Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)193.5 ft × 44.0 ft × 17.0 ft
Registered tonnagegross 488 / net 354
ITC dimensions (L × B × D)193.5 ft × 44.0 ft × 17.0 ft
ITC tonnagegross 1,335 / net 400
BuilderHALTER MARINE INC · ESCATAWPA, MS, UNITED STATES · built 1993
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHONOLULU, HI
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 12 December 2025 · expires 31 December 2026
Service, as the file records itOil Recovery
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it400 - Convention (Subpart B), Net Ton 354 - Regulatory (Subpart C or D), Net Ton 1335 - Convention (Subpart B), Gross Ton 488 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 28 inspections, each with its date, unit and type; 14 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Any vessel of at least five net tons which engages in the fisheries on the navigable waters of the United States or in the Exclusive Economic Zone, or coastwise trade, unless exempt under § 67.9(c), must have a Certificate of Documentation bearing a valid endorsement appropriate for the activity in which engaged. COD on board vessel was expired. Provide valid COD to the satisfaction of attending Marine Inspector.
46 CFR 67.7
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 January 2024
Resolution: Cleared, COD applied for, receipt attached.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 January 2024Resolved
Fire pumps must be fitted with a pressure gage on the discharge side of the pumps. Vessel fire pump pressure gage inoperative. Replace fire pump pressure gage with operational gage.
46 CFR 95.10-5 (e)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 January 2024
Resolution: Vessel replaced fire pump gage.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 January 2022Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel of the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and the vessel complies in all respects with the regulations. Number three generator shutdown and tripped the circuit breakers for all three generators causing a loss of electrical power to the vessel. 46 CFR 91.30-1(a).
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 21 January 2023
Resolved 22 January 2022
Resolution: Attended vessel and verified proper function of the vessel's three on board generators.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 13 January 2022Resolved
At each inspection for certification the inspector will determine that all fire-extinguishing equipment is in suitable condition and may require any tests necessary to determine the condition of the equipment. One pressure switch serving the thermal fluid heater space is missing the cap on top of the plunger, replace.
46 CFR 91.25-20
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 February 2022
Resolution: Vessel replaces pressure switch. All sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 16 January 2020Resolved
Efficient guard rails or bulwarks must be fitted on all exposed parts of the freeboard and superstructure decks. Stern portible railings were found to be made of non-metallic materials. Install metallic railings in accordance with load line assignmnet form.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 February 2020
Resolved 12 February 2020
Resolution: Verified metal portable rails were installed.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 16 January 2020Resolved
Simple, complete operating instructions must be conspicuously located at or near any release station and in the extinguishing agent cylinder storage room. Change all fixed CO2 extinguishing system instructions to say "CLOSE ALL DOORS, HATCHES, AND VENTILATION CLOSURES TO THE PROTECTED SAPCE."
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 February 2020
Resolved 12 February 2020
Resolution: Verified updated instructions had been installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 January 2020Resolved
All pressure vessels other than unfired steam boilers shall be protected by pressure-relieving devices that will prevent the pressure from rising more than 10 percent above the maximum allowable working pressure. Pressure relieving device found to be isolated by shut-off valve.
Action required: 10 - Deficiency Rectified
Resolved 16 January 2020
Resolution: Deficiency rectified prior to completeing exam.
Motor shaft for aft port side cargo crane winch motor found damaged and the crane is inoperable. Cargo gear survey must be conducted by an approved surveyor. Replace crane winch motor shaft and provide OCMI with valid cargo gear survey report. The Coast Guard considers cargo gear to include gear forming part of a vessel’s equipment which is used for the handling of cargo other than bulk liquids, but does not include gear which is used only for handling or holding hoses, handling ships’ stores, or handling the gangway or boom conveyor belt (see 29 CFR 1919.2(b)). While not specifically subject to inspection at a regular interval, other gear or lifting appliances that are not considered cargo gear by the above definition should be maintained in good working order. 46 CFR 91.25-25 (b)
Action required: 705 - Other - as specified
Due 15 April 2019
Resolved 11 March 2019
Resolution: The aft port crane hydraulic hoisting winch was overhauled, re-installed, and operationally tested to the satisfaction of the attending ABS surveyor. Further, the port boom luffing cylinder was replaced with new unit. ABS issued Cargo Gear Certificate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 January 2019Resolved
Primary bilge pump in the engine room found inoperable due to a faulty gasket. Replace gasket and prove proper operation of the pump. 46 CFR 96.03-1 and 46 CFR 56.50-50
Action required: 10 - Deficiency Rectified
Due 24 January 2019
Resolved 24 January 2019
Resolution: Gasket replaced and pump operationally tested.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 24 January 2019Resolved
Load Line deck mark on port and starboard side is not painted in a contrasting color to the hull. Paint deck mark in a contrasting color and contact USCG or ABS surveyor for re-inspection. 46 CFR 42.13-40
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2019
Resolved 11 March 2019
Resolution: Load line deck mark painted in a contrasting color and verified by Certificate issuing authority.
Stability › Freeing Ports › General
Issued 18 January 2018Resolved
Stability book states all freeing ports shall remain unobstructed. Multiple freeing ports on the port and starboard side main deck found with rubber covers over entire freeing port. Remove or resubmit stability information .
Action required: 705 - Other - as specified
Due 18 February 2018
Resolved 21 March 2018
Resolution: ABS amended existing Loadline survey and acknowledged existing freeing port covers installed with hinges on the top.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 18 January 2018Resolved
Structural fire protection must comply with 46 CFR Subchapter I. Multiple electrical penetrations in steel bulkheads on the bridge, galley pantry, corridor bulkheads, and stairtowers found unsealed and do not meet structural fire protection. Provide proof of structural fire protection IAW subchapter I.
Action required: 705 - Other - as specified
Due 18 February 2018
Resolved 13 March 2018
Resolution: Electrical penetrations in "A" class structural bulkheads found sealed with 3M sealant lasting 3 hours in smoke and flame.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 18 January 2018Resolved
Provide satisfactory fire damper test for fire dampers that may damage fusible links when tested. Remove heavy lifting wire strap attached to port aft engine room damper in dry dock. Damper is unable to fully close.
Action required: 705 - Other - as specified
Due 18 February 2018
Resolved 13 March 2018
Resolution: 04 ventilation fire dampers satisfactorily tested using the pull handles.
Lifesaving › Rescue Boat › Markings
Issued 20 January 2016Resolved
Each cargo vessel must carry at least one rescue boat approved under the Coast Guard approval series 160.156. The installation of a workboat in place of an approved rescue boat was noted. Provide an approved rescue boat or prove an equivalent effectiveness of the installed work boat by requesting a determination of an equivalent level of safety IAW 46 CFR 199.09.
Condition: Improper Installation
Due 21 January 2016
Resolved 16 August 2016
Resolution: Fourteenth Coast Guard District granted an exemption from 46 CFR 199.262 as per 46 CFR 199.20(d). The vessel is authorized to operate on an oceans route within the geographic boundaries of the Fourteenth Coast Guard District.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.