22 September 2025
Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8238664
25 July 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8194405
22 July 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8192186
16 January 2025
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8064358
29 July 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7970056
25 October 2023
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7803492
25 July 2022
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7515804
15 February 2022
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7442461
1 February 2022
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7389534
2 September 2021
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7302812
13 January 2021
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7124062
23 October 2020
MARPOL Annex VI Survey · MARPOL Annex I Examination · Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7083083
11 March 2020
Administrative Inspection · Special
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6925524
14 June 2019
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6714080
4 May 2018
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6405495
18 January 2017
MARPOL Annex VI Survey · Internal Structural Exam · Drydock Exam · COI Inspection · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6072934
23 September 2016
MARPOL Annex VI Survey · Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6006991
6 January 2016
Drydock Exam · Internal Structural Exam · Deficiency Check · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5793028
1 September 2015
In-Service Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5232510
13 July 2015
Drydock Extension
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5762026
19 May 2015
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5130189
20 March 2015
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5087689
16 September 2014
MARPOL Annex VI Survey · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4974494
24 October 2013
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4734910
1 October 2012
Administrative Inspection · COI Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4454556
9 August 2012
Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4396796
21 May 2012
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4329736
7 December 2011
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4202676
27 October 2010
Administrative Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4020866
9 February 2010
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3674761
12 February 2009
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3415906
7 October 2008
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3339955
17 September 2008
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3327434
13 February 2008
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3142714
1 February 2008
Internal Structural Exam · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3132143
3 December 2007
Drydock Extension
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3108859
6 October 2006
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2794826
23 May 2006
Annual Inspection · Internal Structural Exam · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2687111
15 November 2004
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2241034
26 March 2003
COI Inspection · Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1763095
13 November 2002
COI Inspection · Drydock Extension
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1697298
17 April 2001
Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1413886
12 March 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 163740
20 December 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 11735
20 December 2000
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1366091
13 September 2000
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1361682
14 July 2000
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 820189
21 June 2000
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1053301
8 June 2000
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 819046
17 March 2000
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1048213
15 March 2000
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1467652
11 June 1999
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 810461
4 June 1999
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 808621
4 May 1999
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1452500
24 April 1998
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 673457
17 March 1998
Initial Certification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1409863
2 March 1998
Deadweight Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1386198
4 November 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 409647
4 November 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 785431
1 November 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 172336
30 October 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 169451
30 October 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 178803
16 October 1997
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1378321
11 February 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 673414
11 February 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 673415
7 February 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 95151
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 22 July 2025
Resolved
Hose and fittings must meet the requirements of subpart 56.60 of this subchapter. Vessel reported that the hydraulic hose used for the pile driving hammer burst causing a hydraulic leak. Provide Technician Report attesting to the replacement of the hydraulic hose and that equipment operates as intended.
46 CFR 58.30-20 (b)
Action required: 705 - Other - as specified
Due 29 July 2025
Resolved 30 July 2025
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 30 July 2024
Resolved
The master, owner, operator, agent, or person in charge
of any vessel equipped with ballast water tanks that
operates in the waters of the United States must follow
these practices: Maintain a ballast water management
(BWM) plan that has been developed specifically for the
vessel and that will allow those responsible for the
plan's implementation to understand and follow the
vessel's BWM strategy and comply with the requirements
of this subpart.
Vessel does not have a ballast water management plan.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 February 2025
Resolved 6 February 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 July 2024
Resolved
Each nameplate for a circuit breaker must show the
electrical load served and the setting of the circuit
breaker.
Forward crane distribution panel labeling was not
legible.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2024
Resolved 12 August 2024
Resolution: Recieved photo evidence of corrections made.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 July 2024
Resolved
The inspection for certification shall include an
inspection of the structure... The inspection shall be
such as to insure that the vessel, as regards the
structure... is in satisfactory condition and fit for
the service for which it is intended.
Vessel has an unauthorized cut out on the deck level of
the crane, forward side.
Condition: Improper Installation
Action required: 702 - Prior to embarking on international voyage
Due 30 August 2024
Resolved 12 August 2024
Resolution: Cut out was repaired with a steel patch.
01 - Certificates & Documentation › 011 - Ships Certificates › International Anti-fouling-System Certificate
Issued 29 July 2024
No resolution recorded
Ships of 400 gross tonnage and above engaged in
international voyages (excluding fixed or floating
platforms, FSUs and FPSOs) will be required to undergo
an initial survey before the ship is put into service or
before the International Anti-fouling System Certificate
(IAFS) is issued for the first time; and a survey should
be carried out when the anti-fouling systems are changed
or replaced.
Vessel does not have a valid Anti-Fouling Certificate.
Condition: Improper/Lack of Maintenance
Action required: 702 - Prior to embarking on international voyage
Due 26 February 2025 — due date passed with no resolution recorded
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 25 July 2022
Resolved
EACH CLASS 1 DOOR ON A VESSEL IN OCEAN SERVICE MUST BE DESIGNED TO WITHSTAND A HEAD OF WATER EQUIVALENT TO THE DEPTH FROM THE SILL OF THE DOOR TO THE MARGIN LINE BUT IN NO CASE LESS THAN 10 FEET (3.05 METERS). OBSERVED WASTED GASKET AND CLASS 1 DOOR ON THE MAIN DECK LEADING TO THE MACHINERY ROOM.
46 CFR 170.270(B)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2022
Resolved 1 August 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 25 July 2022
Resolved
EACH PANEL BOARD MUST HAVE A CIRCUIT DIRECTORY. OBSERVED ELECTRIC PANEL WITHIN MACHINERY SPACE WITHOUT PROPER DIRECTORY.
46 CFR 111.40 11(B)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 July 2022
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 25 July 2022
Resolved
AT EACH INSPECTION FOR CERTIFICATION AND PERIODIC INSPECTION THE MARINE INSPECTOR SHALL CONDUCT SUCH TESTS AND INSPECTIONS OF THE MAIN PROPULSION AND AUXILIARY MACHINERY AND OF ITS ASSOCIATED EQUIPMENT, INCLUDING THE FLUID CONTROL SYSTEMS, AS HE FEELS NECESSARY TO CHECK SAFE OPERATION. OBSERVED INOPERABLE EMERGENCY FUEL SHUT OFF VALVE TO SHIP SERVICE GENERATOR.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 July 2022
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 25 July 2022
Resolved
THE INSPECTION FOR CERTIFICATION SHALL INCLUDE AN INSPECTION OF THE STRUCTURE, BOILERS, AND OTHER PRESSURE VESSELS, MACHINERY, AND EQUIPMENT. THE INSPECTION SHALL BE SUCH AS TO INSURE THAT THE VESSEL…, IS IN SATISFACTORY CONDITION AND FIT FOR THE SERVICE FOR WHICH IT IS INTENDED. OBSERVED CORROSION AND WASTAGE TO TWO AIR RECEIVERS CONNECTED TO ENGINES USED FOR ANCHORING.
46 CFR 91.25-10
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 July 2022
Resolution: Conducted satisfactory hydrostatic test.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 25 July 2022
Resolved
MANHOLES AND FLUSH SCUTTLES IN POSITION 1 OR 2 OR WITHIN SUPERSTRUCTURES OTHER THAN ENCLOSED SUPERSTRUCTURES SHALL BE CLOSED BY SUBSTANTIAL COVERS CAPABLE OF BEING MADE WATERTIGHT. UNLESS SECURED BY CLOSELY SPACED BOLTS, THE COVERS SHALL BE PERMANENTLY ATTACHED. OBSERVED MISSING OR WASTED GASKETS ON MULTIPLE MANHOLES.
46 CFR 42.15 40(A)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 July 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 25 July 2022
Resolved
EACH CABLE ENTRANCE TO AN EMERGENCY ALARM SIGNAL OR DISTRIBUTION FITTING MUST BE MADE WATERTIGHT BY A TERMINAL OR STUFFING TUBE. OBSERVED FREE AND CLEAR CABLE PENETRATION THROUGH BULKHEAD INTO MACHINERY SPACE.
46 CFR 113.25-14
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 July 2022
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 25 July 2022
Resolved
EACH PRIME MOVER MUST SHUT DOWN AUTOMATICALLY UPON LOSS OF LUBRICATING PRESSURE TO THE GENERATOR BEARINGS IF THE GENERATOR IS DIRECTLY COUPLED TO THE ENGINE. OBSERVED FAILURE TO AUTOMATIC SHUTDOWNS DUE TO LOSS OF LUBE OIL PRESSURE AND OVER SPEED FOR VESSEL’S GENERATOR.
46 CFR 111.12 1(C)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 July 2022
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 14 June 2019
Resolved
Each cargo vessel must carry liferafts with an aggregate capacity sufficient to accommodate the total number of persons on board.
No life raft was on board the vessel during the inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2019
Resolution: Installed , 25 person liferaft.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 June 2019
Resolved
Each lifebuoy must be capable of being rapidly cast loose.
The two lifebuoys located on the P/S bow of vessel were installed behind life lines, preventing the lifebuoy
from being rapidly cast loose.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2019
Resolution: Moved/reinstalled lifebuoys in another location that is able to be rapidly cast loose.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 14 June 2019
Resolved
Entries shall be made in the Oil Record Book on each occasion, whenever machinery space operations take place.
The Oil Record Book had not been filled out since 2015.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 August 2019
Resolution: ORB updated. DEF cleared.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 14 June 2019
Resolved
No person may transfer oil or hazardous material to or from a vessel unless each person in charge has filled out and signed the declaration of inspection.
There were no Declarations of Inspections provided to the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 June 2019
Resolution: Def rectified.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 14 June 2019
Resolved
Portable extinguishers must be inspected and maintained in accordance with NFPA 10 as amended.
There was no records of maintenance or servicing of portable fire extinguishers on board during the time of inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2019
Resolution: Verified proof of annual servicing and monthly inspections.
Documentation › Certificates/Documents › Letter of Substantial Compliance (DAPI)
Issued 16 March 2016
Resolved
Marine employers shall establish programs for the chemical testing for dangerous drugs on a random basis of crewmembers on inspected vessels. Marine employers shall maintain records of chemical tests; records shall be sufficient to (1) satisfy the requirements of 46CFR16.21(b) & 46CFR16.220(c) & (2) identify the total number of individuals chemically tested annually. DAPI certificate not provided.
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 31 March 2016
Resolution: Received verification of DAPI enrollment.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 16 March 2016
Resolved
No manned ship subject to this part may operate unless it carries on board a shipboard oil pollution emergency plan approved by the Coast Guard.SOPEP on vessel was not updated.
Action required: 705 - Other - as specified
Due 16 March 2016
Resolved 18 March 2016
Resolution: Received updated SOPEP.
Engineering › Pressure Vessel › Relief Valve
Issued 16 March 2016
Resolved
All pressure vessels other than unfired steam boilers shall be protected by pressure-relieving devices that will prevent the pressure from rising more than 10 percent above the maximum allowable working pressure. PRV is not suited for the pressure vessel's MAWP.
Action required: 705 - Other - as specified
Due 16 March 2016
Resolved 25 March 2016
Resolution: Witnessed satisfactory test of the relief valve.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 16 March 2016
Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port required to be marked on the stern of the vessel under §67.123 of part 67 of this chapter. 02 Life rings did not have name of port and vessel. 46CFR199.70(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 April 2016
Resolved 25 March 2016
Resolution: All lifebuoys have been properly marked.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 16 March 2016
Resolved
The master or person in charge shall insure that the following certificates & record for each crane are maintained on the unit: Each certificate issued by a crane certifying authority. Each record & original certificate, or certified copy of a certificate or manufacturers or testing laboratories, companies or organizations for—Loose gear, wire rope;& the annealing of wrought iron. 46CFR91.25-25(b)
Action required: 705 - Other - as specified
Due 16 March 2016
Resolved 18 March 2016
Resolution: Crane certificate provided.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 21 January 2016
Resolved
Barge is overdue for its Periodic Inspection. Barge cannot conduct cargo operations until the inspection is completed.
Condition: Invalid
Action required: 705 - Other - as specified
Due 4 February 2016
Resolved 16 March 2016
Resolution: Conducted periodic inspection.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 1 September 2015
Resolved
Label Life Saving Equipment including PFDs with vessel name.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 7 September 2015
Resolution: Life saving equipment was labled.
Electrical › Electrical Distribution System (service) › Cable
Issued 1 September 2015
Resolved
Remove electrical extension cords currently in use thru doorways.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 7 September 2015
Resolution: Electrical cords removed.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 1 September 2015
Resolved
Remove oily rags and oil on deck from the e-gen space.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 7 September 2015
Resolution: Oil & Oily rags removed
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 1 September 2015
Resolved
Relocate gas grill from the hazardous location.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 7 September 2015
Resolution: Grill removed from haz location.
Electrical › Lighting (service) › Lighting Fixture
Issued 1 September 2015
Resolved
Remove or mount lighting fixture IVO the boiler that is hanging by wires.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 7 September 2015
Resolution: Old light was removed.
Lifesaving › Inflatable Liferafts › Float Free
Issued 1 September 2015
Resolved
Lower the starboard life raft stand (cradle) to accommodate for the rail height.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 7 October 2015
Resolution: Life raft stand was lowered.
Accommodation/Occupational Safety › Ventilation › General
Issued 1 September 2015
Resolved
Relocate/modify exhaust for the generator powering the Portable Accomidations CONEX boxes away from entrance of the space.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 7 September 2015
Resolution: Generator was re located.
Construction/Loadline › Structures › Trunk
Issued 13 July 2015
Resolved
Vessel to replace ladder in #5S at next Dry Dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 May 2016
Resolution: Item cleared at drydock
Construction/Loadline › Structures › Transverse Bulkhead
Issued 13 July 2015
Resolved
Fracture in last deep web in 6S to be cropped and renewed with 18in x 4 ft insert at next Dry Dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 May 2016
Resolution: Item cleared at drydock
Engineering › Steam Boiler (auxiliary/waste heat) › Dry Pipe
Issued 20 March 2015
Resolved
Vessel Aux Boiler Fireside/Waterside inspections overdue. Vessel shall schedule required inspections to be conducted and witnessed by an attending USCG Marine Inspector prior to operations that require the Aux Boiler.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 May 2016
Resolution: COI has been amended to reflect the boiler has been locked out & tagged out. Inspections must be conducted by USCG prior to use.
Engineering › Pressure Vessel › Blowdown Valve
Issued 24 October 2013
Resolved
To be completed by 27Feb2014 and prior to use of the boiler: Replace leaking stop valve and holed drain piping on the boiler. Boiler will be required to be hydro tested again upon completion of the repairs.
Action required: 705 - Other - as specified
Due 27 February 2014
Resolved 27 February 2014
Resolution: New valve installed along with new drain line section, the boiler hydro tested satisfactory.
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 9 February 2010
Resolved
Prior to operating boiler, prove proper operation of both boiler safety valves, or provide test report.
Action required: 705 - Other - as specified
Resolved 7 April 2010
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 6 October 2006
Resolved
Properly repair the exhaust leak on the manifold of the Aux Generator.
Action required: 705 - Other - as specified
Due 17 October 2006
Resolved 30 October 2006
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 26 June 2006
Resolved
Provide boiler test procedures for automatic boiler. Procedures must be submitted to the USCG for approval.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 June 2006
Resolution: Test procedures were submitted.
Lifesaving › Immersion Suits › Retroreflective Material
Issued 1 June 2006
Resolved
Provide/install retro reflective tape for two of three immersion suits.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 June 2006
Resolution: New retro reflective material was purchased and placed on the immersion suits.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 1 June 2006
Resolved
Properly mark all ring buoys with approved type II retro reflective tape.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 June 2006
Resolution: All ring buoys were fitted with retro reflective tape on both sides and in all four quadrants.
Lifesaving › Inflatable Liferafts › Servicing
Issued 1 June 2006
Resolved
Service/repair life raft and properly install on vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 June 2006
Resolution: The actual, serviced liferaft was inside an old container to protect it during shipping. Vessel operators installed it with the outer covering not knowing this. Outer casing was removed and the liferaft was properly installed.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 1 June 2006
Resolved
Install approved bracket for fire extinguisher in winch control room (station #1)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 June 2006
Resolution: New and approved bracket installed.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 1 June 2006
Resolved
Install approved bracket for fire extinguisher in winch control room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2006
Resolution: Approved bracket installed.
Engineering › Generator (propulsion-electric) › Reverse Power Protection Relay Circuitry
Issued 15 November 2004
Resolved
Both Gen over speed trip not operating as designed.
Condition: Improper Installation
Due 20 December 2004
Resolved 16 December 2004
Resolution: Vsl demostrated proper operation of over speed trip.
Engineering › Compressed Air System (start air)
Issued 3 October 2003
Resolved
Prior to operation of vessels UPV, all relief valves must be tested. LEGACY COMPONENT DESC: Valve
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 6 October 2003
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 13 November 2002
Resolved
Prior to operation, conduct safeties and shutdowns on auxiliary boiler.
Action required: 705 - Other - as specified
Due 30 January 2003
Resolved 25 April 2003
Engineering
Issued 17 April 2001
Resolved
Prove proper operation of emergency fuel stop valve for main deck generator.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Lifesaving
Issued 17 April 2001
Resolved
Provide 7 rocket parachute flares.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Lifesaving
Issued 17 April 2001
Resolved
Provide crew warning signs (hearing and eye protection) for main deck generator room and workshop.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Electrical
Issued 17 April 2001
Resolved
Replace electrical receptacles in boiler area as necessary with approved type for machinery spaces.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Accommodation/Occupational Safety
Issued 17 April 2001
Resolved
Replace broken window at aft operators station.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Lifesaving
Issued 17 April 2001
Resolved
Replace expired eye wash containers for first aid kit.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Engineering
Issued 13 September 2000
Resolved
Make sat repairs to boiler using ASME certified contractors & make ready for USCG inspection: Repair/renew/clean leaking tubes, firetube carbon, watersides, handhole covers, leaking tricock, wasted sheet metal, fusible plug, safety valve test, calibrate steam gauge, hydro, ops test, mfg specs.
Condition: Unknown
Due 13 September 2000
Resolved 13 September 2000
Documentation
Issued 15 March 2000
Resolved
VESSEL TO PROVIDE PROOF OF ENROLLMENT IN A DRUG CONSORTIUM. VESSEL NOT TO OPERATE MANNED UNTILL THIS REQUIREMENT IS CLEARED.
Condition: Unknown
Due 15 April 2000
Resolved 17 March 2000
Construction/Loadline
Issued 15 March 2000
Resolved
VESSEL TO INSTALL A BILGE SYSTEM FOR ALL VOID SPACES.
Condition: Unknown
Due 15 March 2000
Resolved 15 March 2000
Documentation
Issued 15 March 2000
Resolved
VESSEL TO PROVIDE PROOF OF VALID COASTWISE LLC. VESSEL ONLY HAS UNMANNED LLC. NO MANNED OPS UNTIL THIS REQUIREMENT IS CLEARED.
Condition: Unknown
Due 15 March 2000
Resolved 15 March 2000
Lifesaving
Issued 15 March 2000
Resolved
VESSEL TO PROVIDE TWELVE ROCKET PARACHUTE FLARES ONBOARD THE VESSEL. VESSELNOT TO OPERATE MANNED UNTIL THIS REQUIREMENT CLEARED.
Condition: Unknown
Due 15 April 2000
Resolved 17 March 2000
Electrical
Issued 15 March 2000
Resolved
CONDUCT OPERATIONAL TESTS OF BOTH SHIPS SERVICE GENERATORS TO INCLUDE TESTING OF THE OVERSPEED AND LUBE OIL SHUTDOWN DEVICES. VESSEL NOT TO OPERATE GENERATORS UNTIL THIS REQUIREMENT IS CLEARED.
Condition: Unknown
Due 15 April 2000
Resolved 17 March 2000
Fire Fighting
Issued 4 May 1999
Resolved
Service the over charged portable fire extinguisher (B-II) located on the forward end of the crane, main deck.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Engineering
Issued 4 May 1999
Resolved
Install 30 x 30 mesh flame screen on the fuel tank vent, located on the forward end of the crane, main deck.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Documentation
Issued 4 May 1999
Resolved
Provide the approved Ship Oil Pollution Emergency Plan on board the vessel in accordance with 33 CFR 151.26.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Documentation
Issued 4 May 1999
Resolved
Provide pollution prevention placard on board the vessel as per 33 CFR 155.450.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Engineering
Issued 4 May 1999
Resolved
Install lagging on the exhaust manifold and turbo charger on the standby generator.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Fire Fighting
Issued 4 May 1999
Resolved
Fix the portable fire extinguisher bracket so that it will securely hold the entinguisher. Located in way of the stbd door to the spare generator space, main deck.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Documentation
Issued 4 May 1999
Resolved
Post copy of companies' drug policy on board the vessel per 46 CFR Part 16.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Fire Fighting
Issued 4 May 1999
Resolved
Install a fire extinguisher bracket for the portable fire extinguisher (B- II) located in the crane winch room.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Lifesaving
Issued 4 May 1999
Resolved
Vessel is restricted from operating in cold water as a permissively manned vessel, until immersion suits are placed on board the vessel.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Documentation
Issued 4 May 1999
Resolved
Provide copy of consortium certificated of compliance for the companies' drug testing program. 46 CFR Part 16.
Condition: Unknown
Due 4 June 1999
Resolved 6 May 1999
Engineering
Issued 4 May 1999
Resolved
Provide Fuel Oil Tansfer Proceedures on board the vessel, to be in accordance with 33 CFR 155.720.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Lifesaving
Issued 4 May 1999
Resolved
Vessel restricted for operating on a coastwise permissively manned route until the 25 man liferaft is on board the vessel.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Documentation
Issued 4 May 1999
Resolved
Provide hotline numbers for employee assistance program per 46 CFR Part 16,to be posted on the vessel.
Condition: Unknown
Due 4 May 1999
Resolved 4 May 1999
Documentation
Issued 4 November 1997
Resolved
BARGE DID NOT HAVE AN APPROVED SOPEP.
Condition: Unknown
Due 22 January 1998
Resolved 22 January 1998