MAURY USCG vessel records Sign in
← All vessels

SEA MAUI III

SEA MAUI III is a 1993 passenger vessel (inspected). The Coast Guard has recorded 72 inspections since 1993, most recently in July 2026, along with 110 deficiencies, 1 operational control and 3 casualty investigations between 2005 and 2022.

Records from 1993 to 2026. Most recent: inspection, 28 July 2026.

Built
1993
Last inspected
28 July 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDK8909
387915
Flag
UNITED STATES
368098630
Maury page id
psix-387915

Inspections, by type

…with no type recorded7
Years with a record 30 calendar years (1993–2026)
The 72 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)64.0 ft × 32.5 ft × 9.0 ft
Registered tonnagegross 47 / net 38
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRILOGY CORPORATION · ABERDEEN, WA, UNITED STATES · built 1993
Hull materialWood
PropulsionAuxiliary Sail
Hull shapeNot recorded
Hull configurationTwin Hull
Hailing portLAHAINA, HI
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 9 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it47 - Simplified, Gross Ton
38 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDK8909MMSI 368098630 · active · compulsorily equipped · granted 8 June 2019, expires 8 June 2029
WBY9534MMSI 367359830 · cancelled · compulsorily equipped · granted 29 June 2018, cancelled 4 August 2020
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

TRILOGY VII Passenger (Inspected) · MISLE 1723088 · 12 August 2025 · activity 8215341

Inspection history · 72

28 July 2026 Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8448429
12 August 2025 Type not recorded
No type recorded · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8215341
27 May 2025 Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8144412
10 April 2025 In-Service Inspection · Examination of Repairs · Drydock Exam
Physical examination · OP location-Sector Honolulu Prevention Department- Kailua Kona · USCG Oceania District (CGD-O) · Activity 8109831
2 May 2024 Deficiency Check · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 7905051
21 June 2023 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7719523
25 April 2023 Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7675012
3 May 2022 Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7440452
3 March 2022 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7411894
22 November 2021 Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7356123
13 July 2021 Deficiency Check · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7283241
5 May 2021 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7188658
23 June 2020 Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6985168
30 December 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6880826
29 October 2019 Drydock Exam · Deficiency Check · Administrative Inspection · Internal Structural Exam · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6844139
9 September 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6807891
18 July 2019 Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6754347
3 June 2019 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6702807
2 May 2019 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6675314
14 June 2018 Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6445387
8 November 2017 Internal Structural Exam · Deficiency Check · Drydock Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6308775
5 May 2017 DAPI Audit · COI Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6137717
20 July 2016 Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6024280
21 May 2016 Hull Examination · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5913837
15 July 2015 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5223270
10 June 2014 Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4885012
20 May 2014 Administrative Inspection · Examination of Repairs · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4863555
8 May 2012 Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4299182
3 May 2012 Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4301698
23 July 2009 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3544038
13 July 2009 Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3541684
5 November 2008 DAPI Audit
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3358034
3 June 2008 Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3226380
14 May 2008 Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3214675
11 February 2008 In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3148377
24 May 2007 COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2939240
7 June 2006 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2672739
7 June 2005 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2382774
17 February 2005 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2307728
8 June 2004 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2092944
4 May 2004 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2068344
10 February 2004 Administrative Inspection
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2004294
3 June 2002 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1613645
7 May 2002 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1617763
13 September 2001 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1071842
28 August 2001 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1440550
5 July 2000 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1051566
23 June 2000 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1369752
12 June 2000 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1365863
25 May 2000 Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 817919
4 June 1999 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1424773
6 September 1998 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 100002
5 August 1998 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 212877
5 August 1998 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 796364
7 July 1998 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1440022
26 May 1998 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1383882
23 July 1997 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1368327
16 September 1996 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1363791
1 July 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1355864
6 June 1996 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1377738
28 May 1996 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1371409
12 July 1995 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 879452
12 July 1995 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1192861
7 June 1995 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1357187
17 November 1994 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1389878
14 June 1994 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1419278
1 June 1994 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1363001
5 November 1993 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1396010
1 September 1993 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1358156
30 June 1993 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1153765
30 June 1993 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1377028
28 May 1993 Initial Certification · Initial Construction-Excluding Oversight · Hull Examination · Plan Review "T" Boat
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1423786

Deficiency record · 110

05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 27 May 2025 Resolved
Vessel is required to ensure the EPIRB's battery is replaced after it is used, or before the date required by FCC regulations in 47 CFR part 80, whichever comes sooner. Vessel's EPIRB battery was past its expiration date. Owner installed new CAT I EPIRB with registration completed to satisfaction of attending Coast Guard Marine Inspector during inspection. No further requirements. 46 CFR 185.728(b)
Action required: 10 - Deficiency Rectified
Resolved 27 May 2025
Resolution: New EPIRB installed. All sat.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 2 May 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Broken yellow wire found in engine compartment. 46 CFR 183.200 (c)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2024
Resolved 20 May 2024
Resolution: New wire installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 May 2024 Resolved
Machinery and fuel tank spaces must be separated from accommodation spaces by boundaries that prevent the passage of vapors. The starboard engine room has a cable penetration on the bulkhead that is not vapor tight. Provide a proper seal to prevent the passage of vapors. 46 CFR 177.405 (c)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2024
Resolved 20 May 2024
Resolution: Proper barrier installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 May 2024 Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support. Countless wires supported with use of plastic zip ties. 46 CFR 183.340 (b)(4)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2024
Resolved 20 May 2024
Resolution: Supports provided.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 June 2023 Resolved
The EPIRB test required shall be logged or otherwise documented monthly. Vessel unable to provide log for EPIRB tests. Provide monthly EPIRB test log. 46 CFR 185.728(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 20 July 2023
Resolution: EPIRB test log provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 June 2023 Resolved
Abandon ship and man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information: Date of the drill and training; and scenario and training topics. Vessel unable to provide drill/training logs. Provide drill/training logs. 46 CFR 185.520(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 20 July 2023
Resolution: Drill and training log provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 June 2023 Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart. Wires found unsupported. Provide support every 24 inches for wires. 46 CFR 183.340 (b)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 20 July 2023
Resolution: Wire suppported.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 June 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. J-box was not mounted and floating in space. Mount electrical J-box. 46 CFR 183.200
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 20 July 2023
Resolution: J-box mounted.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 21 June 2023 Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required. Missing double hose clamps on bilge pump suction and discharge. Provide double hose clamps. 46 CFR 182.410 (d) (1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 20 July 2023
Resolution: Double hose clamp provided.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 3 May 2022 Resolved
FCC requires mariners that operate a vessel with more than 6 passengers to have a valid FCC Marine Radio Operator Permit(MROP). Vessel master did not have FCC MROP. Master shall provide MROP. 47 CFR 13.7
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 21 May 2022
Resolution: MROP Provided.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 3 May 2022 Resolved
Stern navigation light shall show an unbroken light 67.5 degrees from right aft on each side of the vessel. Stern light obstructed in current location by sugar scoops. Provide new position for stern light to show full light. Vessel restricted to daytime ops until operational. 33 CFR 83.21
Action required: 705 - Other - as specified
Resolved 21 May 2022
Resolution: Stern nav light moved to unobstructed position.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 May 2022 Resolved
Spanner wrench must be provided where a 1.5 inch hose is required. Vessel does not have a spanner wrench. Provide spanner wrench. 46 CFR 181.310(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 21 May 2022
Resolution: Spanner wrench provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 May 2022 Resolved
Each fire nozzle must be capable of being changed between a solid stream pattern and a spray pattern. Starboard side fire Nozzle was clogged not allowing sufficient flow or to switch stream patterns. Secondary fire station and hose operational to all areas on vessel. Provide operational fire nozzle. 46 CFR 181.320
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 21 May 2022
Resolution: Nozzel operational.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 3 May 2022 Resolved
The floating water light for the life float must be attached to the float by a line of at least 18 feet. Line was approximately 6 feet. Provide 18 feet of line. 46 CFR 180.175
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 21 May 2022
Resolution: Line provided for light.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 May 2022 Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment. Crew could not pump water from spaces using installed piped system and engine driven bilge pump. Provide operational bilge pumping system. 46 CFR 182.510
Action required: 10 - Deficiency Rectified
Resolved 3 May 2022
Resolution: Bilge pump operational.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 3 May 2022 Resolved
The materials of rigging on a sailing vessel must be suitable for the intended purpose. 03 bolts showing running rust on baby stay chain plate and starboard diamond chain plate has rusted washer. Replace corroded items and ensure no damage to chain plates. 46 CFR 177.330
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 21 May 2022
Resolution: Chain plates cleaned.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 July 2021 Resolved
No marine employer shall engage or employ any individual to serve as a crewmember unless the individual passes a chemical test for dangerous drugs for that employer. Provide proof of pre-employment tests or acceptable alternative as required by this cite for individuals in a safety sensitive position.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 August 2021
Resolved 9 September 2021
Resolution: DER provided proof of documentation.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 July 2021 Resolved
Provide copy of contract or proof of enrollment in Consortium; and provide Letter of Regulatory Compliance for RDTS consortium.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 August 2021
Resolved 10 August 2021
Resolution: DER provided required documentation from third party consortium.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 May 2021 Resolved
Child and adult life jackets located in same space. Provide segregation from child and adult life jackets. Ensure storage marking is appropriately marking each number of adult and child life jackets.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: Life jackets seperated and marked.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 May 2021 Resolved
Flammable liquids onboard. Remove all flammable materials or provide approved paint/hazmat locker.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: Flammables removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2021 Resolved
Remove dead end wire and 5th terminal from unknown load at battery post.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: Dead end wire removed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 May 2021 Resolved
Fuel shut off marking missing for starboard engine room. Provide fuel shut off marking with 1 inch lettering.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: Fuel shut off marking provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 May 2021 Resolved
Starboard side exhaust missing second band clamp. Provide double clamping on exhaust at all connection points.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: Band clamp provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 5 May 2021 Resolved
Bolts on port side collision bulkhead manhole cover missing. Provide bolts for each hole in collision bulkhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: Bolts provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 May 2021 Resolved
Provide photos and report of past furler opening inspection in accordance with Preventative Maintenance plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: Furler photos provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 May 2021 Resolved
Provide sail rigging Preventative Maintenance Plan to [name withheld] for vessel files.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: PMP Provided.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 5 May 2021 Resolved
Missing paper chart. Provide updated chart for area being transited.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2021
Resolved 1 June 2021
Resolution: Charts provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 June 2020 Resolved
Test remote operated fuel valves in accordance with 46 CFR 176.804. Port remote operated fuel valve did not close completely.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2020
Resolved 23 June 2020
Resolution: Video provided showing satisfactory operation.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 29 October 2019 Resolved
All fuel tanks must be electrically bonded to a common ground. Ground on port fuel tank detached. 46 CFR 182.440 (b)(3)
Action required: 705 - Other - as specified
Resolved 12 November 2019
Resolution: Port fuel tank was electrically bonded.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 July 2019 Resolved
Components of rigging are overdue for renewal as outlined in NVIC 02-16 Sail Rigging. Vessel is due for scheduled drydock 19 Nov. Conduct monthly third party inspections of rigging and renew overdue components at Nov 2019 drydock in accordance with 46 CFR 176.840.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2019
Resolved 9 September 2019
Resolution: Vessel voluntarily removed from passenger service by company.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 July 2019 Resolved
Vessel Rigging Preventative Maintenance Plan is missing description of maintenance tasks. Provide in accordance with 46 CFR 176.840.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 August 2019
Resolved 9 September 2019
Resolution: Task description provided.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 18 July 2019 Resolved
Weak links for three life floats were oversized. Provide correct weak links in accordance with 46 CFR 180.137.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2019
Resolved 9 September 2019
Resolution: Correct weak links provided.
Operations/Management › Vessel Activity › Underway
Issued 17 November 2017 Resolved
Vessel needs to complete satisfactory sea trials under sail propulsion witnessed by an attending USCG Marine Inspector or a accredited rig smith.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 November 2017
Resolved 18 November 2017
Resolution: Vessel completed satisfactory sea trials under sail propulsion with an attending USCG Marine Inspector.
Sail Rigging › Spars › Masthead Hardware and Sheaves
Issued 16 May 2012 Resolved
Provide copy of independent mast/rigging survey report that was completed during May 2012 dry-dock.
Due 16 June 2012
Resolved 7 June 2012
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2012 Resolved
Remove cracked fiberglass and make available for further inspection in way of forward cross beam at port and stbd hull attachements.
Due 20 May 2012
Resolved 14 May 2012
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2012 Resolved
Renew cracked plywood hull in way of port interior forepeak.
Due 20 May 2012
Resolved 14 May 2012
Construction/Loadline › Hull › Keel
Issued 9 May 2012 Resolved
Remove cracked fiberglass and make available for further inspection in way of port keel.
Due 20 May 2012
Resolved 14 May 2012
Fire Fighting › Fire Hoses › Condition
Issued 4 May 2012 Resolved
Fire hoses need to be replaces
Action required: 705 - Other - as specified
Due 31 May 2012
Resolved 14 May 2012
Sail Rigging › Sails › Correct Sail Area of Record
Issued 4 May 2012 Resolved
Vessel needs approved sail/rigging plan
Action required: 705 - Other - as specified
Due 31 May 2012
Resolved 31 May 2012
Construction/Loadline › Hull › Keel
Issued 13 July 2009 Resolved
Vessel's stbd keel was damaged from grounding. Damage is approx. 23' long. Damage progresses from a scrtch to 4" deep at the deepest part. Damaged area shall be repaired at next drydock NLT 31 May 2010. Operator shall conduct a december underwater video and monthly in water inspections of damaged area. If there are any changes to state of the damaged area, contact the Marine Safety Office ASAP.
Action required: 705 - Other - as specified
Due 31 May 2010
Resolved 10 May 2010
Accommodation/Occupational Safety › Occupational Safety › Lifeline
Issued 3 June 2008 Resolved
Renew as original main deck stantion foundation on the port side amidships. Foundation fitting was fractured.
Action required: 705 - Other - as specified
Due 20 June 2008
Resolved 9 June 2008
Engineering › Bilge Water Management System › Not Operational
Issued 3 June 2008 Resolved
Prove port side belt driven bilge/fire pump. Belt is loose.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2008
Resolved 9 June 2008
Engineering › Bilge Water Management System › Hose
Issued 3 June 2008 Resolved
Prove electric bilge pump hoses in the port side foreward compartment and port side amidships compartment under the ladder.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2008
Resolved 9 June 2008
Engineering › Bilge Water Management System › Hose
Issued 3 June 2008 Resolved
Renew as original the degraded bilge hoses located on the fixed bilge suction manifold on both port and stbd sides.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2008
Resolved 9 June 2008
Engineering › Bilge Water Management System › Pump
Issued 3 June 2008 Resolved
Secure in place electric submersible bilge pump in the port forward compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2008
Resolved 9 June 2008
Lifesaving › Buoyant Apparatus › Lifeline
Issued 3 June 2008 Resolved
Renew as original all degraded lifelines, painters and pendants and retroflective tape on the vessels 3 buoyant apparatuses. Repair holes in the buoyant apparatuses using a manufactuers recommended repair procedures.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2008
Resolved 9 June 2008
Lifesaving › Lifebuoys › Serviceable
Issued 3 June 2008 Resolved
Line around ring was degraded. Renew as original, with name and retroflective tape.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2008
Resolved 9 June 2008
Stability › Watertight Integrity › Deadlight Cover
Issued 14 May 2008 Resolved
Make portlight in stbd head space watertight. Latch was broken and could not be closed to maintain watertight integrity.
Action required: 705 - Other - as specified
Resolved 23 May 2008
Engineering › Steering Gear System › Rudder
Issued 14 May 2008 Resolved
Renew wasted portions of rudders as original.
Action required: 705 - Other - as specified
Resolved 17 May 2008
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 14 May 2008 Resolved
Make shafts available for USCG inspection.
Action required: 705 - Other - as specified
Resolved 23 May 2008
Construction/Loadline › Hull › Keel Plate
Issued 14 May 2008 Resolved
Replace deteriorated portions of worm shoe as noted.
Action required: 705 - Other - as specified
Resolved 23 May 2008
Engineering › Bilge Water Management System › Eductor
Issued 14 May 2008 Resolved
Replace deteriorated bilge suction foot and strainer in port side aft of collision bulkhead.
Action required: 705 - Other - as specified
Resolved 23 May 2008
Stability › Watertight Integrity › General
Issued 14 May 2008 Resolved
Clean/remove growth from port generator salt water intake valve and prove proper operation.
Action required: 705 - Other - as specified
Resolved 23 May 2008
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 14 May 2008 Resolved
Provide rigging survey attesting to strength and integrity of spinnaker halyard tang.
Action required: 705 - Other - as specified
Due 2 June 2008
Resolved 6 June 2008
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 14 May 2008 Resolved
Provide USCG with maintenance schedule and age of all rigging.
Action required: 705 - Other - as specified
Due 2 June 2008
Resolved 6 June 2008
Construction/Loadline › Structures › Superstructure
Issued 24 May 2007 Resolved
Remove the mast and replace all aged rigging components (Including chainplates, mast tangs and bolts) at May 2008 Credit Dry-dock per recommendations contained in the Mast and Rigging Inspection Report dtd 01Jun07 completed by Tradwind Yachting Service. This report was scanned into the documents section of MISLE.
Action required: 705 - Other - as specified
Due 30 May 2008
Resolved 6 June 2008
Navigation › Piloting/Steering › US Coast Pilot
Issued 7 June 2006 Resolved
Provide updated US Coast Pilot.
Condition: Unknown
Action required: 705 - Other - as specified
Due 7 July 2006
Resolved 7 July 2006
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 7 June 2006 Resolved
Paint shield for navigation lights matte black.
Condition: Unknown
Action required: 705 - Other - as specified
Due 7 July 2006
Resolved 7 July 2006
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 7 June 2006 Resolved
Replace trash cans with non-combustible cans, with specific attention to those cans located in the heads.
Condition: Unknown
Action required: 705 - Other - as specified
Due 7 July 2006
Resolved 7 July 2006
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 7 June 2006 Resolved
Renew retroreflective tape on lifejackets as needed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 July 2006
Resolved 7 July 2006
Stability › Watertight Integrity › General
Issued 16 May 2004 Resolved
Provide Coast Guard approved drawings and calculations, before any work is accomplished, that documents compliance with the subdivision standards of 46 CFR 171 Subpart B or 46 CFR 179 Subpart B. The vessel shall not carry more than 49 passengers until proper subdivision is installed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 June 2004
Resolved 6 June 2005
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 16 May 2004 Resolved
Service all the vessel's fixed and portable fire extinguishers and provide a servicing report from the servicing facility prior to carrying passengers for hire. LEGACY COMPONENT DESC: Condition
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 May 2004
Resolved 2 June 2004
Fire Fighting › Nozzles
Issued 16 May 2004 Resolved
Provide Coast Guard approved fire nozzles for the two required firefighting stations. LEGACY COMPONENT DESC: Type
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 June 2004
Resolved 2 June 2004
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 16 May 2004 Resolved
Provide Coast Guard approved drawings that reflect the vessel's passenger count stemming from the passenger seating arrangement reconfiguration. LEGACY COMPONENT DESC: Open Deck Space
Action required: 705 - Other - as specified
Due 15 June 2004
Resolved 6 June 2005
Electrical › Electrical Distribution System (service)
Issued 16 May 2004 Resolved
Fabricate proper covers or provide enclosures for the exposed electrical buss bars and exposed wiring in the port & starboard compartments just aft of the collision bulkhead. LEGACY COMPONENT DESC: Bus Bar Connection
Action required: 705 - Other - as specified
Due 24 May 2004
Resolved 2 June 2004
Engineering › Bilge Water Management System
Issued 16 May 2004 Resolved
Replace the corroded bilge strainer and adjacent piping for the starboard companionway bilge suction line. LEGACY COMPONENT DESC: Strainer
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2004
Resolved 2 June 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 16 May 2004 Resolved
Replace all cracked wood steps on the bow ladder prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2004
Resolved 2 June 2004
Lifesaving › Buoyant Apparatus
Issued 3 June 2002 Resolved
Water light for buoyant apparatus OOC. LEGACY COMPONENT DESC: water light
Condition: Unknown
Due 3 June 2002
Resolved 3 June 2002
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 6 May 2002 Resolved
Stbd navigation light OOC.
Due 3 June 2002
Resolved 3 June 2002
Resolution: Stbd light fixed.
Fire Fighting › Fire Pumps
Issued 6 May 2002 Resolved
Install pressure gauge IAW 46CFR181.300. LEGACY COMPONENT DESC: Gauges
Condition: Unknown
Due 3 June 2002
Resolved 3 June 2002
Resolution: Gauge installed.
Construction/Loadline › Structures
Issued 6 May 2002 Resolved
Replace broken dog for stbd head porthole. LEGACY COMPONENT DESC: porthole dog
Condition: Unknown
Due 3 June 2002
Resolved 3 June 2002
Resolution: Dog replaced.
Accommodation/Occupational Safety
Issued 28 August 2001 Resolved
Effect proper repair to fractured welds in starboard side hand rails NLT 11SEP01 IAW 46 CFR 176.700.
Condition: Unknown
Due 13 September 2001
Resolved 13 September 2001
Construction/Loadline
Issued 28 August 2001 Resolved
Renew water tight hatch gasket starboard side forward NLT 11SEP01 IAW 46 CFR 179.360.
Condition: Unknown
Due 13 September 2001
Resolved 13 September 2001
Lifesaving
Issued 23 June 2000 Resolved
Repair or renew life ring buoy IAW 46CFR180.70 NLT 7JUL00.
Condition: Unknown
Due 10 July 2000
Resolved 10 July 2000
Construction/Loadline
Issued 23 June 2000 Resolved
Provide visual & audible bilge high level alarms in spaces required by 46CFR182.530 NLT 7JUL00. Spaces include port and starboard heads with discharge fitting below deep load waterline, as well as port & starboard engine rooms.
Condition: Unknown
Due 10 July 2000
Resolved 10 July 2000
Construction/Loadline
Issued 23 June 2000 Resolved
Prove proper operation of stbd side power driven bilge pump IAW 46CFR182.25-10 AND 182.520 NLT 7JUL00. Vessel is restricted to 49 passengers until in compliance.
Condition: Unknown
Due 10 July 2000
Resolved 10 July 2000
Construction/Loadline
Issued 4 June 1999 Resolved
Provide visual and audible high level bilge alarm IAW 46 CFR 182.510.
Condition: Unknown
Due 22 June 1999
Resolved 22 June 1999
Documentation
Issued 4 June 1999 Resolved
Provide proof of FCC Safety Radio Certificate.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Accommodation/Occupational Safety
Issued 4 June 1999 Resolved
Effect repairs to fractured hand rail, starboard side #3.
Condition: Unknown
Due 22 June 1999
Resolved 22 June 1999
Fire Fighting
Issued 7 July 1998 Resolved
Provide proof of qualified service of portable fire extinguishers.
Condition: Unknown
Due 7 July 1998
Resolved 7 July 1998
Lifesaving
Issued 6 June 1996 Resolved
Conduct and log man overboard and abandon ship drils and training in accordance with IFR 46CFR185.520.
Condition: Unknown
Due 6 June 1996
Resolved 6 June 1996
Navigation
Issued 6 June 1996 Resolved
Repair or replace compass light.
Condition: Unknown
Due 6 June 1996
Resolved 6 June 1996
Lifesaving
Issued 6 June 1996 Resolved
Conduct and log crew training in accordance with IFR 46CFR185.420.
Condition: Unknown
Due 6 June 1996
Resolved 6 June 1996
Lifesaving
Issued 6 June 1996 Resolved
Provide separate stowage for adult and child sized PFD's.
Condition: Unknown
Due 6 June 1996
Resolved 6 June 1996
Fire Fighting
Issued 6 June 1996 Resolved
Conduct and log fire fighting drills and training in accordance with IFR 46CFR185.524.
Condition: Unknown
Due 6 June 1996
Resolved 6 June 1996
Lifesaving
Issued 6 June 1996 Resolved
Conduct and log weekly and annual maintenance and inspections in accordancewith IFR 46CFR185.720 and 46CFR185.726.
Condition: Unknown
Due 6 June 1996
Resolved 6 June 1996
Construction/Loadline
Issued 6 June 1996 Resolved
Label all watertight hatches "WATERTIGHT HATCH-KEEP CLOSED".
Condition: Unknown
Due 6 June 1996
Resolved 6 June 1996
Fire Fighting
Issued 7 June 1995 Resolved
PROVIDE PROPER METALLIC FIRE HOSE NOZZLE.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Lifesaving
Issued 7 June 1995 Resolved
RENEW PERIPHERY LINE ON RING BUOY.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Electrical
Issued 7 June 1995 Resolved
PROVIDE PROPER PROTECTIVE MEANS ON LIGHTS IN ENGINE ROOMS.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Navigation
Issued 7 June 1995 Resolved
PROVIDE PROPER ANCHOR DAYSHAPE, IN ACCORDANCE WITH APPLICABLE COLREGS.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Lifesaving
Issued 7 June 1995 Resolved
RENEW WORN LINE FOR RING BUOY.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Construction/Loadline
Issued 30 June 1993 Resolved
1. REPLACE PLASTIC PIPING, PLASTIC VALVES AND PLASTIC FLEXIBLE HOSE IN THEBILGE SYSTEM IAW REGULATIONS 46 CFR 182.40-5(b) and 46 CFR 56.60-25(b).
Condition: Unknown
Due 30 June 1993
Resolved 30 June 1993
Documentation
Issued 28 May 1993 Resolved
CONDUCT STABILITY TEST OR DEAD WEIGHT SURVEY FOR ISSUANCE OF STABILITY LETTER
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Accommodation/Occupational Safety
Issued 28 May 1993 Resolved
PROVIDE LOW VENT IN PORT AND STBD EINGINE ROOMS AS PER 46 CFR 182.20-4
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Construction/Loadline
Issued 28 May 1993 Resolved
PROVIDE DEAD COVERS FOR PORTLIGHTS BELOW MAIN DECK , TWO FWD INBOARD ON HULLS AND SIX ON OUTBOARD HULLS AS PER 46 CFR 171.119
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Construction/Loadline
Issued 28 May 1993 Resolved
STENCIL VALVES ON BILGE SYSTEM MANIFOLDS PT AND STBD.
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Accommodation/Occupational Safety
Issued 28 May 1993 Resolved
PROVIDE AND POST POLLUTION PLACARDS, GARBAGE PLACARD AND WASTE DISPOSAL PLAN
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Navigation
Issued 28 May 1993 Resolved
PROVIDE ON BOARD NAVIGATION PUBS AND CHARTS FOR ROUTE OF OPERATION
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Documentation
Issued 28 May 1993 Resolved
PROVE VERIFICATION OF COMPLIANCE WITH COMMENTS OF PLAN APPROVAL LETTER DATED 6 AUG 1993 ISSUED AT PORTLAND, OREGON.
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Construction/Loadline
Issued 28 May 1993 Resolved
INSTALL STOP VALVE ON BILGE OVERBOARD DISCHARGE AT THRU HULL FITTING
Condition: Unknown
Due 28 May 1993
Resolved 28 May 1993
Deck/Cargo
Issued 28 May 1993 Resolved
CONDUCT UNDERWAY OPERATIONAL TEST OF SAIL RIGGING
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Fire Fighting
Issued 28 May 1993 Resolved
PROVIDE ON BOARD FIRE HYDRANT, HOSE AND NOZZLE IN ACCORDANCE WITH 46CFR 181.15
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Documentation
Issued 28 May 1993 Resolved
PROVIDE ON BOARD VALID CERTIFICATE OF DOCUMENTATION
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Documentation
Issued 28 May 1993 Resolved
PROVIDE ON BOARD VALID FCC RADIO STATION LICENSE
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Documentation
Issued 28 May 1993 Resolved
PROVIDE ON BOARD VALID RADIO TELEPHONE SAFETY CERTIFICATE
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Navigation
Issued 28 May 1993 Resolved
PROVIDE ON BOARD 200mm (7.9") BELL_x001C_
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Fire Fighting
Issued 28 May 1993 Resolved
PERMANENTLY MOUNT 6 BII FIRE EXTINGUISHERS ON BOARD VESSEL
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Accommodation/Occupational Safety
Issued 28 May 1993 Resolved
PROVIDE ON BOARD, MSD UNIT APPROVED FOR INSPECTED VESSELS
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993
Accommodation/Occupational Safety
Issued 28 May 1993 Resolved
PROVIDE NOTICES, MARKINGS AND STENCILS REQUIRED BY SUBCHAPTER "T"
Condition: Unknown
Due 6 August 1993
Resolved 6 August 1993

Casualty record · 3

17 February 2005Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2307728
6 July 2013Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4719037
3 March 2022Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 7411894
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

TRILOGY (2005–2013). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.