Documentation record
Registered dimensions (L × B × D)61.5 ft × 24.1 ft × 8.7 ft
Registered tonnagegross 86 / net 69
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBERRY BROTHERS GENERAL CONTRACTORS INC · BERWICK, LA, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portMIAMI, FL
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 9 July 2026 · expires 31 July 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it86 - Simplified, Gross Ton
69 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 46
21 July 2026
Drydock Exam · Vessel Attendance · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8443476
19 November 2025
Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8273684
19 November 2025
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8301636
9 September 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8230459
16 December 2024
In-Service Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8048964
9 December 2024
Explosive Handling Operation-Military
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8044952
30 September 2024
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8007675
4 September 2024
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7984207
20 May 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7915016
9 January 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7847123
30 September 2023
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7805642
5 June 2023
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7735647
21 September 2022
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7563920
5 January 2022
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7377942
29 September 2021
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7291046
6 May 2021
Internal Structural Exam · Drydock Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7191177
24 April 2021
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7183087
27 March 2021
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7169473
2 March 2021
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7149432
4 September 2020
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7017234
25 September 2019
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6821127
13 August 2019
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6781855
15 February 2019
Administrative Inspection · Initial Certification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6626361
7 August 2018
Administrative Inspection · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6507088
30 July 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6495521
17 July 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6483617
17 July 2018
Damage Survey · Permit to Proceed · In-Service Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6487885
4 September 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6359634
23 June 2012
Type not recorded
No type recorded · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 4359697
29 May 2012
Industry Initiated Exam · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4328655
17 April 2012
Administration
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4290101
9 April 2012
Administration
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4290081
16 May 2011
Administration
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4290146
17 February 2010
Administration
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3682248
7 February 2010
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3693140
6 October 2008
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3339985
3 February 2003
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1739222
4 October 2002
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1684917
6 September 2002
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1674619
17 January 2002
Hawser Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1479530
3 October 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1073930
30 October 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 178803
9 September 1997
MARPOL Annex V Examination · Uninspected Towing Vessel
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 786146
6 April 1995
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 198716
6 April 1995
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 760042
26 July 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 53856
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 November 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Diagnose failure on the Port Red Gear, Submit report of repair and testing prior to movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 December 2025
Resolution: Received tech report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 December 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel. Vessel has inoperable oil pressure gauge at the helm. Oil pressure gauge at machinery location is operable IAW regulatory requirement. Remove or replace oil pressure gauge with functional gauge at helm. 46CFR143.205(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2024
Resolved 3 January 2025
Resolution: Capt submitted video of new pressure gauge functioning and conducted low oil pressure alarm test as well as purchase receipt of new gauge.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 16 December 2024
Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weather-tight function properly. The portside door leading to the galley does not fully seal when closed. Repair door/gasket and demonstrate proper seal. 46CFR140.610(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2024
Resolved 3 January 2025
Resolution: Vessel submitted video of door closing satisfactorily.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 December 2024
Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Excessive shaft seal leaks were found on the port and stbd shafts, leaking at approximately .5 GPM. Crew tightened shaft seals. 46 CFR 140.605(b)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 16 December 2024
Resolved 16 December 2024
Resolution: Crew tightened shaft seals.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 4 September 2024
Resolved
Security exercises must be conducted at least once each calendar year, with no more than 18 months between exercises. Vessel could not show record of security exercise from the previous 18 months. 33 CFR 104.230(c)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 30 September 2024
Resolution: Vessel rep provided report from security exercise
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 4 September 2024
Resolved
The original COI must be framed under glass or other transparent material and posted in a conspicuous place onboard the towing vessel. Not all pages of COI were posted. 46 CFR 136.220 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 30 September 2024
Resolution: Origional COI posted on port side pilot house
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 4 September 2024
Resolved
The records of inspections and tests of fire-detection systems and fixed fire-extinguishing systems must be recorded in the TVR, official logbook, or in accordance with any TSMS applicable to the vessel. Vessel did not have record of required monthly inspection of portable / semi-portable fire extinguisher(s). 46 CFR 142.240(c)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 30 September 2024
Resolution: Vessel rep provided tech report showing recertification of fire extinguishers.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 4 September 2024
Resolved
A towing vessel must carry adequate and up-to-date charts, maps, and nautical publications for the intended voyage, including: “U.S. Coast Pilot” or similar publication. Vessel did not have up to date copy of “U.S. Coast Pilot” or similar publication. 46 CFR 140.705 (b)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 30 September 2024
Resolution: Vessel's captain provided electronic copy of new Coast Pilot.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 4 September 2024
Resolved
Alarms must be visible and audible at each operating station. Vessel does not have required alarms at upper or aft operating stations. 46 CFR 143.230
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 30 September 2024
Resolution: Vessel has repeater alarms located at two alternate operating atations.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 4 September 2024
Resolved
A fixed fire pump must be capable of being energized remotely from a safe place outside the engine room and at the pump. Fire pumps are not capable of being energized locally at the pump. 46 CFR 142.235 (a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 30 September 2024
Resolution: local fire pump control installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 September 2024
Resolved
All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid into the machinery space. Sight glass on port fwd fuel tank was missing. 46 CFR 143.220 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 30 September 2024
Resolution: Sight glass and associated gaskets replaced with new.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 September 2024
Resolved
Individual circuit breakers on switchboards and distribution panels must be labeled with a description of the loads they serve. Distribution panels #1 and #2 in fwd engine room had several breaker switches with missing labels. 46 CFR 143.400 (d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 30 September 2024
Resolution: All breakers and panels labeled as required.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 17 July 2018
Resolved
PWG01 Complete Subchapter M Compliance Exam to the satisfaction of attending Marine Inspector. No systems could be tested due to 17JUL2018 Marine Casualty. PRIOR TO OPERATION. 46 CFR 137.120. 705c.
Action required: 705 - Other - as specified
Due 20 August 2018
Resolved 1 October 2018
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 17 July 2018
Resolved
PWG02 Complete repairs to hull damage caused by 17 JUL 2018 grounding to the satisfaction of attending Marine Inspector. PRIOR TO OPERATIONS.46 CFR 137.300. 705c.
Action required: 705 - Other - as specified
Due 20 August 2018
Resolved 1 October 2018
Resolution: As per Sector NY MI
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 17 July 2018
Resolved
PWG03 Complete repairs to vessel engines and generators to the satisfaction of the attending Marine Inspector. Damage was caused by 17JUL2018 Marine Casualty. PRIOR TO OPERATIONS. 46 CFR 137.220. 705c.
Action required: 705 - Other - as specified
Due 20 August 2018
Resolved 1 October 2018
Resolution: As per Sector NY MI
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 9 September 1997
Resolved
INSTALL RESTRICTED MANEUVERABILITY LIGHTS IN ACCORDANCE WITH THE INLAND NAVIGATIONAL RULES.
Condition: Unknown
Due 9 October 1997
Resolved 29 September 2004
Resolution: Reicied comformation from Towing vessel representative that deficieny has been corrected. (Weeks Marine).
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 9 September 1997
Resolved
PROVIDE OPERATIONAL TEST OF STERN LIGHT AND MAKE SAME WATER TIGHT.
Condition: Unknown
Due 9 October 1997
Resolved 29 September 2004
Resolution: Reicied comformation from Towing vessel representative that deficieny has been corrected. (Weeks Marine).
Engineering › Steering Gear System › Pin
Issued 9 September 1997
Resolved
REPLACE LOCKING COTTER PIN IN STARBOARD STEERING ARM WHERE MISSING.
Condition: Unknown
Due 9 October 1997
Resolved 29 September 2004
Resolution: Reicied comformation from Towing vessel representative that deficieny has been corrected. (Weeks Marine).
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 9 September 1997
Resolved
PROVIDE THIS OFFICE WITH OPERATIONAL AND MAINTENCE INFORMATION FOR TYPE II MSD SYSTEM.
Condition: Unknown
Due 9 October 1997
Resolved 29 September 2004
Resolution: Reicied comformation from Towing vessel representative that deficieny has been corrected. (Weeks Marine).