloats.
Action required: 705 - Other - as specified
Due 8 January 2006
Resolved 12 January 2006
Documentation › Certificates/Documents › FCC SSL
Issued 7 December 2005
Resolved
Provide valid FCC Safety Radio Certificate onboard vessel.
Action required: 705 - Other - as specified
Due 8 January 2006
Resolved 12 January 2006
Communications › Radio Communications › EPIRB
Issued 17 February 2005
Resolved
Replace hydrostatic release in way of 406MHz EPRIB.
Action required: 705 - Other - as specified
Due 17 March 2005
Resolved 18 February 2005
Construction/Loadline › Structures
Issued 4 February 2004
Resolved
Provide a written plan for repairs to forward bulkhead in aft starboard compartment. Once plan has been approved make repairs as per instruction by Marine Inspector. LEGACY COMPONENT DESC: Transverse Bulkhead
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 February 2004
Resolved 5 February 2004
Resolution: Insected repairs to bulkhead. Found satisfactory.
Lifesaving
Issued 11 January 1999
Resolved
Replace Ring Buoy.
Condition: Unknown
Due 11 January 1999
Resolved 11 January 1999
Construction/Loadline
Issued 11 January 1999
Resolved
Repair cracked web frame in the #4 compartment, starboard side. Complete by 28FEB99.
Condition: Unknown
Due 11 January 1999
Resolved 11 January 1999
Lifesaving
Issued 11 January 1999
Resolved
Written drug test program unavailable. Req'd to provide by 11FEB99 as per Drug Audit form.
Condition: Unknown
Due 11 January 1999
Resolved 11 January 1999
Navigation
Issued 2 December 1997
Resolved
Provide a light list, t-regs, tide/current tables and coast pilot._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 December 1997
Resolved 16 January 1998
Lifesaving
Issued 2 December 1997
Resolved
Provide an emergency broadcast placard._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 December 1997
Resolved 16 January 1998
Documentation
Issued 2 December 1997
Resolved
Provide a proper log book with all required entries._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 December 1997
Resolved 16 January 1998
Lifesaving
Issued 2 December 1997
Resolved
Affix retro-reflective tape on life ring buoy._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 December 1997
Resolved 16 January 1998
Engineering
Issued 7 December 1994
Resolved
Repair inoperative fuel shut off valves.
Condition: Unknown
Due 16 December 1994
Resolved 14 December 1994
Lifesaving
Issued 7 December 1994
Resolved
Replace lanyards on waterlights on both lifefloats.
Condition: Unknown
Due 16 December 1994
Resolved 14 December 1994
Documentation
Issued 7 December 1994
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 16 December 1994
Resolved 14 December 1994
Construction/Loadline
Issued 12 March 1993
Resolved
INSTALL DECK CLAMP IN PORT HULL.
Condition: Unknown
Due 12 March 1993
Resolved 12 March 1993
Construction/Loadline
Issued 3 March 1993
Resolved
COMPLETE REPAIRS TO DECK BEAMS IN #2 COMPARTMENT IN ACCORDANCE WITH APPROVED REPAIR PROPOSAL.
Condition: Unknown
Due 14 March 1993
Resolved 14 March 1993
Construction/Loadline
Issued 3 March 1993
Resolved
SUBMIT DETAILED REPAIR PROPOSAL WITH DRAWINGS FOR DECK BEAMS IN #2 COMPT THAT HAVE DETACHED FROM THEIR FRP TABBING. THIS PROPOSAL SHALL ADDRESS THE AREAS OVER THE TUNNEL AND THE CONNECTIONS OUTBOARD IN EACH HULL. (APPROX. 6BEAMS ARE AFFECTED).
Condition: Unknown
Due 14 March 1993
Resolved 14 March 1993
Construction/Loadline
Issued 4 January 1993
Resolved
REPAIR AND PROVE OPERATION OF THE PORT FORWARD ELECTRIC BILGE PUMP.
Condition: Unknown
Due 4 January 1993
Resolved 4 January 1993
Lifesaving
Issued 4 January 1993
Resolved
PROVIDE WATERTIGHT CONTAINER FOR DISTRESS SIGNALS.
Condition: Unknown
Due 4 January 1993
Resolved 4 January 1993
Lifesaving
Issued 4 January 1993
Resolved
RENEW RETROREFLECTIVE TAPE AND STENCIL VESSEL NAME ON THE FOAM LIFE PRESERVER.
Condition: Unknown
Due 4 January 1993
Resolved 4 January 1993