MAURY USCG vessel records
← All vessels

GADAO

Built
1943
Last inspected
30 June 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 30 June 2026
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 13 calendar years (2014–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

375346
Flag
UNITED STATES
Tonnage
515 - Convention (Subpart B), Gross Ton 262 - Convention (Subpart B), Net Ton
Maury page id
psix-375346
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 28

30 June 2026 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 8419073
1 April 2026 Deficiency Check · Vessel Attendance · Administrative Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 8340646
27 April 2025 COI Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8118192
20 January 2025 Drydock Exam · Internal Structural Exam · Cargo Tank Internal · Examination of Repairs
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8059827
2 August 2024 MARPOL Annex IV Survey · Administrative Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7972742
17 June 2024 Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7936398
14 December 2023 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7838855
25 January 2023 Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7630058
27 December 2022 Internal Structural Exam
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7615495
9 February 2022 Periodic Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7393787
4 March 2021 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7150249
15 February 2021 Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7141007
28 February 2020 DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6917956
2 February 2020 Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6901049
11 December 2019 Examination of Repairs · Drydock Exam · Internal Structural Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6871660
4 February 2019 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6619906
12 February 2018 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6353503
9 December 2017 Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6321365
6 July 2017 Type not recorded
No type recorded · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6200475
27 January 2017 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6079949
19 April 2016 Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 5858865
17 March 2016 Periodic Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 5835614
2 August 2015 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5238014
6 March 2015 COI Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5079119
23 February 2015 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5072993
26 January 2015 Initial Certification · DAPI Audit · Construction Oversight
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 5058793
12 December 2014 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5062376
8 October 2014 MARPOL Annex VI Survey · Administrative Inspection · Construction Oversight
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 5021845

Deficiency record · 59

03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 30 June 2026 Resolved
The construction and the means for securing the weathertightness of cargo and other hatchways in positions 1 and 2 shall be at least equivalent to the requirements of §§ 42.15–25 and 42.15–30. The cargo tank top sight hatch on CC #3 port side was found with a wasted gasket. 46 CFR 42.15-20(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026
Resolved 30 July 2026
Resolution: Observed by MI
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 30 June 2026 Resolved
At positions 1 and 2 the height above the deck of hatchway coamings fitted with weathertight hatch covers of steel or other equivalent material fitted with gaskets and clamping devices shall be as specified in § 42.15–25(a)(1). The aft rake hatch knife edge was found corroded and will not create a proper edge seal. 46 CFR 42.15-30
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026
Resolved 30 July 2026
Resolution: Observed by MI
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 30 June 2026 Resolved
The transfer procedures required by § 155.720 must contain, either in the order listed or by use of a cross-reference index page: A description of each transfer system on the vessel including a line diagram of the vessel's transfer piping, including the location of each valve, pump, control device, vent, and overflow;Procedures for operating the emergency shutdown and communications means required by §§ 155.780 and 155.785, respectively; and Procedures for topping off tanks. The emergency cargo pump shutdown procedure found in the transfer procedures is not labeled at the remote shutdown location. Crew members could not demonstrate the shutdown procedure at the remote location IAW the transfer procedures. Provide labeling at the remote shutdown location to assist crew with the procedure. 33 CFR 155.720
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026
Resolved 30 July 2026
Resolution: Observed by MI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 June 2026 Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering) of this chapter, except as otherwise provided for in this subchapter. 46 CFR § 32.35-1 Exhaust pipe installations must conform to the requirements of ABYC P-1 and Chapter 6 of NFPA 302 (both incorporated by reference; see § 58.03-1) and the following additional requirements. The flame arrestors on the dry exhaust for the port and stbd cargo pumps were found corroded or missing. 46 CFR 58.10-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026
Resolved 30 July 2026
Resolution: Observed by MI
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil fuel tank protection
Issued 30 June 2026 Resolved
A ship of 100 gross tons or more constructed before July 1, 1974, and a ship of 100 or more but less than 300 gross tons constructed after June 30, 1974 must: (1) Meet paragraph (a)(1) of this section. (a) A ship of 300 gross tons or more constructed after June 30, 1974 must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe, that: (1) For a ship of 300 or more but less than 1600 gross tons has a capacity of at least one-half barrel; The containment for the CC #3 tank vent cannot be drained and will not meet the capacity if it is full of rain water. 33 CFR § 155.320
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026
Resolved 30 July 2026
Resolution: Observed by MI
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 30 June 2026 Resolved
Unmanned barges must meet light and sound signal applicances in 33 CFR 82 and 33 CFR 83. Prove operation of the navigation lights. 33 CFR 83
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026
Resolved 30 July 2026
Resolution: Observed by MI
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 30 June 2026 Resolved
At positions 1 and 2 the height above the deck of hatchway coamings fitted with weathertight hatch covers of steel or other equivalent material fitted with gaskets and clamping devices shall be as specified in § 42.15–25(a)(1). The port side gooseneck for #3 void space was found with a corroded gasket. 46 CFR 42.15-30
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026
Resolved 30 July 2026
Resolution: Observed by MI
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 1 April 2026 Resolved
Each vessel subject to load line requirements shall carry on board a valid certificate attesting to the compliance with such requirements. USCG MSU Saipan received a notice of automatic suspension of Class from the load line certificate issuing authority, RINA. The notification states that statutory certificates issued by RINA automatically became invalid as from the date of suspension of Class as from March 20, 2026. The vessel's load line certificate is no longer valid. The vessel is restricted from movement and cargo operations until a valid load line certificate is on board. 46 CFR § 42.09-1(b)
Action required: 17 - Rectify deficiencies prior to departure
Due 2 April 2026
Resolved 7 April 2026
Resolution: A RINA Class rep completed the load line and IOPP annual surveys onboard the barge GADAO in Saipan. The RINA surveyor issued new short-term Load Line and IOPP e-certificates.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 27 April 2025 Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical. The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine (such as by cutting off the intake air). During the COI Inspection, a designated Person-In-Charge was not on board. Prior to cargo operations, prove proper operation of the internal combustion engine driven cargo pump, alarms, and shutdowns to the satisfaction of the attending Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2025
Resolved 7 April 2026
Resolution: The PIC is onboard. Cargo pumps, alarms and shut downs were verified.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 14 December 2023 Resolved
Cargo spaces used in determining volume (Vc) for calculating net tonnage must be permanently marked with the letters “CC” (cargo compartment) which are at least four inches in height and positioned so as to be visible at all times. "CC" was not found permanently marked on each cargo space hatch. 33 CFR 156.120(j) 46 CFR 69.67
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2024
Resolved 17 January 2024
Resolution: The cargo tanks are marked with "CC" and the load line issuing authority provided a due date for permanent markings at the next dry dock.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 14 December 2023 Resolved
No person shall conduct an oil or hazardous material transfer operation unless: Each hose or loading arm in use meets §§ 154.500 and 154.510 of this chapter, respectively. IAW 33 CFR 154.500(g), the hose burst pressure and the pressure used for the test required by 33 CFR 156.170 must not be marked on the hose and must be recorded elsewhere at the facility as described in paragraph (f) of this section. The test pressure was found stenciled on the vessel's oil transfer piping. Each hose must be marked with one of the following: (1)The name of each product for which the hose may be used; or (2) For oil products, the words “OIL SERVICE”; or (3) For hazardous materials, the words “HAZMAT SERVICE. The product name or "oil service" was not found marked on the transfer piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 December 2023
Resolved 28 December 2023
Resolution: Oil Service was found stenciled on the cargo piping. The test pressure was removed from the cargo piping.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 14 December 2023 Resolved
As per 33 CFR 155.715, the letter referenced in § 155.710(e)(1)(ii) must designate the holder as a person-in-charge of the transfer of fuel oil and state that the holder has received sufficient formal instruction from the operator or agent of the vessel to ensure his or her ability to safely and adequately carry out the duties and responsibilities of the PIC described in 33 CFR 156.120 and 156.150. The company did not provide a designation letter for the PIC currently serving onboard. 33 CFR 155.710(e)(1)(ii)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 December 2023
Resolved 28 December 2023
Resolution: The PIC is designated by the company in writing and the letter is stored in the transfer procedures.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 December 2023 Resolved
The transfer procedures required by § 155.720 must contain, either in the order listed or by use of a cross-reference index page: A description of each transfer system on the vessel including a line diagram of the vessel's transfer piping, including the location of each valve, pump, control device, vent, and overflow;Procedures for operating the emergency shutdown and communications means required by §§ 155.780 and 155.785, respectively; and Procedures for topping off tanks. A line diagram of the vessel's transfer piping was not in the transfer procedures. The emergency shutdown procedure found in the transfer procedures does not match the actual procedure to shut down the cargo pump. The topping off procedure does not match the PIC's description of the topping off procedure used. 33 CFR 155.720
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2024
Resolved 17 January 2024
Resolution: The company amended the transfer procedures to meet the regulations.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 14 December 2023 Resolved
The construction and the means for securing the weathertightness of cargo and other hatchways in positions 1 and 2 shall be at least equivalent to the requirements of §§ 42.15–25 and 42.15–30. The cargo tank top hatches and ullage openings were found with wasted gaskets on all cargo tanks. 46 CFR 42.15-20(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2024
Resolved 17 January 2024
Resolution: All cargo hatch gaskets were renewed like and in kind.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 14 December 2023 Resolved
At positions 1 and 2 the height above the deck of hatchway coamings fitted with weathertight hatch covers of steel or other equivalent material fitted with gaskets and clamping devices shall be as specified in § 42.15–25(a)(1). The aft rake hatch cover was found with a wasted gasket material. 46 CFR 42.15-30
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2024
Resolved 28 December 2023
Resolution: The gasket for the aft rake hatch was found renewed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 14 December 2023 Resolved
Side scuttles to spaces below the freeboard deck or to spaces within enclosed superstructures shall be fitted with efficient hinged inside deadlights arranged so that they can be effectively closed and secured watertight. The machinery space port hole located on the port side will not close due to a wasted gasket material and uneven closing devices. 46 CFR 42.15-65
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2024
Resolved 28 December 2023
Resolution: The gasket material was renewed and the port hole was verified to be closed and watertight by the attending MI.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 14 December 2023 Resolved
The installation of all electrical engineering; with the details of design, construction, and installation, must meet the requirements of sub J. Welding cable found on the starting conductors for the cargo pump. The batteries are not secured for movement in all directions. 46 CFR 32.45-1 46 CFR 111.15-5 46 CFR 111.60-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 December 2023
Resolved 28 December 2023
Resolution: The welding cable was replaced with 1 AWG marine grade conductors. The batteries are not braced for movement in all directions.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 February 2022 Resolved
Missing retro-reflector tape on ring buoy. Install retro-reflector tape.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 February 2022
Resolved 14 February 2022
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 9 February 2022 Resolved
Damaged drain valves on FWD most pipe connection containment. Replace drain valve.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 February 2022
Resolved 14 February 2022
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 February 2022 Resolved
Repair damaged FWD deck hand rails.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 February 2022
Resolved 14 February 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 9 February 2022 Resolved
Secure drain plugs for containment on cargo deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 February 2022
Resolved 14 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 February 2021 Resolved
Unable to conduct operational test of the cargo pump's prime movers due to low charge on batteries.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 February 2021
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 February 2021 Resolved
Found two extinguished NAV lights on mast.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 February 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 15 February 2021 Resolved
Found numerous severely wasted fasteners on manhole covers to voids (port and starboard voids).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2021
Resolved 23 February 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Construction (including exempt.)
Issued 28 February 2020 Resolved
VSL shall have a valid Cargo Ship Safety Construction Certificate on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 March 2020
Resolved 6 March 2020
Resolution: Waiting for full CSSCC to be issue by CS, RINA.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 28 February 2020 Resolved
All cargo tank hatches must be clearly marked in not less than three inch lettering " DANGER - KEEP OUT".
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 March 2020
Resolved 28 February 2020
01 - Certificates & Documentation › 011 - Ships Certificates › International Air Pollution Certificate (IAPP)
Issued 28 February 2020 Resolved
All ships of 400 gross tons and above shall be survey and issue a valid International Air Pollution Certificate.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 March 2020
Resolved 6 March 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 February 2020 Resolved
Holed bellow on starboard prime mover exhaust. Temporary repair completed by shorside support in Guam pending new bellow to replace as inkind.
Action required: 705 - Other - as specified
Due 30 March 2020
Resolved 15 February 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 February 2019 Resolved
Installed prime mover for cargo pump must be suitable for intended services. Controler for starboard pump is not oeprational. Repair engine controls and show proper control oeprations to attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 February 2019
Resolved 8 February 2019
Resolution: VSL replaced controler (Gorman-Ruip Pumps) with in-kind, test sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 4 February 2019 Resolved
Repair damaged deck rail aft of the corgo pump room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 February 2019
Resolved 8 February 2019
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 4 February 2019 Resolved
Existing pressure gauges have expired calibartion dates (01FEB2019). Provide up-to-date proof of complete calibration on all cargo pipe gauges.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 February 2019
Resolved 8 February 2019
Lifesaving › Lifebuoys › Serviceable
Issued 12 February 2018 Resolved
Grab line must be in serviceable condition as required by 46 CFR 160.050-4. Replaced deteriorated grab line on (03) ring life buoy IAW manufacture instructions.
Due 19 February 2018
Resolved 13 February 2018
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 27 January 2017 Resolved
Hose must be hydrostatic test annually as required by 33 CFR 155.310. Conduct hydrostatic test to be witnessed by CG Marine Inspector.
Due 3 February 2017
Resolved 30 January 2017
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 27 January 2017 Resolved
Cargo piping must be hydrostatic test as required by 33CFR155.310. Prepare cargo pipes for hydrostatic test.
Due 3 February 2017
Resolved 30 January 2017
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 27 January 2017 Resolved
Replace all expired items in first aid kit
Due 3 February 2017
Resolved 30 January 2017
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 19 April 2016 Resolved
Port running light is out of position due to collision with TUG Mangilao. Repair damage support structure for port running light IAW 72 COLREGS.
Due 21 April 2016
Resolved 20 April 2016
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 March 2016 Resolved
Missing forward deck railing. Replace as original.
Due 25 March 2016
Resolved 6 April 2016
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 17 March 2016 Resolved
Remove oil boom stored on top of the cargo tank.
Due 25 March 2016
Resolved 6 April 2016
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 17 March 2016 Resolved
Mechanical means of closing each drain and scupper in the enclosed deck area as required by 33 CFR 155.310. Install captive chain to the drain plug.
Due 1 April 2016
Resolved 6 April 2016
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 17 March 2016 Resolved
Fire control plan is not current with equipment location on board. Update FCP.
Due 1 April 2016
Resolved 6 April 2016
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 17 March 2016 Resolved
Replace deteriorated gasket on STBD #2 cargo tank hatch cover.
Due 1 April 2016
Resolved 6 April 2016
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 17 March 2016 Resolved
Install valve opening and closing indicator.
Due 25 March 2016
Resolved 6 April 2016
Documentation › Logs/Records › Logbook (official)
Issued 26 January 2015 Resolved
No official logbooks and records on board. Provide CG logbooks and records required by 46CFR35.07-5.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 January 2015
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 26 January 2015 Resolved
Found liquid flammable and combustible materials stored in cargo pump room; paints, oils, rags and cardboard boxes. Remove all liquid flammable and combustible material from cargo pump room.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 January 2015
Communications › Visual Communication › Red Warning Signal
Issued 26 January 2015 Resolved
Missing red warning signal (red flag by day). Provide red flag. 46CFR35.30-1
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 January 2015
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 26 January 2015 Resolved
Found forward lifebuoy with deferent vessel name. Mark lifebuoy with vessel name (GADAO). 46CFR199.70
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 January 2015
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 26 January 2015 Resolved
Stern railing post are not permanently attached to deck. Make permanent repairs for railing post.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 January 2015
Operations/Management › Navigation Safety › Towing Tests/Inspections
Issued 26 January 2015 Resolved
Conduct barge retrieval drills. 33CFR155.230(b)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2015
Resolution: Witnessed successful drill conducted with Tug Magsino.
Electrical › Electric Supply System (service) › Battery Installation
Issued 26 January 2015 Resolved
Provide battery box constructed in accordance with 46CFR111.15.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2015
Electrical › Electrical Distribution System (service) › Junction Box
Issued 26 January 2015 Resolved
Junction box for emergency stop is not gastight, watertight or explosion proof. Junction box must meet requirements in 46CFR111.81-1
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 January 2015
Stability › Incline Test › General
Issued 26 January 2015 Resolved
An additional permanent structure forward of cargo pump room was added after Class RINA and MSC approved plans and issued stability letter. Verify stability calculation and submit updated general arrangement drawings to MSC and Class for approval.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 February 2015
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 26 January 2015 Resolved
Discrepancy on actual cargo tanks capacity. Approved cargo tank plan has total cargo tank capacity of 6101 barrels and stability booklet with a total cargo tank capacity of 6377.87 barrels. Verify actual cargo tank capacity and submit updated tank capacity plan and stability calculations to Class RINA and CG MSC for approval.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2015
Resolution: Received revised intact stability booklet from RINA indication total cargo capacity at 6236 barrels.
Electrical › Electric Supply System (service) › Battery Installation
Issued 26 January 2015 Resolved
Batteries are stored in cargo handling room. Relocate batteries in accordance with 46CFR111.105-29.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 February 2015
Engineering › Diesel Engine (auxiliary) › Air Cleaner
Issued 26 January 2015 Resolved
Per 46 CFR 32.35 main and auxiliary machinery for Tank Barges shall meet requirements of 46 CFR 58.05-1 and 46 CFR 58.10-5 (a), (c) & (d). Provide documentation proving that auxiliary diesel engines meet requirements of marine type and are designed and constructed in conformance with this subchapter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2015
Resolution: Received letter from John Deere accepting prime movers engines a s marine type engines. Saved letter in documentation.
Engineering › Fuel Oil Service System › Valve
Issued 26 January 2015 Resolved
Diesel fuel tank for prime mover must have shutoff valve locate at the tank. 46CFR56.50-60.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2015
Resolution: Valves were installed IAW approved plan.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 26 January 2015 Resolved
Cargo pump has installed relief valve that discharges directly into cargo pump room. Install return line IAW approved piping arrangement plan ref RINA letter SHMC/2014/00379/LHG which states that delivery side of cargo pumps shall be fitted with relief valves leading back to their suction. 46CFR56.50-20
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2015
Engineering › Diesel Engine (auxiliary) › Air Cleaner
Issued 26 January 2015 Resolved
Per 46 CFR 58.05-1 Material, design and construction must be review by classification society (C/S) or OCMI. Provide quadruplicate copies of drawings and particulars for auxiliary machinery to C/S or OCMI for review.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2015
Electrical › Electrical Distribution System (service) › Wiring
Issued 26 January 2015 Resolved
Per 46 CFR 110.25 - Electrical plan must be submitted for Coast Guard review. Provide three copies of electrical schematic plans and particulars to OCMI for review.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2015
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 26 January 2015 Resolved
Per 46 CFR39.20-3: Show proper operation of the cargo tank high level indicating devices.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2015

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.

Maury does not score, rate, or grade vessels. What Maury does not do · Glossary · Correct a record.