Records from 2010 to 2026. Most recent: inspection, 8 May 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 23
8 May 2026
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8372771
3 April 2026
Administrative Inspection · In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8341655
30 September 2025
COI Inspection · Administrative Inspection · MARPOL Annex I Examination · Deficiency Check · MARPOL Annex V Examination · MARPOL Annex VI Survey · MARPOL Annex II Examination · MARPOL Annex IV Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8270721
16 July 2025
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8170024
2 December 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8041807
20 March 2024
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7882670
25 January 2024
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7843018
1 December 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7832056
26 January 2023
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7611775
29 September 2022
Administrative Inspection · Drydock Exam · Deficiency Check · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7568884
6 July 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7498310
30 November 2021
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7359578
23 November 2020
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7100496
16 October 2020
Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7078593
16 September 2020
Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7059138
30 January 2020
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6876144
31 January 2019
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6605107
16 January 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6611720
3 January 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6331882
18 August 2017
Examination of Repairs · Hull Examination · Administrative Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6244705
26 January 2017
Examination of Repairs · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6075289
13 July 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5939503
28 January 2016
Cargo Tank Internal · Drydock Exam · Internal Structural Exam · COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5802836
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 26 February 2026
Resolved
On vessels subject to STCW the licensed engineer must
hold an endorsement as officer in charge of an
engineering watch. Individual serving as licensed
engineer did not have required endorsement on MMC.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: Reviewed crew MMCs, corrected
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 26 February 2026
Resolved
Each vessel must carry on each side of the vessel,
life rafts with an aggregate capacity sufficient to
accommodate 150 percent of the total number of persons on
board. Life rafts were not installed on the vessel.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 March 2026
Resolution: After the vessel departed. Received photos of the rafts with current service stations stickers and arrangements.
10 - Safety of Navigation › N/A - No Subsystem › Electronic charts (ECDIS)
Issued 26 February 2026
Resolved
All vessels must carry adequate and up-to-date charts.
Vessels ECDIS system was not fully installed at the time
of inspection.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: Verified Function of the charts
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 26 February 2026
Resolved
Each vessel must carry an auxiliary line that is at
least 450 meters (1,500 feet) long for the line-throwing
appliance.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2026
Resolution: Verified presense of auxilliary line
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 26 February 2026
Resolved
Each fireman's outfit must consist of one flame safety
lamp. In lieu of the flame safety lamp, vessels may
carry an oxygen depletion meter. Fireman outfits did not
have flame safety lamps.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2026
Resolution: Vessel obtained oxygen depletion meters.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 February 2026
Resolved
A lockout valve must be provided on any carbon dioxide
extinguishing system protecting a space over 6,000 cubic
feet in volume and installed or altered after July 9,
2013. Altered means modified or refurbished beyond the
maintenance required by the manufacturer's design,
installation, operation and maintenance manual. The CO2
system on board had been altered when the helideck was
removed and no lockout valve was installed. 46 CFR 95.15-50
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: Verified lockout installed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 February 2026
Resolved
Each carbon dioxide extinguishing system installed or
altered after July 9, 2013, must have an approved
odorizing unit to produce the scent of wintergreen. The
CO2 system on board had been altered when the helideck
was removed and no odorizer was installed. 46 CFR 95.15-60
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: Oderizor installed
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 26 February 2026
Resolved
Each daylight signaling lamp should be provided
with at least three spare illuminants complying with the
type-tested illuminant. Daylight Signal lamp did not
have spare bulbs. SOLAS (20) CH.V 19.2.2.2 MSC (95).72
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2026
Resolution: Verified new bulbs
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 February 2026
Resolved
Spaces protected by carbon dioxide must be conspicuously
marked as follows CARBON DIOXIDE GAS CAN CAUSE INJURY
OR DEATH. WHEN ALARM OPERATES OR WINTERGREEN SCENT IS
DETECTED, DO NOT ENTER UNTIL VENTILATED. LOCK OUT SYSTEM
WHEN SERVICING. Signage does not include mention of
wintergreen. 46 CFR 97.37-11(b)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: Verified Signage in place
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 February 2026
Resolved
An emergency bilge suction must be provided in the
machinery space for all self-propelled vessels. Vessel’s
emergency bilge suction was inoperable at the time of
inspection.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: verified bilge suction function
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 February 2026
Resolved
Oil strainers and other equipment subject to normal
leakage must be fitted with drip pans. Fuel oil
strainers in the engine room did have drip pans.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2026
Resolution: Drip pans installed
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 26 February 2026
Resolved
Plans are required to show the location of fire-fighting
equipment and general arrangement of the vessel. Fire
control plan unapproved, walk fire control plan with
marine inspector and stamp for approval.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2026
Resolution: Fire control plan verified and stamped
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 February 2026
Resolved
At least two lifebuoys, each with attached selfactivating
smoke signals, must be stowed where they can
be quickly released from the navigating bridge and
should, when released, fall directly into the water
without striking any part of the vessel. Vessel did not
have bridge buoys installed.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: Bridge bouys installed and function tested.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 26 February 2026
Resolved
A stability booklet must be prepared for each vessel
which information needed for safe operation is not
available on the COI or stability letter. Stability book
and calculations need to be completed and issued to the
vessel following helo deck removal.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: Stability book updated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 February 2026
Resolved
It is the duty of the Chief Engineer when assuming
charge of machinery of a vessel to examine thoroughly if
any items are bad they shall be reported to the Master.
The fuel line on the #3 generator leaking oil.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 March 2026
Resolution: Fuel leak repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 26 February 2026
Resolved
Each immersion suit must be designed so that a light
meeting the requirements of subpart 161.012 of this
chapter can be attached to its front shoulder area.
Vessel’s immersion suits did not have attached lights.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2026
Resolution: Immersion suits equiped with lights.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 February 2026
Resolved
The steering gear components must be of sound and
reliable construction. The Port rudder post packing did
not have double nut to prevent loosening of seal
packing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2026
Resolution: Double nut installed on rudder post.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 25 January 2024
Resolved
Appliances to ensure watertight integrity including watertight doors must meet the structural standards of the American Bureau of Shipping's Rules for Building and Classing Offshore Mobile Drilling Units, 1978. Grease fittings on several watertight door appliances were found to be painted over. Properly service grease fittings on watertight doors.
46 CFR 108.113
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 19 February 2024
Resolution: Received ABS report attesting to correction.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 January 2024
Resolved
All marine engineering details, such as boilers, pressure-vessels, main and auxiliary machinery, piping, valves, and fittings, shall be designed, constructed, and installed in accordance with the provisions of this sub-chapter. Multiple butterfly valves in engineering spaces were found with broken valve handles. Replace broken valve handles.
46 CFR 50.01-10(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 19 February 2024
Resolution: Received ABS report attesting to correction.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 25 January 2024
Resolved
On vessels required by § 112.05–5(a) to have a temporary emergency power source, emergency lighting of at least one light is required in each space where a person may be maintaining, repairing, or operating equipment. Two emergency lights were found inoperable in engineering spaces. Repair to provide proper operation.
46 CFR 112.15-1(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 19 February 2024
Resolution: Received ABS report attesting to correction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 December 2023
Resolved
Vessel is leaking hydraulic fluid through bow thruster seal.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2023
Resolved 19 December 2023
Resolution: Observed previously "cleared" 835 from another USCG unit.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 8 February 2018
Resolved
Port & starboard emergency escape routes from the engine room lacked lighting atop the ladder/stairs for proper egress.
Action required: 705 - Other - as specified
Due 8 March 2018
Resolved 27 February 2018
Resolution: Battle lanterns installed at the top of the escape routes.
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 February 2018
Resolved
ECDIS found to be powered via a portable extension cord rather than by a permanent wiring installation.
Action required: 705 - Other - as specified
Due 8 March 2018
Resolved 27 February 2018
Resolution: Power outlet permanently installed near ECDIS so manufacturer's electric cord length would suffice.
Stability › Watertight Integrity › General
Issued 26 January 2017
Resolved
MI's noted that the WTD self closing device on the Engineroom and B/T compartment were not shutting automatically as designed. Crew Adjused and corrected while MI's were on board.
Action required: 705 - Other - as specified
Due 30 January 2017
Resolved 26 January 2017
Resolution: Crew Adjused and corrected while MI's were on board.
Engineering › Steering Gear System › Motor
Issued 26 January 2017
Resolved
Attending MI's noted that the hydraulic oil fill cap on the Steering gear hydraulic motor resivours were missing the hardware allowing for debris to enter the resivour.
Action required: 705 - Other - as specified
Due 30 January 2017
Resolved 26 January 2017
Resolution: Crew replaced missing hardware while MI's were on board the vessel.
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 26 January 2017
Resolved
MI's noted that the heat detector located on the STBD side steering compartment was painted over.
Action required: 705 - Other - as specified
Due 30 January 2017
Resolved 26 January 2017
Resolution: Crew replaced the detector with a new onboard spare and demonstrated a satisfactroy test of syetem.
Communications › Alarms/Indicators › General Alarm
Issued 26 January 2017
Resolved
During the test of fire and general alarms it was noted that the main call bell located in the engineroom was inoperable.
Due 30 January 2017
Resolved 26 January 2017
Resolution: Crew disassembled the bell and effected repairs and demonstrated proper operation of the bell prior to the departure of the attending MI's.
Engineering › Compressed Air System (control) › Fitting
Issued 28 January 2016
Resolved
All 3 air receivers have a MAWP of 300psi, gauges only go up to 300 psi. Replace gauges witin range of 1.2-2 times the setting of the relief valve.
Action required: 705 - Other - as specified
Due 25 February 2016
Resolved 3 February 2016
Resolution: Deficiency was corrected to the staisfaction of the marine inspector.
Lifesaving › Rescue Boat Equipment › Thermal Protective Aid
Issued 28 January 2016
Resolved
Rescue boat is missing 02 thermal protective aids. ensure required equipment is onboard vessel.
Action required: 705 - Other - as specified
Due 25 February 2016
Resolved 3 February 2016
Resolution: Deficiency was corrected to the staisfaction of the marine inspector.