Records from 2016 to 2021. Most recent: inspection, 8 February 2021.
Inspection history · 16
8 February 2021
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7127684
7 December 2020
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7107829
20 September 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7061701
15 June 2020
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6973054
18 November 2019
Ballast Water Examination · ISPS III Exam · PII Safety Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6850737
6 May 2019
Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6674631
8 April 2019
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6658298
21 January 2019
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6610975
9 July 2018
Ballast Water Examination · ISPS III Exam · PII Safety Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6467235
2 March 2018
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6364579
20 February 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6355811
14 August 2017
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6236547
13 February 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6085304
22 December 2016
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6061372
1 August 2016
Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5956525
1 February 2016
MARPOL Annex I Examination · MARPOL Annex VI Survey · PII Safety Exam · MARPOL Annex V Examination · ISPS II Exam · Ballast Water Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 5804757
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 8 February 2021
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards will be ensured. PSCO observed a leak from a scupper drain pipe into the emergency generator room causing an ingress of water and posing an electrical hazard in the emergency generator room. 74 SOLAS (2001) II-1/40.1.3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 February 2021
Resolved 8 February 2021
Resolution: Pipe causing leak of water was replaced by a certified welder. Class provided documenation attesting to good order of replacement.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 6 May 2019
Resolved
Bulkheads at exposed ends of enclosed superstructures shall be of an acceptable level of strength. PSCO discovered 1.5 inch diameter hole through steel bulkhead adjacent to provision store door. ICLL (88) II/11 40ac
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 May 2019
Resolution: Received Class Survey.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 May 2019
Resolved
Terminations and joints in all conductors shall be so made as to retain the original electrical mechanical flame retarding and where necessary fire-resisting properties of the cable. PSCO discovered breaker to battery from ventilation system did not operate due to water ingress. 75SOLAS (04) II-1/45.5.6 10c
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 9 May 2019
Resolution: Received Class Survey
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 8 April 2019
Resolved
All ships of 500 gross tonnage and upwards shall have a gyro-compass to determine and display their heading by shipboard non-magnetic means, being clearly readable by the helmsman at the main steering position.
PSCOs observed that gyrocompass was displaying an error at the main steering position. The gyro error on board the ship had reached 10 degrees and has had ongoing errors requiring servicing.
74 SOLAS (14) V/19.2.5.1
17c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2019
Resolution: Submitted technician report attesting to repairs.
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 8 April 2019
Resolved
All ships of 500 gross tonnage and above shall have a gyrocompass heading repeater to supply heading information visually at the emergency steering position. PSCOs found the digital gyro repeater in steering gear room would not display the ship's heading. The readout was blank.
74 SOLAS (14) V/19.2.5.2
16c
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2019
Resolved 8 April 2019
Resolution: Submitted technician report attesting to repairs.
Documentation › Safety/Response Plans/Programs › Ballast Water Management Plan
Issued 20 February 2018
Resolved
0940- The vessel equipped with ballast water tanks that operates in the waters of the United States must: maintain a ballast water management plan that has been developed specifically for the vessel and that will allow those responsible for the plans implementation to understand and follow the vessel's ballast water management strategy and comply with the requirements of this subpart.
Vessels BWM plan does not state how the vessel complies with the mandatory ballast water management requirements listed in 33CFR151 Subpart D. Vessels ballast water management plan must include the provisions listed in 33CFR151.2050(g).
Action required: 705 - Other - as specified
Due 6 March 2018
Resolved 2 March 2018
Resolution: Vessel Master provided copies of required ammendments to the vessel's BWM Plan to reflect vessel operations in US waters IAW 33CFR151 Subpart D.
Lifesaving › Launching Appliances › Winch Brake
Issued 13 February 2017
Resolved
0630: 74 SOLAS(97)III/48.2.10 Manual brakes shall be so arranged that the brake is always applied unless the operator or a mechanism activated by the operator holds the brake control in the "off" position. PSCO Observed during lowering of the Portside lifeboat the failure of the brake to engage without the operator applying force to brake handle.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 13 February 2017
Resolved 13 February 2017
Resolution: Ships crew resolved the issue, and conducted operational test of lifeboat davit brake.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 1 February 2016
Resolved
Fire doors in galley boundaries shall be self-closing. Galley doors failed to self close when released.
Action required: 705 - Other - as specified
Due 1 February 2016
Resolved 1 February 2016
Resolution: Deficiency rectified on the spot to the satisfaction of the CG Inspector.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 1 February 2016
Resolved
Doors fitted machinery spaces of category A shall be self-closing. Fire door to steering gear room and fire door to engine control room failed to be self-closing.
Action required: 705 - Other - as specified
Due 1 February 2016
Resolved 1 February 2016
Resolution: deficiency was rectified on the spot by the CG Inspector.