Records from 1995 to 2026. Most recent: inspection, 8 April 2026.
Inspection history · 64
8 April 2026
PSC B
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8344773
6 November 2025
Type not recorded
No type recorded · USCGC KIMBALL (WMSL 756) · Activity 8265441
4 November 2025
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 8250621
12 May 2025
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 8133586
26 February 2025
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 8080452
25 February 2025
COE-Administrative
Administrative · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 8080453
6 August 2024
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7961531
18 July 2024
COE-Administrative
Administrative · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7961579
2 October 2023
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7799578
5 April 2023
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7660586
21 February 2023
Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7639885
7 February 2023
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7632933
12 June 2022
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7475221
21 January 2021
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 7124781
24 April 2020
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6943450
3 March 2020
PSC B
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6914675
4 April 2019
Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6648980
10 September 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6534957
6 March 2018
Type not recorded
No type recorded · USCGC DOUGLAS MUNRO (WHEC 724) · Activity 6382356
20 January 2018
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6390584
26 December 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6327624
23 January 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 6076162
19 April 2016
ISPS III Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 5854545
6 October 2015
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 5734626
1 November 2010
ISPS III Exam · PII Safety Exam · MARPOL Annex V Examination · MARPOL Annex I Examination · Ballast Water Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 3882517
17 February 2009
Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 3421310
3 February 2009
MARPOL Annex V Examination · ISPS II Exam · Ballast Water Examination · MARPOL Annex I Examination · PII Safety Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 3411982
21 August 2008
MARPOL Annex V Examination · Ballast Water Examination · MARPOL Annex I Examination · Random ISPS/MTSA/PSC
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 3295794
14 February 2008
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 3147509
24 April 2007
Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2907446
21 February 2007
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2875430
9 February 2007
Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2869759
17 August 2006
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2752470
10 April 2006
Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2621251
19 February 2006
Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2596256
18 August 2005
ISPS II Exam · Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2432100
19 January 2005
PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2273105
9 November 2004
PII Safety Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2232496
8 November 2004
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2247200
6 August 2004
ISPS II Exam
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 2154018
6 July 2004
MARPOL Annex I Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2123615
12 February 2004
Annual Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1991022
21 November 2003
Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1950076
8 October 2003
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1923932
27 February 2003
Annual Inspection · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1750994
23 September 2002
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1706088
11 September 2002
MARPOL Annex I Examination · MARPOL Annex V Examination · Re-Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1674759
7 September 2002
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1725327
18 February 2002
MARPOL Annex V Examination · Annual Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1487223
5 July 2001
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 291509
17 April 2001
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 289098
9 February 2001
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 286670
12 September 2000
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 282010
1 May 2000
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 277268
24 December 1999
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 435849
7 September 1999
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 432865
6 May 1999
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 428564
12 March 1999
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 426398
7 October 1998
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 421143
18 February 1998
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 412886
5 March 1997
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 401115
14 January 1997
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 398996
11 May 1996
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 391105
15 August 1995
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 381713
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 February 2025
Resolved
74SOLAS(97)II-2/20.2
In all ships a duplicate set of fire control plans or a booklet containing such plans shall be permanently stored in a prominently marked weathertight enclosure outside the deckhouse for the assistance of shoreside fire fighting personnel. PSCO observed fire control plan to be in poor condition.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 24 April 2025
Resolution: At the request of owner, occasional survey for verification and rectification of deficiency was carried out in accordance with the deficiencies which had been pointed out by USCG at Dutch Harbor, AK, USA on 26 Feb 2025. Defs were cleared by NKK.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 26 February 2025
Resolved
74SOLAS(97)II-2/12.1.1
Any required automatic sprinkler, fire detection and fire alarm system shall be capable of immediate operation at all times and no action by the crew shall be necessary to set it in operation. PSCO observed smoke detector not working above the fuel purifier when tested. Crew changed out detector and was tested satisfactorily.
Action required: 10 - Deficiency Rectified
Resolved 26 February 2025
Resolution: Crew changed out faulty smoke detector and tested it satisfactorily.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 6 August 2024
Resolved
The Machinery shall be of a a design and constroction adequate for the service for which they are intended and shall be so installed and protected as to reduce to minimum any damage to persoon on board.
Emergency fire pump did not have protection over the drive belt.Guarding must be added to limit risk to operator.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 6 August 2024
Resolution: Chief engeneer installed guard to machinery prior finishing the inspection.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 6 August 2024
Resolved
05AUG24 - Cylinders when not in use must be stowed with the valve protection cap in place. Oxygen and acetylene gas cynlenders do not have the protection cap.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 September 2024
Resolution: Received Class Survey Report verifying caps were installed on Oxygen and Acetylene tanks.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 7 February 2023
Resolved
When the emergency fire pump is delivering the quantity of water required by paragraph 3.3.2.1 (not less than 25m^3/h), the pressure at any hydrant shall not be less than the minimum pressure given in paragraph 4.2 (with the following minimum pressure of 0.25N/mm^2; cargo ships 1000 gross tonnage and upwards but under 6000 gross tonnage); emergency fire pump onboard provided approximately 0.138 N/mm^2 which does not meet the minimum standard. Current draft conditions of vessel at time of exam: 4.4m forward, 4.8m aft.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2023
Resolution: Vessel provided Class Report and examiners witnessed testing of the firepump and was found to be in compliance.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 March 2020
Resolved
Electric lines must be double insulated. Multiple electric lines on main engine and ship service generator were exposed and not properly insulated.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 24 April 2020
Resolution: CLASS REPORT RECEIVED
Lifesaving › Lifeboat › Hull
Issued 3 February 2009
Resolved
No 2. Lifeboat had a patch on the forward starboard hull. Vessel had no class report available in regards to the condition of the hull.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 February 2009
Resolution: Vessel had fiberglass repairman grind down existing patch and repair No 2 lifeboat according to lifeboat manufacturer standards.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Nozzle
Issued 17 August 2006
Resolved
Two CO2 discharge cover plates found missing in the #2 reefer hold.
Condition: Improper/Lack of Maintenance
Due 17 August 2006
Resolved 17 August 2006
Resolution: Cover plates were replaced.
Engineering › Bilge Water Management System › Pump
Issued 17 August 2006
Resolved
Electrical wires were exposed (pulled away from grommet) in bilge pump in engine space.
Condition: Improper/Lack of Maintenance
Due 17 August 2006
Resolved 17 August 2006
Resolution: Wires were tightened.
Engineering › Generator (propulsion/auxiliary-electric) › Battery
Issued 17 August 2006
Resolved
The emergency generator was found inoperable due to inadequately charged batteries.
Condition: Improper/Lack of Maintenance
Due 17 August 2006
Resolved 17 August 2006
Resolution: Batteries were replaced.
Electrical › Electric Generation Source (service) › Generator
Issued 9 November 2004
Resolved
NO. 2 SHIPS SERVICE GENERATOR IS NOT OPERATIONAL. PROVE PROPER OPERATION PRIOR TO DEPARTURE.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 November 2004
Resolved 17 November 2004
Resolution: Bad turbo charger was replaced and satisfactory operation was demonstrated.
Lifesaving › Lifeboat › Propulsion Starting System
Issued 9 November 2004
Resolved
PORT LIFEBOAT NOT MAINTAINED IN OPERATIONAL READY CONDITION. BATTERY WAS RUN DEAD. PROVE PROPER OPERATION PRIOR TO DEPARTURE.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 November 2004
Resolved 17 November 2004
Resolution: Batteries were recharged and the lifeboat satisfactorily started several times.
Accommodation/Occupational Safety › Washroom/Toilet
Issued 8 October 2003
Resolved
Provide usable shower head for crew's shower (bathroom). Crew removed shower head due to extremely hot temperature of water to head. (ILO 147 Crew Accomodation) LEGACY COMPONENT DESC: Shower/Bathtub
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 November 2003
Resolution: Sighted and satisfactorily tested newly installed shower head.
Navigation › Piloting/Steering
Issued 8 October 2003
Resolved
Provide maneuvering information including turning circle diagram with "warning" statement on bottom. Make information read specific to the vessel. LEGACY COMPONENT DESC: Maneuvering Information Fact Sheet
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 November 2003
Resolution: Sighted proper maneuvering information card on bridge.
Electrical › Electrical Distribution System (service)
Issued 27 February 2003
Resolved
Insufficient non cunductive matting in engine control room and emergency gen. room. LEGACY COMPONENT DESC: Non-conducting Deck Covering
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 28 February 2003
Resolved 6 March 2003
Fire Fighting › Structural - A Class Divisions
Issued 27 February 2003
Resolved
Engine room fire door near boiler on starboard side does not close automatically (A-60). LEGACY COMPONENT DESC: Openings - Fire Doors
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 February 2003
Resolved 6 March 2003
Fire Fighting › Structural - A Class Divisions
Issued 27 February 2003
Resolved
A/C room fire door (A-)) does not not meet the fire control plan specifications (A-60). LEGACY COMPONENT DESC: Openings - Fire Doors
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 February 2003
Resolved 8 October 2003
Resolution: Fire Control re-annotated by Class Society (NKK). Door is appropriate for location and matches Fire Control Plan.
Navigation › Emergency Steering
Issued 27 February 2003
Resolved
#1 emergency steering gear low hydraulic alarm is inoperative.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 February 2003
Resolved 6 March 2003
Resolution: Tested sat.
Lifesaving › Lifeboat
Issued 25 February 2002
Resolved
Port and Starboard limit switches and connecting juction boxes wasted and not operational.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 11 September 2002
Resolution: Limit switches were replaced.
Fire Fighting › Structural Fire Protection - General
Issued 18 February 2002
Resolved
Fire protection insulation missing from bulkhead and overhead port forward corner behind engine control room switchboard. LEGACY COMPONENT DESC: Structural Bulkhead Construction
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 11 September 2002
Resolution: Insulation was installed.
Documentation
Issued 17 April 2001
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 18 April 2001
Resolved 19 April 2001
Accommodation/Occupational Safety
Issued 17 April 2001
Resolved
Toilet for hospital would not operate. ILO 147
Condition: Unknown
Due 5 July 2001
Resolved 5 July 2001
Lifesaving
Issued 1 May 2000
Resolved
LIFEBOAT UNABLE TO WORK AT FULL LOAD. SOLAS 74/78 CH II SEC IV REG 41.6.2
Condition: Unknown
Due 20 June 2000
Resolved 21 June 2000
Fire Fighting
Issued 1 May 2000
Resolved
REPLACE ALL FIRE LEAKING FIRE HOSES. 5 TOTAL. SOLAS 74/78 CHAP II-2 REG 21.
Condition: Unknown
Due 24 May 2000
Resolved 24 May 2000
Lifesaving
Issued 1 May 2000
Resolved
EMERGENCY GENERATOR UNABLE TO POWER UNDER AUTO START. SOLAS 74/78 CHAP II-1 REG 43.
Condition: Unknown
Due 24 May 2000
Resolved 24 May 2000
Fire Fighting
Issued 1 May 2000
Resolved
FIRE DOOR TO ENGINE ROOM NEAR GALLEY DOES NOT LATCH PROPERLY. SOLAS 74/78 II-2 REG 47.
Condition: Unknown
Due 13 September 2000
Resolved 13 September 2000
Lifesaving
Issued 1 May 2000
Resolved
REQUEST CLASS TO INSPECT CRACKS AND REPAIR IF NEEDED INSIDE LIFEBOAT #1_x001C_ AND #2. ISSUE LETTER OF CLASS INSPECTION TO USCG.
Condition: Unknown
Due 13 September 2000
Resolved 13 September 2000
Lifesaving
Issued 1 May 2000
Resolved
LIFEBOAT #2 WILL NOT OPERATE. BATTERY POWER UNABLE TO START ENGINE. ALTERNATOR BELT BROKEN. SOLAS 74/78 CHAP III SEC IV REG 41.6.2
Condition: Unknown
Due 20 June 2000
Resolved 21 June 2000
Lifesaving
Issued 1 May 2000
Resolved
#2 LIFEBOAT HANDRAILS NEED REPAIR. SOLAS 74/78 CHAP I REG 11 (A)._x001C_
Condition: Unknown
Due 20 June 2000
Resolved 21 June 2000
Lifesaving
Issued 7 September 1999
Resolved
LIFE BOUY QUICK RELEASE SYSTEM (PORT AND STARBOARD)REQUIRE CORRECTIONS. SEE SOLAS 74/78/III/7.1.3.
Condition: Unknown
Due 11 September 1999
Resolved 16 September 1999
Navigation
Issued 7 September 1999
Resolved
STARBOARD RAM SEAL LEAKS HYDRAULIC FLUID EXCESSIVELY.
Condition: Unknown
Due 25 December 1999
Resolved 25 December 1999
Navigation
Issued 7 September 1999
Resolved
INTERNATIONAL RULES OF THE ROAD REQUIRED. SEE SOLAS 74/78/V/20 AND 33 CFR 164.33.
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Navigation
Issued 7 September 1999
Resolved
INLAND RULES OF THE ROAD REQUIRED. SEE SOLAS 74/78/V/20 AND 33 CFR 164.33.
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Navigation
Issued 7 September 1999
Resolved
CHARTS REQUIRE UPDATES. SEE SOLAS 74/78/V/20 AND 33 CFR 164.33.
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Fire Fighting
Issued 7 September 1999
Resolved
EMERGENCY FIRE PUMP INOPERABLE. SEE SOLAS 74/78 II/2/4.3.3.2.
Condition: Unknown
Due 11 September 1999
Resolved 16 September 1999
Electrical
Issued 12 March 1999
Resolved
Emergency generator exhaust vents too close to emergency generator room._x001C_ SOLAS 74, Ch I-1, Reg 26_x001C_ _x001C_
Condition: Unknown
Due 12 May 1999
Resolved 12 May 1999
Fire Fighting
Issued 12 March 1999
Resolved
Lower Bridge Deck Aft (O1 level) fire detector head missing._x001C_ SOLAS 74, Ch II-2, Reg 47
Condition: Unknown
Due 1 April 1999
Resolved 19 March 1999
Fire Fighting
Issued 12 March 1999
Resolved
Bridge self-closing door does not self-close._x001C_ SOLAS 74 Ch II-2, Reg 23
Condition: Unknown
Due 1 April 1999
Resolved 19 March 1999
Electrical
Issued 12 March 1999
Resolved
Wire way in stairtower (bridge level) not tight._x001C_ SOLAS 74, Ch II-1, Reg 23
Condition: Unknown
Due 1 April 1999
Resolved 19 March 1999
Fire Fighting
Issued 12 March 1999
Resolved
Galley fire doors port and starboard not tight._x001C_ SOLAS 74, Ch II-2, Reg 24
Condition: Unknown
Due 1 April 1999
Resolved 19 March 1999
Fire Fighting
Issued 12 March 1999
Resolved
Galley passing window not tight._x001C_ SOLAS 74, Ch II-2, Reg 24
Condition: Unknown
Due 1 April 1999
Resolved 19 March 1999
Fire Fighting
Issued 12 March 1999
Resolved
Forecastle vent wasted through._x001C_ SOLAS Ch II-2, Reg 25
Condition: Unknown
Due 1 April 1999
Resolved 19 March 1999
Lifesaving
Issued 12 March 1999
Resolved
No lifeboat launching instructions, starboard side._x001C_ SOLAS 74, Ch III, Reg 7
Condition: Unknown
Due 12 March 1999
Resolved 16 March 1999
Fire Fighting
Issued 12 March 1999
Resolved
Firemain drain valves wasted through/leaking._x001C_ SOLAS 74, Ch I, Reg 11
Condition: Unknown
Due 1 May 1999
Resolved 19 March 1999
Lifesaving
Issued 12 March 1999
Resolved
Lifeboat drill unsatisfactory._x001C_ SOLAS 74, Ch III, Reg 26
Condition: Unknown
Due 1 April 1999
Resolved 19 March 1999
Navigation
Issued 12 March 1999
Resolved
Emergency steering drill unsatisfactory._x001C_ STCW
Condition: Unknown
Due 1 April 1999
Resolved 19 March 1999
Fire Fighting
Issued 14 January 1997
Resolved
PROVIDE INSTRUCTION PLACARD FOR OPERATION OF CO2 FIXED FIRE EXTINGUISHING SYSTEM IN BOTTLE STORAGE COMPARTMENT.
Condition: Unknown
Due 6 March 1997
Resolved 6 March 1997
Fire Fighting
Issued 11 May 1996
Resolved
Aft door to engine room not self-closing as required by SOLAS 74, II-2/47.1
Condition: Unknown
Due 12 May 1996
Resolved 12 May 1996
Fire Fighting
Issued 15 August 1995
Resolved
FIREMAN'S OUTFITS AND SELF CONTAINED BREATHING APPARATUS NOT WORN DURING DRILLS AS REQUIRED BY SOLAS 74, III/18.3.10. MASTER REQUIRED TO CONDUCT TRAINING PRIOR TO DEPARTING DUTCH HARBOR.
Condition: Unknown
Due 16 August 1995
Resolved 16 August 1995
Navigation
Issued 15 August 1995
Resolved
STEERING GEAR LINKAGE MISSING COTTER PIN; CORRECTED PRIOR TO DEPARTING VESSEL.
Condition: Unknown
Due 16 August 1995
Resolved 16 August 1995
Unknown
Issued 15 August 1995
Resolved
STEERING ROOM DECK NEEDS CLEANING.
Condition: Unknown
Due 16 August 1995
Resolved 16 August 1995
Lifesaving
Issued 15 August 1995
Resolved
LIFEBUOYS NOT RIGGED FOR QUICK RELEASE WITH SMOKE (SOLAS 74, III/7.1.3). TEMPORARILY RIGGED PRIOR TO DEPARTING VESSEL.
Condition: Unknown
Due 16 August 1995
Resolved 16 August 1995
Navigation
Issued 15 August 1995
Resolved
CHARTS 16529 AND 16530 NOT CORRECTED.
Condition: Unknown
Due 16 August 1995
Resolved 16 August 1995