Records from 2002 to 2025. Most recent: inspection, 19 September 2025.
Inspection history · 34
19 September 2025
Administrative Inspection · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8237649
12 September 2025
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8234449
2 August 2025
Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8214717
28 April 2025
In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8127693
16 April 2025
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8113425
14 November 2024
Hull Examination · Deficiency Check · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8034988
26 September 2024
Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8009914
21 September 2023
Annual Inspection · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7796215
22 May 2023
In-Service Inspection · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7693695
16 December 2022
Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7608224
13 December 2022
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7616053
16 September 2022
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7560500
9 September 2022
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7555438
31 May 2022
Type not recorded
No type recorded · Station Ketchikan · USCG Arctic District (CGD-A) · Activity 7464981
25 February 2022
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7402190
9 September 2021
COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7307869
25 July 2021
Type not recorded
No type recorded · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7277216
6 April 2021
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7170115
12 January 2021
Administrative Inspection · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7123397
3 December 2020
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7105753
16 November 2020
Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7096203
14 April 2020
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6939198
10 October 2019
Annual Inspection · Internal Structural Exam · DAPI Audit
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6832532
19 September 2019
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6819865
11 September 2019
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6809775
6 May 2019
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6684895
9 November 2018
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6581057
16 October 2018
Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6562732
1 June 2018
Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6435119
7 May 2018
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6408694
26 September 2017
Annual Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6277238
10 May 2017
Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6143293
9 November 2016
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6037907
7 September 2016
COI Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 5987672
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 September 2024
Resolved
Shutoff valves, installed so as to close against the feul flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the feul line to stop the flow when servicing accesories. Port fuel tank shutoff valve would not full close when actuated.
46 CFR 182.20-40(3) Old T
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 September 2024
Resolution: Valve was replaced in kind and operated as designed when tested.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 21 September 2023
Resolved
Except as otherwise noted, medical certificates will be issued for the following periods of time: (2) Medical certificates issued to all other mariners will be issued for a maximum period of 5 years. Master could not produce a valid medical certificate. Last valid medical certificate in MISLE expired on 25FEB21. Provide an updated medical certificate or another Master with valid medical certificate prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 September 2023
Resolution: O/O provided another Master with valid Medical Certificate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 September 2023
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Port side wet exhaust discharge pipe has a small leak along the inner portion of the weld. Replace or make permanent repairs to the leak.
46 CFR 182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 October 2023
Resolved 2 October 2023
Resolution: Leak repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 September 2023
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. Audible alarm was not functioning properly at time of testing. Mechanic identified a loose wire and made repairs. Additional tests were satisfactory.
Action required: 10 - Deficiency Rectified
Resolved 21 September 2023
Resolution: Repair made before completion of inspection
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 21 September 2023
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. The starboard side bridge window (plexiglass) is starting to crack along the edge of the opening. Replace window at next drydock.
Action required: 705 - Other - as specified
Due 31 October 2024
Resolved 14 November 2024
Resolution: Closed worklist item and added to new ddx activity #8034988 for tracking purposes.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 16 December 2022
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Vessels EPIRB was not onboard.
46 CFR 180.64
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 April 2023
Resolution: New EPIRB was installed and verified registration.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 December 2022
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Dead end wires were located in the accommodation space overhead. Place wires into an enclosure or remove.
46 CFR 183.340(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 May 2023
Resolution: Dead end wire was removed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 December 2022
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (21/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. Fire bucketes were not present on the vessel.
46 CFR 181.610
Action required: 10 - Deficiency Rectified
Resolved 16 December 2022
Resolution: Missing fire buckets with lanyards were placed onto the vessel.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 9 September 2022
Resolved
Whenever damage or deterioration to full plating that may affect seaworthiness of a vessel is discovered, the OCMI may require the vessel to be drydocked to assess the extent of the damage, and to effect permanent repairs. The vessel reported a substantial leak from the STBD jet drive. Permanent repairs shall be made to the satisfaction of the attending MI.
46 CFR 176.600
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 December 2022
Resolution: Repairs completed SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 9 September 2021
Resolved
AT EACH INSPECTION FOR CERTIFICATION AND AT EVERY OTHER VESSEL INSPECTION THE BILGES AND OTHER SPACES MAY BE EXAMINED TO SEE THAT THERE IS NO EXCESSIVE ACCUMULATION OF OIL, TRASH, DEBRIS, OR OTHER MATTER THAT MIGHT CREATE A FIRE HAZARD, CLOG BILGE PUMPING SYSTEMS, OR BLOCK EMERGENCY ESCAPES. ENGINE SPACE HAD EXCESSIVE OIL, WATER AND MARINE DEBRIS THROUGHOUT THE SPACE. CLEAN FOR RESINSPECTION.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2021
Resolution: Bilges were cleaned and re-inspection completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 September 2021
Resolved
AT EACH INSPECTION FOR CERTIFICATION AND AT EVERY OTHER VESSEL INSPECTION ALL OBSERVED UNSAFE PRACTICES, FIRE HAZARDS, AND OTHER HAZARDOUS SITUATIONS MUST BE CORRECTED. MUST BE IN SATISFACTORY CONDITION. IDENTIFY AND MAKE REPAIRS TO FUEL LEAK ON THE FUEL RETURN VAVLE LOCATED NEAR FORWARD BULKHEAD OF ENGINE ROOM. REMOVE AND REPLACE ALL OIL SOAKED LAGGING THROUGHOUT ENGINE SPACE.
46 CFR 176.830(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2021
Resolution: Oil soaked lagging has been removed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 September 2021
Resolved
MACHINERY, EQUIPMENT, MATERIALS, AND ARRANGEMENTS NOT COVERED BY STANDARDS IN THIS SUBCHAPTER MAY BE INSPECTED IN ACCORDANCE WITH STANDARDS ACCEPTABLE TO THE COGNIZANT OCMI AS GOOD MARINE PRACTICE. EMERGENCY FUEL SHUT OFF CABLES ARE RAN THROUGH A HOLE IN THE DECK WHICH IS CAUSING CORROSION FROM DISSIMILAR METALS AND CHAFFING THE CABLE. - PROVIDE ADEQUATE DECK PENETRATION FOR BOTH FUEL SHUT OFF VALVE PULL CABLES.
46 CFR 176.800
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 February 2022
Resolution: Verified installation of adequate deck penetration insulation
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 9 September 2021
Resolved
AT EACH INSPECTION FOR CERTIFICATION AND AT EVERY OTHER VESSEL INSPECTION ALL OBSERVED UNSAFE PRACTICES, FIRE HAZARDS, AND OTHER HAZARDOUS SITUATIONS MUST BE CORRECTED AND ALL REQUIRED GUARDS AND PROTECTIVE DEVICES MUST BE IN SATISFACTORY CONDITION. LOCATE AND REPAIR MINOR FUEL LEAK/DRIP ON OUTBOARD SIDE OF PORT ENGINE BETWEEN THE TWO FILTERS AND THE HEATER COOLANT LEAK ON PORT SIDE OUTBOARD BULKHEAD BENEATH THE LADDER.
46 CFR 182.100
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 February 2022
Resolution: Verified repair to leak
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 September 2021
Resolved
ALL MACHINERY AND EQUIPMENT MUST BE INSTALLED AND MAINTAINED IN SUCH A MANNER AS TO AFFORD ADEQUATE PROTECTION FROM CAUSING FIRE, EXPLOSION, MACHINERY FAILURE, AND PERSONNEL INJURY. MAKE REPAIRS TO COOLING WATER OVERBOARD DISCHARGE ON PORT SIDE MDE WHERE A MINOR LEAK/DRIP WAS OBSERVED.
46 CFR 182.100
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 February 2022
Resolution: Verified leak repaired, no drip observed while engines were operational.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 9 September 2021
Resolved
GAGES TO INDICATE COOLING WATER DISCHARGE TEMPERATURE AND LUBRICATING OIL PRESSURE SHALL BE PROVIDED FOR ALL PROPULSION ENGINES. REPAIR INOPERABLE COOLING WATER DISCHARGE TEMPERATURE AND OIL PRESSURE GAUGES FOR PORT ENGINE.
46 CFR 182.15-5 (OLD T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 February 2022
Resolution: Witnessed operational test of cooling and oil pressure gauges
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 September 2021
Resolved
THE LIGHTS PRESCRIBED BY THESE RULES SHALL, IF CARRIED, ALSO BE EXHIBITED FROM SUNRISE TO SUNSET IN RESTRICTED VISIBILITY AND MAY BE EXHIBITED IN ALL OTHER CIRCUMSTANCES WHEN IT IS DEEMED NECESSARY. REPAIR INOPERABLE STERN LIGHT. VESSEL IS RESTRICTED TO OPERATING IN PERIODS OF UNRESTRICTED VISIBILITY AND DAYLIGHT HOURS ONLY.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 February 2022
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 9 September 2021
Resolved
PROGRAM MISSING MMSI NUMBER INTO DSC ENABLED VHF RADIO ON BRIDGE.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 February 2022
Resolution: Verified MMSI programing
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 November 2020
Resolved
Switch board missing drip shield and has water dripping from overhead on switch panel. Provide drip shield form switch board on fwd center engine room bulkhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2020
Resolved 6 April 2021
Resolution: Verified newly installed drip shield over switch panel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 November 2020
Resolved
Port side turbo leaking jacket water. Remove lagging and make permanent repairs to leak. Leave lagging off until deficiency is cleared.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2020
Resolved 6 April 2021
Resolution: Vessel installed new exhaust on Port Side engine. Tested Port side turbo. No leaks identified. All found satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 November 2020
Resolved
Starboard side turbo missing lagging in elbow just after turbo. Replace lagging.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2020
Resolved 6 April 2021
Resolution: New lagging installed on starboard side turbo. Found satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 November 2020
Resolved
Water hose unsupported resting on hot side of port side turbo. Provide proper support for water hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2020
Resolved 6 April 2021
Resolution: New hose supports were installed on Port side turbo. Found satisfactory.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 10 October 2019
Resolved
Complete underway drills with CG inspectors.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 April 2020
Resolution: Got vessel underway and witnessed satisfactory MOB and fire drill.
Engineering › Bilge Water Management System › Valve
Issued 9 November 2016
Resolved
Properly install the bilge foot valve locaed in the #2 void.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 10 May 2017