Records from 2016 to 2024. Most recent: inspection, 8 February 2024.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 17
8 February 2024
Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7853579
25 April 2023
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7646282
22 March 2022
Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7408737
3 March 2022
Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7394367
30 March 2021
Annual Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7152135
8 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7108433
16 January 2020
COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6875377
22 February 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6631886
22 February 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6632868
12 January 2018
Drydock Exam · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6337103
1 December 2017
Type not recorded
No type recorded · Station Venice · USCG Heartland District (CGD-H) · Activity 6316575
30 October 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6297870
28 July 2017
Type not recorded
No type recorded · Station Venice · USCG Heartland District (CGD-H) · Activity 6225601
2 March 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6093967
26 February 2016
Type not recorded
No type recorded · Station Venice · USCG Heartland District (CGD-H) · Activity 5823089
3 February 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5809295
22 January 2016
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5801821
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 8 February 2024
Resolved
Leak under exhaust penetration through hull in transom.
Action required: 705 - Other - as specified
Due 8 February 2024
Resolved 21 May 2024
Resolution: Weld ground down and verified integrity by inspector. Weld re capped. All sat.
05 - Radio Communications › N/A - No Subsystem › Distress messages: obligations and procedures
Issued 25 April 2023
Resolved
Vessels operated solely within 20 nautical miles of land must be equipped with a VHF–DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2). VHF-DSC did not have GPS position input into radio. Repair to satisfaction of attending MI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2023
Resolved 15 May 2023
Resolution: GPS coordinates are displaying on radio.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 25 April 2023
Resolved
Marine inspector shall examine all accessible parts of the exterior and interior of the hull, watertight bulkheads, and weather deck. ID'd crack in bulkhead between engine room and lazerette & where exhaust pipe meets shell plating.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2023
Resolved 15 May 2023
Resolution: Witnessed photos of weld.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 April 2023
Resolved
Lighting fixtures shall be constructed in accordance with the Underwriters' Laboratories In. Standard for Marine Type Electric Lighting Fixtures. Light fixture in engine room globe was found to be cracked, replace globe.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2023
Resolved 15 May 2023
Resolution: Globe replaced
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 April 2023
Resolved
Batteries where location elsewhere is impracticable shall be effectively screened by a cage or similar structure to minimize the danger of accidental spark. Battery box cover was found to be missing, replace.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2023
Resolved 15 May 2023
Resolution: Battery box cover installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 April 2023
Resolved
That part of the exhaust system between the point of the cooling water injection and the engine manifold shall be water-jacketed or effectively insulated. Repair worn lagging on stbd engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2023
Resolved 15 May 2023
Resolution: Lagging replaced.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 25 April 2023
Resolved
Examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads and weather deck. Penetrations on fwd bulkhead in engine room need to be sealed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2023
Resolved 15 May 2023
Resolution: Penetrations sealed on fwd bulkhead.
02 - Structural Conditions › N/A - No Subsystem › Wheelhouse -door -window
Issued 25 April 2023
Resolved
Examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. Replace broken window in aft stbd side pilothouse.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2023
Resolved 15 May 2023
Resolution: Window replaced.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 22 March 2022
Resolved
46 CFR 176.810(b)(1)(i): The owner, managing operator, or a qualified servicing facility as applicable must conduct the following inspections and tests. Certification or licensing by a state or local jurisdiction as a fire extinguisher servicing agency will be accepted by the Coast Guard as meeting the personnel certification requirements for NFPA 10 for annual maintenance and recharging of extinguishers. MI found the annual maintenance overdue. New extinguishers replaced prior to MI departure.
Action required: 10 - Deficiency Rectified
Resolved 23 March 2022
Resolution: New extinguishers replaced prior to MI departure.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 22 March 2022
Resolved
33 CFR 83.20(d): The rules concerning shapes shall be complied with by day. MI found the vessel missing all day shapes.
Action required: 10 - Deficiency Rectified
Resolved 23 March 2022
Resolution: Vessel rep provided pictures to satisfy the vessel is carrying required day shapes.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 March 2022
Resolved
46 CFR 183.10-5(f)(2): Generators and motors designed for 40 degrees Celsius may be used in 50 degrees Celsius ambient locations provided the machines are derated to 80 percent of full load rating, and the rating or setting of the overcurrent devices is reduced accordingly. MI found the generator installed onboard to have a 40 degree Celsius data plate. Rep shall provide satisfactory evidence that generator has been derated to 80 percent, or manufacturers data plate stating the generator is rated for 50 degree operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 April 2022
Resolved 7 April 2022
Resolution: New tag with 50C rating and tech report provided by third party.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2021
Resolved
Acid batteries shall be located in a tray of lead or other suitable material resistant to deteriorating action by the electrolyte.
Observed several holes in both battery boxes allowing for the electrolyte to spill directly to the bilge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2021
Resolved 14 April 2021
Resolution: replaced battery boxes
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 March 2021
Resolved
each major generator motor shall be fitted with a nameplate of corrosion-resistant material.
Nameplate is faded and illegible. Install new nameplate on generator and ensure ambient temperature is 50 degrees C.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2021
Resolved 14 April 2021
Resolution: provided new nameplate data
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2021
Resolved
Electrical equipment shall be drip proof protected.
Engine room light fixture was broken and hanging from wiring.
Replace damaged lighting fixture
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2021
Resolved 14 April 2021
Resolution: installed new lighting fixture
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2021
Resolved
A battery charger shall have an ammeter that is readily visible.
Ammeter on battery charger was inoperable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2021
Resolved 14 April 2021
Resolution: removed inoperable battery charger
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 30 March 2021
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc.
Bilge pump belts from main engine were exposed and need a guard installed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2021
Resolved 14 April 2021
Resolution: Installed new guard to cover alernator and bilge pump belts
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 March 2021
Resolved
all tanks not vented to the atmosphere shall be constructed and tested in accordance with 46 CFR 182.10-5(d)
Observed that the primary fuel tank vent was removed and capped off. Fuel tank vent needs to be installed back to original Coast Guard approved configuration to be considered a vented fuel tank and satisfactory.
Action required: 10 - Deficiency Rectified
Due 30 March 2021
Resolved 30 March 2021
Resolution: Owner rep installed new vent hose.
02 - Structural Conditions › N/A - No Subsystem › Wheelhouse -door -window
Issued 22 February 2019
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew.
Vessel experienced a collision with another vessel, incurring extensive damage to the wheelhouse structure and navigation equipment. Prior to movement, conduct thorough inspection of all damaged hull material and wheelhouse equipment, and provide repair plan to the USCG for review and approval.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 January 2020
Resolution: Verified repairs completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 August 2018
Resolved
Engine Start/Stop does not function on the Port MDE from either operating station. 46 CFR 184.620(b)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 August 2018
Resolved 15 August 2018
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 August 2018
Resolved
Improperly spliced electrical wires in E/R and behind operating station. 46 CFR 183.05-50(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 August 2018
Resolved 15 August 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 2 August 2018
Resolved
Hydraulic Steering Line is leaking behind operating station. 46 CFR 182.30
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 August 2018
Resolved 15 August 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 August 2018
Resolved
All generator fuel hose connections need two hose clamps with flexible hose lines. 46 CFR 182.20-40(a)(2)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 August 2018
Resolved 15 August 2018
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 2 August 2018
Resolved
Vessel needs passenger safety orientation. 46 CFR 185.406
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 August 2018