MAURY USCG vessel records
← All vessels

GOL WARRIOR

Built
1991
Last inspected
20 July 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 20 July 2026
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 9 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8964305
WDL2198
363742
Flag
UNITED STATES
Maury page id
psix-363742

Documentation record

Registered dimensions (L × B × D)120.4 ft × 24.0 ft × 11.4 ft
Registered tonnagegross 90 / net 61
ITC dimensions (L × B × D)120.4 ft × 24.0 ft × 11.4 ft
ITC tonnagegross 219 / net 65
BuilderBREAUX'S BAY CRAFT INC · LOREAUVILLE, LA, UNITED STATES · built 1991
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portMORGAN CITY, LA
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 27 August 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it90 - Regulatory (Subpart C or D), Gross Ton
219 - Convention (Subpart B), Gross Ton
61 - Regulatory (Subpart C or D), Net Ton
65 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 13 inspections, each with its date, unit and type; 14 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 13

20 July 2026 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8442646
30 September 2025 Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8244428
6 August 2025 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8204111
25 July 2024 COI Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7966803
28 November 2023 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7830396
31 August 2023 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7781899
30 November 2022 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7602324
24 November 2021 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7356775
11 August 2021 Hull Examination · Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7282339
18 November 2020 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7096907
18 April 2020 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6974753
19 August 2019 Drydock Exam · Deficiency Check · Internal Structural Exam · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6792640
15 April 2016 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6142575

Deficiency record · 14

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2025 Resolved
At all inspections special attention shall be paid to ensure that no fire hazards exist. Vessel's port generator's oil pressure sensor was leaking fluid and significant amount of oil was present under both generators. 46 CFR 176.25-10(b)Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 August 2025
Resolved 7 August 2025
Resolution: Provided proof of repair.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 6 August 2025 Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed hazardous places such as rotating machinery. Port generator's crankshaft pulley was not protected by a cover, guard, or rail. 46 CFR 177.35-15 Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 August 2025
Resolved 7 August 2025
Resolution: Guard installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 6 August 2025 Resolved
At each initial and subsequent inspection for certification the marine inspector shall examine and test the following items to determine they are in operating condition such as generators. Vessel's starboard generator was unable to start. 46 CFR 176.25-15
Action required: 10 - Deficiency Rectified
Resolved 7 August 2025
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 30 November 2022 Resolved
Buoyant apparatus must not have any evident defects in workmanship. Port Life buoy had hole in outer shell.
Action required: 10 - Deficiency Rectified
Due 30 November 2022
Resolved 30 November 2022
Resolution: replaced life float
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 November 2022 Resolved
The design of all exhaust systems must ensure minimum risk of injury to personnel. Port exhaust bracket was cracked
Action required: 10 - Deficiency Rectified
Due 30 November 2022
Resolved 30 November 2022
Resolution: welder fixed crack
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 November 2022 Resolved
If individual wires, rather than cable are used in systems greater than 50 volts, wire must be in conduit. Conduit on wiring going into pressure switch on potable water head tank was not installed
Action required: 10 - Deficiency Rectified
Due 30 November 2022
Resolved 30 November 2022
Resolution: removed and sealed dead-end wire
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 November 2022 Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford adequate precautions against hazards that might endanger the vessel and the persons being transported. Dead end wire (cut and exposed) located in between engine room and laundry space.
Action required: 10 - Deficiency Rectified
Due 30 November 2022
Resolved 30 November 2022
Resolution: dead-end wire was fixed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 November 2022 Resolved
Watertight bulkheads must be capable of remaining watertight. Copper piping cut on both ends between laundry and galley, leaving three openings between spaces.
Action required: 10 - Deficiency Rectified
Due 30 November 2022
Resolved 30 November 2022
Resolution: pipe was removed and hole was sealed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 November 2022 Resolved
Weathertight door must be provided for each opening located in a deck house. Wire penetration located in deck house was not weathertight
Action required: 10 - Deficiency Rectified
Due 30 November 2022
Resolved 30 November 2022
Resolution: penetrations were sealed
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 24 November 2021 Resolved
All machinery and equipment must be maintained to afford adequate protection from causing fire and machinery failure; hoses on each of the MDE's were chaffing. Chaffing protection was added on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 November 2021
Resolution: Chaffing protection added in noted locations.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 24 November 2021 Resolved
Rotating machinery must be properly protected by cover, guard, or rail; MDE #3 had exposed rotating machinery.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 November 2021
Resolution: Guard added over rotating machinery.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 November 2021 Resolved
All machinery and equipment must be maintained to afford adequate protection from causing fire; port generator fuel fileter was missing flame shield.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 November 2021
Resolution: Flame shield added.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 24 November 2021 Resolved
Exhaust piping must be properly supported; two hanger bolts were missing in the support of exhaust piping for MDE #1. Corrected on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 November 2021
Resolution: Hanger bolts added.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 24 November 2021 Resolved
A vessel must carry up-to-date charts; charts were missing most recent three (03) weeks of corrections from NTM, corrected on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 November 2021
Resolution: Chart corrections made.

Recorded names · 1

WARRIOR (2012). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.