MAURY USCG vessel records
← All vessels

RUDEE ANGLER

RUDEE ANGLER is a 1991 passenger vessel (inspected). The Coast Guard has recorded 25 inspections since 2016, most recently in April 2026, along with 26 deficiencies.

Records from 2016 to 2026. Most recent: inspection, 15 April 2026.

Built
1991
Last inspected
15 April 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 15 April 2026
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDC9042
358259
Flag
UNITED STATES
Maury page id
psix-358259

Documentation record

Registered dimensions (L × B × D)77.0 ft × 21.0 ft × 4.0 ft
Registered tonnagegross 43 / net 34
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLYDIA YACHTS OF STUART · STUART, FL, UNITED STATES · built 1991
Hull materialWood
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portVIRGINIA BEACH, VA
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational
DocumentationValid · issued 4 February 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it43 - Simplified, Gross Ton
34 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 25

15 April 2026 Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8350183
17 April 2025 Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8109600
12 March 2025 Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8087388
11 April 2024 Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7893682
18 April 2023 In-Service Inspection · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7670969
15 March 2023 Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7650982
29 April 2022 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7440460
24 March 2022 COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7417945
11 February 2022 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7401579
17 September 2021 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7314604
20 August 2021 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7294042
15 July 2021 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7256971
14 July 2021 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7256274
25 June 2021 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7235696
2 June 2021 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7211929
9 February 2021 Special · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7200284
26 May 2020 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6957717
10 January 2020 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6887130
22 April 2019 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6665074
3 April 2019 Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6649673
10 May 2018 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6410800
23 April 2018 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6397211
18 April 2017 Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6126456
29 March 2017 COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6112216
25 April 2016 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5857373

Deficiency record · 26

07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 April 2026 Resolved
The fire pump outlet shall be fitted with a pressure gauge. The gauge did not work on the fire pump. 46 CFR 181.10-1(c)/16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2026
Resolved 15 April 2026
Resolution: Received objective evidence that gauge was replaced and tested.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 April 2025 Resolved
L. All vessels shall be fitted with three ring life buoys of not less than 24 inches in diameter. 01 life ring was unserviceable. 46 CFR 180.70(a)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 23 April 2025
Resolution: Recieved photos of new life buoy.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 17 April 2025 Resolved
The intent of this part is to insure that each vessel is provided with safe, readily available and sufficient firefighting equipment. Fire extinguisher brackets were rusted and difficult to open limiting accessibility of firefighting gear. 46 CFR 181.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 1 May 2025
Resolution: Receieved viedo of properly working brackets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 April 2025 Resolved
It is intended that all machinery be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure and personnel injury. MI’s noted a piece of line holding up a section of exhaust cooling line forward of the port main. 46 CFR 182.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: Recieved photo of proper supports.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 April 2025 Resolved
Wiring joints and splices shall be mechanically secure and made in junction boxes. There were two dead end wires under the control panel on the port side of the bridge. 183.05-50(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: Recieved photo of electrical wiring.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 April 2025 Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/or originating in electrical equipment, and reasonably safe from electrical shock of personnel. Electrical power strips were daisy chained together under panel on bridge. 46 CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: Recieved photo of electrical wiring.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 April 2025 Resolved
The certificate of Inspection shall, in general, be framed under glass or other transparent material and posted in a conspicuous place. COI was not posted. 46 CFR 176.01-40
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: Recieved photo of posted COI.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 11 April 2024 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible; (2) U.S. Coast Pilot or similar publication; (3) Coast Guard Light List. Vessel did not have current Light List and Coast Pilot on board. 46CFR184.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2024
Resolved 16 April 2024
Resolution: New charts, coast pilot and light list are onboard the vessel.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 April 2024 Resolved
An emergency instruction placard containing the following information will satisfy the requirements of § 185.510. Fire. (i) Cut off air supply to fire—close items such as hatches, ports, doors, ventilators, and louvers, and shut off ventilation system. (ii) Cut off electrical system supplying affected compartment if possible. (iii) If safe, immediately use portable fire extinguishers at base of flames for flammable liquid or grease fires or water for fires in ordinary combustible materials. Do not use water on electrical fires. (iv) If fire is in machinery spaces, shut off fuel supply and ventilation and activate fixed extinguishing system if installed. (v) Maneuver vessel to minimize effect of wind on fire. (vi) If unable to control fire, immediately notify the Coast Guard and other craft in the vicinity by radiotelephone. (vii) Move passengers away from fire, have them put on life jackets, and if necessary, prepare to abandon the vessel. Vessel did not have detailed instructions for machinery space fire response. 46CFR185.512(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2024
Resolved 16 April 2024
Resolution: Updated emergency instructions are now posted at the operating station and galley.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 April 2024 Resolved
Complete but simple instructions for the operation of a fixed gas fire extinguishing system must be located in a conspicuous place at or near each pull box and stop valve control and in the space where the extinguishing agent cylinders are stored. If the storage cylinders are separate from the protected space, the instructions must also include a schematic diagram of the system and instructions detailing alternate methods of releasing the extinguishing agent should the local manual release or stop valve controls fail to operate. Each control valve to a distribution line must be marked to indicate the space served. Instructions were not available at the operating station or locally at the CO2 bottles. No schematic diagram was present locally at the CO2 bottles. 46CFR185.612(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2024
Resolved 16 April 2024
Resolution: Fixed extinguishing system instructions are now posted at the operating station and locally at the CO2 bottles, as well as a schematic diagram. [name withheld] stated vessel manager Skip Fellar received the system operating instructions from Hiller Companies.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 11 April 2024 Resolved
Piping, valves, and fittings must be securely supported, and where necessary, protected against damage. The CO2 system distribution piping coming from the bottle's was not secured in its clamps. 46CFR181.410(d)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2024
Resolved 16 April 2024
Resolution: System piping is secured within its clamps.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 April 2023 Resolved
All vessels must have navigational lights that are in compliance with the applicable section of the International and Inland Navigational Rules. All around white light was found inoperable. Vessel restricted to daylight operations, and no operations during restricted visibility. 46 CFR 183.420
Action required: 705 - Other - as specified
Resolved 19 April 2023
Resolution: O/O submitted objective evidence of operational light
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 15 March 2023 Resolved
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Submit plans to MSC for approval. 46CFR181.405(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 18 April 2023
Resolution: CID approved X-sense interconnected system, conducted sat operational test
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 March 2023 Resolved
On vessels described by 46 CFR 175.110(c), flammable items not otherwise covered by the regulations of this subchapter, such as rechargeable batteries, including lithium ion batteries utilized for commercial purposes, must be handled, stored, and operated in a way that mitigates the risk of hazardous conditions. Provide plan to attending MI's. 46CFR185.364
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 18 April 2023
Resolution: MI's reviewed sat plan
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 15 March 2023 Resolved
For a vessel described by 46 CFR 175.110(c), the training program in paragraph (a) of this section must address firefighting proficiency and must include but need not be limited to - (1) Training in the use and location of firefighting equipment and firefighting knowledge, including: (i) Location of firefighting appliances and emergency escape routes; (ii) Types and sources of ignition; (iii) Flammable materials, fire hazards and spread of fire; (iv) The need for constant vigilance; (v) Actions to be taken on board; (vi) Fire and smoke detection and automatic systems on board; and (vii) Classification of fire and applicable extinguishing agents. (2) The drills required by § 185.524, including fire location and fire type; and (3) Emergency egress training for each member of the crew, to occur for all members of the crew - (i) At least monthly while such members are employed on board the vessels; and (ii) Each time a crew member joins the crew of such vessel. Provide training program to attending MI's. 46CFR185.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2023
Resolved 18 April 2023
Resolution: MI's reviewed sat training procedures and logs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 March 2022 Resolved
STBD MDE has no protective cover over FWD rotating assembly/crank pulley.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2022
Resolved 18 April 2022
Resolution: Vessel owner fabricated and installed sufficient engine cover over STBD MDE rotating machinery.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 29 March 2022 Resolved
Light list and Coast pilot were not up to date. Vessel owner showed proof of purchase and tracking information and given 07 days to rectify.
Action required: 705 - Other - as specified
Due 5 April 2022
Resolved 4 April 2022
Resolution: Attending CGMI's verified vessel added updated Light List and Coast Pilot publications to it's library.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 20 August 2021 Resolved
Machinery, equipment, materials and arrangement not covered by the standards in this subchapter may be inspected in accordance with standards acceptable to the OCMI as good marine practice. Make ballast installation into more permanent of a configuration. Submit & communicate ballast configuration design to local OCMI prior to changing the configuration. To be completed prior to February 2022.
Action required: 705 - Other - as specified
Due 1 February 2022
Resolved 28 February 2022
Resolution: Vessel made ballast installation IAW CGMSC letter. Vessel fabricated boxes and installed IAW OCMI approved plans.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 15 July 2021 Resolved
46 CFR 178.230 Vessel underwent a recent repowering and received informal approval from MSC to install led ballast to offset the weight change. O/O still does not have official MSC approval letter for the ballast. Provide USCG MI the official MSC approval letter attesting to led ballast install.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 August 2021
Resolution: Received letter from MSC accepting weight change from repowering/installing ballast.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 29 June 2021 Resolved
46 CFR 178.230 Vessel underwent a recent repowering and received informal approval from MSC to install led ballast to offset the weight change. O/O still does not have official MSC approval letter for the ballast. Provide USCG MI the official MSC approval letter attesting to led ballast install.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 July 2021
Resolution: Naval Architect submitted weight change analysis to MSC
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 2 June 2021 Resolved
Due to recent engine modifications and weight changes, vessel's stability letter is nullified. Vessel must reach out to MSC to determine if new test needs to be completed to issue new letter prior to operating with passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2021
Resolution: O/O received approval from MSC to install led ballast to offset the repowering weight change. Witnessed SAT install of led ballast.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 2 June 2021 Resolved
An exposed hazard such as rotating machinery must be properly protected by a cover. Engines had exposed hazards on belts and shafts. Required to add guards.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2021
Resolved 29 June 2021
Resolution: Vessel has installed guards over both shafts, and over the port side eninge belt driven pump.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 June 2021 Resolved
Generators must be designed for an ambient temperature of 50C or be de-rated to 80% if designed for 40C. Stbd generator was rated for 40C. Required vessel to contact generator manufacturer to get temperature testing range.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2021
Resolved 17 September 2021
Resolution: New breaker meets UL489, completed sat test in presence of MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 February 2021 Resolved
Vessel returned to homeport prior to attending marine inspector witnessing operational test of the vessel's two new main engines. Conduct operational test to the satisfaction of attending CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 June 2021
Resolution: MI's conducted satisfactory sea trial.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 May 2020 Resolved
Alcohol testing devices need to be carried on board each vessel. Found expired alcohol testing devices on board. Vessel is restricted to operate within two hours of their open collection site. Outfit vessel with valid alcohol testing devices to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2020
Resolved 29 May 2020
Resolution: Owner provided proof of purchase of alcohol test kits. Pictures uploaded into documents.
Fire Fighting › Fire Pumps › Pressure
Issued 23 April 2018 Resolved
The fire pump failed to produce the proper PSI. Repair /Replace the fire pump to produce the Proper PSI. Due date is 30 April 2018. Old T 46 CFR 181.10-1 (c).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 May 2018
Resolved 10 May 2018
Resolution: Qualified Marine Inspector witnessed satisfactory PSI test of the new fire pump.

Ownership record